ARMECH RFI -Statement of Objectives-.pdf
PDF 455 KB Posted
- Solicitation number
- FA8307-25-RFI-ARMECH
About this file
This document is a Request for Information (RFI) from the Department of the Air Force Materiel Command Lifecycle Management Center Joint Base San Antonio (AFLCMC/HNCKA) for the Atmospheric Research Mission Equipment Case and Handling (ARMECH) solution. The government is seeking capability statements from interested vendors to design and manufacture a Single Vessel Case (SVC) to protect a 900 cubic inch Composite Overwrapped Pressure Vessel (COPV) and a Rack-Case-Interface (RCI) to secure the SVC within the existing Gas Collection System rack on the WC-135 aircraft. Key requirements include meeting airworthiness standards, enabling manual handling and bulk shipment, and maximizing manufacturability. The government will provide drawings and sample equipment as government furnished items. Capability statements are due by October 8, 2024, and the government intends to issue the requirement as a small business set-aside. The overall goal is to select a design that meets mission needs and supports maximum manufacturability.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
Controlled Unclassified Information (CUI)
CUI
REQUEST FOR INFORMATION:
“ARMECH”
Atmospheric Research Mission Equipment Case and Handling
3 October 2024
Version 0
DISTRIBUTION STATEMENT F: Further dissemination only as directed by Cryptologic and Cyber Systems Division/Tech Apps
(CCSD/HNCBM) (June 2024) or DOD higher authority.
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC Sec 2751 et seq.)
or the Export Administration Act of 1979, as amended (Title 50 USC App. 2401 et seq.). Violators of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.
HANDLING AND DESTRUCTION NOTICE: Comply with distribution statement and destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Table of Contents
6.0 Executive Summary
7.0 Level of Effort (LOE)
7.1 Single Vessel Case (SVC)
7.2 Rack-Case-Interface (RCI)
7.3 Weight Constraints
8.0 Programmatic
8.1 Contract Line-Item Number(s)
8.2 Costing
8.3 Government Furnished Items
8.4 Travel and Meetings
9.0 Deliverables
9.1 Technical Data Package
9.2 Pre-Production Prototypes
9.3 Low-Rate Initial Production (LRIP) Integrated Production Plan
10.0 Shipping and Transportation
11.0 Appendix A
12.0 Appendix B
Table of Figures Figure 1: WC-135 Constant Pheonix Aircraft Figure 2: 900 Cubic Inch, 3000 PSI Composite Overwrapped Pressure Vessel (COPV) Figure 3: Legacy 900 cubic inch Spherical Pressure Vessel Figure 4: Sphere with Case Figure 5: WC-135 GCS racks with Spheres in bays Figure 6: Event Driven Plan
Table 1: Glossary of Terms Table 2: Applicable Documents
Table 1: Glossary of Terms
Term Definition
CLIN
Contract Line-Item Number. A line item captures the information about separately identifiable goods and services that the
Government needs to purchase (See FAR 2.101) and a Line-Item
Number (LIN) is the numeric or alphanumeric format to identify a line item.
COA Course of Action. Path(s) taken to achieve the desired end-state.
COPV
Composite Overwrapped Pressure Vessel. A 900 cubic inch, 3000
PSI pressure vessel design was selected to support the WC-135
Constant Phoenix mission in 2022, with the legacy spherical vessels planned for obsolescence.
GCS
Gas Collection System. Mission Equipment that collects atmosphere during flight and compresses the atmospheric gasses. The GCS store the compressed samples in the COPV(s) for analysis.
PPP
Pre-Production Prototype. A geometric model constructed from dimensionally stable materials that support the physical fitting and verification of design features. The PPP is not required to be constructed from materials anticipated in a production unit (e.g. it may be 3D printed) but is required to geometrically match the proposed design.
RCI
Rack-Case Interface. A socket that may remain with the GCS rack and secures the SVC while in flight. Modifying the GCS rack to interface with the SVC is unacceptable within the scope of this effort.
Sphere
Spherical Pressure Vessel. 900 cubic inch legacy pressure vessel in use since the 1960's, featuring a semi-spherical design and manufactured from stainless steel. High manufacturing costs and high-risk lot acceptance criteria created the impetus to pursue the
COPV.
SVC
Single Vessel Case. Proposed case for a single 900 cubic inch
COPV and high-pressure valve assembly. For the purposes of this defining features for the design, the SVC should be understood to contain a COPV assembly and 3000 psi pressurized atmosphere.
WC-135 Constant Phoenix
Mission Aircraft. A special-purpose aircraft derived from the Boeing C-135 Stratolifter and used by the United States Air
Force. Its mission is to collect samples from the atmosphere for the purpose of detecting and identifying nuclear explosions.
