Approved JA JA UH60 Blackhawk Maint and Ovhl Items signed redacted Redacted.pdf

PDF 10 MB Posted

Attached to
Accessory Gearbox; Transmission, Mechanical; Main Module Assembly; Blade, Rotary Wing; Panel, Control, Electrical; Accessory Gearbox, Tail Rotor
Solicitation number
W58RGZ-19-R-0163
Issued by

About this file

This document summarizes a redacted Justification and Approval (J&A) for a sole source contract award. The J&A approved awarding contract W58RGZ-22-D-0002 to an unknown vendor for an unknown amount on June 29, 2022. The contract is with the Department of the Army Materiel Command Contracting Command at Redstone Arsenal and is for accessory gearboxes, transmissions, main module assemblies, rotary wing blades, control panels, and tail rotor accessory gearboxes for UH-60 Blackhawk maintenance and overhaul items. The J&A provides approval and rationale for awarding this contract on a sole source non-competitive basis to the unknown vendor.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .