APPLICATION INSTRUCTIONS for 2018-NIST-PSIAP-PC2 AMENDED NOFO.pdf

PDF 103 KB Posted

Attached to
NIST Public Safety Innovation Accelerator Program - Point Cloud City
Opportunity number
2018-NIST-PSIAP-PC2
Issued by

About this file

2018-NIST-PSIAP-PC2 AMENDED NOFO APPLICATION INSTRUCTIONS

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPLICATION INSTRUCTIONS for 2018-

NIST-PSIAP-PC2 AMENDED NOFO

Applicants are strongly advised to use Grants.gov’s “Download Submitted Forms and Applications” option to check that their application’s required attachments were contained in their submission.

After submitting the application, follow the directions found at this link, https://www.grants.gov/help/html/help/Applicants/CheckApplicationStatus/Downl oad_Submitted_Forms_and_Applications.htm in the Grants.gov Online Users Guide.

If any, or all, of the required attachments are absent from the submission, follow the attachment directions found above, resubmit the application, and check again for the presence of the required attachments.

If the directions found at https://www.grants.gov/help/html/help/Applicants/CheckApplicationStatus/Downl oad_Submitted_Forms_and_Applications.htm are not effective, please contact the Grants.gov Help Desk immediately. If calling from within the United States or from a U.S. territory, please call 800-518-4726. If calling from a place outside the United States or a U.S. territory, please call 606-545-5035. E-mails should be addressed to support@grants.gov. Assistance from the Grants.gov Help Desk will be available around the clock every day, with the exception of Federal holidays. Help Desk service will resume at 7:00 a.m. Eastern Time the day after Federal holidays.

This document consists of seven important sections:

1) Overview;

2) Required Application Forms and Documents;

3) Application Format;

4) Grants.gov Application Submission Process;

5) Attachment of Required Documents;

6) Verifying the Submission and Tracking the Application; and

7) Submission Date and Time.

1) Overview

We strongly recommend that applicants do not wait until the last minute to submit an application. Allowances will not make for any late submissions. To avoid any potential https://www.grants.gov/help/html/help/Applicants/CheckApplicationStatus/Download_Submitted_Forms_and_Applications.htm https://www.grants.gov/help/html/help/Applicants/CheckApplicationStatus/Download_Submitted_Forms_and_Applications.htm https://www.grants.gov/help/html/help/Applicants/CheckApplicationStatus/Download_Submitted_Forms_and_Applications.htm https://www.grants.gov/help/html/help/Applicants/CheckApplicationStatus/Download_Submitted_Forms_and_Applications.htm mailto:support@grants.gov processing backlogs due to last minute Grants.gov registrations, applicants are highly encouraged to begin their Grants.gov registration process early.

When developing your submission timeline, please keep in mind that (1) all applicants are required to have a current registration in the System for Award Management (SAM.gov); (2) the free annual registration process in the electronic System for Award Management (SAM.gov) may take between three and five business days or as long as more than two weeks; and (3) electronic applicants are required to have a current registration in Grants.gov; and (4) applicants using Grants.gov will receive a series of e-mail messages over a period of up to two business days before learning whether a Federal agency’s electronic system has received its application.

Please note that a federal assistance award cannot be issued if the designated recipient’s registration in the System for Award Management (SAM.gov) is not current at the time of the award.

Applicants will find instructions on registering with SAM.gov as part of the Grants.gov process at:

http://www.grants.gov/web/grants/applicants/organization-registration.html .

All applicants should be aware that adequate time must be factored into an applicant’s schedule for delivery of the application.

Submitters are advised that volume on Grants.gov may be extremely heavy leading up to the deadline date.

2) Required Application Forms and Documents

The Application must contain the following:

(1) SF-424, Application for Federal Assistance. The SF-424 must be signed by an authorized representative of the applicant organization.

• SF-424, Item 8.d Zip/Postal Code field should reflect the zip code + 4 (#####

- ####) format.

• Item 12, should list the NOFO number 2018-NIST-PSIAP-PC2.

• SF-424, Item 18, field a., should list the total Federal budget amount requested for the entire project.

• If the applicant includes voluntary committed cost share, SF-424, Item 18, field b., should list the applicant’s anticipated voluntary committed cost share for the entire project.

http://www.grants.gov/web/grants/applicants/organization-registration.html

• For SF-424, Item 21, the list of certifications and assurances is contained in the SF-424B.

