ARMY_SBIR_26BX_R4_v4.pdf

PDF 1 MB Posted

Attached to
Ground-Based Affordable Mass (G-BAM)
Solicitation number
ARM26BX04-DV010
Issued by

About this file

This document is the Department of the Army's Component-Specific Proposal Instructions for the 2026 Small Business Innovative Research (SBIR) Program Commercial Solutions Opening, Release 4. The solicitation seeks innovative technology solutions from small business concerns addressing Army priorities aligned with Multi-Domain Operations through Phase I feasibility studies and Direct to Phase II prototype development efforts. Proposals must be submitted via the Defense SBIR/STTR Innovation Portal (DSIP) by 12:00 p.m. ET on the topic closing date, with Phase I awards funding feasibility studies up to $300,000 for 1-6 months (plus optional Technical and Business Assistance up to $6,500), while Direct to Phase II awards provide up to $2,000,000 for 12-18 months of prototype development (plus optional TABA up to $50,000).

The solicitation contains three active topics: ARM26BX04-NV008 addressing distributed AI for asymmetric counter-swarm capabilities; ARM26BX04-DV009 for a UH-60M modular patient handling system; and ARM26BX04-DV010 for ground-based affordable mass payload delivery systems (tied to a Defense Innovation Unit challenge requiring prior finalist status). Proposals must comply with stringent formatting requirements including a seven-page technical volume for Phase I and 15-page volume for DP2, include mandatory supporting documents addressing non-proprietary work plans, foreign national disclosures, key personnel resumes, and controlled unclassified information compliance. Award selection is based on comprehensive evaluation of technical merit, foreign risk assessment, contractor responsibility, and fair and reasonable pricing, with phase-dependent evaluation criteria covering introduction, Army benefits, technical approach, programmatic potential, and commercialization potential. All awardees must meet System for Award Management (SAM) registration and pre-award screening requirements, comply with Arms, Ammunition, and Explosives protocols if applicable, and satisfy contract deliverables including status reports, scientific/technical reports, start-of-work meetings, and invention reporting on DD Form 882.

View the file

Other files

File Type Posted
ARM26BX04-DV010.pdf PDF
26.BX_Modifications_10292026.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Version 4

ARMY - I

DEPARTMENT OF THE ARMY

2026 Small Business Innovative Research (SBIR) Program

Commercial Solutions Opening (CSO) Component-Specific Proposal Instructions

Release 4

To the extent possible, all Department of the Army component specific text follows the same numbering as the related sections in the Department of War (DoW) 2026 SBIR Program CSO.

Supplemental numbering is used only when the text cannot be integrated intelligibly with the DoW 2026 SBIR Program CSO counterpart.

Each Small Business Concern (SBC) (also referred to herein as “proposer”, “offeror”, and/or “firm”) is encouraged to thoroughly review the DoW 2026 SBIR Program CSO, to include any amendments/revisions, and the Army component-specific proposal instructions herein.

Please note that these instructions contain active hyperlinks. Offerors are encouraged to utilize these hyperlinks for additional information and resources. Ensure your browser or Portable Document Format viewer settings permit hyperlink access to take full advantage of these resources.

The following resources are provided to assist SBCs with SBIR Program Opportunities:

• The DoW 2026 SBIR Program CSO is located at:

https://www.dodsbirsttr.mil/submissions/solicitation-documents/active-solicitations.

• To remain apprised of important programmatic and solicitation changes, SBCs should register for the Defense SBIR / Small Business Technology Transfer (STTR) Innovation Portal (DSIP) Listserv at: https://www.dodsbirsttr.mil/submissions/login.

• Department of the Army’s SBIR|STTR Website: https://www.armysbir.army.mil/.

https://www.dodsbirsttr.mil/submissions/solicitation-documents/active-solicitations https://www.dodsbirsttr.mil/submissions/login https://www.armysbir.army.mil/

ARMY - II

Table of Contents

1.0 PROGRAM DESCRIPTION 4

1.1 Introduction 4

1.5 Majority Ownership in Part by Multiple Venture Capital, Hedge Fund, and Private Equity Firms 4

1.7 Direct to Phase II (DP2) Program 4

1.8 Program on Innovation Open Topics 4

1.9 Discretionary Technical and Business Assistance (TABA) 5

1.10 Department of the Army Phase II Enhancement Policy 6

1.10.1 Overview 6

1.10.2 Application Process 7

1.10.3 Limitations 7

2 CERTIFICATIONS AND REGISTRATIONS 8

2.1 System for Award Management (SAM) Registration 8

2.3 DoW SBIR|STTR Innovation Portal (DSIP) Registration 8

3 PROPOSAL PREPARATION INSTRUCTIONS AND REQUIREMENTS 8

3.7 Phase I Proposal Instructions 8

3.8 Phase II Proposal Information 14

3.9 Direct to Phase II (DP2) Proposal Instructions 15

3.10 Prize Competition Selectees 18

3.11 Controlled Unclassified Information (CUI) 18

3.12 Arms, Ammunition, and Explosives (AA&E) 18

4 METHOD OF SELECTION AND EVALUATION CRITERIA 20

4.1 Evaluation Process 20

4.1.1 Initial Screening 20

4.1.2 Comprehensive Evaluation 21

4.1.3 Selection (Not Applicable to DoW Prize Competition Selectees) 22

4.2 Evaluation Criteria 22

4.3 Proposal Status and Feedback 22

4.5 Pre-Award and Post Award Protests 23

5 ADDITIONAL CONSIDERATIONS 23

5.1 Award Information 23

5.1.1 Additional Award Considerations 23

5.1.2 Possible Contract Award 24

5.2 Contract Requirements 24

ARMY - III

5.6 Invention Reporting 25

6 PROPOSAL SUBMISSION 26

6.1 Submission Details 26

6.2 Technical Questions 27

6.3 Contact Information 28

ARMY - 4

1.0 PROGRAM DESCRIPTION

1.1 Introduction

The future Army must be capable of conducting Multi-Domain Operations (MDO) as part of an integrated Joint Force across an array of situations in multiple theaters by 2035. The MDO concept describes how the Army will support the Joint Force in the rapid and continuous integration of all domains of warfare – land, sea, air, and cyberspace – to deter and prevail as we compete short of conflict, and fight and win if deterrence fails. The Army must provide game-changing capabilities to our Soldiers.

