Application Criteria NPSNOFONTIR170001.doc

DOC document 172 KB Posted

Attached to
Route 66 Grant Program Federal grant opportunity
Opportunity number
NPSNOFONTIR170001
Issued by
Department of the Interior

View the file

Other files for this federal grant opportunity

Other files attached to Route 66 Grant Program, newest first.
File Type Posted
Notice of Funding Opportunity NPSNOFONTIR17001.docx DOCX document
Application Criteria NPSNOFONTIR170001.doc DOC document
Notice of Funding Opportunity NPSNOFONTIR17001.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1) Construction Projects - Preservation, Restoration, and Rehabilitation The preservation, restoration, and rehabilitation of transportation-related historic properties on Route 66 are eligible project activities. Properties must have been in service and have had a strong and direct association with Route 66 during its 1926-1985 period of national significance; be on, or within view of a Route 66 road alignment; be in their original location; and retain historical and architectural integrity. Properties that are listed on the National Register of Historic Places or a state register, or that have been determined eligible for a register, will receive priority consideration.

Examples of eligible transportation-related property types include:

· Gas stations, automotive repair shops, and other automobile-related businesses

· Restaurants and cafes

· Motels, hotels, and campgrounds

· Curio shops, tourist trading posts, tourism-related attractions

· Original road pavement and associated road features (e.g., bridges, culverts)

Other potentially eligible property types, though of lesser priority are:

· Transportation-related properties that date to the 1926-1985 period of significance, but are not listed on or determined eligible for the National Register of Historic Places.

· Properties that did not directly serve the traveler, but were used by travelers or impacted the traveling experience such as theaters, public buildings, and landscape features. These properties must date to the 1926-1985 period of significance and have a well- documented and significant association with Route 66.

Eligible activities include, but are not limited to repair, rehabilitation, or restoration of:

Important: Project plans and drawings prepared by a registered historical architect or other qualified professional must be included in all preservation, rehabilitation and restoration projects, or the development of such plans must be part of the project proposal. All work must conform to the Secretary of Interior’s Standards for the Treatment of Historic Properties; requirements for Section 106 of the National Historic Preservation Act review; Occupational Health and Safety Administration Standards; and all applicable local/state building codes.

Property owners must commit to providing care and protection for the properties to the best of their ability for no less than 10 years after the project is completed (see Property Maintenance and Protection Agreement for more information.)

Ineligible activities include but are not limited to:

· Acquisition of property or museum objects

· New construction (e.g., building additions, entrance gates)

· Reconstruction of non-extant buildings, structures, or significant features

· Demolition of historic buildings or historically significant building additions

· Standard maintenance of roadbed or parking lots, including new asphalt overlays, or widening (exception: historic concrete pavement repair/restoration)

· Fabrication/installation of new signs or murals

· Replica gas pumps

· Furnishings (carpet, beds, chairs, desks, museum display cases/fixtures, etc.)

· Landscaping

· General property maintenance (e.g., painting, mowing, site cleanup)

· Operating costs (e.g., insurance, utility bills)

· Production of tourism brochures and/or materials

· Events, festivals

· Projects or project phases that have already been completed

2) Non-Construction Projects – Planning , Research, Interpretive, or Educational Planning, research, interpretive or educational outreach projects are eligible project activities. Examples of eligible activities include:

· Project Planning and Architectural Drawings for preservation, rehabilitation or restoration of eligible historic properties. Plans and drawings must be prepared by a registered historical architect or other related professional, and comply with the Secretary of Interior's Standards for the Treatment of Historic Properties.

· Historic Structure Reports for properties listed on or determined eligible for the National Register of Historic Places. Other properties relating to the 1926-1985 period of significance may also be considered. Reports must be prepared by a historical architect and follow guidelines established in Preservation Brief 43, Preparation and Use of Historic Structure Reports: www.nps.gov/tps/how-to-preserve/briefs/43-historic-structure-reports.htm.

· Building, Road and/or Archeological Surveys by local, state, and tribal governments that identify and describe historic properties within an area or region along Route 66, and assess the significance, cultural value, condition and/or threats to the properties.

· Road Alignment or Pavement Preservation Plans prepared by local, state, and tribal governments.

