APPROVED APRIL 17 2025_MARAD_RRF_VAM_JOFOC_693JF721D000007_Final.pdf
PDF 386 KB Posted
- Solicitation number
- 693JF721D000007
About this file
This document is a Justification for Other than Full and Open Competition (JOFOC) from the U.S. Department of Transportation Maritime Administration. The document seeks to modify contract 693JF721D000007 with Crowley Government Services, Inc. (CGS) to increase the maximum contract ceiling by $400M from $638M to $1,038M for Vessel Acquisition Management (VAM) services supporting the Ready Reserve Force (RRF) Recapitalization program. The contract, originally awarded on July 2, 2021, supports the Department of Defense's strategic sealift recapitalization program and involves vessel acquisition, surveys, business case analysis, reflagging, outfitting, upgrading, and repairing vessels.
The justification argues that recompeting the contract would result in unacceptable delays and substantial additional costs, estimated at approximately $100M. The modification is necessary due to external cost drivers including increased ship acquisition costs, regulatory compliance changes, and operational schedule impacts. The contract is fully funded by the Navy Program through a reimbursable agreement and covers the acquisition of specific vessels with planned delivery dates between May 2025 and December 2025, including Cape Arundel, Cape Cortes, Cape San Juan, Cape Starr, Cape Sable, Cape San Roman, and Cape Suarez Point.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Transportation
Maritime Administration
Justification for Other than Full and Open Competition
1. Identification of the agency and the contracting activity.
U.S. Department of Transportation (USDOT), Maritime Administration (MARAD), Office of Acquisition Management (OAM), 1200 New Jersey Avenue, SE, Washington, DC 20590.
2. Nature and/or description of the action being approved.
MARAD intends to modify the Vessel Acquisition Management (VAM), Ready Reserve
Force (RRF) Recapitalization contract 693JF721D000007 to increase the maximum contract ceiling to complete the work required from Crowley Government Services, Inc
(CGS).
3. Description of the supplies or services required to meet the agency’s needs
(including the estimated value).
46 U.S.C. § 57100(a) requires the Secretary of Transportation to maintain a National
Defense Reserve Fleet (NDRF). The RRF is a subset of vessels within MARAD’s NDRF.
The RRF is supported by the Department of Defense (DoD), Navy’s strategic sealift recapitalization program to address the expanding logistical gap needed to address the nation’s mission objectives.
Contract 693JF721D000007 was awarded to Crowley Government Services, Inc. (CGS) on July 2, 2021, for the VAM services for the Recapitalization of the RRF to fulfill DoD sealift requirements. The contract scope includes the acquisition of vessels; surveys and business cases analysis; reflagging and outfitting of each acquired vessel; and the upgrade and repairs of vessels.
Challenges due to vessel conditions and used-ship market impacts increased the overall contract estimate. A modification is required to increase the contract ceiling by $400M from $638M to $1,038M.
4. Statutory authority permitting other than full and open competition.
41 U.S.C. § 3304(a)(1) and FAR 6.302-1, only one responsible source and no other supplies or services will satisfy agency requirements, permits MARAD to use other than competitive procedures for this activity.
5. Demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the authority cited.
CGS has satisfactorily performed under the RRF Recapitalization contract since its award in 2021, however external cost drivers impacted the total amount needed to complete the work. Factors such as- (a) cost of acquired ships, (b) changes in regulatory framework for compliance, and (c) increased operational cost (due to schedule), has impacted the total amount to complete this contract. An increase in the contract ceiling is required to complete the contract. MARAD and CGS have both made significant investments in this contract that recompeting the requirement would not result in recoverable savings for the
Government.
CGS has completed assessment and inspection of the acquired vessels; identified the efforts required to reflag the vessels; negotiated lay berth; and secured qualified repairment to complete the work. It is not typical in the industry, for one vessel management company to use the assessment and inspection completed by another company. A new contractor would result in having to re-do work already accomplished by CGS.
In addition to the duplicative work, transitioning the contract will also result in other additional cost. Other costs anticipated with a recompete include the cost to transition/handover work to the new contractor, cost to shutdown the current contractor operation, and cost for the new contractor to ramp-up operation for reflagging. The government estimates the cost to transition at $100M1. This is in addition to the needed increased ceiling value from this action.
Lastly, a recompete will result in unacceptable delay. These ships are scheduled for delivery as specified below to support sealift capacity. The longer the gap to delivery, the more the nation would be at national security risk.