To capitalize on small business innovation and reduce the time from solicitation to award, the Army leverages an approach that advertises SBIR funding opportunities through the DoW SBIR CSO process, with monthly topic releases. Additionally, the Army has established a contracting activity dedicated to executing all SBIR|STTR Phase I and Phase II awards for Army customers.

1.5 Majority Ownership in Part by Multiple Venture Capital, Hedge Fund, and Private Equity Firms Under the Department of the Army’s SBIR Program, proposing SBCs that are owned in majority part by multiple venture capital operating companies (VCOCs), hedge funds (HF), or private equity funds (PEF) are eligible to submit applications or receive awards. Reference may be made to the DoW 2026 SBIR Program CSO, including revisions/amendments, as well as 13 CFR 121.702, regarding eligibility standards, to include ownership and control requirements, applicable to the SBIR program.

All applicants that are majority‐owned by multiple VCOC, HF or PEF, and are submitting a proposal to an Army Topic, shall complete the certification at Verification of Eligibility of Small Business Joint Ventures, prior to submitting an application/proposal and must include the certification with their submission.

1.7 Direct to Phase II (DP2) Program

Implementing the authority granted by 15 U.S.C. §638 (cc), as amended, the U.S. Army will be conducting ‘Direct to Phase II’ awards for eligible SBIR topics. For topics leveraging this authority, please refer to Section 3.9, Direct to Phase II (DP2) Proposal Instructions, below.

1.8 Program on Innovation Open Topics

This release may contain an open topic. Proposing SBCs shall refer to the DoW 2026 SBIR Program CSO, to include any amendments/revisions, for additional information regarding open topic submissions.

https://www.dodsbirsttr.mil/submissions/api/public/download?uploadId=MTM3MjI4Nw==&fileName=Verification_of_Eligibility_of_Small_Business_Joint_Ventures_%5Bpdf%5D.pdf&showOnWeb=true https://www.dodsbirsttr.mil/submissions/api/public/download?uploadId=MTM3MjI4Nw==&fileName=Verification_of_Eligibility_of_Small_Business_Joint_Ventures_%5Bpdf%5D.pdf&showOnWeb=true

ARMY - 5

This CSO may contain a topic tied to an Expeditionary Technologies (xTech) Prize Competition or other competitive process that leverages DoW prize authority. This approach leverages the DoW prize authority, granted under 10 U.S.C. § 4025 to stimulate innovation and identify promising technologies, to serves as the competitive selection process. This allows us to satisfy the competitive requirements for the SBIR|STTR programs (15 U.S.C. § 638) through the prize competition's down-select mechanism.

Combining these authorities creates a more accessible, lower-barrier-to-entry pathway for firms to compete for government funding, especially those new to working with the DoW.

If an SBIR|STTR topic is associated with a prize competition in this release, there is a two-step application process:

1. Enter the Prize Competition: First, you must enter the specific prize competition and be selected as a finalist. Applications for the prize competition are submitted according to its unique instructions, not through DSIP.

2. Submit an SBIR|STTR Proposal: Only finalists of the prize competition are eligible to submit a full SBIR|STTR proposal for the corresponding topic through the DSIP portal.

The SBIR|STTR topic will remain in pre-release on DSIP during the entire prize competition. However, the opportunity to submit a proposal is exclusively reserved for competition finalists. Any proposals submitted by companies that were not selected as finalists will not be evaluated. Failure to enter the prize competition by its stated deadline will make you ineligible to apply for the associated SBIR|STTR funding.

1.9 Discretionary Technical and Business Assistance (TABA)

The Small Business Innovation and Economic Security Act Section 7 mandates agencies to offer TABA.

The Army SBIR|STTR program provides TABA to assist awardees in making informed technical decisions, mitigating risks, and accelerating commercialization. Army may provide up to $6,500 per Phase I project and up to $50,000 per DP2 project if the SBC supports the need for TABA sufficiently as determined by the Government. These amounts are in addition to the maximum award funding guideline limitation listed above. TABA funding is not guaranteed and is based upon the review of the services requested and the available TABA budget. Proposers may choose one of the following options:

• Option 1 - Army-Preferred Vendor(s): Proposers/Offerors may receive up to $6,500 per Phase I project and up to $50,000 per DP2 for assistance services. If selecting to utilize the Army’s preferred provider(s), the cost for TABA does not need to be included in the DSIP cost proposal (Volume 3). If approved, this funding is provided directly to the Army’s preferred provider(s) to perform the assistance agreed upon. Participation is voluntary, and application instructions are provided upon contract award. The Army’s preferred provider(s) and the current services they are offering can be found on the Army SBIR|STTR Website https://www.armysbir.army.mil/taba/. Frequently requested services include:

o Customized market research and strategy o Intellectual Property support o Cybersecurity Maturity Model Certification (CMMC) compliance o Defense Contract Audit Agency (DCAA) Compliance o Communications and Marketing