· Local Corridor Preservation Management Plans prepared by local, state, and tribal governments

· Planning and Development of Research, Oral Histories, Interpretive or Educational Activities that directly advance the understanding and preservation of Route 66.

All proposals will be rated based on the following criteria:

· Relevance to automobile travel on Route 66 from the route’s period of significance from 1926-1985.

· Demonstrable, long-term public benefit and access to project results.

· Demonstrated availability of the required 1:1 cost-share match.

· Technical and professional qualifications of the project team.

· Approach, thoroughness and resources of the project work plan, budget and schedule.

· Demonstrated ability to complete the project in a timely, professional manner, ensuring laws and standards are met.

· Completeness of application.

· Consideration will be given to the location and type of project to ensure broad representation and diversity of the route’s stories and places.

Preservation, rehabilitation and restoration (construction) projects will also be assessed on:

· Thoroughness of project planning documents, or plans for their preparation by a qualified historical architect or other qualified professional.

· Listing on a state historic register, the National Register of Historic Places, or a determination of eligibility for listing by a State Historic Preservation Office.

· Existing historic and architectural integrity of the property. (Does it retain its historical appearance, design, features, and materials? Is it in its historic location?)

· Needs of the historic property, including demonstrable degrees of physical deterioration to the property, and/or threats to its stability or integrity.

· Strength of direct relationship to Route 66 as a transportation-related property during the commissioned period of the associated Route 66 alignment.

· Demonstrated evidence of 1) property’s location on, or within view of Route 66, and 2) length of time the property operated during the commissioned period of the associated alignment.

· Economic viability of intended long-term use of the property.

· Potential of the property to benefit the local economy.

· Potential for the project to serve as a preservation model.

· Applicant’s demonstrated commitment to the long-term preservation, protection and management of the property, including provisions that, to the best of the owner’s ability, the property will be preserved and protected for no less than 10 years.

· Applicant’s demonstrated understanding and intent to comply with insurance requirements (see Award Requirements on Page 5, Appendix I, and Appendix II of these application guidelines), required laws and standards relating to the Secretary of the Interior’s Standards for Treatment of Historic Properties, Section 106 of the National Historic Preservation Act, and Occupational Health and Safety.

Applications must be received by the program office on or before April 3, 2017, COB 5:00 PM MT. Applications postmarked April 3, 2017 but received after that date WILL NOT be accepted. Please include in your application (see project proposal instructions, Pg. 3, Attachments, and Application Checklist):

· Application Cover Sheet

· Project Proposal

· Attachments:

Letters of Recommendation

Project Graphics (if applicable)

State/National Register of Historic Places Nomination Forms (if applicable)

Signed Property Maintenance and Protection Agreement (if applicable)

Signed Laws and Standards Agreement (if applicable) mandatory: The following must be submitted with proposal or application will not be considered:

· Standard Forms 424 (all projects) plus 424A, 424B (non-construction projects), or 424C, 424D (construction projects) as pertains to your project type. These can be found at http://www.grants.gov/web/grants/forms/sf-424-family.html#sortby=1.

Please submit ONE (1) DIGITAL COPY on CD or DVD disc, and FOUR (4) PAPER COPIES (one with original signature) of the complete proposal as follows:

· THREE-HOLE PUNCH each paper copy at the left-hand margin

· Use paper/binder clips. Do NOT bind copies

· Do NOT use tabbed dividers or report covers

The National Park Service will review eligible applications, and determine final cost-share grant awards. Award decisions are based on eligibility and evaluation criteria defined in these guidelines, and on recommendations from a panel of reviewers. All applicants will receive notification of results on or before May 26, 2017. Awardees can NOT begin project work until a grant agreement is in place, typically on or before September 30, 2017.

All post-award, successful applicants are required to register online in the SAM System of Award Management (www.sam.gov) and ASAP Automated Standard Application for Payments (www.asap.gov). Construction (preservation, rehabilitation, and restoration) projects are also subject to Section 106 (see Appendix I, Section B) and liability insurance requirements (see Appendix II).

