AR19Add1.pdf
PDF 160 KB Posted
- Attached to
- East-West Connector Corridor Improvements Study
- Solicitation number
- PE-77050-NONST-2024-000000010
- Issued by
- Cobb County, Georgia
About this file
The document is an addendum to a Request for Proposals (RFP) issued by the state of Georgia and Cobb County for the East-West Connector Corridor Improvements Study. The purpose of this study is to develop viable, safe, connected, and cost-effective solutions to improve operational safety, congestion, access management, and pedestrian connectivity for all roadway users, while also preparing the proposed project for advancement to the Preliminary Engineering phase. The addendum indicates that the link provided in the RFP for the pre-proposal meeting is not working, and requests that the link be resent.
The state and local contract opportunity does not provide any additional details on pricing terms, set asides, incumbents, funding requirements and sources, or other salient information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AR19 MDJ Legal Ad.pdf | ||
| RFP_AR19 East_West Connector Corridor Improve.pdf | ||
| AR19Add2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Could you please resend the link for the above-referenced pre-proposal meeting? The one in the RFP does not appear to be working.
Laura Beall Digitally signed by Laura Beall Date: 2024.09.04 11:51:26 -04'00'
File details come from the government source that posted it. Updated .