Table 2: Applicable Documents
Document ID Document Title Revision
TBD DRAWING - COPV
Composite Overwrapped Pressure Vessel, 900
Cubic Inches, with Hand Valve, Assembly of A
TBD DRAWING - MICD
Mechanical Interface Control Document, Pressure
Vessel Bay, Gas Collection System A
DOT-CFFC
Basic Requirements for Fully Wrapped Carbon-
Fiber Reinforced Aluminum Lined Cylinders
(DOT-CFFC)
Electronic/Web
MIL-HDBK-310
Global Climatic Data for Developing Military
Products A
MIL-STD-31000 Technical Data Packages B
MIL-STD-810
Environmental Engineering Considerations and
Laboratory Tests H
NIOSH Applications Manual Applications Manual for the Revised NIOSH
Lifting Equation Electronic/Web
SAE-AMS-STD-595 Colors Used in Government Procurement A
42E1-1-1 Air Force Technical Order; Aviation Hoses and
Manual G
1.0 Executive Summary
Technical Applications Products, Department of the Air Force (DAF), (heretofore “the
Government”), requires the development of a solution, Atmospheric Research Mission
Equipment Case and Handling (ARMECH) to interface the 900 cubic inch Composite
Overwrapped Pressure Vessels (COPVs) with pre-existing mission equipment onboard the
WC-135 aircraft. The ARMECH provides protection to individual COPV’s during transloading or shipping activities; it also acts as the secure, ruggedized, stackable, single person carrying case.
The mission equipment that these products are intended to support is onboard the WC-135
Constant Pheonix aircraft fleet. One of the subsystems, the Gas Collection System (GCS), requires pressure vessels to collect and store gaseous atmospheric samples.
Prior to the acquisition of the Composite Overwrapped Pressure Vessels (COPVs), the
Government deployed 900 cubic inch, stainless steel, spherical pressure vessels. These legacy spherical vessels are of an obsolete design and specification. Due to extremely high manufacturing costs, a suitable replacement pressure vessel, the COPV, was sought and acquired.
Figure 3: Legacy 900 cubic inch
Spherical Pressure Vessel
Figure 4: Sphere with Case
Figure 5: WC-135 GCS racks with Spheres in bays
However, the GCS was designed to secure two (2) 900 cubic inch spherical pressure vessels
(Figure 3, Figure 4) in each “bay” (front-to-back relative to the center aisle) within the
Figure 1: WC-135 Constant Pheonix Aircraft
Figure 2: 900 Cubic Inch, 3000 PSI Composite Overwrapped
Pressure Vessel (COPV) mission equipment rack (Figure 5). Thus, this effort must produce solutions for a Single
Vessel Case (SVC) and an interface for two (2) SVCs to the GCS rack.
Level of Effort (LOE)
The overall goals of this effort are to develop an interface with the aircraft mission equipment, protect the COPV against abrasion and impact, improve COPV manual material handling, and integrate features to support bulk shipment of forty-eight (48) units (minimum, no maximum) on 48-50” width x 48” length x 72” height standard-size, synthetic or metal commercially available pallets.
The Government reserves unlimited data rights for this effort.
1.1 Single Vessel Case (SVC)
The Single Vessel Case (SVC) is intended to protect the COPV and attached high-pressure valve against abrasion and impact, as well as provide outer surfaces that support material handling and shipment. Additionally, the SVC must be demonstrated through modeling and simulation to meet airworthiness requirements. The SVC should be designed with the following high-level guidance:
1.1.1 The Government will provide a technical drawing (see appendix A) as GFI, as well as an exemplar COPV-Valve assembly as GFE.
1.1.2 Maximum manufacturability as defined by production unit cost and schedule.
This is a criteria item for design and influences all follow-on manufacturing. It is possible that there will be multiple awards to the contract, and product manufacturability will be used to determine the Government’s next course of action (COA).
1.1.3 Must meet or exceed DOT-CFFC test requirements of the bare COPV (see Table
2: Applicable Documents, DOT-CFFC for reference).
1.1.4 Must meet airworthiness requirements, including manufacture from a UL-94 or other flame-retardant material meeting or exceeding UL-94 by existing technical specification or newly developed testing to meet contractual requirements.
1.1.5 Additionally, retention against 9G forward loading (axis of flight of the aircraft), 2G vertical loading, and 1.5G horizontal loading (axis of wingspan) is required. The COPV will be loaded into the mission equipment rack from the center aisle, with the vessel’s longitudinal axis parallel to the horizontal axis of the aircraft.
1.1.6 Must include hand-access for the high-pressure valve to be connected to quick disconnect pneumatic line and the valve must be able to be actuated during flight.