Please submit hard copy applications to:

Trish Fresquez-Hernandez, Contracting Officer

Physical Address:

National Park Service

1100 Old Santa Fe Trail

P.O Box 728

Santa Fe, NM 87505 Santa Fe, NM 87504

Please direct inquiries to the NPS Route 66 Corridor Preservation Program:

Tel: 505-988-6701, Email: im_rt66@nps.gov Cost-Share Grant Guidelines and Application – 2017 are available from the Route 66 Program office and at: www.nps.gov/rt66/cost-share-grants.

Insurance: Grantees (recipients) who are completing a construction project (preservation, rehabilitation, or restoration) will be required to meet the following requirements for liability insurance. “Construction” means construction, alteration, or repair (including painting) of building, structures, signs, or other real property. Cost for liability insurance may be included in proposed project budget. For the purposes of this clause, "recipient" includes such sub-recipients, contractors, or subcontractors as, in the judgment of the recipient and subject to the Government's determination of sufficiency, have sufficient resources and/or maintain adequate and appropriate insurance to achieve the purposes of this clause.

A. Insurance. The recipient shall be required to (1) obtain liability insurance or (2) demonstrate present financial resources in an amount determined sufficient by the Government to cover claims brought by third parties for death, bodily injury, property damage, or other loss resulting from one or more identified activities carried out in connection with this financial assistance agreement.

B. Insured. The federal government shall be named as an additional insured under the recipient's insurance policy.

C. Indemnification. The recipient hereby agrees to indemnify the federal government, NPS or from any act or omission of Recipient, its officers, employees, members, participants, agents, representatives, agents as appropriate, or: (1) against third party claims for damages arising from one or more identified activities carried out in connection with this financial assistance agreement, and (2) for damage or loss to government property resulting from such an activity. This obligation shall survive the termination of this Agreement.

a. To purchase public and employee liability insurance at its own expense from a responsible company or companies with a minimum limitation of one hundred thousand dollars ($100,000) per person for any one claim, and an aggregate limitation of five hundred thousand dollars ($500,000) for any number of claims arising from any one incident. The policies shall name the United States as an additional insured, shall specify that the insured shall have no right of subrogation against the United States for payments of any premiums or deductibles due thereunder, and shall specify that the insurance shall be assumed by, be for the account of, and be at the insured's sole risk. Prior to beginning the work authorized herein, Recipient shall provide the NPS with confirmation of such insurance coverage.

b. To pay the United States the full value for all damage to the lands or other property of the United States caused by the Recipient.

c. To provide workers' compensation protection to Recipient officers, employees, and representatives.

d. To cooperate with NPS in the investigation and defense of any claims that may be filed with NPS arising out of the activities of the Recipient, its agents, and employees.

e. In the event of damage to or destruction of the buildings and facilities assigned for the use of Recipient in whole or in part by any cause whatsoever, nothing herein contained shall be deemed to require NPS to replace or repair the buildings or facilities. If NPS determines in writing, after consultation with Recipient that damage to the buildings or portions thereof renders such buildings unsuitable for continued use by Recipient, NPS shall assume sole control over such buildings or portions thereof If the buildings or facilities rendered unsuitable for use are essential for conducting operations authorized under this Agreement, then failure to substitute and assign other facilities acceptable to Recipient will constitute termination of this Agreement by NPS.

Project Name: ________________________________________________________________________

Applicant Information:

Organization/Agency __________________________________________________________________

Contact Name/Title ___________________________________________________________________

Address _____________________________________________________________________________

Phone ______________________________________________________________________________

Email _______________________________________________________________________________

Applicant Type:

City ____ State ____ Nonprofit Organization ____ Private ____

County ____ Tribe ____ Educational Institution ____ Other (specify) ___________

Project Location (for preservation, rehabilitation and restoration projects only):

Property Address ____________________________________________________________________

County in which property resides ______________________________________________________

Project Area: Congressional Representation:

U.S. Representative(s) ________________________________________________________________

U.S. Senators _______________________________________________________________________

Project Cost (in dollar amounts):

NP

NPS Grant Request Appl Applicant Cost-Share Total (gr Total (grant + cost-share)

Applicant signature certifies that the information contained within this application is true and correct (original signature required on a minimum of one copy):

Applicant Name and Title (print or type)

Applicant (signature)

Submit to:

Trish Fresquez-Hernandez, Contracting Officer Physical address:

National Park Service

P.O. Box 728

PART I - Please provide a description of the proposed project by addressing the topics below.