(2) SF-424A, Budget Information - Non-Construction Programs. The budget should reflect anticipated expenses for the project, considering all potential cost increases, including cost of living adjustments.

The Grant Program Function or Activity on Section A, Line 1, Column (a) should be entered as “Public Safety Communications Research Grant Program”. The Catalog of Federal Domestic Assistance Number on Line 1, Column (b) should be entered as “11.609”. Line 1, Column (e) should reflect the anticipated federal expenses for the full term of the project. If the applicant intends to include voluntary committed cost share, that voluntary committed cost share for the full term of the project should be reflected on Section A, Line 1, Column (f).

Section B, column (1) of the SF-424A should reflect funds for the full performance period of the award.

Section C, line 8., column (b) of the SF-424A should reflect the applicant’s anticipated voluntary committed cost share for the full term of the project.

(3) SF-424B, Assurances - Non-Construction Programs

(4) CD-511, Certification Regarding Lobbying. Enter “2018-NIST-PSIAP-PC2” in the Award Number field. Enter the title of the application used in field 15 of the SF-424, or an abbreviation of that title, in the Project Name field.

(5) SF-LLL, Disclosure of Lobbying Activities (if applicable)

(6) Executive Summary. This section should summarize key aspects of the technical approach and qualifications of the team. This section must not include any proprietary or sensitive business information as NIST may make the executive summary available to the public after selection of awards. The executive summary must not exceed one (1) single-sided page. Any executive summary material provided beyond this one-page limit will be redacted and not provided to the reviewers.

(7) Technical Proposal. The Technical Proposal is a document of no more than twenty (20) pages total, which is responsive to the program description (see Section I. of this NOFO) and the evaluation criteria (see Section V.1. of this NOFO). The Technical Proposal must contain the following information:

(a) Project Description. This is a detailed description of the proposed project and should include information regarding:

(i) The total square footage and diversity of previously non-surveyed buildings and structures that will be surveyed as part of this project, including a map identifying all the buildings and structures that will be surveyed and made available.

(ii) The types of data that will be collected in addition to, or conjunction with, the point cloud models.

(iii) How the data will be collected, specifying the 3D LiDAR product that will be used and including how the applicant will address laser safety issues and notification of building stakeholders and occupants about the survey and data collection process.

(iv) The file format, accuracy, and point spacing (resolution) of the data, as well as the approach to georeferencing the point clouds.

(v) How the data will be annotated, processed, organized, stored, and made available; the longevity of the datastore(s) and how the datastore(s) will be supported; any restrictions that will be placed on access; and, if applicable, how information security concerns will be addressed.

(vi) How the surveyed facilities will be made available in the future for both the public safety and the R&D communities to leverage for test and evaluation purposes.

This section will be evaluated in accordance with the Technical Merit and Availability evaluation criteria: (see Sections V.1.a. and V.1.b. of this NOFO).

The Project Description section must not exceed ten (10) single-sided pages. Any material provided beyond this page limit will be redacted and not

(b) Project Execution. This section should provide clear and quantifiable goals, milestones, timelines, and key performance indicators that support the objectives in the Technical Proposal. In addition, this section should describe the cost effectiveness and value, including the use of any in-kind or cost-share with respect to executing the proposed project and meeting the stated objectives.

This section will be evaluated in accordance with the Project Execution evaluation criterion (see Section V.1.c. of this NOFO). The Project Execution section must not exceed five (5) single-sided pages. Any material provided beyond this page limit will be redacted and not provided to the reviewers.

(c) Qualifications. This section should provide a detailed description of the qualifications of key personnel, both technical and programmatic, who will be assigned to work on the proposed project. Examples of demonstrated success on projects similar in scope and magnitude to the proposed project should be included in this section, if applicable. In addition, the applicant’s plans to sustain and manage work related to or in support of the proposed project once the project is complete should be included.

This section will be evaluated in accordance with the Qualifications evaluation criterion (see Section V.1.d. of this NOFO). The Qualifications and Resource Availability section must not exceed five (5) single-sided pages. Any material provided beyond this page limit will be redacted and not

(8) Resume(s). Resumes are required for all key personnel, including the principal investigator. Awardees are advised that any changes to individuals deemed ‘key personnel’, including disengagement from the project for more than three months or a 25% reduction of effort, will require prior approval, in writing, by the NIST Grants Officer.