• Option 2 - Firm-Selected Vendor: Proposers/Offerors may request to contract TABA services through one or more TABA providers or through funding used to hire new or augment staff, or https://www.armysbir.army.mil/taba/

ARMY - 6

direct staff to conduct or participate in training activities consistent with the goals listed in 15 U.S.C.§638(q)(1) for up to $6,500 per Phase I project and up to $50,000 per DP2 in total obligations. These amounts are in addition to the maximum award funding guideline limitation specified in the respective SBIR/STTR topic. If selecting to utilize your own TABA provider, the proposed TABA amount must be included in the DSIP Cost Volume (Volume 3) and can be in addition to the maximum funding limitation for this topic, and details of TABA request must be included in Supporting Documents (Volume 5).

o Cost Volume (Volume 3) Requirements: Proposers must explicitly state the intent to use an outside provider in the proposal and include the associated costs in the Cost Volume.

TABA costs cannot include any profit/fee for the proposer/offeror. Additionally, TABA costs cannot be factored into the calculation of general and administrative expenses (G&A) for the proposer/offeror. The amount is based on the original contract period of performance and does not apply to period of performance extensions and/or enhancements. TABA funding will be denied if costs are omitted from the initial proposal submission or if the TABA costs proposed exceed $6,500 per Phase I project or $50,000 per DP2 project.

o Details of TABA Request: A detailed rationale for the requested TABA services must be included in Supporting Documents (Volume 5) of the proposal. A statement (maximum of 2 pages) is required to clearly demonstrate the provider's specialized expertise and relevant experience. This documentation must include at a minimum:

TABA provider(s) name TABA provider(s) point of contact, email address, and phone number An explanation of the TABA provider(s) suitability and qualifications to provide the service Outline of the specific tasks to be performed Total TABA provider(s) cost, number of hours, and labor rates (average/blended rate is acceptable).

1.10 Department of the Army Phase II Enhancement Policy

To further encourage the transition of SBIR|STTR research into DoW acquisition programs as well as the private sector, the Department of the Army may provide a Phase II awardee with up to $500,000.00 in matching SBIR funding (on a dollar-for-dollar basis) if the performer obtains commitment of non- SBIR|STTR funding from a DoW component(s), Federal Agency(ies), and/or a commercial investor(s).

The proposed Enhancement effort must develop, deliver, and integrate a technology or product into a program within a DoW component(s), Federal Agency(ies), and/or the commercial sector. All Enhancement requests are subject to the approval of the Army SBIR|STTR Program’s SSA, successful completion of negotiations, and the availability of funding. Enhancement funding is typically applied to an active Phase II award via a contract modification and will result in an additional scope of work and/or period of performance that is commensurate with the total funding received.

1.10.1 Overview

To further encourage the transition of SBIR|STTR research into DoW acquisition programs as well as the private sector, the Department of the Army may provide a Phase II awardee with up to $500,000.00 in matching SBIR funding (on a dollar-for-dollar basis) if the performer obtains commitment of non- SBIR|STTR funding from a DoW component(s), Federal Agency(ies), and/or a commercial investor(s).

ARMY - 7

Enhancement funding is typically applied to an active Phase II award via a contract modification and will result in an additional period of performance that is commensurate with the total funding received, typically 6 to 18 months (18 months being the maximum). On a case-by-case basis, however, a new Phase II contract may be awarded if appropriate. The proposed Enhancement effort must develop, deliver, and integrate a technology or product into a program within a DoW component(s), Federal Agency(ies), and/or the commercial sector.

1.10.2 Application Process

Enhancement requests should be submitted at least 6 months prior to the end of the Phase II period of performance to allow adequate time to complete the contracting process. Applications to the Enhancement Program will be reviewed for overall merit, transition potential, commercialization strategy, and value to the Army mission and are typically initiated through the Contracting Officer Representative (COR), Technical Point(s) of Contact (TPOC), SBIR|STTR Coordinator, and/or the Army SBIR|STTR Program Office, with oversight and input from the Contracting Officer.

Upon Army SBIR|STTR Program’s Source Selection Authority (SSA) approval to proceed, assigned contracting personnel will prepare and issue a letter request for proposal (RFP), soliciting the firm’s Enhancement proposal.

1.10.3 Limitations

All Enhancement requests are subject to the approval of the Army SBIR|STTR Program’s SSA, successful completion of negotiations, and the availability of funding.

In order to be considered for matching SBIR funds under a Phase II Enhancement, the Contracting Officer must receive certified proof of the non-SBIR|STTR funding transfer. Certification consists of a notarized letter, stating that "$ in cash has been transferred to [company name] from [investor name] in accordance with the DA Enhancement Program procedures” that is signed by both the awardee and its investor. The letter must be sent to the Contracting Officer along with a copy of the SBIR awardees bank statement showing the funds were deposited. This certification should be received by the Contracting Officer within 45 days of the Enhancement approval notification. Failure of the awardee to certify and provide proof of the Investor’s total cash contribution may significantly delay the Phase II enhancement or result in the awardee becoming ineligible for the Phase II Enhancement.

“Outside investment” must meet DoW Guidelines to qualify for Phase II Enhancement matching funds.

Eligible third-party investors include:

• Non-SBIR|STTR Department of Defense funds

• Any other non-SBIR|STTR federal agency funds

• An SBC other than the eligible/performing SBC

• Venture capital firms

• Individual investors

• A non-SBIR|STTR federal, state, or local government; or

• Any combination thereof

Ineligible sources include:

• The eligible SBC’s internal research and development funds

• Funding in forms other than cash (such as in-kind or other tangible assets)

• Funding from the owners of the eligible SBC, or the family members or affiliates of such owners; or

ARMY - 8

• Funding attained through loans or other forms of debt obligations

2 CERTIFICATIONS AND REGISTRATIONS

2.1 System for Award Management (SAM) Registration

Interested SBCs are required to be registered and active in SAM in accordance with FAR Provision 52.204-7, System for Award Management, when submitting an offer or quotation and at time of award.

