This is an approved construction drawing and specification document for a bathroom renovation project at the East Main Individualized Residential Alternatives (IRA) facility located at 83 East Main Street, Clifton Springs, New York 14432, prepared for the Office for People with Developmental Disabilities (OPWDD) Finger Lakes Developmental Services Organization (DDSO). The project scope includes complete bathroom renovation with demolition of existing finishes down to wood framing, installation of new porcelain tile flooring (12" x 12" Daltile "Volume 1.0"), solid surface wall panels (Wilsonart or approved equal), new plumbing fixtures including a Kohler Cimarron water closet and Swanstone vanity with integral sink, electrical work including GFCI receptacles and new lighting, HVAC installation of a new Broan exhaust fan, and interior painting with Sherwin Williams products. The project includes detailed floor plans, elevations, sections, and specifications across multiple drawing sheets (A1-A3) with construction details for wall assemblies, grab bar installations, threshold transitions, and exhaust ductwork. A mandatory site visit is required on Wednesday, May 27, 2026 at 10:00 a.m., and vendors who do not attend or arrive late will be disqualified from bidding; bids will not be accepted before the site visit completion.

This is a New York State public works project requiring prevailing wage compliance. Bidders must provide valid New York State Department of Labor (NYSDOL) registration numbers and current Certificates of Registration at the time of bid submission, with the NYSDOL noting that registration applications may require approximately three to four weeks for review and issuance. Interested contractors should request an invitation for bid by referencing the project location and title on company letterhead and submitting current contact information via fax to 585-461-8811, Attention: Franchesca Sagen, or by email to FL.Purchasing@opwdd.ny.gov. The specifications require compliance with the New York State Building Code and Residential Building Code for all construction, electrical, plumbing, and mechanical work, with contractor responsibility for field measurement verification, daily debris removal, and coordination with the OPWDD Project Manager throughout the project duration.

View the file

Other files

File Type Posted
SOW.pdf PDF
RFQ.pdf PDF
CP-FL-H2471-20260326_Bathroom_Renovation__EAST_MAIN.pdf PDF
FLDDSO - 83 East Main Street -9-11-25.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVISION TAG

ELEVATION

DETAIL/SECTION

WINDOW TAG

WALL TAG

ROOM TAG

DOOR TAG

A

A101

W1

A

ROOM

101B

COLUMN GRID

CL

A101

INTERIOR ELEVATION 2

+2'-0"

AX.X

X

AREA OF WORK

A P

P R

O V

E D

C H

E C

K E

D B

Y

D R

A W

N B

Y

S C

A L E

P R

O

JE

C T I D

E N

T

IF

IC

A

T

IO

N N

O

D A

T E

N U

M B

E R

S H

E E

T

S H

E E

T T

IT

L E

IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN

ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL AND NOTATION

"ALTERED BY" FOLLOWED BY A SIGNATURE AND THE DATE AND A SPECIFIC DESCRIPTION OF THE ALTERATION.