This section will be evaluated in accordance with the Qualifications evaluation criterion (see Section V.1.d. of this NOFO). There are no page limits for resumes.

However, any material considered inappropriate for inclusion in a resume (e.g.

supplementary text for another section) will be redacted and not provided to the reviewers.

Resumes do not count against the twenty (20) page limit of the Technical Proposal.

(9) Budget Narrative. (This does not count toward the page limit). The Budget Narrative must provide a detailed breakdown of each of the object class categories as reflected on the SF-424A. The budget justification should address all the budget categories (personnel, fringe benefits, equipment, travel, supplies, other direct costs and indirect costs) for which Federal funds are requested. The written justification should include the necessity and the basis for the cost.

Proposed funding levels must be consistent with the project scope, and only allowable costs should be included in the budget. Information on cost allowability is available in the Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards at 2 C.F.R. Part 200 (http://go.usa.gov/SBYh), which apply to awards in this program. Voluntary committed cost share must be included in the appropriate categories. Information needed for each category is as follows:

(a) Personnel. At a minimum, the budget justification for all personnel should include the following: name, job title, commitment of effort on the proposed project in terms of average number of hours per week or percentage of time, salary rate, total direct charges on the proposed project, description of the role of the individual on the proposed project and the work to be performed.

(b) Fringe Benefits. Fringe benefits should be identified separately from salaries and wages and based on rates determined by organizational policy. The items included in the fringe benefit rate (e.g. health insurance, parking, etc.)

should not be charged under another cost category.

http://go.usa.gov/SBYh

(c) Travel. For travel costs required by the recipient to complete the project, including attendance at any relevant conferences, the budget justification for travel should include the following: destination; names and number of people traveling; dates and/or duration; mode of transportation, lodging and subsistence rates; and description of how the travel is directly related to the proposed project. For travel that is yet to be determined, please provide best estimates based on prior experience. If a destination is not known, an approximate amount may be used with the assumptions given for the location of the meeting.

As described in the Program Description (see Section I. of this NOFO), recipients will be required to attend the PSCR Public Safety Broadband Stakeholder Meetings (PSBSM) and the GCTC Expo to meet with stakeholders and present key plans and findings of their work to date.

Recipients must send a minimum of one team member to each event during the term of the grant. The PSCR PSBSMs are held each June in the continental United States and are typically four days in length. In 2018, the PSBSM will be held June 5-8 in San Diego, CA. The dates and location of the 2019 PSBSM have not been determined at this time. The GCTC Expo is typically two days in length and is held in the Washington D.C. area.

Applicants should factor in the cost for attending these events in their budget narrative and SF424A form.

(d) Equipment. Equipment is defined as an item of property that has an acquisition cost of $5,000 or more (unless the organization has established lower levels) and an expected service life of more than one year. Any items that do not meet the threshold for equipment can be included under the supplies line item. The budget justification should list each piece of equipment, the cost, and a description of how it will be used and why it is necessary to the successful completion of the proposed project. Please note that any general use equipment (computers, etc.) charged directly to the award should be allocated to the award according to expected usage on the project.

(e) Supplies. Supplies are defined as all tangible personal property other than those described in equipment (see Section IV.2.a.(9)(d) of this NOFO).

Provide a list of each supply necessary for the project, and the breakdown of the total costs by quantity or unit of cost. Include the necessity of the cost for the completion of the proposed project.

(f) Contracts/Subawards. Each contract or subaward should be treated as a separate item. Describe the services to be provided and the necessity of the subaward or contract to the successful performance of the proposed project.

Contracts are for obtaining goods and services. Subawardees perform part of the project scope of work. For each subaward, applicants must provide budget detail justifying the cost of the work performed on the project.

(g) Construction. Applications to PSIAP-PC2 may not include construction costs as part of their budget.

(h) Other Direct Costs. For costs that do not easily fit into the other cost categories, e.g., publishing fees or software distribution expenses, please list the cost and the breakdown of the total costs by quantity or unit of cost.

Include the necessity of the cost for the completion of the proposed project.

Only allowable costs can be charged to the award.

