Approved for Construction-20260409_106 Cobblestone Bathroom.pdf
PDF 2 MB Posted
- Attached to
- Cobblestone 106 IRA - Bathroom Renovation
- Solicitation number
- 2135127
- Issued by
- Warren County, New York
About this file
This is an approved construction document set for a bathroom renovation project at 106 Cobblestone Terrace in Newark, New York, prepared by Patriot Design & Consulting under the Office for People with Developmental Disabilities (OPWDD). The project scope includes complete demolition and renovation of approximately 95 square feet of bathroom space within a 5,800 square foot residential building classified as occupancy type R-3 under the 2025 New York State Building Code. The work encompasses removal of existing fixtures, installation of new porcelain tile flooring with cove base, solid surface wall panels, plumbing fixtures including a water closet and lavatory, a new accessible shower with hand-held showerhead, grab bars, lighting, and exhaust ventilation. All work must comply with alteration level 2 standards for the existing building, and a mandatory site visit is scheduled for Thursday, May 28, 2026, at 10:00 a.m., with bids not accepted from contractors who do not attend. The construction documents include detailed floor plans, elevations, sections, fixture schedules, and material specifications organized across three drawing sheets (A1, A2, A3) plus specifications.
This is a New York State public works project requiring prevailing wage compensation and contractor registration with the New York State Department of Labor (NYSDOL) prior to bid submission. Bidders must submit a valid NYSDOL registration number and Certificate of Registration with their bid proposal or face disqualification; applications typically require 3-4 weeks for processing. The project requires coordination with OPWDD field staff and compliance with OPWDD safety requirements throughout construction. The building will remain occupied during work, necessitating phased construction, dust containment, protection of existing fire alarm and sprinkler systems, and maintenance of all exits and fire suppression systems. Material selections including tile colors, paint colors, and finish colors are to be made by the owner. Bids should be submitted to the Finger Lakes DDSO via fax to 585-461-8811 (Attention: Franchesca Sagen) or email to FL.Purchasing@opwdd.ny.gov with reference to the project location and title on company letterhead.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CP-FL-H7848-2026049_Bathroom_Renovation_yellow_Bathroom_106_CT_IRA.pdf | ||
| ACM.106Cobblestone.Test1.Bathroom13.BR7.pdf | ||
| RFQ.pdf | ||
| SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISION TAG
ELEVATION
DETAIL/SECTION
WINDOW TAG
WALL TAG
ROOM TAG
DOOR TAG
A
A101
W1
A
ROOM
101B
COLUMN GRID
CL
A101
INTERIOR ELEVATION 2
+2'-0"
AX.X
X
GENERAL DEMOLITION NOTES
1. THE OWNER WILL REMOVE LOOSE ITEMS AND FURNISHING FROM THE
BATHROOM
2. PROVIDE A DUST ENCLOSURE OF FIRE-RETARDANT POLYETHYLENE, SEALED
WITH TAPE AT PERIMETER AND AT ALL JOINTS AT AREA OF WORK. PROVIDE
DOUBLE OVERLAPPING POLYETHYLENE ENTRIES INTO THE DUST ENCLOSURES.
3. DEMOLITION DRAWINGS AND NOTES DEMONSTRATE INTENT OF DEMOLITION.
CONTRACTOR SHALL SURVEY THE WORK SITE PRIOR TO SUBMITTING A
PROPOSAL AND DETERMINE THE FULL EXTENT IF REMOVALS, THE WORK
INCLUDES ALL REMOVALS REQUIRED TO PROPERLY INSTALL THE NEW WORK,
INCLUDING REMOVALS REQUIRED FOR NEW MECHANICAL, PLUMBING, AND
ELECTRICAL SCOPE.
4. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY PROTECTION FOR THE
EXISTING FIRE ALARM AND SPRINKLER SYSTEM AS REQUIRED DURING THE
COURSE OF DEMOLITION AND CONSTRUCTION ACTIVITIES. IF THE FIRE ALARM
AND/OR SPRINKLER SYSTEM IS REQUIRED TO BE DISABLED FOR ANY REASON,
THE CONTRACTOR SHALL PROVIDE A WRITTEN NOTICE TO DASNY AND THE
OPWDD FIELD REPRESENTATIVES SEVENTY-TWO (72) HOURS PRIOR TO
SHUTDOWN. SHOULD ANY DAMAGE TO THE FIRE ALARM AND SPRINKLER
SYSTEM OCCUR AS A RESULT OF DEMOLITION OR CONSTRUCTION ACTIVITIES,
THE DAMAGE TO THESE SYSTEMS SHALL BE REPAIRED IMMEDIATELY BY THE
CONTRACTOR AT NO EXPENSE TO THE OWNER.
OCCUPANCY: R-3, 2025 NYSBC 310.4.1
CONSTRUCTION CLASSIFICATION: VB
CODE COMPLIANCE: 2025 EXISTING BUILDING CODE
2025 NYS RESIDENTIAL BUILDING CODE
ALTERATION LEVEL: ALTERATION LEVEL 2, 95 SFT
TOTAL BUILDING SFT: APPROX. 5800 SFT
GENERAL NOTES
CODE INFORMATION
GENERAL CONSTRUCTION NOTES
1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS
PRIOR TO COMMENCING WORK. NOTIFY THE ARCHITECT OF ANY
DISCREPANCIES FROM THESE DOCUMENTS, OF CONDITIONS THAT REQUIRE
DEVIATIONS FROM THE DOCUMENTS, AND OF CONDITIONS THAT REQUIRE WORK
ADDITIONAL TO THE WORK IN THESE DOCUMENTS.
2. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING DAMAGE TO EXITING
MATERIALS THAT REMAIN WHEN THAT DAMAGE RESULTS FROM THE EXECUTION
OF THE WORK. THE CONTRACTOR SHALL PROVIDE RECORD PHOTOGRAPHS OF
PRE-EXISTING DAMAGE PRIOR TO COMMENCING WORK.
3. THE BUILDING WILL BE OCCUPIED CONTINUOUSLY DURING THE COURSE OF
WORK. SECURE AND PROTECT ALL AREAS, INTERIOR AND EXTERIOR, DURING
THE DURATION OF WORK. MAINTAIN EXITS AND FIRE SUPPRESSION SYSTEMS AT
ALL TIMES.
4. PHASE THE WORK AS REQUIRED FOR THE OWNER TO CONTINUE OPERATIONS.
5. WHERE EXISTING MATERIALS THAT REMAIN ARE PARTIALLY REMOVED FOR THE
PLACEMENT OF THE NEW WORK, THE CONTRACTOR SHALL PATCH THE
REMOVALS WITH MATERIALS MATCHING THE EXISTING MATERIALS IN MAKEUP
AND FINISH PLANE. EXTEND THE NEW FINISH OVER THE EXISTING MATERIALS TO
A NATURAL BREAK POINT OF THE SURFACE (E.G. PAINT FROM FLOOR TO
CEILING, PAINT FROM INSIDE CORNER OF WALL TO INSIDE CORNER OF WALL,
ETC.).
6. ALL COLOR SELECTIONS INCLUDING, BUT NOT LIMITED TO, AGGREGATE COLORS
TO BE MADE BY THE OWNER.
7. CONTRACTOR SHALL COMPLY WITH OPWDD SAFETY PLAN AND COORDINATE
ALL WORK WITH DASNY AND OPWDD FIELD STAFF.
A P
P R
O V
E D
C H
E C
K E
D B
Y
D R
A W
N B
Y
S C
A L E
P R
O
JE
C T I D
E N
T
IF
IC
A
T
IO
N N
O
D A
T E
N U
M B
E R
S H
E E
T
S H
E E
T T
IT
L E
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN
ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL AND NOTATION
"ALTERED BY" FOLLOWED BY A SIGNATURE AND THE DATE AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
P
T R
I O
T S
T
IL
L S
E R
V
IN
G
D E
S I G
N
C O
N S
U L
T I N
G
C
A N
A L V
IE
W
B L V
D S
U
IT
E
R O
C H
E S
T E
R N
Y
.4
.0
W
W .P
A T R
IO
T -D
C .C
O M
A s i n d ic a te d
B A
T H
R O
O M
R E
N O
V A
T
IO
N
C
O B
B L
E S
T O
N E
T E
R R
A C
E
N E
W A
R K
N
Y
C O
V E
R S
H E
E T
C S
A
P R
C R
B
K M
G
F S
W
O P
W D
C
M M
F L
LOCATION MAP
N
BATHROOM RENOVATION
106 COBBLESTONE TERRACE
NEWARK, NY 14513
620 WESTFALL ROAD
ROCHESTER, NY 14620
PROJECT LOCATION
SYMBOLS DRAWING LIST
A1 FLOOR PLANS AND ELEVATIONS
A2 DETAILS
A3 SPECIFICATIONS
ABBREVIATIONS
AB ANCHOR BOLT
AC AIR CONDITIONING
ACT ACOUSTIC TILE
ADJT ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AL ALUMINUM
ALUM ALUMINUM
ANOD ANODIZED
ARCH ARCHITECTURAL
BD BOARD
BLK BLOCK
BLKG BLOCKING
BO BOTTOM OF
BOT BOTTOM
BTM BOTTOM
CER CERAMIC
CIRC CIRCUMFERENCE
CJ CONTROL JOINT
CK CAULKING
CL CENTER LINE
^^C CENTER LINE
CLG CEILING
CLR CLEARANCE
CMT CERAMIC MOSAIC TILE
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
CONT CONTINUOUS
COL COLUMN
CONC CONCRETE
CPT CARPET
CT CERAMIC TILE
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DS DOWNSPOUT
DWG DRAWING
EA EACH
EB EXPANSION BOLT
HM HOLLOW METAL
HORIZ HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION
AIR CONDITIONING
HWH HOT WATER HEATER
ID INSIDE DIAMETER
INSUL INSULATION
INT INTERIOR
INV INVERT
JC JANITOR'S CLOSET
JT JOINT
JNT JOINT
L ANGLE
LAM LAMINATE
LAV LAVATORY
LBL LABEL
LT LIGHT
LTL LINTEL
LVR LOUVER
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MIN MINIMUM
MFR MANUFACTURER
MH MANHOLE
MO MASONRY OPENING
MTL METAL
NIC NOT IN CONTRACT
NTS NOT TO SCALE
O OVER
OC ON CENTER
OP OPAQUE
OPNG OPENING
OPP OPPOSITE
PCC PRE CAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PLF POUNDS PER LINEAR FOOT
PSF POUNDS PER SQUARE FOOT
PL PLATE
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PNL PANEL
PSF PER SQUARE FOOT
PT PAINT
PT PRESSURE TREATED
PTD PAINTED
PWD PLYWOOD
PLYWD PLYWOOD
QT QUARRY TILE
R RISER
RD ROOF DRAIN
REINF REINFORCING
REF REFER/REFERENCE
RES RESILIENT
RFG ROOFING
RFH ROOF HATCH
RL RAILING
RM ROOM
RO ROUGH OPENING
SC SOLID CORE
SCH SCHEDULE
SHTG SHEATHING
SIM SIMILAR
SNT SEALANT
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STR STRUCTURAL
SUSP SUSPENDED
SYS SYSTEM
EIFS EXTERIOR INSULATION
FINISHING SYSTEM
ELEC ELECTRICAL
EL ELEVATION
ELEV ELEVATION
ETC ETCETERA
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
EXTG EXISTING
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FFE FINISHED FLOOR ELEVATION
FLG FLASHING
FLR FLOOR
FLCO FLOOR CLEANOUT
FLUR FLUORESCENT
FND FOUNDATION
FOIC FURNISHED BY OWNER,
INSTALLED BY CONTRACTOR
FV FIELD VERIFY
FR FRAMING
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GL GLASS
GLZ GLAZING
GR GUARDRAIL
GYP GYPSUM
H HIGH
HB HOSE BIBB
HC HOLLOW CORE
HDR HEADER
HDWR HARDWARE
TD TRAVEL DISTANCE
TEL TELEPHONE
T TREAD
TO TOP OF
TOC TOP OF CONCRETE
TOP TOP OF PAVEMENT
TOS TOP OF STEEL
TYP TYPICAL
UNF UNFINISHED
UON UNLESS OTHERWISE NOTED
VB VAPOR BARRIER
VB VINYL BASE
VCT VINLYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VIN VINYL
VWC VINYL WALL COVERING
VT VINYL TILE
W/ WITH
W WIDE
WB WOOD BASE
WP WATERPROOFING
WD WOOD
WWF WELDED WIRE FABRIC
WT WALL TILE
KEY PLAN
NOT TO SCALE
AREA OF WORK
95 SFT
R E V
IS
IO
N
D A
T E
B Y
CAPITAL SERVICES
ACCEPTED FOR CONSTRUCTION
By: stroudjj 04/09/2026Date:
GFI
GFI
LEGEND
GFI
CONSTRUCTION KEYNOTE
GFCI WALL RECEPTACLE
LIGHT SWITCH
EXISTING SPRINKLER TO REMAIN
LIGHT FIXTURE
EXISTING DOOR TO REMAIN
TO BE REMOVED
EXISTING TO REMAIN
GRAB BAR KEYNOTE X
NEW FRAMING MEMBER
A1
BATHROOM
SLOPE
S L O
P E
SLOPE
S L O
P E
S L O
P E
SLOPE
SLOPE
1' - 5 3/4" 1' - 5 3/4"
3' - 6" 3' - 1" 2' - 0"
S H
O W
E R
A R
E A
CL
CLCL
CL
6"
24 4
LAV-1
CL
WC-1
SH-1
A
B
A
C
D D
*NOTE: COUNTER IS SHOWN AS TRANSPARENT TO
SHOW LOCATION OF ETR FLOOR DRAIN AND
ASSOCIATED FLOOR SLOPES
A
SHOWER AREA, PCT-2
4' - 0"
PCT-1
± 9' - 2"
11 12
6"
*NOTE: COUNTER IS SHOWN AS TRANSPARENT TO
SHOW LOCATION OF ETR FLOOR DRAIN AND
ASSOCIATED FLOOR SLOPES
UTILIZE
EXISTING
LIGHTING
POWER
CIRCUIT
NOTE: PROVIDE SEPARATE SINGLE
POLE SWITCH FOR EACH LIGHT
REMOVE LIGHT
FIXTURES AND
EXHAUST. SEE 1/A1
DEMO PLAN.
A
E Q
E Q
EQ EQ 2' - 0" 4' - 7" 2' - 0"
E Q
E Q
BB
S O
LI
D
S U
R
FA
C E
/2
FRAMED SOFFIT ASSEMBLY IN
PLANE OF EXISTING SOFFIT, PAINT.
22 13
A B
ALIGN
S O
LI
D
S U
R
FA
C E
A
S O
LI
D
S U
R
FA
C E
/2
CLEAR
3' - 0" 1"
S O
LI
D
S U
R
FA
C E
ALIGN
FRAMED SOFFIT ASSEMBLY IN
PLANE OF EXISTING SOFFIT, PAINT.
D
C
AB
WC-1
LAV-1
13 17
SH-1
2' - 6"
D
S O
LI
D
S U
R
FA
C E
/2
A
WC-1
LAV-1
D
25 24
C
A B A
SH-1
S O
LI
D
S U
R
FA
C E
60" x 30" CLEAR FLOOR
SPACE FOR SHOWER ENTRY
60" DIA. CLEAR TURN
AROUND SPACE
30" x 48" CLEAR
FLOOR SPACE, w 8"
KNEE CLEARANCE
59" x 60" CLEAR
FLOOR SPACE
60" CLR DEPTH
AT ENTRANCE
NEW OWNER-PROVIDED
SHOWER GURNEY SPACE,
ASSUME 32" X 72"
A P
P R
O V
E D
C H
E C
K E
D B
Y
D R
A W
N B
Y
S C
A L E
P R
O
JE
C T I D
E N
T
IF
IC
A
T
IO
N N
O
D A
T E
N U
M B
E R
S H
E E
T
S H
E E
T T
IT
L E
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN
ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL AND NOTATION
I O
T S
T
IL
L S
E R
V
IN
G
D E
S I G
N
C O
N S
U L
T I N
G
C
A N
A L V
IE
W
B L V
D S
U
IT
E
R O
C H
E S
T E
R N
Y
.4
.0
W .P
A T R
IO
T -D
C .C i n d ic a te d
B A
T H
R O
O M
R E
N O
V A
T
IO
N
C
O B
B L
E S
T O
N E
T E
R R
A C
E
N E
W A
R K
N
Y
F L O
O R
P L A
N S
A N
D E
L E
V A
T
IO
N S
A
A
P R
C R
B
K M
G
F S
W
O P
W D
C
M M
F L
1/2" = 1'-0"
FLOOR PLAN - NEW CONSTRCUTION
1/2" = 1'-0"
FLOOR PLAN/REFLECTED CEILING PLAN - DEMOLITION
1/2" = 1'-0"
REFLECTED CEILING PLAN
1/2" = 1'-0"
BATHROOM - SOUTH ELEVATION
1/2" = 1'-0"
BATHROOM - NORTH ELEVATION
1/2" = 1'-0"
BATHROOM - EAST ELEVATION
1/2" = 1'-0"
BATHROOM - WEST ELEVATION
1/2" = 1'-0"
FLOOR PLAN - ACCESSIBILITY CLEARANCE
NEW WORK KEYNOTES
10 NEW FLOOR TILE FINISH SYSTEM OVER ENTIRE BATHROOM FLOOR AREA AND SHOWER FLOOR AREA WITH ASSOCIATED 6" HIGH PORCELAIN TILE COVE BASE. BASIS OF DESIGN TO BE DALTILE "VOLUME 1.0" LINE WITH INTEGRAL "STEPWISE" SURFACE TREATMENT. SEE FLOOR PLANS FOR TILE FORMATS
AND SIZES.
11 PATCH AND REPAIR WALLS TO MATCH EXISTING FINISH/COLOR/TEXTURE.
12 5/8" GOLD BOND HI-ABUSE XP GYPSUM PANELS AS MANUFACTURED BY NATIONAL GYPSUM (OR
APPROVED EQUAL). PRIME AND PAINT ALL WALLS, CEILING AND SOFFIT.
13 1/4" THICK SOLID SURFACE WALL PANEL MATERIAL AS MANUFACTURED BY "WILSONART" (OR APPROVED EQUAL) ON ALL WALLS IN BATHROOM. WALL PANELS TO BE FULL HEIGHT OF WALL AT SHOWER, REFER TO ELEVATIONS FOR HEIGHT OF PANELS AT BALANCE OF LOCATIONS. SEE DETAILS
FOR MORE INFORMATION.
14 WATER CLOSET AND GRAB BARS. SEE PLUMBING FIXTURE SCHEDULE AND STANDARD ACCESSIBLE
MOUNTING HEIGHTS.
15 SOLID SURFACE VANITY 22" X 37" TOP ASSEMBLY WITH INTEGRAL BOWL. SEE PLUMBING FIXTURE SCHEDULE AND DETAILS. PROVIDE (2) ADA COMPLIANT SUPPORT BRACKETS, MODEL #EH-1818-LV
MANUFACTURED BY "RAKKS" (OR APPROVED EQUAL) PROVIDE SOLID IN-WALL BLOCKING AS
REQUIRED.
16 PLAM SINK BASE, REFER TO DETAILS.
17 PLASTIC LAMINATE WALL-MOUNTED CABINET, 30" W X 8" D X 30" H. BASIS OF DESIGN "DESIGN
HOUSE" WYNDHAM, WHITE.
18 FRAMED MIRROR MODEL #0535-2436 AS MANUFACTURED BY "AMERICAN SPECIALTIES" (OR
APPROVED EQUAL).
19 WALL-ANCHORED SHOWER CURTAIN ROD. PROVIDE IN-WALL BLOCKING.
20 TOILET PAPER HOLDER MODEL #7305-S AS MANUFACTURED BY "AMERICAN SPECIALTIES" (OR
APPROVED EQUAL. FINISH AS SELECTED BY OWNER.
21 MARBLE THRESHOLD. SEE DETAIL
22 PAINT EXISTING DOOR FRAME.
23 EXISTING CABINET UNIT HEATER TO REMAIN, CLEAN, REMOVE RUST, PRIME AND PAINT.
24 NEW HAND HELD SHOWER HEAD UNIT. SEE PLUMBING FIXTURE SCHEDULE. MOUNT CONTROLS AT 42"
AFF.
25 EXHAUST FAN. PROVIDE DUCTWORK TO FOLLOW EXISTING PATH TO ROOF. SEE DETAIL.
26 NEW LOCATION OF ELECTRICAL SWITCHES. SEE CEILING PLAN.PROVIDE COVER PLATE FOR PREVIOUS
SWITCH LOCATION.
27 GFCI ELECTRICAL RECEPTACLE.
DEMOLITION KEYNOTES
1 REMOVE EXISTING FLOOR FINISH AND ASSOCIATED BASE, GYPSUM WALL AND CEILING BOARD AND ASSOCIATED WALL TILE, TOILET, SINK, VANITY AND ALL ASSOCIATED PIPING WITHIN BATHROOM
SPACE. REMOVE ALL GRAB BARS AND MIRROR. REMOVE ALL SWITCHES, RECEPTACLES, AND
CONDUCTORS. REMOVE EXISTING CABINETRY.
2 REMOVE LIGHT FIXTURES AND EXHAUST FAN. REMOVE ASSOCIATED WIRING BACK TO SWITCHES.
3 REMOVE EXISTING DIFFUSER ONLY. SUPPLY DUCT TO REMAIN
4 EXISTING FLOOR DRAIN TO REMAIN, PROTECT DURING COURSE OF CONSTRUCTION.
5 REMOVE EXISTING SHOWERHEAD ASSEMBLY AND ASSOCIATED WING WALL. DHW AND DCW
UTILITIES TO BE RELOCATED FOR USE, REFER TO NEW WORK PLAN
6 EXISTING SPRINKLERS TO REMAIN. PROTECT FROM DUST. SPRINKLERS TO REMAIN FUNCTIONAL
THROUGHOUT CONSTRUCTION.
7 EXISTING SMOKE DETECTOR TO REMAIN. PROTECT DURING COURSE OF CONSTRUCTION.
8 REMOVE TOWEL HOOK.
9 SHOWER BED TO BE REMOVED BY OWNER.
R E V
IS
IO
N
D A
T E
B Y
CAPITAL SERVICES
WATER CLOSET
CL
7" MIN
9" MAX
36" MIN
42" MIN 12" MAX
M
IN 39" - 41"
1' - 6"
MIRROR
/2
COUNTER & SINK
8" MIN
17" MIN
M
A X
M
IN
M
IN
STANDARD ACCESSIBLE MOUNTING HEIGHTS
- 1
- 1
- 3
- 4
6" MAX
ACCESSIBLE SHOWER UNIT
M
IN
M A
X
M
IN
- 6
- 3
4" MAX
6" MAX
24" MIN
6" MAX
CL
- 3
15 3/4" H0LD
M
IN
PLUMBING FIXTURE SCHEDULE
DESIGNATION MANUFACTURER MODEL SPECIFICATION
WC-1 KOHLER CIMARRON
MODEL #K-3619
ONE PIECE WATER CLOSET, ELONGATED BOWL, 3" DIAMETER
FLUSH VALVE, 2-1/2" DIAMETER TRAP, VITREOUS CHINA, WHITE
OPERATING HANDLE ON THE LEFT SIDE (WHEN FACING TOILET).
INCLUDE TOILET SEAT AND ANGLE SUPPLY WITH STOP MODEL
K-76737 (OR APPROVED EQUAL).
WATER CLOSET SHALL BE 1.28 GPF MAXIMUM.
SOLID SURFACE VANITY TOP WITH INTEGRAL SINK. THREE 1-3/4"
DIAMETER DECK HOLES AT 2" O.C. COLOR AS SELECTED BY OWNER.
PROVIDE STAINLESS STEEL P-TRAP. REFER TO DETAIL FOR MORE
INFORMATION.
FAUCET - PIVOT ACTION LEVER STYLE SINGLE-HANDLE, METAL
CONSTRUCTION. FLOW LIMITED TO 1.5 GPM MAXIMUM AT 60 PSI,
METAL POP UP WASTE ASSEMBLY, "MOEN" CHATEAU MODEL L4621.
VT1B2237
37"W x 22"D
SWANSTONELAV-1
SH-1 KOHLER AWAKEN G110
MODEL #K-99242-G
MULTIFUNCTION HANDSHOWER, 24" SLIDEBAR W/ADJSTABLE
MOUNTING BRACKETS AND A 60" SMOOTH HOSE (OR APPROVED
EQUAL). FINISH AS SELECTED BY OWNER.
GRAB BAR SCHEDULE
DESIGNATION SIZE MODEL NOTES
A 3701-30P
3701-36PB
C
30" LONG x 1.25" DIA.
36" LONG x 1.25" DIA.
PEENED GRAB BAR
PEENED GRAB BAR
NOTES:
PROVIDE CONCEALED BLOCKING FOR ALL WALL MOUNTED GRAB BARS, CABINETRY, SHOWER CURTAIN RODS, AND ACCESSORIES.
PROVIDE ESCUTCHEON PLATES FOR ALL GRAB BARS TO HIDE FASTENERS.
GRAB BARS AS MANUFACTURED BY "AMERICAN SPECIALTIES" OR APPROVED EQUAL.
D
PEENED GRAB BAR, VERTICALLY MOUNTED18" LONG x 1.25" DIA. 3701-18P
PEENED SWING UP GRAB BAR3413-P30" LONG x 1.25" DIA.
LIGHT FIXTURE SCHEDULE
DESIGNATION MANUFACTURER MODEL SPECIFICATION
TYPE A AE50110DCLBROAN
TYPE B HLB6HALO
FLEX DC SERIES FAN LIGHT COMBINATION. SURFACE MOUNTED
LED. PROVIDE NEW RIGID EXHAUST DUCT TO ROOF. SEE DETAIL.
6" LED DISC LIGHT, SURFACE MOUNTED.