P

T R

I O

T S

T

IL

L S

E R

V

IN

G

D E

S I G

N

C O

N S

U L

T I N

G

C

A N

A L V

IE

W

B L V

D S

U

IT

E

R O

C H

E S

T E

R N

Y

.4

.0

W

W .P

A T R

IO

T -D

C .C

O M

A s i n d ic a te d

B A

T H

R O

O M

R E

N O

V A

T

IO

N

E M

A

IN

S T

C L

IF

T O

N S

P R

IN

G

S

N Y

C O

V E

R S

H E

E T

C S

M A

R

C R

B

K M

G

F S

W

O P

W D

C

M M

F L

LOCATION MAP N

BATHROOM RENOVATION

83 E MAIN ST

CLIFTON SPRINGS, NY 14432

620 WESTFALL ROAD

ROCHESTER, NY 14620

PROJECT LOCATION

SYMBOLS

DRAWING LIST

A1 FLOOR PLANS AND ELEVATIONS

A2 DETAILS

A3 SPECIFICATIONS

ABBREVIATIONS

AB ANCHOR BOLT

AC AIR CONDITIONING

ACT ACOUSTIC TILE

ADJT ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AL ALUMINUM

ALUM ALUMINUM

ANOD ANODIZED

ARCH ARCHITECTURAL

BD BOARD

BLK BLOCK

BLKG BLOCKING

BO BOTTOM OF

BOT BOTTOM

BTM BOTTOM

CER CERAMIC

CIRC CIRCUMFERENCE

CJ CONTROL JOINT

CK CAULKING

CL CENTER LINE

^^C CENTER LINE

CLG CEILING

CLR CLEARANCE

CMT CERAMIC MOSAIC TILE

CMU CONCRETE MASONRY UNIT

CO CLEAN OUT

CONT CONTINUOUS

COL COLUMN

CONC CONCRETE

CPT CARPET

CT CERAMIC TILE

DF DRINKING FOUNTAIN

DIA DIAMETER

DIM DIMENSION

DS DOWNSPOUT

DWG DRAWING

EA EACH

EB EXPANSION BOLT

HM HOLLOW METAL

HORIZ HORIZONTAL

HT HEIGHT

HVAC HEATING/VENTILATION

AIR CONDITIONING

HWH HOT WATER HEATER

ID INSIDE DIAMETER

INSUL INSULATION

INT INTERIOR

INV INVERT

JC JANITOR'S CLOSET

JT JOINT

JNT JOINT

L ANGLE

LAM LAMINATE

LAV LAVATORY

LBL LABEL

LT LIGHT

LTL LINTEL

LVR LOUVER

MAX MAXIMUM

MECH MECHANICAL

MEMB MEMBRANE

MIN MINIMUM

MFR MANUFACTURER

MH MANHOLE

MO MASONRY OPENING

MTL METAL

NIC NOT IN CONTRACT

NTS NOT TO SCALE

O OVER

OC ON CENTER

OP OPAQUE

OPNG OPENING

OPP OPPOSITE

PCC PRE CAST CONCRETE

PCF POUNDS PER CUBIC FOOT

PLF POUNDS PER LINEAR FOOT

PSF POUNDS PER SQUARE FOOT

PL PLATE

PL PROPERTY LINE

PLAM PLASTIC LAMINATE

PNL PANEL

PSF PER SQUARE FOOT

PT PAINT

PT PRESSURE TREATED

PTD PAINTED

PWD PLYWOOD

PLYWD PLYWOOD

QT QUARRY TILE

R RISER

RD ROOF DRAIN

REINF REINFORCING

REF REFER/REFERENCE

RES RESILIENT

RFG ROOFING

RFH ROOF HATCH

RL RAILING

RM ROOM

RO ROUGH OPENING

SC SOLID CORE

SCH SCHEDULE

SHTG SHEATHING

SIM SIMILAR

SNT SEALANT

SS STAINLESS STEEL

STD STANDARD

STL STEEL

STR STRUCTURAL

SUSP SUSPENDED

SYS SYSTEM

EIFS EXTERIOR INSULATION

FINISHING SYSTEM

ELEC ELECTRICAL

EL ELEVATION

ELEV ELEVATION

ETC ETCETERA

ETR EXISTING TO REMAIN

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

EXTG EXISTING

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FFE FINISHED FLOOR ELEVATION

FLG FLASHING

FLR FLOOR

FLCO FLOOR CLEANOUT

FLUR FLUORESCENT

FND FOUNDATION

FOIC FURNISHED BY OWNER,

INSTALLED BY CONTRACTOR

FV FIELD VERIFY

FR FRAMING

FTG FOOTING

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GL GLASS

GLZ GLAZING

GR GUARDRAIL

GYP GYPSUM

H HIGH

HB HOSE BIBB

HC HOLLOW CORE

HDR HEADER

HDWR HARDWARE

TD TRAVEL DISTANCE

TEL TELEPHONE

T TREAD

TO TOP OF

TOC TOP OF CONCRETE

TOP TOP OF PAVEMENT

TOS TOP OF STEEL

TYP TYPICAL

UNF UNFINISHED

UON UNLESS OTHERWISE NOTED

VB VAPOR BARRIER

VB VINYL BASE

VCT VINLYL COMPOSITION TILE

VERT VERTICAL

VIF VERIFY IN FIELD

VIN VINYL

VWC VINYL WALL COVERING

VT VINYL TILE

W/ WITH

W WIDE

WB WOOD BASE

WP WATERPROOFING

WD WOOD

WWF WELDED WIRE FABRIC

WT WALL TILE

NOT TO SCALE

KEY PLAN

R E V

IS

IO

N

D A

T E

B Y

CAPITAL SERVICES

ACCEPTED FOR CONSTRUCTION

By: stroudjj 03/26/2026Date:

GFI

GFI GFI

LEGEND

GFI

CONSTRUCTION/DEMOLITION

KEYNOTE

GFCI WALL RECEPTACLE

LIGHT SWITCH

EXISTING SPRINKLER TO REMAIN

LIGHT FIXTURE

EXISTING DOOR TO REMAIN

TO BE REMOVED

EXISTING TO REMAIN

GRAB BAR KEYNOTE

NEW FRAMING MEMBER

EXHAUST FAN

A1

TOILET ROOM

WC-1

LAV-1

1' - 6" 3' - 6" 1' - 6 1/2"

5' - 0" 3' - 1"

CL

4 5

CL

V .I.

F

± 13' - 8" V.I.F.

10 1

M

A X

4"

*NOTE: TUB TO BE POSITIONED AT DESIGNATED

ACCESSIBLE LOCATION DURING USE

ABOVE

7 8

5' - 8"

CONNECT TO

EXISTING LIGHTING

POWER CIRCUIT

NOTE:

PROVIDE SEPARATE

SINGLE POLE SWITCH

FOR EACH LIGHT

REMOVE LIGHT FIXTURES

AND EXHAUST FAN. SEE

1/A1 DEMO PLAN.

B

A

/4

B

B

4' - 0" 5' - 8"

E Q

E Q

E Q

E Q

2' - 8"

SWITCH FOR

NIGHTLIGHT, SEE LIGHT

FIXTURE SCHEDULE

V .I.

F

CL

CL

C L

CLCL

CL

C L

3' - 10 3/4"

ETR SOFFIT

5' - 1 3/4"

S O

LI

D

S U

R

FA

C E

4' - 2"

S O

LI

D

S U

R

FA

C E

/2

3' - 0"

5' - 0 1/2"

CLEAR

3' - 0"

C

B A

24 D

S O

LI

D

S U

R

FA

C E

/2

WC-1

C

E

ALIGN

4"

ETR SOFFIT

± 5' - 1 3/4"

V.I.F.

± 4' - 7 1/2"

D

S O

LI

D

S U

R

FA

C E

/2

V.I.F.

3"

15" MAX.1' - 0"

NOTE: PER STANDARD MOUNTING HEIGHTS, BOTH REQ'D GRAB BARS WOULD

OVERLAP DUE TO TUB SEAT HEIGHT. ADD'L GRAB BAR PROVIDED 8" ABOVE

STANDARD GRAB BAR HEIGHT FOR CONVENIENCE.

WC-1

C

AB

S O

LI

D

S U

R

FA

C E

/2

30" x 48" CLEAR

FLOOR SPACE FOR

LAVATORY, 8" KNEE

SPACE

60" DIA. CLEAR

TURNING SPACE

59" x 60" CLEAR

FLOOR SPACE FOR

WATERCLOSET

5' - 0"

1' - 6"

5' - 0"

60" DEEP CLEAR FLOOR

SPACE FOR FRONT

APPROACH TO DOOR, 18"

CLEAR ON LATCH SIDE

1. ALL WORK IS TO CONFORM TO FEDERAL, STATE, AND LOCAL

CODES AS INTERPRETED BY THE AUTHORITY HAVING

JURISDICTION.

2. ALL DIMENSIONS OF GYPSUM BOARD AND METAL STUD

PARTITIONS SHOWN ARE DRAWN TO FINISH FACE OF WALL. ALL

DIMENSIONS OF MASONRY PARTITIONS AND MASONRY OPENINGS

ARE TO THE FACE OF MASONRY.

3. DIMENSIONS NOTED "CLEAR" ARE BETWEEN FINISHED FACES OF

WALL/MILLWORK AND ARE CRITICAL MINIMUM, HOLD DIMENSIONS.

4. KEYNOTE SYSTEM CONSISTING OF SYMBOL AND A NUMBER WITHIN

IS USED TO DEFINE DEMOLITION, CONSTRUCTION AND MATERIALS.