This section will be evaluated in accordance with the Project Execution evaluation criteria (see Section V.1.c. of this NOFO). It will also be reviewed to determine if all costs are reasonable, allocable, and allowable under 2 C.F.R. Part 200 Subpart E, Cost Principles.

(10) Indirect Cost Rate Agreement If indirect costs are included in the proposed budget, provide a copy of the approved negotiated agreement if this rate was negotiated with a cognizant Federal audit agency. If the rate was not established by a cognizant Federal audit agency, provide a statement to this effect. If the successful applicant includes indirect costs in the budget and has not established an indirect cost rate with a cognizant Federal audit agency, the applicant will be required to obtain such a rate in accordance with the Department of Commerce Financial Assistance Standard Terms and Conditions (http://go.usa.gov/xXRxK).

Alternatively, in accordance with 2 C.F.R. § 200.414(f), applicants that have never received a negotiated indirect cost rate may elect to charge indirect costs to an award pursuant to a de minimis rate of 10 percent of modified total direct costs (MTDC), in which case a negotiated indirect cost rate agreement is not required. Applicants proposing a 10 percent de minimis rate pursuant to 2 C.F.R.

§ 200.414(f) should note this election as part of the budget and budget narrative portion of the application.

(11) Letters of Commitment. Letters of Commitment must be submitted by all funded and unfunded entities that will have an active role in executing the activities outlined in the Technical Proposal. Letters of Commitment must address the level of participation, qualifications of the personnel who will be actively involved, and how successful completion of this project would positively impact their profession or community. Letters of Commitment must also specify any voluntary committed cost-share, including the specific services and/or products to be used in the project. Letters of Commitment must be signed by an individual with sufficient authority to legally bind the organization to its commitment. Letters of Commitment are required from the entities that own or have the legal authority to authorize access to the buildings to be surveyed and for their future use as testing/evaluation sites.

Letters of Commitment will be evaluated in accordance with the Qualifications evaluation criteria (see Section V.1.d.) of this NOFO).

http://go.usa.gov/xXRxK

Letters of commitment do not count against the twenty (20) page limit of the Technical Proposal.

(12) Letters of Support. Letters of Support are not required but may be provided by any entity that has a shared interest in the proposal's success from a technological standpoint. Letters of Support may not be provided by an entity proposed to be actively involved in the performance of the Technical Proposal.

Letters of Support do not count against the twenty (20) page limit of the Technical Proposal.

(13) Data Management Plan. Consistent with NIST Policy 5700.001, Managing Public Access to Results of Federally Funded Research, and NIST Order 5701.002, Managing Public Access to Results of Federally Funded Research, applicants must include a Data Management Plan (DMP).

The DMP is a supplementary document of not more than two pages that must include, at a minimum, a summary of proposed activities that are expected to generate data, a summary of the types of data expected to be generated by the identified activities, a plan for storage and maintenance of the data expected to be generated by the identified activities, and a plan describing whether and how data generated by the identified activities will be reviewed and made available to the public. As long as the DMP meets these NIST requirements, it may take the form specified by the applicant’s institution or some other entity (e.g., the National Science Foundation3 or the National Institutes of Health4).

All applications for activities that will generate scientific data using NIST funding are required to adhere to a DMP or explain why data sharing and preservation are not within the scope of the project.

For the purposes of the DMP, NIST adopted the definition of “research data” at 2 C.F.R. § 200.315(e)(3) (available at http://go.usa.gov/3sZvQ).

Reasonable costs for data preservation and access may be included in the application.

The sufficiency of the DMP will be considered as part of the administrative review (see Section V.3.a. of this NOFO); however, the DMP will not be evaluated against any evaluation criteria.

Please pay close attention to the guidance in Section 5) of this document, “Attachment of Required Documents”.

3) Application Format

1http://www.nist.gov/data/upload/Final-P-5700.pdf 2http://www.nist.gov/data/upload/Final-O-5701_0.pdf 3http://www.nsf.gov/bfa/dias/policy/dmp.jsp 4http://grants.nih.gov/grants/policy/data_sharing/data_sharing_guidance.htm http://go.usa.gov/3sZvQ http://www.nist.gov/data/upload/Final-P-5700.pdf http://www.nist.gov/data/upload/Final-O-5701_0.pdf http://www.nsf.gov/bfa/dias/policy/dmp.jsp http://grants.nih.gov/grants/policy/data_sharing/data_sharing_guidance.htm

(1) Paper, E-mail and Facsimile (fax) Submissions. Will not be accepted.