WALL BRACKETS, SEE NOTES
PLAM. ON 3/4" PT SUBSTRATE
APRON ON EXPOSED SIDE OF
VANITY, PROVIDE PT BLOCKING
BEHIND
PROVIDE CONCEALED BLOCKING
AS REQUIRED IN WALL
PLAM. ON 3/4" TREATED
PLYWOOD SUBSTRATE.
REMOVABLE PANEL SECURED
WITH Z-CLIPS MOUNTED TO
3"x3" CLEAT AT EACH END
3/4" SOLID SURFACE
INTEGRAL SINK / VANITY TOP
6" MAX.
8" MIN.
(9
M
IN
FIN. FLR.
PROVIDE ADDITIONAL
WALL CLEATS TO
SECURE VANITY TOP
AS REQUIRED
EXISTING WALL FRAMING
1/4" SOLID SURFACE PANELS SECURED TO
GYPSUM BOARD WITH FLEXIBLE PANEL ADHESIVE
1/8" EXPANSION GAP FILLED WITH SILICON
5/8" HI ABUSE XP GYPSUM PANELS SYSTEM IN
ENTIRE BATHROOM OVER EXISTING FRAMING
EXISTING WALL FRAMING
1/4" SOLID SURFACE PANELS SECURED TO GYPSUM
BOARD WITH FLEXIBLE PANEL ADHESIVE
1/8" EXPANSION GAP FILLED WITH SILICON
5/8" HI ABUSE XP GYPSUM PANELS SYSTEM IN
ENTIRE BATHROOM OVER EXISTING FRAMING
1/4" SOLID SURFACE PANELS SECURED TO GYPSUM
BOARD WITH FLEXIBLE PANEL ADHESIVE
SOLID BLOCKING IN WALL
5/8" HI ABUSE XP GYPSUM
WALL PANELS
GRAB BAR
SECURE GRAB BAR INTO STUDS
/ SOLID WOOD BLOCKING
SILICONE AT WALL FLANGES
1/4" SOLID SURFACE PANELS
EXISTING ASPHALT ROOF SHINGLE SYSTEM
CONNECT NEW EXHAUST FAN AND VENT. TIE
INTO EXISTING ROOF TERMINATION CAP.
FLASHING FLANGE
PROVIDE AND INSTALL NEW RIGID
DUCTWORK FROM EXHAUST FAN
TO EXISTING ROOF CAP
EXISTING CEILING FRAMING
5/8" HI ABUSE XP GYPSUM
PANELS AT CEILING
PRIMED AND PAINTED
1/8" EXPANSION GAP FILLED
WITH SILICONE
1/4" SOLID SURFACE PANELS
SECURED TO GYPSUM BOARD WITH
100% SILICONE ADHESIVE PER
MANUFACTURER RECOMMENDATIONS
5/8" HI ABUSE XP GYPSUM PANELS
SYSTEM OVER EXISTING FRAMING
1/8" EXPANSION GAP FILLED
WITH SILICON
CONT. SCHLUTER PROFILE
"RONDEC-DB" SATIN ANODIZED
ALUMINUM STRIP
6" PORCELAIN TILE COVE BASE
PORCELAIN TILE FLOORING,
REFER TO SPECS AND FLOOR
PLAN FOR FORMAT/EXTENTS
PROVIDE THINSET MORTAR
BED TO RECEIVE TILE
EXISTING SLAB ON
GRADE ASSEMBLY
EXISTING SLAB ON
GRADE ASSEMBLY
MARBLE THRESHOLD WITH SINGLE HOLLYWOOD BEVEL,
INSTALLED OVER THIN SET, COLOR SELECTED BY OWNER
/4
M A
X
/2
M A
X
EXISTING FINISH FLOOR & EXISTING SUBFLOOR
OUTSIDE OF BATHROOM TO REMAIN
NEW BATHROOM FLOORING, SEE FLOOR PLAN
1/2" MIN.
NOTE: VERIFY SLAB CONDITION AFTER
FASTENERS & ADHESIVES ARE REMOVED.
REPORT FINDINGS TO OWNER'S
REPRESENTATIVE & ENGINEER PRIOR TO
INSTALLING NEW FLOOR FINISH ASSEMBLY.
THINSET SLOPED TO EXISTING DRAIN
LOCATIONS
A P
P R
O V
E D
C H
E C
K E
D B
Y
D R
A W
N B
Y
S C
A L E
P R
O
JE
C T I D
E N
T
IF
IC
A
T
IO
N N
O
D A
T E
N U
M B
E R
S H
E E
T
S H
E E
T T
IT
L E
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN
ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL AND NOTATION
I O
T S
T
IL
L S
E R
V
IN
G
D E
S I G
N
C O
N S
U L
T I N
G
C
A N
A L V
IE
W
B L V
D S
U
IT
E
R O
C H
E S
T E
R N
Y
.4
.0
W .P
A T R
IO
T -D
C .C i n d ic a te d
B A
T H
R O
O M
R E
N O
V A
T
IO
N
C
O B
B L
E S
T O
N E
T E
R R
A C
E
N E
W A
R K
N
Y
D E
T A
IL
S
A
A
P R
C R
B
A W
M
F S
W
O P
W D
C
M M
F L
1 1/2" = 1'-0"
SINK BASE DETAIL
3" = 1'-0"
SOLID SURFACE WALL PANELS AT VERTICAL JOINT
3" = 1'-0"
TYPICAL INSIDE CORNER SOLID SURAFACE WALL PANELS
3" = 1'-0"
BLOCKING AT GRAB BAR
3" = 1'-0"
EXHAUST CAP AT ROOF
3" = 1'-0"
TYPICAL WALL SECTION
6" = 1'-0"
DOOR THRESHOLD
R E V
IS
IO
N
D A
T E
B Y
CAPITAL SERVICES
1.01 Project Overview
The Bathroom Renovation project consists of the following general scope
(refer to specifications and drawings for more detail):
1. Remove all existing finishes, fixtures, etc. down to existing wood framing as indicated on drawings.
2. Contractor is responsible to Field Measure all existing conditions and coordinate with new work.
3. Provide all new electrical wiring back to panel board for new bathroom lighting, fan, and receptacles.
4. Provide all new supply and sanitary waste piping within bathroom space.
1.02 General
1. General Contractor will perform the work. This is a NYS Public Works Project which requires a Prevailing Wage.
2. The General Contractor will work with and cooperate with OPWDD Project
Manager for the coordination and installation of the work described herein.
Contractor shall familiarize themselves with the work pertaining to each trade. Contractor shall verify existing conditions and measurements including demolition work. Contractor shall inspect all drawings and immediately report any discrepancies to the OPWDD Project Manager and Architect.