ALL SYMBOLS SHOWN MAY NOT APPEAR ON ALL DRAWINGS.

5. GENERAL CONTRACTOR TO PROVIDE WOOD OR SHEET METAL

BLOCKING FOR ANY AND ALL WALL MOUNTED ITEMS INCLUDING

BUT NOT LIMITED TO: MILLWORK AND CASEWORK, PLUMBING

ACCESSORIES, GRAB BARS AND MISCELLANEOUS ACCESSORIES.

6. MEANS OF EGRESS AND BUILDING SECURITY SHALL BE

MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT.

7. THE WORD “PROVIDE” SHALL MEAN THAT THE CONTRACTOR SHALL

SUPPLY ALL LABOR AND MATERIALS TO RESULT IN A COMPLETELY

FINISHED AND/OR OPERABLE SYSTEM.

GENERAL CONSTRUCTION NOTES

A P

P R

O V

E D

C H

E C

K E

D B

Y

D R

A W

N B

Y

S C

A L E

P R

O

JE

C T I D

E N

T

IF

IC

A

T

IO

N N

O

D A

T E

N U

M B

E R

S H

E E

T

S H

E E

T T

IT

L E

IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN

ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL AND NOTATION

I O

T S

T

IL

L S

E R

V

IN

G

D E

S I G

N

C O

N S

U L

T I N

G

C

A N

A L V

IE

W

B L V

D S

U

IT

E

R O

C H

E S

T E

R N

Y

.4

.0

W .P

A T R

IO

T -D

C .C i n d ic a te d

B A

T H

R O

O M

R E

N O

V A

T

IO

N

E M

A

IN

S T

C L

IF

T O

N S

P R

IN

G

S

N Y

F L O

O R

P L A

N S

A N

D E

L E

V A

T

IO

N S

A

M A

R

C R

B

K M

G

F S

W

O P

W D

C

M M

F L

1/2" = 1'-0"

FLOOR PLAN - NEW CONSTRCUTION

1/2" = 1'-0"

FLOOR PLAN/REFLECTED CEILING PLAN - DEMOLITION

1/2" = 1'-0"

REFLECTED CEILING PLAN

1/2" = 1'-0"

BATHROOM - SOUTH ELEVATION

1/2" = 1'-0"

BATHROOM - NORTH ELEVATION

1/2" = 1'-0"

BATHROOM - EAST ELEVATION

1/2" = 1'-0"

BATHROOM - WEST ELEVATION

1/2" = 1'-0"

FLOOR PLAN - NEW ACCESSIBILITY CLEARANCE

DEMOLITION KEYNOTES

1 REMOVE EXISTING FLOOR FINISH AND ASSOCIATED BASE, GYPSUM WALL BOARD, TOILET, SINK, VANITY AND ALL ASSOCIATED PIPING WITHIN BATHROOM SPACE. REMOVE ALL GRAB BARS AND

MIRROR. REMOVE ALL SWITCHES, RECEPTACLES, AND CONDUCTORS. REMOVE EXISTING

CABINETRY.

2 REMOVE LIGHT FIXTURES AND EXHAUST FAN. REMOVE ASSOCIATED WIRING BACK TO SWITCHES.

3 REMOVE EXISTING CEILING-MOUNTED HEATERS AND ASSOCIATED WIRING.

4 EXISTING FLOOR DRAIN TO REMAIN, PROTECT DURING COURSE OF CONSTRUCTION.

5 EXISTING DHW AND DCW SUPPLIES TO REMAIN.

6 EXISTING BATHTUB TO BE UNINSTALLED AND REINSTALLED BY GC. COORDINATE TEMPORARY

STORAGE LOCATION ON SITE WITH OWNER. CONTRACTOR TO PROVIDE ELECTRICAL RECEPTACLE

FOR TUB IN CONJUNCTION WITH REINSTALLATION, RECEPTACLE TO COMPLY WITH MANUFACTURER REQUIREMENTS AND ALL APPLICABLE CODES/AUTHORITIES HAVING JURISDICTION. COORDINATE

LOCATION OF RECEPTACLE WITH OWNER’S REPRESENTATIVE.

7 EXISTING FIRE ALARM TO REMAIN, PROTECT THROUGH COURSE OF CONSTRUCTION.

8 REMOVE THERMOSTAT CONTROLS. WIRING BETWEEN CEILING HEATERS AND THERMOSTAT TO BE

REMOVED. TERMINATE REMAINING WIRING AND PROVIDE JUNCTION BOX WITH COVER.

NEW WORK KEYNOTES

9 PROVIDE NEW FLOOR FINISH: DALTILE "VOLUME 1.0" PORCELAIN FLOOR TILE, 12" X 12" OVER (1)

LAYER CEMENTITIOUS BACKER BOARD. PREP PLYWOOD SUBFLOOR AS REQUIRED TO MEET

SPECIFICATION OF NEW FLOOR MATERIAL.

10 5/8" GOLD BOND HI-ABUSE XP GYPSUM PANELS AS MANUFACTURERED BY NATIONAL GYPSUM

(OR APPROVED EQUAL). PRIME AND PAINT ALL WALLS, CEILING AND SOFFIT

11 1/4" THICK SOLID SURFACE WALL PANEL MATERIAL AS MANUFACTURED BY "WILSONART" (OR

APPROVED EQUAL) ON ALL WALLS IN BATHROOM. SEE DETAILS FOR MORE INFORMATION.

12 WATER CLOSET AND GRAB BARS. SEE PLUMBING FIXTURE SCHEDULE AND STANDARD

ACCESSIBLE MOUNTING HEIGHTS

13 SOLID SURFACE VANITY TOP ASSEMBLY WITH INTEGRAL BOWL. SEE PLAN FOR DIMENSIONS, SEE

PLUMBING FIXTURE SCHEDULE AND DETAILS. PROVIDE (2) ADA COMPLIANT SUPPORT

BRACKETS, MODEL #EH-1818-LV MANUFACTURED BY "RAKKS" (OR APPROVED EQUAL) PROVIDE

SOLID IN WALL BLOCKING AS REQUIRED TO SUPPORT COUNTER AND ASSOCIATED CABINETRY.