Answer all questions below. Completeness of the application is a priority evaluation factor. Failure to include MANDATORY Standard Form 424 series will render the application unacceptable and ineligible for award consideration (See page 3, Section 8.6).

1) Statement of Project Need, Purpose, Goals, and Potential Public Benefit

State the demonstrated need and purpose of the proposed project; the benefit or contribution the project will make to the overall goal of preserving or commemorating the history of Route 66; and how the project will achieve this. What is the intended use of the property or project results? Will the completed project be accessible long-term to the public? Will it benefit the local economy? If so, state how. Include business plans, if applicable.

Response should not to exceed two typed 8-1/2 x 11 pages (12 point font)

2) History and Description of Historic Property (If applicable - other projects skip to Question 4)

Please describe the property’s history including construction, ownership, and use, providing dates whenever possible. Describe how the property’s original historic appearance has changed over time over time (additions, alterations, etc.) Provide description of current ownership, use, and condition of property.

Response should not exceed two typed 8-1/2 x 11 pages (12-point font)

3) Significance of Historic Property (If applicable - other projects skip to Question 4)

Is the property listed on a state historic register, the National Register of Historic Places, or determined eligible for listing on a historic register by a State Historic Preservation Office? If so, please provide a copy of the register nomination form, or a written determination of eligibility from the State Historic Preservation Office. If not, please describe the length of association and significance of the property to the historic period of Route 66 (1926-1985).

Response should not exceed one typed 8-1/2 x 11 page, excluding nomination forms (12-point font)

4) Project Description and Project Budget

Part One: Provide a clear, concise description of the specific work to be accomplished, including design and/or construction documents. If specific plans have not been developed, explain your plan for having them developed.

Page allotment for response will depend on the scope and complexity of the project.

4) Project Description and Project Budget (cont.)

Part Two: Develop a Task Timeline and Budget table, using the headings below. List and describe each individual task to be performed including the timeframe for implementation, cost, and funding source for each task. The task descriptions should be sufficiently detailed to give a clear understanding of the general flow of work necessary to complete the project. At the end of the table, tally total NPS, cash, and in-kind contributions, as well as total project cost.

Indirect Costs: If your proposed budget includes indirect costs, the rate as proposed must meet the requirements of 2 CFR Part 200, Section 200.414 and 2 CFR Part 200, and Appendix III through Appendix VII as applicable (http://www.ecfr.gov/cgi-bin/text-idx?tpl=/ecfrbrowse/Title02/2cfr200_main_02.tpl). A negotiated indirect cost rate agreement must be provided with your proposal. Proposals that fail to document their indirect costs will have those costs disallowed.

Note: Timeline should include 45 days for Section 106 review for preservation, restoration, and rehabilitation projects.

Please use the following headings for developing the table (additional headings may be included as needed):

Task

Description Task

Timeline

Task

Budget

NPS

Contribution

($ amount) Applicant

Cash Contribution

($ amount) Applicant In-Kind

Contribution

(Service/Item

Description) Source of Cash or In-Kind

Contribution

5) Project Team

Please provide information on each member of the Project Team, including contractors and subcontractors. Describe the role and qualifications of each member, including a brief profile or resume if applicable.

Page Allotment for Question Five:

The page allotment for response will depend on the number of project team members.

6) Funding Considerations

Applicants must demonstrate how the required minimum 1:1 match will be provided. Non-federal funds and/or in-kind contributions (e.g. donated services, materials, and equipment) may be used to meet this requirement. Please list all sponsors, donors, etc., here and/or in Section #4, Task Budget.

Response should not exceed one typed 8-1/2 x 11 page (12-point font)

7) Project Completion and Ongoing Project Maintenance

What financial and other plans exist for the maintenance and continued support of the project results? If the proposed project is part of a multi-phase or long-term project, explain how and when the additional phases will be financed and completed.

Response should not exceed one typed 8-1/2 x 11 page (12-point font)

8) Attachments

1) Three Letters of Recommendation (for example, community members/leaders; Chambers of Commerce; Scenic Byway programs; Route 66 associations; historical societies; nonprofit organizations; State Historic Preservation Office; and/or state/federal legislators).