3. Prior to commencement of any Work, Contractor shall notify the OPWDD
Project Manager. Contractor shall keep the grounds clear of all debris, dust and any other hazardous conditions throughout the project each day. Take all necessary steps to keep all areas clean.
4. All General Construction, Electrical, Plumbing, and Mechanical Work shall be provided in accordance with New York State Building Code and all other agencies having jurisdiction.
5. Contractor shall review OPWDD requirements and coordinate work of their various trades for compliance. Contractor shall notify the OPWDD Project
Manager at each stage of completion of the project.
PROJECT DESCRIPTION
DALTILE "VOLUME 1.0" GLAZED PORCELAIN TILE
PART 1 GENERAL
1.1 SUMMARY
A. Section Includes:
1. Porcelain tile.
2. Stone thresholds.
3. Tile backing panels.
4. Metal edge strips.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Samples:
1. Each type and composition of tile and for each color and finish required.
2. Stone thresholds.
1.3 INFORMATIONAL SUBMITTALS
A. Qualification Data: For Installer.
SECTION 093013 - CERAMIC TILING
1.4 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials that match and are from same production runs as products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Tile and Trim Units: Furnish quantity of full-size units equal to 5 percent of amount installed for each type, composition, color, pattern, and size indicated.
A. 12” x 12” Field Tile
B. 6" X 6" Field Tile
C. 6” x 12” Cove Base
PART 1 GENERAL
1.03 Project Conditions
A. Existing Conditions: Do not disturb existing structures, construction, materials, or equipment unless required by the contract.
1. Do not cut, drill, or remove structural members such as joists, beams, and columns which support construction which is scheduled to remain unless expressly required by the Contract Documents.
2. Remove all demolished materials from the premises and dispose of on a daily basis.
B. Items to remain the property of OPWDD: The following items shall remain the property of OPWDD and shall be stored at the site where directed by the OPWDD project manager.
This includes excess wood trim and existing windows if requested.
Coordinate with OPWDD Project Manager.
1. Construction Work Contract. Remove and salvage existing building materials or other accessories as designated by OPWDD.
2. Store all items at a location as directed by OPWDD.
3. Properly dispose of all remaining scrap items and remove from the site each day.
4. Shower gurney.
PART 2 PRODUCTS
2.01 Materials
A. Match the appearance and performance of existing corresponding materials as closely as possible.
PART 3 EXECUTION
3.01 Examination
A. Prior to cutting, drilling, or removal investigate both sides of the surface involved with the Work. Determine the exact location of all structural members.
B. If unforeseen obstructions are encountered., take necessary precautions to prevent damage and obtain instruction from the
OPWDD Project Manager before proceeding with the Work.
3.02 Preparation
A. Prepare existing surfaces properly to receive, and where required, bond with the new Work.
3.03 Patching
A. Patch existing construction and finishes which are disturbed, damaged, or left incomplete due to alterations and removals.
Patching: except as otherwise indicated, shall be limited to the areas which have been cut or altered with this Work. Finish patched surfaces to match existing adjacent surfaces as closely as possible.
B. Perform patching around items in a manner which will maintain the water and fire resistance capabilities of the existing construction.
C. Paint patched areas and cover plates to match existing adjacent surfaces as closely as possible using the same type of paint. Painting, except as otherwise indicated, shall be limited to areas which have been patched.
D. Where surfaces exposed by removals are to remain as exposed surfaces, paint these areas to match existing surfaces as closely as possible using the same type of paint.
REMOVALS, CUTTING, AND PATCHING
SECTION 061053 - MISCELLANEOUS ROUGH CARPENTRY
PART 1 GENERAL
1.01 Related Documents
A. Drawings and general provisions of the Contract, including General and
Supplementary Conditions and Division 1 Specification Sections, apply to this Section.
1.02 Summary
A. This section includes the following:
1. Framing with dimension lumber.
2. Wood blocking with nailers.
3.5 INTERIOR CERAMIC TILE INSTALLATION SCHEDULE
A. Interior Floor Installations, Wood Subfloor:
1. Ceramic Tile Installation PCT-1: TCNA F144; thinset mortar over cementitious backer units or fiber-cement backer board.
a. Ceramic Tile Type: PCT-1, PCT-2
b. Thinset Mortar: Latex-modified cement mortar.
c. Grout: Water-cleanable epoxy grout.
B. Interior Wall Installation, Wood or Metal Studs or Furring:
1. Ceramic Tile Installation PCT-1: TCNA W243; thinset mortar on gypsum board.
A. Ceramic Tile Type: PCT-1, PCT-2
B. Thinset Mortar: Latex-modified cement mortar.
C. Grout: Water-cleanable epoxy grout.
END OF SECTION 093013
PART 3 - EXECUTION
2.5 SETTING MATERIALS
A. Portland Cement Mortar (Thickset) Installation Materials: ANSI A108.02.
B. Latex-Portland Cement Mortar (Thinset): ANSI A118.4.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following or comparable equivalent:
a. Boiardi Products Corporation; a QEP company; Elastiment Porcelain
Set.
b. Custom Building Products; VersaBond LFT.
c. MAPEI Corporation; Keraflex Plus.
d. North American Adhesives; NA 3785 Magna Flex Pro.
2. Provide prepackaged, dry-mortar mix combined with liquid-latex additive at project site.
3. For wall applications, provide non-sagging mortar.
2.6 GROUT MATERIALS
A. Water-Cleanable Epoxy Grout: ANSI A118.3.
1. Products: Subject to compliance with requirements, provide one of the following or comparable equivalent:
a. Boiardi Products Corporation; a QEP company; Elastiment 1026 Epoxy
Tile Grout.
b. Custom Building Products; CEG-Lite.
c. MAPEI Corporation; Kerapoxy CQ.
d. North American Adhesives; NA 4650 Ever Color Q.
2.7 MISCELLANEOUS MATERIALS
A. Trowelable Underlayments and Patching Compounds: Latex-modified, Portland cement-based formulation provided or approved by manufacturer of tile-setting materials for installations indicated.
1. Products: Subject to compliance with requirements, provide one of the following or comparable equivalent:
a. Ardex Engineered cements; Ardex MRF.
b. Custom Building Products; Skim Coat and Patch.
c. MAPEI Corp; Mapecem Quickpatch.
d. North American Adhesives; NA 600 Multi Patch.
B. Metal Transition Strips: Angle or L-shape or as otherwise indicated on drawings, height to match tile and setting-bed thickness, metallic or combination of metal and PVC or neoprene base, designed specifically for flooring or wall applications; anodized aluminum exposed-edge material.
1. Basis of Design: Schluter Systems “RONDEC-DB” decorative profile.
2. Products: Subject to compliance with requirements, provide products by one of the following:
a. Blanke Corporation.
b. Ceramic Tool Company, Inc.
c. Profilitec.
d. Schluter Systems L.P.