1.1.7 Must include hand-access for the quick disconnect pneumatic line routed from the valve to the top of the rack bay, with a minimum bend radius of 2” for the pneumatic line, reference Table 2: Applicable Documents, Air Force
Technical Order 42E1-1-1.
1.1.8 Must be capable of some environmental resistance to light rain, UV solar radiation, and debris ingress, such as including feature such a removeable cap or panel to access the high-pressure valve, reference MIL-HDBK-310, MIL-
STD-810. SVC does not have to be hermetically sealable.
1.1.9 Must include some features that aid in manual handling of the SVC with contained COPV, such as handholds or handles. A handhold or handle is desired at the long end of the SVC to aid in loading individual SVCs through a trapdoor and ladder behind the cockpit.
1.1.10 Maximum SVC weight defined after Rack-Case-Interface (RCI) guidance below.
1.1.11 Must include features that support high-density packing on a 48-50” width x
48” length x 84” height standard-size, synthetic or metal commercially available pallets. Non-removable interlocking features are desirable. A minimum palletized load is forty-eight (48) SVC’s, with no maximum other than the outer geometric constraints and a maximum pallet weight of
10,000lbs.
1.1.12 Color(s) chosen must be in accordance with IAW SAE-AMS-STD-595.
1.2 Rack-Case-Interface (RCI)
A Rack-Case-Interface (RCI) is required to secure the two SVCs within the rack bay with no modification to the GCS rack and be demonstrated through modeling and simulation to meet airworthiness requirements. The SVC may be designed with features that eliminate the need for an RCI part or assembly or the RCI may be designed as a separate part or assembly.
1.2.1 The Government will provide a technical drawing (see appendix B) as GFI, as well as an exemplar Mechanical Interface Control Document [Part] as GFE.
1.2.2 Maximum manufacturability as defined by production unit cost and schedule.
This is a criteria item for award of a follow-on manufacturing contract. It is possible that there will be multiple awards to the contract, and product manufacturability will be used to determine the best option to the Government.
1.2.3 The RCI may a separate construct or integrated features in the SVC.
1.2.4 No modification of the Mission Equipment Gas Collection System (GCS) racks is authorized.
1.2.5 The RCI may stay installed in the GCS rack with or without one (1) or two (2)
SVCs. If the RCI is a separate construct, then it is intended to leave the RCI always installed in the racks.
1.2.6 Must meet airworthiness requirements, including manufacture from a UL-94 or other flame-retardant material, as well as retention against 9G forward loading
(axis of flight of the aircraft), 2G vertical loading, and 1.5G horizontal loading
(axis of wingspan). The COPV will be loaded into the mission equipment rack from the center aisle, with the vessel’s longitudinal axis parallel to the horizontal axis of the aircraft. These requirements must be met whether the SVC(s) are present or not.
1.3 Weight Constraints
The GCS rack bay was designed to restrain two (2) 900 cubic inch Spheres within their respective cases. Thus, the ARMECH solution of two (2) SVC’ restrained in the rack by the
RCI product or integrated features must not exceed 110 lbs. Individual SVC’s containing
COPV assemblies with pressurized atmosphere to 3000psi must, at a minimum, meet NIOSH
Applications Manual guidance of 51 lbs. or less. However, it is desirable to minimize the mass of the SVC’s as much as possible to aid in manual handling tasks and reduce loading on palletized SVC’s during transport activities.
2.0 Programmatic
The overall goal of this effort is to select a design suitable for mission needs and designed in a manner that supports maximal manufacturability. Thus, the LOE of this effort is constrained to the “Phase 1” engineering and design activities necessary to produce a Level
3 TDP as defined by MIL-STD-31000, LRIP plan, and Pre-Production Prototype.
Figure 6: Event Driven Plan
2.1 Contract Line-Item Number(s)
This effort will only cover the “Design” phase as depicted in Figure 6. Thus, there are two
(2) Contract Line-Item Number(s) (CLINS):
2.1.1 CLIN001 is comprised of the award of contract, the receipt of Government
Furnished Items, and completion of the Kickoff Meeting, and the initiation of the design activity.
2.1.2 CLIN002 is comprised of the delivery of all deliverables listed in Section 0, Deliverables.
2.2 Costing
Respondents should provide a Rough Order Magnitude (ROM) cost based on a Firm Fixed
Price (FFP) contract structure.
2.3 Government Furnished Items
Respondents should anticipate that the Government will provide both GFI and GFE to support this design effort.