(2) Figures, Graphs, Images, and Pictures. Should be of a size that is easily readable or viewable and may be landscape orientation.

(3) Font. Easy to read font (12-point minimum). Smaller type may be used in figures and tables but must be clearly legible.

(4) Page Limit. Twenty (20) pages for the Technical Proposal, noting the following limits for each section of the Technical Proposal (see Section IV.2.a.(7) of this NOFO): Project Description ten (10) pages; Project Execution five (5) pages;

Qualifications and Resources Availability five (5) pages excluding resumes.

(5) Page Limit Excludes: SF-424, Application for Federal Assistance; SF-424A, Budget Information – Non-Construction Programs; SF-424B, Assurances – Non- Construction Programs; CD-511, Certification Regarding Lobbying; SF-LLL, Disclosure of Lobbying Activities; Resumes of key personnel (although resumes are limited to two (2) pages each); Budget Narrative; Indirect Cost Rate Agreement, Letters of Commitment; Letters of Support; and the Data Management Plan.

(6) Page size. 21.6 centimeters by 27.9 centimeters (8 ½ inches by 11 inches).

(7) Application language. English.

4) Grants.gov Application Submission Process

(1) Applications must be submitted via Grants.gov at www.grants.gov, under announcement 2018-NIST-PSIAP-PC2.

a) Submitters of electronic applications should carefully follow specific Grants.gov instructions to ensure the attachments will be accepted by the Grants.gov system. A receipt from Grants.gov indicating an application is received does not provide information about whether attachments have been received. For further information or questions regarding applying electronically for the 2018-NIST-PSIAP-PC2 announcement, contact Christopher Hunton by phone at 301-975-5718 or by e-mail at grants@nist.gov.

b) Applicants are strongly encouraged to start early and not wait until the approaching due date before logging on and reviewing the instructions for submitting an application through Grants.gov. The Grants.gov registration process must be completed before a new registrant can apply electronically. If all goes well, the registration process takes three (3) to five (5) business days. If problems are encountered, the http://www.grants.gov/ mailto:grants@nist.gov registration process can take up to two (2) weeks or more. Applicants must have a valid unique entity identifier number and must maintain a current registration in the Federal government’s primary registrant database, the System for Award Management (https://www.sam.gov/), as explained on the Grants.gov Web site. See also Section IV.4. of the Full Announcement/NOFO document. After registering, it may take several days or longer from the initial log-on before a new Grants.gov system user can submit an application. Only individuals authorized as organization representatives will be able to submit the application, and the system may need time to process a submitted application. Applicants should save and print the proof of submission they receive from Grants.gov. If problems occur while using Grants.gov, the applicant is advised to (a) print any error message received and (b) call Grants.gov directly for immediate assistance. If calling from within the United States or from a U.S. territory, please call 800-518-4726. If calling from a place other than the United States or a U.S. territory, please call 606-545-5035. Assistance from the Grants.gov Help Desk will be available around the clock every day, with the exception of Federal holidays. Help Desk service will resume at 7:00 a.m. Eastern Time the day after Federal holidays. For assistance using Grants.gov, you may also contact support@grants.gov.

c) To find instructions on submitting an application on Grants.gov, Applicants should refer to the “Applicants” tab in the banner just below the top of the www.grants.gov home page. Clicking on the “Applicants” tab produces two useful sources of information, Applicant Actions and Applicant Resources, which applicants are advised to review.

Applicants will receive a series of e-mail messages over a period of up to two business days before learning whether a Federal agency’s electronic system has received its application. Closely following the detailed information in these subcategories will increase the likelihood of acceptance of the application by the Federal agency’s electronic system.

Applicants should pay close attention to the guidance under “Applicant FAQs,” as it contains information important to successful submission on Grants.gov, including essential details on the naming conventions for attachments to Grants.gov applications.

All applicants should be aware that adequate time must be factored into applicants’ schedules for delivery of their application. Applicants are advised that volume on Grants.gov may be extremely heavy on the deadline date.