2) Project Graphics (if applicable):

· Labeled photographs (digital printouts and/or color photocopies):

- historic images of property, if available

- current images of property

- current images of property showing details of existing conditions

· Map showing property location and physical address.

· Drawings of existing conditions and work proposed, prepared by a registered historical architect or other related professional. If drawings have not yet been created, their production may be included as part of the project proposal.

3) State or National Register of Historic Places nomination forms, or statement of eligibility from State

Historic Preservation Office (if applicable).

4) Property Protection and Maintenance Agreement – see attached (if applicable).

5) Laws and Standards Agreement – see attached (if applicable).

6) MANDATORY: Applicants are required to submit the following forms as they apply to their project, or the application will not be considered for award.

For non-construction projects applicants must complete a SF-424, SF-424A, and SF-424B.

For construction projects applicants must complete a SF-424, SF-424C, and SF-424D. “Construction” means construction, alteration, or repair (including painting) of building, structures or other real property.

· SF-424, Application for Federal Assistance (All applicants must complete) Important: in Box 11 enter “CFDA Number 15.958, Route 66 Corridor Preservation program”, and in Box 12 enter “Funding Opportunity Number NPSFOANTIR160001” (no “Title” necessary).

· SF-424A, Budget Information for Non-Construction Programs (complete if you are proposing a non-construction project such as a research, interpretive, oral history, or educational project)

· SF-424B, Assurances for Non-Construction Programs (complete if you are proposing a non-construction project such as a research, interpretive, oral history, or educational project)

· SF-424C, Budget Information for Construction Programs (complete if you are proposing a brick-and-mortar preservation, restoration, and rehabilitation project)

· SF-424D, Assurances for Construction Programs (complete if you are proposing a brick-and-mortar preservation, restoration, and rehabilitation project t)

Copies of all SF-424 forms can be found at: http://www.grants.gov/web/grants/forms/sf-424-family.html#sortby=1

I/we, ___________________________________________, owner of the property known as _____________________________________________, agree that if funds from the National Park Service Route 66 Corridor Preservation Program are used towards the preservation, restoration, or rehabilitation of the property, I/we will ensure that the property is maintained and kept in a state of good repair for no less than 10 years after the project work is completed. This will be done in order to preserve the historical and architectural integrity of the property in its improved condition, and to protect the investment of public federal funds.

If I/we are personally unable to maintain the property, I/we will ensure that another entity assumes these responsibilities.

If I/we must sell the property, I/we will encourage the new owner to continue the care and protection of the property.

Name of Owner Date

Property Name

I/we, _________________________________, if awarded a cost-share grant from the National Park Service Route 66 Corridor Preservation Program for the project known as __________________________________, agree to comply with laws and standards set forth in the Secretary of the Interior’s Standards for Treatment of Historic Properties; Section 106 of the National Historic Preservation Act again, as amended; Occupational Health and Safety Administration Regulations; and all appropriate local and state building codes.

If awarded a cost-share grant, I will ensure that the project is implemented in compliance with these laws and standards, and provide documentation and reporting of this compliance as specified in the final award contract.

Name of Owner Date

Project Name

Include all items listed below, as specified in the Cost-Share Grant Guidelines and Application materials. Completeness of the application is a priority evaluation factor. Failure to include MANDATORY Standard Form 424 series will render the application unacceptable and ineligible for award consideration (See page 3, Section 8.6). Please use the boxes to show that the application is complete, and include this sheet with your application.

