This Statement of Work (SOW) is issued by the Colorado Department of Transportation (CDOT) for the A-Basin Tank Installation project located at 28214 Highway 6 in Dillon, Colorado. The project requires a contractor to purchase and install one 2500-gallon sand-oil separator tank and one 5000-gallon holding tank at the CDOT A-Basin facility. Additional requirements include filling the existing 2,500-gallon tank containment with concrete and utilizing existing floor drain piping to connect the new tanks below the exterior asphalt surface. The contractor must complete all work within 150 calendar days from the notice to proceed, with work scheduled to initiate in June/July 2025, subject to weather conditions.
The project scope includes adhering to engineering design drawings by Level Engineering, locating underground utilities, obtaining necessary permits, and complying with CDOT Standard Specifications for Road and Bridge Construction (2023 version). The contractor must provide personal protective equipment, conduct compaction testing, and follow stormwater control measures. No construction Storm Water Permit is required as the disturbance area is less than one acre. Project submittals must be reviewed by the CDOT project manager and Level Engineering prior to material purchases, and an as-built drawing of the newly installed holding tanks must be provided upon project completion. The primary point of contact is Tim Hagert, CDOT Project Manager, who can be reached at 720-582-0694 or tim.hagert@state.co.us.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
A-Basin Tank Installation
28214 Highway 6, Dillon, CO 80435
Project Number: 20312 Project Title: A-Basin Tank Installation
Project Description
The Colorado Department of Transportation (CDOT) has a need for a Contractor to purchase and install one 2500-gallon sand-oil separator tank and one 5000-gallon holding tank at the CDOT A- Basin facility. The Contractor shall also leave in place the existing 2,500-gallon tank containment (inside the facility) and fill with concrete. The Contractor shall utilize the existing floor drain piping inside the facility to connect to the 2,500-gallon and 5-000-gallon tanks to be installed below the exterior asphalt surface. The site is located at 28214 Highway 6 in Dillon, Colorado.
Scope of Services
CDOT is requiring a Contractor to install one 2500-gallon sand-oil separator tank and one 5000-gallon holding tank at the CDOT A-Basin facility. The Contractor shall be responsible for the following:
• Adhere to the Engineering Design drawings labeled “Arapahoe Basin Tank Installation” as designed by Level Engineering and in accordance with this Statement of Work (SOW).
• The Contractor shall also fill the interior holding tank with concrete, per Level Engineering’s project drawings.
• Prior to initial site work, the Contractor shall be responsible for locating all underground utilities prior to any site disturbing activities. A private utility company, hired by the Contractor, will be required to locate all existing utilities in the vicinity of all work areas not covered by UNCC.
• Personal Protective Equipment (PPE: hard hat, safety glasses, gloves, reflective vest and safety shoes) shall be worn by all personnel while in the construction areas.
• The Contractor shall have compaction testing completed per sheet C3 of Level Engineering’s design.
• The Contractor shall obtain any required permits and pay the associated permit fees for any local, county or state entities.
• The Contractor shall schedule the work to be initiated in June/July of 2025 (weather dependent).
• The Contractor shall allow the CDOT A-Basin maintenance crew access to the facility at all times during construction activities.
• As the area of disturbance for the site is less than one acre, a construction Storm Water Permit with the Colorado Department of Public Health & Environment (CDPHE) is NOT required. The Contractor, however, shall comply with all stormwater control measures as listed in Level Engineering’s design and in the Storm Water Management Plan Notebook.
• All work shall also be completed in compliance with the “Colorado Department of Transportation Standard Specifications for Road and Bridge Construction,” the 2023 version, including but not limited to sections 203, 208, 304, 401 and 403. The CDOT 2023 version can be found online at:
https://www.codot.gov/business/designsupport/cdot-construction-specifications/2023-construction-specifications https://www.codot.gov/business/designsupport/cdot-construction-specifications/2023-construction-specifications https://www.codot.gov/business/designsupport/cdot-construction-specifications/2023-construction-specifications
Deliverables
The Contractor shall complete all work listed in this SOW within 150 calendar days from notice to proceed. The Contractor shall also send project submittals for review to the CDOT project manager and Level Engineering prior to purchasing any materials for the project. Upon project completion the Contractor shall provide an as-built drawing of the newly installed holding tanks.
CDOT Point of Contact