14 PLASTIC LAMINATE WARDROBE CABINET WITH APPLIED TILE COVE BASE, 36" W X 12" D X 72" H.

TOE KICK TO BE 6” H X 3” D TO ACCOMMODATE TILE BASE. CABINET TO HAVE (4) ADJUSTABLE

SHELVES AND (2) HINGED DOORS.

15 NOT USED.

16 PLASTIC LAMINATE ADA ACCESSIBLE SINK APRON, 36" x 24" x 29". EXPOSED END PANELS TO BE

FINISHED TO MATCH CABINET FACE.

17 FRAMED MIRROR MODEL #0535-2436 AS MANUFACTURED BY "AMERICAN SPECIALTIES" (OR

APPROVED EQUAL).

18 EXISTING SOFFIT ASSEMBLY TO REMAIN, PAINT.

19 MARBLE THRESHOLD. SEE DETAIL

20 TOILET PAPER HOLDER MODEL #0710 AS MANUFACTURED BY "AMERICAN SPECIALTIES" (OR

APPROVED EQUAL). FINISH AS SELECTED BY OWNER

21 PAINT EXISTING DOOR FRAME.

22 PROVIDE DOOR STOP OVER SOLID SURFACE. MATCH EXISTING DOOR HARDWARE HEIGHT.

23 ELECTRICAL SWITCHES. SEE CEILING PLAN

24 PROVIDE GFCI ELECTRICAL RECEPTACLE.EXISTING WIRING TO BE REUSED.

26 EXHAUST FAN. PROVIDE DUCTWORK TO FOLLOW EXISTING PATH TO ROOF. SEE DETAIL.

27 EXISTING SPRINKLERS TO REMAIN. PROTECT FROM DUST AND DAMAGE DURING THE COURSE OF

CONSTRUCTION. SPRINKLERS TO REMAIN FUNCTIONAL THROUGHOUT CONSTRUCTION.

28 NIGHT LIGHT, SEE LIGHT FIXTURE SCHEDULE, TYPE "C".

R E V

IS

IO

N

D A

T E

B Y

NOT TO SCALE

EXISTING TUB W/ INTEGRAL GRAB BARS

CAPITAL SERVICES

WATER CLOSET

CL

7" MIN

9" MAX

36" MIN

42" MIN 12" MAX

M

IN 39" - 41"

1' - 6"

MIRROR

/2

COUNTER & SINK

8" MIN

17" MIN

M

A X

M

IN

M

IN

STANDARD ACCESSIBLE MOUNTING HEIGHTS

- 1

- 1

- 3

- 4

CL

- 3

15 3/4" H0LD

M

IN

15" MAX.

- 1

12" MAX.

- 3

"24" MIN.

MAX.

4"

BATHTUB W/ FIXED SEAT

PLUMBING FIXTURE SCHEDULE

DESIGNATION MANUFACTURER MODEL SPECIFICATION

WC-1 KOHLER CIMARRON

MODEL #K-3619

ONE PIECE WATER CLOSET, ELONGATED BOWL, 3" DIAMETER

FLUSH VALVE, 2-1/2" DIAMETER TRAP, VITREOUS CHINA, WHITE

OPERATING HANDLE ON THE LEFT SIDE (WHEN FACING TOILET).

INCLUDE TOILET SEAT AND ANGLE SUPPLY WITH STOP MODEL

K-76737 (OR APPROVED EQUAL).

WATER CLOSET SHALL BE 1.28 GPF MAXIMUM.

SOLID SURFACE VANITY TOP WITH INTEGRAL SINK. THREE 1-3/4"

DIAMETER DECK HOLES AT 2" O.C. COLOR AS SELECTED BY OWNER.

PROVIDE STAINLESS STEEL P-TRAP. REFER TO DETAIL FOR MORE

INFORMATION.

FAUCET - PIVOT ACTION LEVER STYLE SINGLE-HANDLE, METAL

CONSTRUCTION. FLOW LIMITED TO 1.5 GPM MAXIMUM AT 60 PSI,

METAL POP UP WASTE ASSEMBLY, "MOEN" CHATEAU MODEL L4621.

#VT1B2237

38" W X 22" D

SWANSTONELAV-1

GRAB BAR SCHEDULE

DESIGNATION SIZE MODEL NOTES

A 3701-36P

3701-42PB

C

36" LONG x 1.25" DIA.

42" LONG x 1.25" DIA.

PEENED GRAB BAR

PEENED GRAB BAR

NOTES:

PROVIDE CONCEALED BLOCKING FOR ALL WALL MOUNTED GRAB BARS AND ACCESSORIES.

PROVIDE ESCUTCHEON PLATES FOR ALL GRAB BARS TO HIDE FASTENERS.

GRAB BARS AS MANUFACTURED BY "AMERICAN SPECIALTIES" OR APPROVED EQUAL.

PEENED GRAB BAR, VERTICALLY MOUNTED18" LONG x 1.25" DIA. 3701-18P

E PEENED GRAB BAR24" LONG x 1.25" DIA. 3701-24P

D PEENED GRAB BAR, CENTER SUPPORT AS REQ'D BY MANUF.60" LONG x 1.25" DIA. 3802-60P

LIGHT FIXTURE SCHEDULE

DESIGNATION MANUFACTURER MODEL SPECIFICATION

TYPE A 50110DCLBROAN

TYPE B HLB6HALO

FLEX DC SERIES FAN LIGHT COMBINATION. SURFACE MOUNTED

LED. PROVIDED NEW RIGID EXHAUST DUCT TO ROOF. SEE DETAIL.

6" LED DISC LIGHT, SURFACE MOUNTED.

TYPE C HN610HEALTHCARE LIGHTING MVOLT LED AMB TR AM

WALL BRACKETS, SEE NOTES

PLAM. ON 3/4" PT SUBSTRATE

APRON ON EXPOSED SIDE OF

VANITY, PROVIDE PT BLOCKING

BEHIND

PROVIDE CONCEALED BLOCKING

AS REQUIRED IN WALL

PLAM. ON 3/4" TREATED

PLYWOOD SUBSTRATE.

REMOVABLE PANEL SECURED

WITH Z-CLIPS MOUNTED TO

3"x3" CLEAT AT EACH END

3/4" SOLID SURFACE

INTEGRAL SINK / VANITY TOP

6" MAX.

8" MIN.

(9

M

IN

FIN. FLR.