Proposals or offers submitted by firms failing to meet this requirement may be deemed unresponsive.

SBCs may only submit offers using their legal business name or ‘Doing Business As’ (DBA) name, as indicated in the SAM registration for the provided Unique Entity Identifier (UEI). A firm submitting an offer using a DBA name shall have the DBA registered and linked to their current, active, SAM registration. Please refer to section 2.3 below for instructions regarding the correlation between your firm’s DSIP account profile, and the SAM.

Firms must not be debarred, suspended, proposed for debarment, or voluntarily excluded from Government contracting within the SAM –

• Contractors debarred, suspended, proposed for debarment, or voluntarily excluded, are excluded from receiving an award. Contractors that are debarred, suspended, proposed for debarment, or voluntarily excluded, are also excluded from conducting business with the Government as agents or representatives of other contractors.

• Contractors and other entities that have an active exclusion record in SAM because they have been declared ineligible on the basis of statutory or other regulatory procedures are excluded from receiving an award under the conditions and for the period set forth in the statute or regulation.

• The Army SBIR|STTR Program will not consent to subcontracts with these contractors.

2.3 DoW SBIR|STTR Innovation Portal (DSIP) Registration

It is the SBCs responsibility to ensure that the firm’s DSIP account profile information correlates to the data found within the firm’s SAM registration. This includes, but is not limited to the following:

• 5-Digit Commercial and Government Entity Code

• 12-Digit UEI

• Legal Business Name

• “Doing Business As” Name

• Physical Address

Failure to correlate the SBCs entity information between the DSIP application and SAM and/or submit required certifications may significantly delay funding agreement award or become grounds for cancellation of the funding agreement.

3 PROPOSAL PREPARATION INSTRUCTIONS AND REQUIREMENTS

3.7 Phase I Proposal Instructions

The following proposal instructions supplement, and in some cases, supersede, those found within the DoW 2026 SBIR Program CSO, including any amendments/revisions/appendices.

https://sam.gov/content/home https://www.acquisition.gov/far/part-52#FAR_52_204_7 https://www.acquisition.gov/far/part-52#FAR_52_204_7

ARMY - 9

a. Proposal Coversheet (Volume 1) The proposal coversheet is prepared on DSIP and in accordance with the DoW solicitation.

b. Technical Volume Format (Volume 2) Proposals shall adhere to the formatting instructions provided in the DoW 2026 SBIR Program CSO, including any amendments/revisions, as supplemented by the technical volume formatting requirements described herein. Information provided in these Service/Component-specific proposal instructions take precedence over any instructions listed in the DoW 2026 SBIR Program CSO.

Submissions that fail to conform to the technical volume formatting requirements shall be deemed unresponsive.

1. File Type: The Technical Volume shall be a single Adobe Acrobat (supporting Windows 10-11) Portable Document Format (.pdf) searchable text format file, including graphics. PDF files that cannot be opened using Adobe Acrobat products may be rejected by the Government. Perform a virus check before uploading the technical volume file. If a virus is detected, the proposal may be rejected. Do not lock, password protect or encrypt the uploaded file. Do not include or embed active graphics, such as videos, moving pictures, or other similar media, in the document.

2. Length: The Technical Volume shall not exceed seven (7) pages including all key sections described in Section 3.7(c), Technical Volume Content. The seven (7) page limit applies to the entire Technical Volume submission as uploaded to DSIP. At the Government's discretion, if included in the submission, pages that clearly do not substantiate or contribute to the technical approach, such as a cover sheet or table of contents, may be excluded from the page count. However, any appendices or supplemental content/materials that expand upon the requirements described in section 3.7(c), shall count toward the seven (7) page limitation. SBCs may allocate any portion of the technical volume page limit to each of the key sections, as desired. It is the proposing SBCs responsibility to ensure that the Technical Volume file uploaded to DSIP complies with the stated page limitation.

3. Layout: Number all proposal pages consecutively. Submit a direct, concise, and informative research or R&D proposal (no type smaller than 10-point on standard 8-1/2" x 11" paper with one-inch margins, including the header). The header on each page of the technical volume, which may be included in the one-inch margin, should contain the proposing SBC’s name, topic number, and the DSIP assigned proposal number from the cover sheet.

4. General:

• Technical volume MUST be a single Adobe Acrobat PDF file

• Graphics are strongly encouraged to be included throughout the white paper as you see fit.

Ensure they are logical and easy to read. Supporting images should be thoughtful and visually attractive.

• For plots and charts: Include title, caption, axes labels, and be sure to include scale.

• Avoid jargon and define all technical terms

• Use the "Compress Pictures" feature to reduce file size when possible.

c. Technical Volume Content (Volume 2) The following technical volume content instructions supersede those stated in the DoW 2026 SBIR Program CSO, including any amendments/revisions/appendices.

ARMY - 10

Offerors must address the requirements outlined for the Non-Proprietary Work Plan in Supporting Documents (Volume 5). This overview should directly reflect the key elements of the technical approach detailed in this volume, ensuring consistency between both documents.