Applications are due and must be received by the National Park Service no later than April 3, 2017. Applications postmarked April 3, 2017 but received after that date WILL NOT be accepted. Please submit all documents to:

Trish Fresquez-Hernandez, Contracting Officer Physical address:

P.O. Box 728

Project Title:__________________________________________________________________________

One (1) digital copy on CD/DVD and four (4) paper copies each of:

· 1. Application Cover Sheet

· 2. Project Proposal

· 4. Attachments

· Letters of Recommendation

· Graphics and Maps (if applicable)

· State/National Register of Historic Places Nomination Forms (if applicable)

· Signed Property Maintenance and Protection Agreement (if applicable – for construction [preservation, restoration, and rehabilitation] projects only)

· Signed Laws and Standards Agreement (if applicable – for construction [preservation, restoration, and rehabilitation] projects only)

· MANDATORY (your application will not be considered for award unless these are included): Standard Forms SF-424, 424A, 424B if submitting a non-construction project, or SF-424, 424C and 424D if submitting an application for a construction (preservation, rehabilitation, or restoration) project which can be found at:

http://www.grants.gov/web/grants/forms/sf-424-family.html#sortby=1

Funding

Availability

The cost-share grant funds for the Route 66 Corridor Preservation Program are congressionally appropriated and vary each year. The estimated total of funds available for cost-share grants in 2017 is approximately $90,000 Applicants may apply for funds in an amount between $5,000 and $30,000.

Non-Acceptance

Notice

The National Park Service, Route 66 Corridor Preservation Program is dedicated to preserving the diverse history of U.S. Highway 66. The program provides financial assistance in the form of competitive cost-share grants for the preservation of the most significant and representative buildings, structures, road segments, and cultural landscapes along the length of the Route 66 corridor, covering Illinois, Missouri, Kansas, Oklahoma, Texas, New Mexico, Arizona, and California. Cost-share grants are also available for planning, research, and educational initiatives related to the preservation of Route 66.

The eligibility and evaluation criteria set forth in the cost-share grant application guidelines are for fiscal year 2017, and are subject to revision in subsequent years based on the continuing development of long-term strategies.

The legislation enabling this program is provided through the Route 66 Corridor Preservation Act of 1999 (Public Laws 106-45; 111-11, Section 7304), which is administered by the National Park Service, National Trails Intermountain Region. For more information about the program and its services, visit � HYPERLINK "http://www.nps.gov/rt66/cost-share-grants" �www.nps.gov/rt66/cost-share-grants�.

Applications must be received by April 3, 2017 COB 5:00 PM (MT) OR they WILL NOT be accepted. applications must include standard Form 424 series or they will not be accepted.

Introduction

CONTENTS

Guidelines

Introduction …………………….1

Non-Acceptance Notice ... ....….1

Funding Availability …………….1

Cost-Share Requirements ....….1

Eligible Applicants ……………..2

Eligible Projects ………….….….2

Evaluation Criteria ….…....….…4

Application Process ……..……..5

Review Process .………………...5

Award Requirements…………...5

Contacts …………………….…..5

Appendices

I – Laws and Standards

A) Secretary of the Interior’s

Standards for the Treatment of Historic Properties

B) Section 106 of the National

Historic Preservation Act

C) Occupational Health and

Safety Administration

Standards

II – Insurance Requirements

Application Materials

Application Cover Sheet

Project Proposal - Instructions

Property Maintenance and Protection Agreement

Laws and Standards Agreement

Standard Forms 424 A/B/C/D

Application Checklist

A minimum 1:1 cost-share match is required in direct, non-federal funds and/or in-kind contributions (e.g., donated services, materials, and equipment).

Cost-Share

Requirements

APPLICATION DEADLINE: April 3, 2017

COB 5:00 PM MT

Funding Opportunity No. NPSNOFONTIR170001

COST-SHARE GRANT GUIDELINES AND APPLICATION– 2017

ROUTE 66 CORRIDOR PRESERVATION PROGRAM

1 Route 66 Corridor Preservation Program Experience Your America

Cost-Share Grant Application Guidelines - 2017

U.S. Department of the Interior

National Trails Intermountain Region

Santa Fe, New Mexico

Route 66 Corridor Preservation Program

Local government agencies

State government agencies

Tribal government agencies

Private individuals and business owners

Nonprofit organizations

Educational institutions

Eligible Applicants

Eligible Projects

Doors and windows

Light fixtures

Historic neon, signs (in historic location)

Bridges

Historic road pavement

Roofs

Floors

Foundations

Structural elements

Plumbing, electrical, HVAC

2 Route 66 Corridor Preservation Program Experience Your America

Eligible Projects

(continued)