PROVIDE ADDITIONAL

WALL CLEATS TO

SECURE VANITY TOP

AS REQUIRED

EXISTING WALL FRAMING

1/4" SOLID SURFACE PANELS SECURED TO

GYPSUM BOARD WITH FLEXIBLE PANEL ADHESIVE

1/8" EXPANSION GAP FILLED WITH SILICONE

5/8" HI ABUSE XP GYPSUM PANELS SYSTEM IN

ENTIRE BATHROOM OVER EXISTING FRAMING

EXISTING WALL FRAMING

1/4" SOLID SURFACE PANELS SECURED TO GYPSUM

BOARD WITH FLEXIBLE PANEL ADHESIVE

1/8" EXPANSION GAP FILLED WITH SILICON

5/8" HI ABUSE XP GYPSUM PANELS SYSTEM IN

ENTIRE BATHROOM OVER EXISTING FRAMING

1/4" SOLID SURFACE PANELS SECURED TO GYPSUM

BOARD WITH FLEXIBLE PANEL ADHESIVE

SOLID BLOCKING IN WALL

5/8" HI ABUSE XP GYPSUM

WALL PANELS

GRAB BAR

SECURE GRAB BAR INTO

STUDS/SOLID WOOD BLOCKING

SILICONE AT WALL FLANGES

1/4" SOLID SURFACE PANELS

EXISTING ASPHALT ROOF SHINGLE SYSTEM

CONNECT NEW EXHAUST FAN AND VENT. TIE

INTO EXISTING ROOF TERMINATION CAP.

FLASHING FLANGE

PROVIDE AND INSTALL NEW RIGID

DUCTWORK FROM EXHAUST FAN

TO EXISTING ROOF CAP

EXISTING CEILING FRAMING

EXISTING FLOOR STRUCTURE

5/8" HI ABUSE XP GYPSUM

PANELS AT CEILING

PRIMED AND PAINTED

1/8" EXPANSION GAP FILLED

WITH SILICONE

1/4" SOLID SURFACE PANELS

SECURED TO GYPSUM BOARD WITH

100% SILICONE ADHESIVE PER

MANUFACTURER RECOMMENDATIONS

5/8" HI ABUSE XP GYPSUM PANELS

SYSTEM OVER EXISTING FRAMING

1/8" EXPANSION GAP FILLED

WITH SILICON

CONT. SCHLUTER PROFILE

"RONDEC-DB" SATIN ANODIZED

ALUMINUM STRIP

6" PORCELAIN TILE COVE BASE

12" X 12" PORCELAIN

TILE FLOORING

PROVIDE THINSET MORTAR

BED TO RECEIVE TILE

(1) LAYER 5/8" CEMENTITIOUS

BACKER BOARD

EXISTING SUBFLOOR. WHERE

REQUIRED, PROVIDE MARINE GRADE

PLYWOOD INFILL TO ACCOMMODATE

NEW FLOORING INSTALLATION

EXISTING FLOOR

STRUCTURE

MARBLE THRESHOLD WITH SINGLE HOLLYWOOD BEVEL,

INSTALLED OVER THIN SET, COLOR SELECTED BY OWNER

/4

M A

X

/2

M A

X

EXISTING FINISH FLOOR & EXISTING SUBFLOOR

OUTSIDE OF BATHROOM TO REMAIN

NEW BATHROOM FLOORING, SEE FLOOR PLAN

1/2" MIN.

EXISTING FLOOR STRUCTURE TO REMAIN.

MODIFY JOISTS AS REQUIRED TO

ACCOMMODATE DEPTH OF TILE AND

ASSOCIATED SLOPED MORTAR BED.

NOTE: VERIFY FRAMING SIZE & SPACING IN

FIELD AFTER SUBFLOOR, FASTENERS &

ADHESIVES ARE REMOVED. REPORT FINDINGS

TO OWNER'S REPRESENTATIVE & ENGINEER

PRIOR TO INSTALLING NEW FLOOR FINISH

ASSEMBLY.

(1) LAYER 5/8" THICK CEMENTITIOUS BACKER

BOARD

EXISTING SUBFLOOR. WHERE REQUIRED,

PROVIDE MARINE GRADE PLYWOOD INFILL TO

ACCOMMODATE NEW FLOORING INSTALLATION

A P

P R

O V

E D

C H

E C

K E

D B

Y

D R

A W

N B

Y

S C

A L E

P R

O

JE

C T I D

E N

T

IF

IC

A

T

IO

N N

O

D A

T E

N U

M B

E R

S H

E E

T

S H

E E

T T

IT

L E

IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN

ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL AND NOTATION

I O

T S

T

IL

L S

E R

V

IN

G

D E

S I G

N

C O

N S

U L

T I N

G

C

A N

A L V

IE

W

B L V

D S

U

IT

E

R O

C H

E S

T E

R N

Y

.4

.0

W .P

A T R

IO

T -D

C .C i n d ic a te d

B A

T H

R O

O M

R E

N O

V A

T

IO

N

E M

A

IN

S T

C L

IF

T O

N S

P R

IN

G

S

N Y

D E

T A

IL

S

A

M A

R

C R

B

K M

G

F S

W

O P

W D

C

M M

F L

1 1/2" = 1'-0"

SINK BASE DETAIL

3" = 1'-0"

SOLID SURFACE WALL PANELS AT VERTICAL JOINT

3" = 1'-0"

TYPICAL INSIDE CORNER SOLID SURAFACE WALL PANELS

3" = 1'-0"

BLOCKING AT GRAB BAR

3" = 1'-0"

EXHAUST CAP AT ROOF

3" = 1'-0"

TYPICAL WALL SECTION

6" = 1'-0"

DOOR THRESHOLD

R E V

IS

IO

N

D A

T E

B Y

CAPITAL SERVICES

1.01 Project Overview

The Bathroom Renovation project consists of the following general scope

(refer to specifications and drawings for more detail):

1. Remove all existing finishes, fixtures, etc. down to existing wood framing as indicated on drawings.

2. Contractor is responsible to Field Measure all existing conditions and coordinate with new work.

3. Provide all new electrical wiring back to panel board for new bathroom lighting, fan, and receptacles.

4. Provide all new supply and sanitary waste piping within bathroom space.

1.02 General

1. General Contractor will perform the work. This is a NYS Public Works Project which requires a Prevailing Wage.

2. The General Contractor will work with and cooperate with OPWDD Project

Manager for the coordination and installation of the work described herein.