C. Grout Sealer: Manufacturer's standard product for sealing cement grout joints and that does not change color or appearance of grout.
1. Products: Subject to compliance with requirements, provide one of the following:
A. Boiardi Products Company; Elastiment 907 Penetrating Sealer.
B. Custom Building Products; Aqua Mix grout Sealer.
C. MAPEI Corp; Ultracare Grout Sealer.
2. Grout sealers shall comply with the testing and product requirements of the
California Department of Public Health's (formerly, the California Department of Health Services') "Standard Method for the Testing and Evaluation of Volatile
Organic Chemical Emissions from Indoor Sources Using Small-Scale
Environmental Chambers."
3.1 EXAMINATION
A. Examine substrates, areas, and conditions where tile will be installed, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.
1. Verify that substrates for setting tile are firm; dry; clean; free of coatings that are incompatible with tile-setting materials, including curing compounds and other substances that contain soap, wax, oil, or silicone; and comply with flatness tolerances required by ANSI A108.01 for installations indicated.
2. Verify that concrete substrates for tile floors installed with bonded mortar bed or thinset mortar comply with surface finish requirements in ANSI A108.01 for installations indicated.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Fill cracks, holes, and depressions in concrete substrates for tile floors installed with thinset mortar with trowelable leveling and patching compound specifically recommended by tile-setting material manufacturer.
B. Where indicated, prepare substrates to receive waterproofing by applying a reinforced mortar bed that complies with ANSI A108.1A and is sloped 1:50 (1/4 inch per foot) toward drains.
C. Blending: For tile exhibiting color variations, verify that tile has been factory blended and packaged so tile units taken from one package show same range of colors as those taken from other packages and match approved Samples. If not, factory blended, either return to manufacturer or blend tiles at Project site before installing.
3.3 CERAMIC TILE INSTALLATION
A. Comply with TCNA's "Handbook for Ceramic, Glass, and Stone Tile Installation" for TCNA installation methods specified in tile installation schedules. Comply with parts of the
ANSI A108 series "Specifications for Installation of Ceramic Tile" that are referenced in
TCNA installation methods, specified in tile installation schedules, and apply to types of setting and grouting materials used.
1. For the following installations, follow procedures in the ANSI A108 series of tile installation standards for providing 95 percent mortar coverage:
A. Tile floors in wet areas.
B. Tile floors consisting of tiles 200 by 200 mm (8 by 8 inches) or larger.
B. Extend tile work into recesses and under or behind equipment and fixtures to form complete covering without interruptions unless otherwise indicated. Terminate work neatly at obstructions, edges, and corners without disrupting pattern or joint alignments.
C. Accurately form intersections and returns. Perform cutting and drilling of tile without marring visible surfaces. Carefully grind cut edges of tile abutting trim, finish, or built-in items for straight aligned joints. Fit tile closely to electrical outlets, piping, fixtures, and other penetrations so plates, collars, or covers overlap tile.
D. Provide manufacturer's standard trim shapes where necessary to eliminate exposed tile edges.
E. Joint Pattern: Lay tile in grid pattern unless otherwise indicated. Lay out tile work and center tile fields in both directions in each space or on each wall area. Lay out tile work to minimize the use of pieces that are less than half of a tile. Provide uniform joint widths unless otherwise indicated.
F. Joint Widths: Unless otherwise indicated, install tile with the following joint widths:
1. Porcelain Tile: [6.4 mm (1/4 inch)] [9.5 mm (3/8 inch)].
G. Stone Thresholds: Install stone thresholds in same type of setting bed as adjacent floor unless otherwise indicated.
1. At locations where mortar bed (thickset) would otherwise be exposed above adjacent floor finishes, set thresholds in latex-portland cement mortar (thinset).
H. Metal Edge Strips: Install where exposed edge of tile meets wall finish that is not flush with tile.
PART 2 PRODUCTS
2.1 PRODUCTS, GENERAL
A. ANSI Ceramic Tile Standard: Provide Standard-grade tile that complies with ANSI A137.1 for types, compositions, and other characteristics indicated.
B. ANSI Standards for Tile Installation Materials: Provide materials complying with ANSI
A108.02, ANSI standards referenced in other Part 2 articles, ANSI standards referenced by TCNA installation methods specified in tile installation schedules, and other requirements specified.
2.2 TILE PRODUCTS
A. Ceramic Tile Type PCT-1: Glazed porcelain tile.
1. Basis-of-Design Product: Subject to compliance with requirements, provide
Daltile “Volume 1.0” Glazed Porcelain Tile with "Stepwise Technology."
2. Face Size: 12 inches by 12 inches
3. Face Size Variation: Rectified.
4. Thickness: 5/16 inch
5. Face: Plain with square edges.
6. Dynamic Coefficient of Friction: Not less than 0.6.
8. Tile Color, Glaze, and Pattern: As selected by Architect from manufacturer's full range.
9. Grout: sanded grout, seal coated.
10. Grout Color: As selected by Architect from manufacturer's full range.
11. Trim Units: Coordinated with sizes and coursing of adjoining flat tile where applicable and matching characteristics of adjoining flat tile. Provide shapes as follows, selected from manufacturer's standard shapes:
a. Cove Base: Cove base, 6” x 12.
B. Ceramic Tile Type PCT-2: Glazed porcelain tile.
1. Basis-of-Design Product: Subject to compliance with requirements, provide
Daltile “Volume 1.0” Glazed Porcelain Tile with "Stepwise Technology."
2. Face Size: 6 inches by 6 inches.
3. Face Size Variation: Rectified.
4. Thickness: 5/16 inch
5. Face: Plain with square edges.
6. Dynamic Coefficient of Friction: Not less than 0.6.
8. Tile Color, Glaze, and Pattern: As selected by Architect from manufacturer's full range.
9. Grout: sanded grout, seal coated.
10. Grout Color: As selected by Architect from manufacturer's full range.
11. Trim Units: Coordinated with sizes and coursing of adjoining flat tile where applicable and matching characteristics of adjoining flat tile. Provide shapes as follows, selected from manufacturer's standard shapes:
a. Cove Base: Cove base, 6” x 12.
2.3 THRESHOLDS
A. General: Fabricate to sizes and profiles indicated or required to provide transition between adjacent floor finishes.
1. Bevel edges at 1:2 slope, with lower edge of bevel aligned with or up to 1.5 mm (1/16 inch) above adjacent floor surface. Finish bevel to match top surface of threshold. Limit height of threshold to 12.7 mm (1/2 inch) or less above adjacent floor surface.