3 Route 66 Corridor Preservation Program Experience Your America

Evaluation Criteria

3 Route 66 Corridor Preservation Program Experience Your America

Cost-Share Grant Application Guidelines - 2010

4 Route 66 Corridor Preservation Program Experience Your America

Cost-Share Grant Application Guidelines -

Application Process

Review Process

Award Requirements

Contacts

5 Route 66 Corridor Preservation Program Experience Your America

Appendix I – Laws and Standards

For Construction Projects Only (Preservation, Rehabilitation, and Restoration)

Recipients of cost-share grant funds for construction projects (preservation, rehabilitation, and restoration) only are subject to the following laws and standards:

A) Secretary of the Interior’s Standards for the Treatment of Historic Properties

The Secretary of Interior’s Standards for the Treatment of Historic Properties are federal standards intended to promote the highest degree of professionalism in protecting and maintaining the historic integrity of historic properties. Historic integrity refers to the authenticity of a property’s historic identity, or the extent to which a resource retains its historic appearance. The Standards have accompanying Guidelines, which provide guidance in determining what type of treatment is appropriate, and what course of action should be taken for each type. The Standards and Guidelines are designed to guide the treatment of properties that are listed on, or eligible for listing on, the National Register of Historic Places, but they are also valuable tools for anyone planning and undertaking work on historic properties. The Standards are mandatory when projects involve federal funding.

All proposals must reflect an understanding of and adherence to the Standards. For more information about the Standards and their accompanying guidelines, visit the website http://www.nps.gov/tps/standards.htm, or contact your State Historic Preservation Office at � HYPERLINK "http://www.nps.gov/nr/shpolist.htm" �http://www.nps.gov/nr/shpolist.htm�.

B) Section 106 of the National Historic Preservation Act

Section 106 of the National Historic Preservation Act requires Federal agencies to consult with State Historic Preservation Offices to consider the effects of federally-assisted projects on historic properties. The goal of consultation is to seek ways during the early stages of project planning to avoid, minimize, or mitigate any adverse effects on historic properties.

The Route 66 Corridor Preservation Program initiates Section 106 review for most preservation, restoration or rehabilitation projects. Section 106 review typically takes 4-6 weeks to complete. It is important that applicants are aware of this time requirement and account for it in proposed project schedules.

Work on cost-share grant projects cannot begin until a Section 106 review is completed and concurred upon by the State Historic Preservation Office.

For more information about Section 106, visit http://www.achp.gov/work106.html, or contact your State Historic Preservation Office at � HYPERLINK "http://www.nps.gov/nr/shpolist.htm" �http://www.nps.gov/nr/shpolist.htm�.

C) Occupational Health and Safety Administration Standards

The Occupational Health and Safety Administration (OSHA) sets standards to assure the safety and health of workers by providing training, outreach, and education; establishes partnerships; and encourages continual improvement in workplace safety and health. All cost-share grant projects that include construction-related work are required to comply with OSHA safety standards and guidelines. Information about keeping your project site safe can be found at � HYPERLINK "http://www.osha.gov" �www.osha.gov�, or by calling 1-800-321-OSHA. You can contact your state OSHA office at https://www.osha.gov/html/RAmap.html.

Route 66 Corridor Preservation Program Experience Your America

Appendix I – Cost-Share Grant Application Guidelines – 2017

Appendix II – Insurance Requirements

Route 66 Corridor Preservation Program Experience Your America

Appendix II – Cost-Share Grant Application Guidelines – 2017

Application Cover Sheet

Route 66 Corridor Preservation Program Experience Your America

Application Cover Sheet - 2017

Project Proposal - Instructions

1 Route 66 Corridor Preservation Program Experience Your America

Project Proposal Instructions - 2017

2 Route 66 Corridor Preservation Program Experience Your America

3 Route 66 Corridor Preservation Program Experience Your America

Project Proposal Instructions - 2015

3 Route 66 Corridor Preservation Program Experience Your America

Property Maintenance and Protection Agreement

Route 66 Corridor Preservation Program Experience Your America

Property Maintenance and Protection Agreement - 2017

Laws and Standards Agreement

Route 66 Corridor Preservation Program Experience Your America

Laws and Standards Agreement - 2017

Application Checklist

File details come from the government source that posted it. Updated .