Contractor shall familiarize themselves with the work pertaining to each trade. Contractor shall verify existing conditions and measurements including demolition work. Contractor shall inspect all drawings and immediately report any discrepancies to the OPWDD Project Manager and Architect.

3. Prior to commencement of any Work, Contractor shall notify the OPWDD

Project Manager. Contractor shall keep the grounds clear of all debris, dust and any other hazardous conditions throughout the project each day. Take all necessary steps to keep all areas clean.

4. All General Construction, Electrical, Plumbing, and Mechanical Work shall be provided in accordance with New York State Building Code and all other agencies having jurisdiction.

5. Contractor shall review OPWDD requirements and coordinate work of their various trades for compliance. Contractor shall notify the OPWDD Project

Manager at each stage of completion of the project.

PROJECT DESCRIPTION

DALTILE "VOLUME 1.0" GLAZED PORCELAIN TILE

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Porcelain tile.

2. Stone thresholds.

3. Tile backing panels.

4. Metal edge strips.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Samples:

1. Each type and composition of tile and for each color and finish required.

2. Stone thresholds.

1.3 INFORMATIONAL SUBMITTALS

A. Qualification Data: For Installer.

SECTION 093013 - CERAMIC TILING

1.4 MAINTENANCE MATERIAL SUBMITTALS

A. Furnish extra materials that match and are from same production runs as products installed and that are packaged with protective covering for storage and identified with labels describing contents.

1. Tile and Trim Units: Furnish quantity of full-size units equal to 5 percent of amount installed for each type, composition, color, pattern, and size indicated.

A. 12” x 12” Field Tile

B. 6” x 12” Cove Base

PART 1 GENERAL

1.03 Project Conditions

A. Existing Conditions: Do not disturb existing structures, construction, materials, or equipment unless required by the contract.

1. Do not cut, drill, or remove structural members such as joists, beams, and columns which support construction which is scheduled to remain unless expressly required by the Contract Documents.

2. Remove all demolished materials from the premises and dispose of on a daily basis.

B. Items to remain the property of OPWDD: The following items shall remain the property of OPWDD and shall be stored at the site where directed by the OPWDD project manager.

This includes excess wood trim and existing windows if requested.

Coordinate with OPWDD Project Manager.

1. Construction Work Contract. Remove and salvage existing building materials or other accessories as designated by OPWDD.

2. Store all items at a location as directed by OPWDD.

3. Properly dispose of all remaining scrap items and remove from the site each day.

PART 2 PRODUCTS

2.01 Materials

A. Match the appearance and performance of existing corresponding materials as closely as possible.

PART 3 EXECUTION

3.01 Examination

A. Prior to cutting, drilling, or removal investigate both sides of the surface involved with the Work. Determine the exact location of all structural members.

B. If unforeseen obstructions are encountered., take necessary precautions to prevent damage and obtain instruction from the

OPWDD Project Manager before proceeding with the Work.

3.02 Preparation

A. Prepare existing surfaces properly to receive, and where required, bond with the new Work.

3.03 Patching

A. Patch existing construction and finishes which are disturbed, damaged, or left incomplete due to alterations and removals.

Patching: except as otherwise indicated, shall be limited to the areas which have been cut or altered with this Work. Finish patched surfaces to match existing adjacent surfaces as closely as possible.

B. Perform patching around items in a manner which will maintain the water and fire resistance capabilities of the existing construction.

C. Paint patched areas and cover plates to match existing adjacent surfaces as closely as possible using the same type of paint. Painting, except as otherwise indicated, shall be limited to areas which have been patched.

D. Where surfaces exposed by removals are to remain as exposed surfaces, paint these areas to match existing surfaces as closely as possible using the same type of paint.

REMOVALS, CUTTING, AND PATCHING

SECTION 061053 - MISCELLANEOUS ROUGH CARPENTRY

PART 1 GENERAL

1.01 Related Documents

A. Drawings and general provisions of the Contract, including General and

Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.02 Summary

A. This section includes the following:

1. Framing with dimension lumber.

2. Wood blocking with nailers.

3.5 INTERIOR CERAMIC TILE INSTALLATION SCHEDULE

A. Interior Floor Installations, Wood Subfloor:

1. Ceramic Tile Installation PCT-1: TCNA F144; thinset mortar over cementitious backer units or fiber-cement backer board.

a. Ceramic Tile Type: PCT-1

b. Thinset Mortar: Latex-modified cement mortar.

c. Grout: Water-cleanable epoxy grout.

B. Interior Wall Installation, Wood or Metal Studs or Furring:

1. Ceramic Tile Installation PCT-1: TCNA W243; thinset mortar on gypsum board.

A. Ceramic Tile Type: PCT-1.

B. Thinset Mortar: Latex-modified cement mortar.

C. Grout: Water-cleanable epoxy grout.

END OF SECTION 093013

PART 3 - EXECUTION

2.5 SETTING MATERIALS

A. Portland Cement Mortar (Thickset) Installation Materials: ANSI A108.02.

B. Latex-Portland Cement Mortar (Thinset): ANSI A118.4.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following or comparable equivalent:

a. Boiardi Products Corporation; a QEP company; Elastiment Porcelain

Set.

b. Custom Building Products; VersaBond LFT.

c. MAPEI Corporation; Keraflex Plus.

d. North American Adhesives; NA 3785 Magna Flex Pro.

2. Provide prepackaged, dry-mortar mix combined with liquid-latex additive at project site.

3. For wall applications, provide non-sagging mortar.

2.6 GROUT MATERIALS

A. Water-Cleanable Epoxy Grout: ANSI A118.3.

1. Products: Subject to compliance with requirements, provide one of the following or comparable equivalent:

a. Boiardi Products Corporation; a QEP company; Elastiment 1026 Epoxy

Tile Grout.

b. Custom Building Products; CEG-Lite.

c. MAPEI Corporation; Kerapoxy CQ.

d. North American Adhesives; NA 4650 Ever Color Q.

2.7 MISCELLANEOUS MATERIALS

A. Trowelable Underlayments and Patching Compounds: Latex-modified, Portland cement-based formulation provided or approved by manufacturer of tile-setting materials for installations indicated.