2.3.1 Government Furnished Information (GFI)
2.3.1.1 Drawing # XXXXXX, “Composite Overwrapped Pressure Vessel, 900 Cubic
Inches, with Hand Valve, Assembly of”
2.3.1.2 Drawing # XXXXXX, “Mechanical Interface Control Document, Pressure
Vessel Bay, Gas Collection System”
2.3.1.3 Additional GFI upon request/approval
2.3.2 Government Furnished Equipment (GFE)
2.3.2.1 Two (2) COPV assemblies, per Drawing # XXXXXXXX
2.3.2.2 One (1) MICD 1:1 model, per Drawing # XXXXXXXX
2.3.2.3 Additional GFE upon request/approval
2.4 Travel and Meetings
The government reserves the right to visit the contractor facility at any time, provided five
(5) business days advance notice. Respondents should anticipate travel and meetings for the following activities:
2.4.1 Kickoff Meeting
2.4.1.1 The Kickoff Meeting agenda includes discussion of the overall system requirements, anticipated technical approach, support a forum for Government
SME interaction, and provide access to a physical GCS rack assembly. This meeting is anticipated to occur at Lackland Air Force Base, San Antonio, TX.
2.4.2 Preliminary Design Review (PDR)
2.4.2.1 The PDR is a review of the proposed design and preliminary manufacturing plan. The intent of this meeting is to provide a forum for the Government to give critical feedback on the design, if required, in preparation for final delivery of the listed deliverables. This meeting is anticipated to occur at Lackland Air
Force Base, San Antonio, TX.
2.4.3 Critical Design Review (CDR)
2.4.3.1 The CDR is a review of the modified design if, at PDR, critical feedback required a full or partial redesign effort. Additional CDRs may be required at the contractor expense if the contractor is unable to demonstrate that the proposed design will meet the system requirements. This meeting is anticipated to occur at Lackland Air Force Base, San Antonio, TX.
2.4.4 Final Design Review (FDR)
2.4.4.1 The intent of the FDR is a final review and acceptance of the contractor deliverables and provides a forum for discussing the available courses of action
(COAs) to bring the design to Low-Rate Initial Production. This meeting is anticipated to occur at Lackland Air Force Base, San Antonio, TX.
3.0 Deliverables
The deliverables for this design effort will include a Technical Data Package, Pre-Production
Prototypes (PPP) of the Single Vessel Case (SVC) and Rack Case Interface (RCI), as well as a formal Low-Rate Initial Production (LRIP) price quotation for up to 3,072 SVC units and up to 250 RCI units.
3.1 Technical Data Package
3.1.1 The Technical Data Package (TDP) for this effort is comprised of:
3.1.1.1 Level 3 production drawings and models, as defined by MIL-STD-31000 for the
SVC and RCI.
3.1.1.2 Finite Element Analysis (FEA) electronic data files and reports that support claims of conformance to Airworthiness requirements
3.2 Pre-Production Prototypes
3.2.1 Pre-Production Prototypes of two (2) SVC units and one (1) Rack-Case-Interface
(if applicable).
3.3 Low-Rate Initial Production (LRIP) Integrated Production Plan
3.3.1 The LRIP Integrated Production Plan should, at minimum, include market survey documentation that supports cooperation or partnership with an identified transition-to-manufacture industry partner and a formal quote for Low-Rate Initial
Production (LRIP) unit costs of:
SVC Quantities: 48, 96, 384, 1536, and 3072
RCI Quantities: 50, 100, 150, 200, 250
Shipping and Transportation
The hardware deliverables for this effort will be shipped to the following address:
ATTN: Loretta Lopez
Technical Application Products (TAP), AFLCMC/HNCBML
230 Hall Blvd, Bldg 2028, Central Receiving Suite 158
San Antonio, TX 78243
Phone: 210-925-4749
Appendix A
COPV Assembly Drawing
Appendix B
MICD Drawing
| 6.0 Executive Summary 5 |
| 7.0 Level of Effort (LOE) 6 |
| 8.0 Programmatic 8 |
| 9.0 Deliverables 11 |
| 10.0 Shipping and Transportation 11 |
| 11.0 Appendix A 12 |
| 12.0 Appendix B 13 |
| 1.0 Executive Summary |
| Level of Effort (LOE) |
| 1.1 Single Vessel Case (SVC) |
| 1.2 Rack-Case-Interface (RCI) |
| 1.3 Weight Constraints |
| 2.0 Programmatic |
| 2.1 Contract Line-Item Number(s) |
| 2.2 Costing |
| 2.3 Government Furnished Items |
| 2.4 Travel and Meetings |
| 3.0 Deliverables |
| 3.1 Technical Data Package |
| 3.2 Pre-Production Prototypes |
| 3.3 Low-Rate Initial Production (LRIP) Integrated Production Plan |
| Shipping and Transportation |
| Appendix A |
| Appendix B |
File details come from the government source that posted it. Updated .