The Technical Volume shall be structured in the following order:

i. Introduction;

ii. Army Benefits;

iii. Technical Approach;

iv. Programmatic Potential; and

v. Commercial Potential

Each of the key sections align directly with the evaluation rubric, Phase I Evaluation Criteria (Appendix A), ensuring clarity in how proposals will be assessed. The following outlines the specific content expectations for each section of the Technical Volume, as guided by the evaluation criteria in Appendix A. Offerors should ensure their proposals clearly address the key elements identified in the rubric to maximize the proposal’s competitiveness.

i. Introduction: Write a clear, concise description of what your innovation does or will do, and where you are in your evolution. Make clear its intended impact on the Army. Evaluators should "get it" after reading this.

ii. Army Benefits: Briefly describe any identified Army use cases, the solutions’ advantages and potential level of impact and scale of impact the solution would have for the Army. If you are unsure how an Army end-user might benefit from this technology or the scale of impact it could have, please provide an analogous use case to allow the Army evaluators a way to connect the dots using their knowledge of potential Army use cases when evaluating this section. The rubric prompts below are provided to guide you in preparing this section:

• Alignment. Argue your technology innovation is aligned with this Army topic's priorities as defined in the solicitation.

• Solution’s Advantages. Prove your prospective customers will choose you given limited resources and myriad choices. Have you accounted for indirect substitute products as well as direct competitors?

• Solution’s Impact. The Army seeks higher-risk, high-impact solutions through SBIR - not engineering changes or incremental improvements. Use this section to describe your technology's impact and improvement upon the state of the art.

iii. Technical Approach: Provide details and supporting data on how the proposer is going to solve the problem. It shall detail key elements of the firm’s approach, the technical team, and any risks and mitigation plans identified. Use data to substantiate your claims that your technical risk mitigation plans are credible. Show us quality data attributed to reliable, credible sources. The rubric prompts below are provided to guide you in preparing this section:

• Scientific Feasibility. Convince readers that your innovation is built atop sound scientific and/or engineering principles. Ensure that your feasibility argument adequately responds to the requirements this Army topic.

• Enabling Technologies. Do the required enabling technologies introduce added risk?

ARMY - 11

• Technical Team. Briefly list and describe your core scientific and technical team with an emphasis on their past accomplishments and experiences that would relate to this Army SBIR topic. As a reminder, the primary employment of the Principal Investigator/Project Manager must be with the SBC (or the Research Institution – STTR only) at the time of award and during the conduct of the proposed project.

• Technical Risk and Mitigation Plans. Describe any technical risks that still exist between you and a fully mature solution and your plans to mitigate those risks.

iv. Programmatic Potential: Outline where your company is today, what will be accomplished under this SBIR effort with Army customer discovery and in identifying the risks and mitigation plans for successfully transitioning beyond SBIR funding into a contract with an Army or integration with an Army system. The rubric prompts below are provided to guide you in preparing this section:

• Project Milestone Schedule. Outline your execution plan. What milestones do you hope to accomplish, and what deliverables if any do you hope to produce during this phase and subsequent phases of the effort.

• Army Customer Discovery and Validation. Argue you are "getting out of the building" to engage in productive customer-discovery with Army stakeholders and describe any customer validation you may have received formally or informally to date on this proposed technology.

• Army Transition Pathways. Describe the next type of deal you aim to make with the Army following this award. Briefly outline your current plan to unlock that next opportunity and/or share the biggest risks you see post this SBIR award to transition this technology to the Army.

v. Commercialization Potential: Highlight any commercial market for this solution that the

DoW can build upon. Describe your past success and future potential in commercial applications. The rubric prompts below are provided to guide you in preparing this section:

• R&D to Product Revenue. Argue that your team members have transitioned research and development efforts into products successfully, as evidenced by product revenue. (Product revenue is realized by directly selling a solution to solve a problem

vs. selling consulting, services, or research activities.)

• Competitive Edge. Why will you win? A small company needs to have a competitive edge in the marketplace: Something your team does very well that is difficult to match. Some examples may include: well protected intellectual property;

unmatched relevant experience; a novel business model; network effects; etc.

• Other People’s Money. Make the case for the commercial market (non-DoW) potential of your technology from which the Army will benefit.

d. Cost Volume Content (Volume 3) Cost and duration limits are detailed within each topic. With the exception of the instructions provided below, Offerors must comply with all Cost Volume (Volume 3) requirements outlined in the DoW 2026 SBIR Program CSO. Note: Options are not anticipated at this time. If an option is identified in the topic posting, costs for the Base and Option shall be separated and clearly identified.

In anticipation of a possible contract award, all proposed costs shall be accompanied by documentation to substantiate how the cost was derived. Failure to include supporting

ARMY - 12

documentation with the proposal may delay any potential contract award, as the proposer will be asked to submit the necessary documentation to the Contracting Officer to substantiate costs. It is important to respond as quickly as possible to the Contracting Officer’s request for documentation.

Failure or refusal to provide documentation may result in dissolution of the contract action.

e. Company Commercialization Report (Volume 4)

Completion of the CCR as Volume 4 of the proposal submission in DSIP is required for prior SBIR|STTR awardees. Please refer to the DoW 2026 SBIR Program CSO for full details on this requirement. Information contained in the CCR will be considered by the Army during proposal evaluations.

f. Supporting Documents (Volume 5) Volume 5 is provided for proposing SBCs to submit additional documentation to support the Cover Sheet (Volume 1) and the Technical Volume (Volume 2), and the Cost Volume (Volume 3). A completed proposal submission in DSIP does NOT indicate that the mandatory supporting documents have been uploaded. It is the responsibility of the proposing SBC to ensure that the mandatory documents listed above have been uploaded and included with the proposal submission.