The application must be both received and validated by Grants.gov. The application is “received” when Grants.gov provides the applicant a confirmation of receipt and https://www.sam.gov/ http://www.grants.gov/ an application tracking number. If an applicant does not see this confirmation and tracking number, the application has not been received. After the application has been received, it must still be validated. During this process, it may be “validated” or “rejected with errors.” To know whether the application was rejected with errors and the reasons why, the applicant must log in to Grants.gov, select “Applicants” from the top navigation, and select “Track my application” from the drop-down list. If the status is “rejected with errors,” the applicant may still seek to correct the errors and resubmit your application before the deadline. If the applicant does not correct the errors, the application will not be forwarded to NIST by Grants.gov.

Refer to important information in Section IV.4. Submission Dates and Times, of the Full Announcement/NOFO document to help ensure your Application is received on time.

5) Attachment of Required Documents

Items (1) through (5) in Section 2) above, Required Application Forms and Documents, are part of the standard application package in Grants.gov and can be completed through the download application process.

Items (6) through (13) in Section 2) above, Required Application Forms and Documents, must be completed and attached by clicking on “Add Attachments” found in item 15 of the SF-424, Application for Federal Assistance. This will create a zip file that allows for transmittal of the documents electronically via Grants.gov.

Applicants should carefully follow specific Grants.gov instructions at www.grants.gov to ensure the attachments will be accepted by the Grants.gov system. A receipt from Grants.gov indicates only that an application was transferred to a system. It does not provide details concerning whether all attachments (or how many attachments) transferred successfully. Applicants using Grants.gov will receive a series of e-mail messages over a period of up to two business days before learning whether a Federal agency’s electronic system has received its application.

6) Verifying the Submission and Tracking the Application

The Grants.gov Online Users Guide available at the Grants.gov site (http://go.usa.gov/cjaEh) provides vital information on application process.

Applicants are strongly advised to use Grants.gov’s “Download Submitted Forms and Applications” option to check that their application’s required attachments were contained in their submission.

After submitting the application, follow the directions found at this link, https://www.grants.gov/help/html/help/Applicants/CheckApplicationStatus/Downl http://www.grants.gov/ http://go.usa.gov/cjaEh https://www.grants.gov/help/html/help/Applicants/CheckApplicationStatus/Download_Submitted_Forms_and_Applications.htm oad_Submitted_Forms_and_Applications.htm in the Grants.gov Online Users Guide.

If any, or all, of the required attachments are absent from the submission, follow the attachment directions found above, resubmit the application, and check again for the presence of the required attachments.

If the directions found at https://www.grants.gov/help/html/help/Applicants/CheckApplicationStatus/Downl oad_Submitted_Forms_and_Applications.htm are not effective, please contact the Grants.gov Help Desk immediately. If calling from within the United States or from a U.S. territory, please call 800-518-4726. If calling from a place outside the United States or a U.S. territory, please call 606-545-5035. E-mails should be addressed to support@grants.gov. Assistance from the Grants.gov Help Desk will be available around the clock every day, with the exception of Federal holidays. Help Desk service will resume at 7:00 a.m. Eastern Time the day after Federal holidays.

Applicants can track their submission in the Grants.gov system by following the procedures at the Grants.gov site (http://go.usa.gov/cjamz). It can take up to two business days for an application to fully move through the Grants.gov system to

NIST.

NIST uses the Tracking Numbers assigned by Grants.gov, and does not issue its own Agency Tracking Numbers.

7) Submission Date and Time

Electronic applications must be received at Grants.gov no later than 11:59 p.m. Eastern Time, Friday, April 20, 2018. Applications received after this deadline will not be reviewed or considered. Paper applications will not be accepted.

Applicants should be aware, and factor in their application submission planning, that the Grants.gov system is expected to be closed for routine maintenance from 12:01 a.m.

Eastern Time, Saturday, March 17, 2018 until 6:00 a.m. Eastern Time, Monday, March 19, 2018.

Applications cannot be submitted when Grants.gov is closed.

https://www.grants.gov/help/html/help/Applicants/CheckApplicationStatus/Download_Submitted_Forms_and_Applications.htm https://www.grants.gov/help/html/help/Applicants/CheckApplicationStatus/Download_Submitted_Forms_and_Applications.htm https://www.grants.gov/help/html/help/Applicants/CheckApplicationStatus/Download_Submitted_Forms_and_Applications.htm http://go.usa.gov/cjamz

File details come from the government source that posted it.