1. Products: Subject to compliance with requirements, provide one of the following or comparable equivalent:

a. Ardex Engineered cements; Ardex MRF.

b. Custom Building Products; Skim Coat and Patch.

c. MAPEI Corp; Mapecem Quickpatch.

d. North American Adhesives; NA 600 Multi Patch.

B. Metal Transition Strips: Angle or L-shape or as otherwise indicated on drawings, height to match tile and setting-bed thickness, metallic or combination of metal and PVC or neoprene base, designed specifically for flooring or wall applications; anodized aluminum exposed-edge material.

1. Basis of Design: Schluter Systems “RONDEC-DB” decorative profile.

2. Products: Subject to compliance with requirements, provide products by one of the following:

a. Blanke Corporation.

b. Ceramic Tool Company, Inc.

c. Profilitec.

d. Schluter Systems L.P.

C. Grout Sealer: Manufacturer's standard product for sealing cement grout joints and that does not change color or appearance of grout.

1. Products: Subject to compliance with requirements, provide one of the following:

A. Boiardi Products Company; Elastiment 907 Penetrating Sealer.

B. Custom Building Products; Aqua Mix grout Sealer.

C. MAPEI Corp; Ultracare Grout Sealer.

2. Grout sealers shall comply with the testing and product requirements of the

California Department of Public Health's (formerly, the California Department of Health Services') "Standard Method for the Testing and Evaluation of Volatile

Organic Chemical Emissions from Indoor Sources Using Small-Scale

Environmental Chambers."

3.1 EXAMINATION

A. Examine substrates, areas, and conditions where tile will be installed, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.

1. Verify that substrates for setting tile are firm; dry; clean; free of coatings that are incompatible with tile-setting materials, including curing compounds and other substances that contain soap, wax, oil, or silicone; and comply with flatness tolerances required by ANSI A108.01 for installations indicated.

2. Verify that concrete substrates for tile floors installed with bonded mortar bed or thinset mortar comply with surface finish requirements in ANSI A108.01 for installations indicated.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Fill cracks, holes, and depressions in concrete substrates for tile floors installed with thinset mortar with trowelable leveling and patching compound specifically recommended by tile-setting material manufacturer.

B. Where indicated, prepare substrates to receive waterproofing by applying a reinforced mortar bed that complies with ANSI A108.1A and is sloped 1:50 (1/4 inch per foot) toward drains.

C. Blending: For tile exhibiting color variations, verify that tile has been factory blended and packaged so tile units taken from one package show same range of colors as those taken from other packages and match approved Samples. If not, factory blended, either return to manufacturer or blend tiles at Project site before installing.

3.3 CERAMIC TILE INSTALLATION

A. Comply with TCNA's "Handbook for Ceramic, Glass, and Stone Tile Installation" for TCNA installation methods specified in tile installation schedules. Comply with parts of the

ANSI A108 series "Specifications for Installation of Ceramic Tile" that are referenced in

TCNA installation methods, specified in tile installation schedules, and apply to types of setting and grouting materials used.

1. For the following installations, follow procedures in the ANSI A108 series of tile installation standards for providing 95 percent mortar coverage:

A. Tile floors in wet areas.

B. Tile floors consisting of tiles 200 by 200 mm (8 by 8 inches) or larger.

B. Extend tile work into recesses and under or behind equipment and fixtures to form complete covering without interruptions unless otherwise indicated. Terminate work neatly at obstructions, edges, and corners without disrupting pattern or joint alignments.

C. Accurately form intersections and returns. Perform cutting and drilling of tile without marring visible surfaces. Carefully grind cut edges of tile abutting trim, finish, or built-in items for straight aligned joints. Fit tile closely to electrical outlets, piping, fixtures, and other penetrations so plates, collars, or covers overlap tile.

D. Provide manufacturer's standard trim shapes where necessary to eliminate exposed tile edges.

E. Joint Pattern: Lay tile in grid pattern unless otherwise indicated. Lay out tile work and center tile fields in both directions in each space or on each wall area. Lay out tile work to minimize the use of pieces that are less than half of a tile. Provide uniform joint widths unless otherwise indicated.

F. Joint Widths: Unless otherwise indicated, install tile with the following joint widths:

1. Porcelain Tile: [6.4 mm (1/4 inch)] [9.5 mm (3/8 inch)].

G. Stone Thresholds: Install stone thresholds in same type of setting bed as adjacent floor unless otherwise indicated.

1. At locations where mortar bed (thickset) would otherwise be exposed above adjacent floor finishes, set thresholds in latex-portland cement mortar (thinset).

H. Metal Edge Strips: Install where exposed edge of tile meets wall finish that is not flush with tile.

PART 2 PRODUCTS

2.1 PRODUCTS, GENERAL

A. ANSI Ceramic Tile Standard: Provide Standard-grade tile that complies with ANSI A137.1 for types, compositions, and other characteristics indicated.

B. ANSI Standards for Tile Installation Materials: Provide materials complying with ANSI

A108.02, ANSI standards referenced in other Part 2 articles, ANSI standards referenced by TCNA installation methods specified in tile installation schedules, and other requirements specified.

2.2 TILE PRODUCTS

A. Ceramic Tile Type PCT-1: Glazed porcelain tile.

1. Basis-of-Design Product: Subject to compliance with requirements, provide

Daltile “Volume 1.0” Glazed Porcelain Tile with "Stepwise Technology."

2. Face Size: 12 inches by 12 inches

3. Face Size Variation: Rectified.

4. Thickness: 5/16 inch

5. Face: Plain with square edges.

6. Dynamic Coefficient of Friction: Not less than 0.6.

8. Tile Color, Glaze, and Pattern: As selected by Architect from manufacturer's full range.

9. Grout: sanded grout, seal coated.

10. Grout Color: As selected by Architect from manufacturer's full range.

11. Trim Units: Coordinated with sizes and coursing of adjoining flat tile where applicable and matching characteristics of adjoining flat tile. Provide shapes as follows, selected from manufacturer's standard shapes:

a. Cove Base: Cove base, 6” x 12.