B. Marble Thresholds: ASTM C 503/C 503M, with a minimum abrasion resistance of 12 according to ASTM C 1353 or ASTM C 241/C 241M and with honed finish.
1. Description: Uniform, fine- to medium-grained white stone with gray veining.
2.4 TILE BACKING PANELS
A. Cementitious Backer Units: ANSI A118.9 or ASTM C 1325, Type A.
1. Products: Subject to compliance with requirements, provide one of the following:
a. C-Cure; C-Cure Board 990.
b. Custom Building Products; Wonderboard.
c. FinPan, Inc.; ProTEC Concrete Backer Board.
d. USG Corporation; DUROCK Cement Board.
2. Thickness: 15.9 mm (5/8 inch).
1.1 SUMMARY
A. Door hardware for swinging doors.
1.2 WARRANTY
A. Materials and Workmanship: Three years.
1.3 PRODUCTS
A. Thresholds: Single-beveled, marble.
B. Door Stop: Concave Solid Cast Wall Stop with Concealed fasteners, US26
END OF SECTION 087111
SECTION 087111 - DOOR HARDWARE
PART 2 PRODUCTS
A. General: Match existing construction. Verify and remove all damaged and rotten floor joists, floor sheathing and miscellaneous damaged items from designed work area. All building materials and debris shall be removed from the premises at the end of each work day.
B. Lumber
1. Framing Lumber: AWPA HEM-FIR #2 grade or better.
2. Dimensioning: As shown on drawings.
3. Piece in trim and wallboard in a craftsman like manner to match surrounding work.
SECTION 099123 - INTERIOR PAINTING
PART 1 GENERAL
1.01 Summary
A. Surface preparation and the application of paint systems on interior substrates.
PART 2 PRODUCTS
A. No VOC Paint Materials, paint walls equal to: Sherwin Williams
"Emerald" series. All interior painting shall be one coat primer, and two finish coats. Paint for trim frames to be semi-gloss finish. Allow two colors for bidding purposes (not including white for ceilings).
B. Ceilings
1. Primer shall be equal to Kilz 2 Interior Latex Primer.
2. Paint: Equal to Zinssner. "Perma-White" mold and mildew proof ceiling paint, semi-gloss finish. Color: White
C. Interior Gypsum Board Walls: Paint all new wallboard of the entire renovation area.
1. Finish: Semi-Gloss
2. Color: Sherwin Williams SW6365 "Cachet Creme."
D. Interior Trim and Doors:
1. Finish: Semi-Gloss
2. Color: White
E. Existing Metal Cabinet Heater: Prepare existing metal cabinet heater surfaces by removing corrosion, loose paint, and contaminants in accordance with SSPC-SP2/SP3 (hand/power tool cleaning).
1. Primer: shall be equal to Sherwin Williams "Pro Industrial Pro-
Cryl Universal" Acrylic Primer
2. Paint: moisture resistant, waterborne alkyd urethane enamel equal to Sherwin Williams "Pro Industrial Waterbased Alkyd
Urethane Enamel"
a. Finish: Semi-Gloss
b. Color: Selected by Owner
END OF SECTION 099123
SECTION 220000 - PLUMBING
PART 2 PRODUCTS
A. Water supply: Contractor option:
1. Water supply: Type-L Copper. Drainage system: Schedule 40
PVC. Make special provisions for connections to existing copper/cast iron connections and cast iron drain lines. Trap and vent all fixtures per Residential Building Code of NYS 2025 edition. Contractor's Plumber to include all accessories, mixing valves, and plumbing access doors.
B. Install new shower trim as noted. Shower and slide bar assembly
(including 30" mounting arm, shower head, escutcheon plate and metal hose): See schedule on A2.
C. Install new vanity and counter top with integral sink. See schedule on A2.
D. Provide hot and cold shut off valves at sink and at cold shut off at toilet. Valves equal to 1/2" X 3/8" - BrassCraft Compression Angle Stop
OCR19X C.
END SECTION 220000
SECTION 230000 - HVAC
PART 2 PRODUCTS
A. Remove existing ceiling fan. Install new Bathroom fan, Equal to: Broan. Model AE50110DCL or equal.
1. Smart Exhaust SE1 bath fan/light switch/ventilation controller, all functions to be wired on a single switch
a. Unit shall be field adjustable to 50/80/110 CFM. Set to 80
CFM unless otherwise noted.
b. Delayed timer.
c. Remove existing housing and install new unit. Connect to new rigid ductwork, extended to existing roof cap.
END SECTION 230000
SECTION 260000 - ELECTRICAL
PART 1 GENERAL
A. Install per Residential Code of NYS 2025 Edition.
B. Provide new convenience outlets shown on drawings.
C. Add GFCI at all outlets at bathroom noted. Outlets shall be wired to Arc fault circuit back to house panel.
D. All electrical feeders shall be #12 AWG min.
E. Light switches: Provide paddle type light switches. Switch shall be equal to Lutron "Claro" Paddle 15 amp light switch. Model #
CA-1PSH-LA. Plastic switch cover plates. Color: White.
PART 2 PRODUCTS
A. See schedule on A2.
PART 3 EXECUTION
A. Protect ceiling/wall mounted light fixtures/sprinkler heads and smoke detectors where noted in the bathroom DURING construction.
B. Hard-wired smoke detection system shall remain in place.
C. Electrical work for this project shall comply with the New York State
Residential Code 2025 Edition.
D. All new electrical runs for convenience outlets for the Project shall be on a GFCI and Arc-Fault circuit at main panel box.
END SECTION 260000
A P
P R
O V
E D
C H
E C
K E
D B
Y
D R
A W
N B
Y
S C
A L E
P R
O
JE
C T I D
E N
T
IF
IC
A
T
IO
N N
O
D A
T E
N U
M B
E R
S H
E E
T
S H
E E
T T
IT
L E
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN
ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL AND NOTATION
I O
T S
T
IL
L S
E R
V
IN
G
D E
S I G
N
C O
N S
U L
T I N
G
C
A N
A L V
IE
W
B L V
D S
U
IT
E
R O
C H
E S
T E
R N
Y
.4
.0
W .P
A T R
IO
T -D
C .C
'-0
B A
T H
R O
O M
R E
N O
V A
T
IO
N
C
O B
B L
E S
T O
N E
T E
R R
A C
E
N E
W A
R K
N
Y
S P
E C
IF
IC
A T
IO
N S
A
A
P R
C R
B
K M
G
F S
W
O P
W D
C
M M
F L
R E V
IS
IO
N
D A
T E
B Y
CAPITAL SERVICES
| Sheets |
| A1 - FLOOR PLANS AND ELEVATIONS |
| A2 - DETAILS |
| A3 - SPECIFICATIONS |
| CS - COVER SHEET |