• Cape Arundel September 2025
• Cape Cortes June 2026
• Cape San Juan May 2025
• Cape Starr June 2025
• Cape Sable August 2025
• Cape San Roman November 2025
• Cape Suarez Point December 2025
Based on the above findings, no other contractor will be able to meet MARAD’s needs without an unacceptable delay in delivery and a substantial duplication of cost and resources that are unlikely to be recovered through competition. Therefore it is in the best interest of the Government to increase the ceiling maximum of contract
693JF721D000007.
1 Without a ceiling increase, ship crews will depart and vessels will be placed in lay-up status. Restarting operations would incur estimated restoral and certification costs of $42M, subcontract re-competition costs of $24.5M, additional crew costs of $25.2M, and layberth expenses of
$9M—totaling approximately $100.7M in added costs and delays.
6. Description of efforts made to ensure that offers are solicited from as many potential sources as is practicable, including whether a notice was or will be publicized.
In accordance with FAR subpart 6.305, “Availability of the justification,” this justification shall be publicly available within 14 days after processing the contract action.
7. Determination that the anticipated cost to the Government will be fair and reasonable.
The proposed action will increase the contract ceiling. Cost/price evaluations are done at individual task order level. MARAD will evaluate each order under this contract for fair and reasonableness.
8. Description of the market research conducted and the results or a statement of the reason market research was not conducted.
MARAD conducted extensive market research during the pre-award phase. Market research included (a) issuing sources-sought announcement; (b) contacting knowledgeable individuals in Government and the maritime industry (i.e., Naval Sea
Systems Command, Military Sealift Command, various Ready Reserve Force Ship
Managers (Companies), and Maritime Security Program companies; (c) publishing three
Requests for Information; and (d) hosting two industry days. Additional market research to support this JOFOC was not conducted since the cost of awarding a new contract vehicle would not result in cost or time savings.
9. Other facts supporting the use of other than full and open competition.
The contract is funded 100% by the Navy Program through reimbursable agreement and is fully funded through the FY25 Future Years Defense Plan (FY25-FY29).
10. A listing of the sources, if any, that expressed, in writing, an interest in the acquisition.
Not applicable.
11. Statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required.
Based on the above, the Government does not foresee a feasible alternative to the action proposed on this documentation.
12. Certification.
I certify that the information provided in this justification is complete and accurate to the best of my knowledge and belief.
I certify that the information provided in this justification is complete and accurate to the best of my knowledge and belief.
CERTIFICATION (Certification by the technical or requirements personnel that the justification is accurate and complete):
PRINTED NAME/SIGNATURE OF
TECHNICAL/REQUIREMENTS PERSONNEL
DATE
CONTRACTING OFFICER’S CERTIFICATION:
IAW FAR 6.303 Justifications and FAR 6.304 Approval of Justification. The Contracting Officer’s signature represents certification that the justification is accurate and complete to the best of here knowledge and belief.
PRINTED NAME/SIGNATURE OF CONTRACTING
OFFICER
DATE
CHIEF OF CONTRACTING OFFICE, MARITIME ADMINISTRATION
APPROVED:
PRINTED NAME/SIGNATURE OF CHIEF OF
CONTRACTING OFFICE
DATE
HEAD OF CONTRACTING ACTIVITY, MARITIME ADMINISTRATION
APPROVED:
PRINTED NAME/SIGNATURE OF HEAD OF
CONTRACTING OFFICE
DATE
SENIOR PROCUREMENT EXECUTIVE, U.S. DEPARTMENT OF TRANSPORTATION
APPROVED:
PRINTED NAME/SIGNATURE OF SPE DATE
RICHARD DAVID FONTANA Digitally signed by RICHARD DAVID FONTANA Date: 2025.02.28 09:10:36 -05'00'
DENISE CAROL
CLARKE
Digitally signed by DENISE
CAROL CLARKE
Date: 2025.02.28 09:15:03 -05'00'
03/04/2025
03/04/2025
BRUCE ANTHONY
MARKMAN
Digitally signed by BRUCE
ANTHONY MARKMAN
Date: 2025.03.04 09:57:09 -05'00'
DELIA PARSON
DAVIS
Digitally signed by DELIA
PARSON DAVIS
Date: 2025.03.06 10:04:47 -05'00'
| 2025-04-16T18:09:59-0400 | |