All proposing SBCs are REQUIRED to submit the following documents to Volume 5:

1. Non-Proprietary Work Plan: This summary, which should be based upon the technical approach discussed in your Technical Volume (Volume 2), is subject to a two (2) page limit and should provide a clear and concise overview of the proposed project's technical objectives, key milestones and their target completion dates, associated key deliverables, and the anticipated project duration. This information will serve as the basis for publicly releasable information about the project and will serve as the basis for establishing performance requirements within the contract. Therefore, the summary should be written in a manner understandable to a technically literate audience without disclosing sensitive or proprietary information.

2. List of Foreign Citizens. Identify any foreign nationals or individuals holding dual citizenship expected to be involved on this project as a direct employee, subcontractor, consultant, or Research Institution. For these individuals, please specify and include in a single PDF file, a table listing their citizenship(s), countries of origin, type of visa or work permit under which they are performing, and an explanation of their anticipated level of involvement on this project (see example below). Failure to provide this information may significantly delay selection, and/or any potential contract award.

NOTE: submitting small business concerns often incorrectly assume that all individuals with dual citizenship or a work permit will be permitted to work on SBIR|STTR projects and fail to identify them. As a reminder, applicants must report any and all individuals who are considered foreign nationals (including dual citizens) as defined in the DoD SBIR|STTR BAAs and are expected to be involved in the project. Additional information may be requested during negotiations in order to verify the foreign national’s eligibility to participate. Supplemental information provided in response to this paragraph will be protected in accordance with the Privacy Act (5 U.S.C. 552a), if applicable, and the Freedom of Information Act (5 U.S.C. 552(b)(6)).

Note: If NO foreign nationals will be involved in proposed work, a statement to that effect must be substituted for the table.

ARMY - 13

3. Key Personnel: Identify all Key personnel involved in the project to include information directly related to education and experience. A technical resume for the Principle Investigator including publications, if any, must be included. Technical resumes for other technical staff, subcontractors and consultants, if any, are also useful and may be included in Volume 5.

All proposing SBCs are required to submit the following documents to Volume 5, if applicable:

4. SBIR|STTR Funding Agreement Certification

5. Verification of Eligibility of Small Business Joint Ventures

6. Assertion of use, release, or disclosure restriction (in accordance with DFARS 252.227- 7017)

7. DD Form 2345, Military Critical Technical Data Agreement – Applicable to actions subject to ITAR

8. (IF APPLICABLE) SBC-selected Details of TABA Request NOTE: This is not required if selecting to use one of the Army’s preferred TABA provider(s). If selecting to use your own TABA provider, you are required to include a detailed rationale in two (2) pages or less, for the requested TABA services to clearly demonstrate the provider's specialized expertise and relevant experience. This documentation must include at a minimum:

a. TABA provider(s) name

b. TABA provider(s) point of contact, email address, and phone number

c. An explanation of the TABA provider(s) suitability and qualifications to provide the service

d. Outline of the specific tasks to be performed

e. Total TABA provider(s) cost, number of hours, and labor rates (average/blended rate is acceptable).

If contracting TABA services through one or more TABA providers, the providers cannot be your firm or any affiliated entity, and TABA costs must be directly related to their services, excluding indirect costs, profit, or fees passed through by your company. TABA costs cannot be factored into the calculation of general and administrative expenses (G&A) for the proposing SBC.

9. Other Documentation such as Letters of Support

Name

[include direct employees, subcontractors, and consultants]

Citizenship(s) Type of Visa or Work Permit

Level of Involvement (Role) https://www.socom.mil/SOF-ATL/SBIR-Docs/22-4DirectToPhaseII/SOCOM224-007/Atch5_Funding_Agreement.pdf https://www.dodsbirsttr.mil/submissions/api/public/download?uploadId=MTM3MjI4Nw==&fileName=Verification_of_Eligibility_of_Small_Business_Joint_Ventures_%5Bpdf%5D.pdf&showOnWeb=true

ARMY - 14

In addition to the Volume 5 requirements, the Department of the Army may accept the following documents in Volume 5:

10. Cost/Pricing Information

11. Other (only as specified in the topic)

Please only submit documents that are identified immediately above, and as required by the DoW 2026 SBIR Program CSO. All other documents submitted will be disregarded, including but not limited to promotional and non-project related information.

g. Fraud, Waste and Abuse Training (Volume 6) Fraud, Waste and Abuse training material can be found in the Volume 6 section of the proposal submission module in DSIP and must be thoroughly reviewed once per year to proceed with proposal submission.

h. Disclosures of Foreign Affiliations or Relationships to Foreign Countries (Volume 7) Proposers must complete the web-form regarding foreign affiliations to assess national security risks.

PDF uploads are no longer accepted.

Mandatory Compliance Statement: Disclosure of foreign affiliations or relationships on this form does not mean automatic denial; however, failure to complete this form completely and accurately may result in the proposal being deemed administratively non-compliant and unresponsive. Unresponsive proposals are un-awardable and may be excluded from technical evaluation and removed from further consideration.

NOTE: Pursuant to 15 U.S.C. § 638(vv), 15 U.S.C. § 638(g)(13), and the SBA SBIR|STTR Policy Directive, disclosures must consider the following when it comes to affiliations to include subcontractors, subsidiaries, joint ventures, consultants, and the employees of such institutions:

• Foreign Affiliations: Any subsidiary, parent company, or joint venture that is based in, funded by, or has a foreign affiliation with any foreign country of concern.

• Contractual/Financial Obligations: Any current or pending contractual or financial obligation or other business arrangement with a foreign entity. Firms are advised that a subcontracting agreement is, by definition, a contractual and financial obligation.