2.3 THRESHOLDS

A. General: Fabricate to sizes and profiles indicated or required to provide transition between adjacent floor finishes.

1. Bevel edges at 1:2 slope, with lower edge of bevel aligned with or up to 1.5 mm (1/16 inch) above adjacent floor surface. Finish bevel to match top surface of threshold. Limit height of threshold to 12.7 mm (1/2 inch) or less above adjacent floor surface.

B. Marble Thresholds: ASTM C 503/C 503M, with a minimum abrasion resistance of 12 according to ASTM C 1353 or ASTM C 241/C 241M and with honed finish.

1. Description: Uniform, fine- to medium-grained white stone with gray veining.

2.4 TILE BACKING PANELS

A. Cementitious Backer Units: ANSI A118.9 or ASTM C 1325, Type A.

1. Products: Subject to compliance with requirements, provide one of the following:

a. C-Cure; C-Cure Board 990.

b. Custom Building Products; Wonderboard.

c. FinPan, Inc.; ProTEC Concrete Backer Board.

d. USG Corporation; DUROCK Cement Board.

2. Thickness: 15.9 mm (5/8 inch).

1.1 SUMMARY

A. Door hardware for swinging doors.

1.2 WARRANTY

A. Materials and Workmanship: Three years.

1.3 PRODUCTS

A. Thresholds: Single-beveled, marble.

B. Door Stop: Concave Solid Cast Wall Stop with Concealed fasteners, US26

END OF SECTION 087111

SECTION 087111 - DOOR HARDWARE

PART 2 PRODUCTS

A. General: Match existing construction. Verify and remove all damaged and rotten floor joists, floor sheathing and miscellaneous damaged items from designed work area. All building materials and debris shall be removed from the premises at the end of each work day.

B. Lumber

1. Framing Lumber: AWPA HEM-FIR #2 grade or better.

2. Dimensioning: As shown on drawings.

3. Piece in trim and wallboard in a craftsman like manner to match surrounding work.

SECTION 099123 - INTERIOR PAINTING

PART 1 GENERAL

1.01 Summary

A. Surface preparation and the application of paint systems on interior substrates.

PART 2 PRODUCTS

A. No VOC Paint Materials, paint walls equal to: Sherwin Wiliams

"Emerald" series. All interior painting shall be one coat primer, and two finish coats. Paint for trim frames to be semi-gloss finish. Allow two colors for bidding purposes (not including white for ceilings).

B. Ceiling primer paint: Primer shall be equal to Kilz 2 Interior Latex

Primer.

Ceiling Paint: Equal to Zinssner. "Perma-White" mold and mildew proof ceiling paint. semi-gloss finish. Color: White.

C. Interior gypsum board walls: Semi-gloss finish one base coat and two finish coats. Allow two colors in base bid.

1. Sherwin Williams color SW6365 "Cachet Crème".

2. Paint all new wallboard of the entire renovation area.

D. Interior trim and doors: Acrylic semi-gloss paint. Color white.

END OF SECTION 099123

SECTION 220000 - PLUMBING

PART 2 PRODUCTS

A. Water supply: Contractor option:

1. Water supply: Type L Copper. Drainage system: Schedule 40

PVC. Make special provisions for connections to existing copper/cast iron connections and cast iron drain lines. Trap and vent all fixtures per Residential Building Code of NYS 2020 edition. Contractor's Plumber to include all accessories, mixing valves, and plumbing access doors.

B. Install new vanity and counter top with integral sink. See schedule on A2.

C. Provide hot and cold shut off valves at sink and at cold shut off at toilet. Valves equal to 1/2" X 3/8" - BrassCraft Compression Angle Stop

OCR19X C.

END OF SECTION 220000

SECTION 230000 - HVAC

PART 2 PRODUCTS

A. Remove existing ceiling fan. Install new Bathroom fan, Equal to: Broan. Model A70L or equal.

1. Smart Exhaust SE1 bath fan/light switch/ventilation controller, all functions to be wired on single switch

a. 80 CFM

b. Delayed timer.

c. Remove existing housing and install new unit. Connect to existing ductwork.

d. Install separate manufacturer's standard timer wall plate switch.

END OF SECTION 230000

SECTION 260000 - ELECTRICAL

PART 1 GENERAL

A. Install per Residential Code of NYS 2025 Edition.

B. Provide new convenience outlets shown on drawings.

C. Add GFCI at all outlets at bathroom noted. Outlets shall be wired to Arc fault circuit back to house panel.

D. All electrical feeders shall be #12 AWG min.

E. Light switches: Provide paddle type light switches. Switch shall be equal to Lutron "Claro" Paddle 15 amp light switch. Model #

CA-1PSH-LA. Plastic switch cover plates. Color: White.

PART 2 PRODUCTS

A. See schedule on A2.

PART 3 EXECUTION

A. Protect ceiling/wall mounted light fixtures/sprinkler heads and smoke detectors where noted in the bathroom DURING construction.

B. Hard-wired smoke detection system shall remain in place.

C. Electrical work for this project shall comply with the New York State

Residential Code 2025 Edition.

D. All new electrical runs for convenience outlets for the Project shall be on a GFCI and Arc-Fault circuit at main panel box.

END OF SECTION 260000

A P

P R

O V

E D

C H

E C

K E

D B

Y

D R

A W

N B

Y

S C

A L E

P R

O

JE

C T I D

E N

T

IF

IC

A

T

IO

N N

O

D A

T E

N U

M B

E R

S H

E E

T

S H

E E

T T

IT

L E

IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN

ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL AND NOTATION

I O

T S

T

IL

L S

E R

V

IN

G

D E

S I G

N

C O

N S

U L

T I N

G

C

A N

A L V

IE

W

B L V

D S

U

IT

E

R O

C H

E S

T E

R N

Y

.4

.0

W .P

A T R

IO

T -D

C .C

'-0

B A

T H

R O

O M

R E

N O

V A

T

IO

N

E M

A

IN

S T

C L

IF

T O

N S

P R

IN

G

S

N Y

S P

E C

IF

IC

A T

IO

N S

A

M A

R

C R

B

K M

G

F S

W

O P

W D

C

M M

F L

R E V

IS

IO

N

D A

T E

B Y

CAPITAL SERVICES

Sheets
A1 - FLOOR PLANS AND ELEVATIONS
A2 - DETAILS
A3 - SPECIFICATIONS
CS - COVER SHEET

File details come from the government source that posted it. Updated .