• Related Entities: Any foreign business entity, offshore entity, or entity outside the United States related to the SBC. A subcontractor is an entity "related" to the SBC's performance of the federal award and must be disclosed to ensure the agency can assess foreign influence.

• Covered Individuals: By definition, the term ‘covered individual’ means an individual, regardless of their official title, labor category, or designation as ‘Key Personnel, who contributes in a substantive, meaningful way to the scientific development or execution of the project. This requirement applies to all individuals performing work on the project, whether they are employed by the Prime SBC, a subcontractor, a consultant, or a partnering Research Institution.

3.8 Phase II Proposal Information

Unless a Topic posting specifies that the DA will be accepting Direct to Phase II proposal submissions, Phase II proposals may only be submitted by Phase I awardees. Submission of Phase II proposals is not permitted at this time, and if submitted, will be rejected without evaluation. Phase II proposal

ARMY - 15

preparation and submission instructions will be provided via subsequent notification.

3.9 Direct to Phase II (DP2) Proposal Instructions

Offerors may submit DP2 proposals only if allowed pursuant to the topic posting. With the exception of the DP2 component specific proposal instructions for the Technical Volume (Volume 2), identified below, DP2 Proposals shall follow the Phase I Proposal Instructions described above.

b. Technical Volume Format (Volume 2)

2. Length: The Technical Volume shall not exceed 15 pages including all key sections described in Section 3.9(c), Technical Volume Content. The 15-page limit applies to the entire Technical Volume submission as uploaded to DSIP. At the Government's discretion, if included in the submission, pages that clearly do not substantiate or contribute to the technical approach, such as a cover sheet or table of contents, may be excluded from the page count. However, any appendices or supplemental content/materials that expand upon the requirements described in section 3.9(c), shall count toward the 15-page limitation. SBCs may allocate any portion of the technical volume page limit to each of the key sections, as desired. It is the proposing SBCs responsibility to ensure that the Technical Volume file uploaded to DSIP complies with the stated page limitation.

c. Technical Volume Content (Volume 2) The following instructions supersede those stated in the DoW 2026 SBIR Program CSO, including any amendments/revisions/appendices.

Offerors must address the requirements outlined for the Non-Proprietary Work Plan in Supporting Documents (Volume 5). This overview should directly reflect the key elements of the technical approach detailed in this volume, ensuring consistency between both documents.

The Technical Volume shall be structured in the following order:

i. Introduction;

ii. Army Benefits;

iii. Feasibility for Direct to Phase II;

iv. Technical Approach;

v. Programmatic Potential; and

vi. Commercial Potential Each of the key sections align directly with the evaluation rubric, Direct to Phase II Evaluation Criteria (Appendix B), ensuring clarity in how proposals will be assessed. The following outlines the specific content expectations for each section of the Technical Volume, as guided by the evaluation criteria in Appendix B. Offerors should ensure their proposals clearly address the key elements identified in the rubric to maximize the proposal’s competitiveness.

i. Introduction: Write a clear, concise description of what your innovation does or will do, and where you are in your evolution. Make clear its intended impact on the Army. Evaluators should "get it" after reading this.

ii. Army Benefits: Briefly describe any identified Army use cases, the solutions’ advantages and potential level of impact and scale of impact the solution would have for the Army. If

ARMY - 16

you are unsure how an Army end-user might benefit from this technology or the scale of impact it could have, please provide an analogous use case to allow the Army evaluators a way to connect the dots using their knowledge of potential Army use cases when evaluating this section. The rubric prompts below are provided to guide you in preparing this section:

• Alignment. Argue your technology innovation is aligned with this Army topic's priorities as defined in the solicitation.

• Solution’s Advantages. Prove your prospective customers will choose you given limited resources and myriad choices. Have you accounted for indirect substitute products as well as direct competitors?

• Solution’s Impact. The Army seeks higher-risk, high-impact solutions through SBIR - not engineering changes or incremental improvements. Use this section to describe your technology's impact and improvement upon the state of the art.

iii. Feasibility for Direct to Phase II: Provide documentation that demonstrates the scientific and technical merit, feasibility, and commercialization potential of ideas that would otherwise have been accomplished in a SBIR Phase I feasibility study. Use data to substantiate your claims. Documentation should include all relevant information including, but not limited to:

technical reports, test data, prototype designs/models, and performance goals/results. Work submitted within this section must have been substantially performed by the proposer and/or the Principal Investigator. Feasibility documentation cannot be based upon any prior or ongoing federally funded SBIR or STTR work and DP2 proposals MUST NOT logically extend from any prior or ongoing federally funded SBIR or STTR work. DP2 authority is intended for companies that have matured their technologies outside of the SBIR/STTR pipeline, and who are ready for Phase II development without requiring a Phase I feasibility study. This ensures that DP2 funding is directed towards novel, non-SBIR/STTR funded R&D, rather than the continuation or repurposing of work already supported through prior SBIR/STTR awards. Proposals that derive from previously funded SBIR/STTR work are not eligible for DP2 consideration. The rubric prompts below are provided to guide you in preparing this section:

• Proof of Feasibility. Provide documentation to substantiate the scientific and technical merit and feasibility has been met.

• Work Ownership. Document the people, organizations, and any intellectual property (IP) ownership responsible for the work products in this section. The work must have been at least "substantially" performed by your organization and/or the proposed principal investigator for this research, and your firm must either own any IP discussed outright or have appropriate and sufficient licenses thereto.

• New Research. Prove that the proposed DP2 research is not in any way a logical extension of previous or ongoing federally funded SBIR or STTR research.

• Prototype Delivery. Demonstrate that the research will result in appropriately mature Prototype at the conclusion of the DP2 SBIR contract.

iv. Technical Approach: Provide details and supporting data on how the proposer is going to solve the problem. It shall detail key elements of the firm’s approach, the technical team, and any risks and mitigation plans identified. Use data to substantiate your claims that your technical risk mitigation plans are credible. Show us quality data attributed to reliable, credible sources. The rubric prompts below are provided to guide you in preparing this section:

ARMY - 17

• Scientific Feasibility. Convince readers that your innovation is built atop sound scientific and/or engineering principles. Ensure that your feasibility argument adequately responds to the requirements this Army topic.

• Enabling Technologies. Do the required enabling technologies introduce added risk?

• Technical Team. Briefly list and describe your core scientific and technical team with an emphasis on their past accomplishments and experiences that would relate to this Army SBIR topic. As a reminder, the primary employment of the Principal Investigator/Project Manager must be with the SBC (or the Research Institution – STTR only) at the time of award and during the conduct of the proposed project.

o Note: In addition to this Technical Team narrative within the Volume 2 Technical Volume, a listing of all key personnel involved in the project to include information directly related to education and experience is required in Volume 5 along with a technical resume for the Principle Investigator including publications. Concise resumes of other technical staff including subcontractors and consultants, if any, are useful and may also be included in Volume 5.

• Technical Risk and Mitigation Plans. Describe any technical risks that still exist between you and a fully mature solution and your plans to mitigate those risks.

v. Programmatic Potential: Outline where your company is today, what will be accomplished under this SBIR effort with Army customer discovery and in identifying the risks and mitigation plans for successfully transitioning beyond SBIR funding into a contract with an Army or integration with an Army system. The rubric prompts below are provided to guide you in preparing this section:

• Project Milestone Schedule. Outline your execution plan. What milestones do you hope to accomplish, and what deliverables if any do you hope to produce during this phase and subsequent phases of the effort.

• Army Customer Discovery and Validation. Argue you are "getting out of the building" to engage in productive customer-discovery with Army stakeholders and describe any customer validation you may have received formally or informally to date on this proposed technology.

• Army Transition Pathways. Describe the next type of deal you aim to make with the Army following this award. Briefly outline your current plan to unlock that next opportunity and/or share the biggest risks you see post this SBIR award to transition this technology to the Army.

vi. Commercialization Potential: Highlight any commercial market for this solution that the

DoW can build upon. Describe your past success and future potential in commercial applications. The rubric prompts below are provided to guide you in preparing this section:

• R&D to Product Revenue. Argue that your team members have transitioned research and development efforts into products successfully, as evidenced by product revenue. (Product revenue is realized by directly selling a solution to solve a problem

vs. selling consulting, services, or research activities.)

• Competitive Edge. Why will you win? A small company needs to have a competitive edge in the marketplace: Something your team does very well that is difficult to match. Some examples may include: well protected intellectual property;

ARMY - 18

unmatched relevant experience; a novel business model; network effects; etc.

• Other People’s Money. Make the case for the commercial market (non-DoW) potential of your technology from which the Army will benefit.

3.10 Prize Competition Selectees

This section applies exclusively to companies selected as winners in Part 2 of the respective Expeditionary Technologies (xTech) Prize Competition, DIU Challenge, or other competitive processes that leverage the DoW prize authority. These companies, having successfully competed their solutions to Army and DoW experts, are the only SBCs eligible to submit Army SBIR proposals under the corresponding topic area.

DoW Prize Competition selectees must follow the Army Phase I or DP2 Proposal Submission Instructions, with one important exception regarding the Technical Volume (Volume 2). In lieu of submitting a full Technical Volume (Volume 2), selectees shall submit the Non-Proprietary Work Plan, outlined in Section f. Supporting Documents (Volume 5) of the Army Phase I or DP2 Proposal Submission Instructions, in place of a Technical Volume. This waives the requirement to include the Non-Proprietary Work Plan in Volume 5 – Supporting Documents. Ensure your Non-Proprietary Work Plan adheres to the guidelines outlined in Section f. Supporting Documents (Volume 5), including the two

(2) page limitation.

All remaining proposal volumes, including any applicable and/or optional documents discussed in Section

f. Supporting Documentation (Volume 5) must be completed according to the standard Army Phase I or DP2 Proposal Submission Instructions.

NOTE: The Technical Evaluation (Section 4.1.2) and Selection (Section 4.1.3) guidance defined below do not apply to DoW Prize Competition selectees. Your proposals have already undergone a comprehensive evaluation as part of the xTech competition.

3.11 Controlled Unclassified Information (CUI)

Successful firms will be required to comply with CUI DoDI 5200.48. Firms must monitor CUI for aggregation and compilation based on the potential to generate classified information pursuant to security classification guidance addressing the accumulation of unclassified data or information. Firms shall report the potential of classification of aggregated or compiled CUI to ASA(ALT) Security Manager. Firms, pursuant to mandatory DoW contract provisions, will submit unclassified DoW information for review and approval for release and approval for release in accordance with the standard DoDI 5230.09. All CUI records must follow the approved mandatory disposition authorities whenever the DoW provides CUI to, or CUI is generated by, non‐DoW entities in accordance with Section 1220‐1236 of Title 36, CFR, Section 3301a of Title 44, U.S.C., DoDI 5200.48.

3.12 Arms, Ammunition, and Explosives (AA&E)

If the proposed statement of work requires the use, development, production, manufacture, purchase, or delivery of Arms, Ammunition and Explosives (AA&E) data and/or hardware, the offeror shall follow the following instructions:

a. References:

1. MIL-STD-1168 - Ammunition Lot Numbering and Ammunition Data…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .