Summary of Appendix A - IFB26-0519 Chiller Replacement Technical Specifications
This document is a set of technical design drawings and specifications prepared by the Commonwealth of Virginia Professional Engineer for Clarke County Public Schools' chiller replacement project at Boyce Elementary School located at 119 W. Main St., Boyce, VA 22620. The project scope includes the complete removal of the existing chiller unit, chiller supports, and associated accessories while retaining the existing chilled water pump, concrete pad, chain link fence, disconnect switch, and Building Automation System (BAS) wiring for reuse. The new work requires the installation of a replacement chiller with vibration isolators on the existing concrete slab, new power wiring and water-tight conduit from the existing disconnect to the new chiller, connection of existing BAS wiring to the new chiller with extended wiring and conduit as necessary, and installation of new 3-inch chilled water supply and return piping with heat trace and insulation. The project is governed by the 2021 Virginia Existing Building Code (VEBC) and includes mechanical and electrical work with detailed plans for basement mechanical room demolition and new work, piping diagrams, and electrical modifications to existing panelboards and circuits.
The electrical work encompasses removal of the existing 250-amp three-pole breaker supporting the old chiller and installation of a new 300-amp three-pole breaker (Eaton/Westinghouse CAT.KT3300T) in Panel A, installation of three #350KCMIL conductors with #4 ground in 3.0-inch conduit from the new breaker to the chiller's integral breaker disconnect, extension of existing control power sources and heat trace power sources to the new chiller unit, and provision of a 20-amp single-pole breaker for the new evaporator heater. All contractors are required to visit the site prior to bid submission to verify existing conditions and determine the full extent of demolition and relocation work required, with no change orders approved for additional work due to contractor failure to conduct pre-bid site visits. All new wiring must utilize simpul or equal impregnated color-coded insulation without color tape, and all panel schedules must be typed with updated nameplates reflecting the scope of work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB_26-0519_Chiller-Boyce.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGNED DRAWN
APPROVEDCHECKED
COMM. NO. DATE
SHEET
B O
Y C
E E
LE
M
E N
T A
R Y
S C
H O
O L
C H
IL
LE
R R
E P
LA
C
E M
E N
T B
O Y
C E
, V
IR
G
IN
IA
REVISION DATE
26101.10 04-21-26C O M M O
N W
EA
LTH OF
V
IR
G I N I A
P R O
F E
SS IONAL E
N G
IN
E R E
04/21/26
C O M M O
N W
EA
LTH OF
V
IR
G I N I A
P R O
F E
SS IONAL E
N G
IN
E R E
04/21/26
T001
T
IT
LE
S
H E
E T
JLK/MAR WBS
RCH LPA
BOYCE
ELEMENTARY
SCHOOL
INDEX OF DRAWINGS
T001 TITLE SHEET
M001 MECHANICAL LEGEND, SCHEDULES, CONTROLS & PIPING DIAGRAMS
M101 MECHANICAL PARTIAL BASEMENT PLANS & PIPING DIAGRAMS
M102 MECHANICAL DETAILS AND DIAGRAMS
E001 ELECTRICAL LEGEND, NOTES AND ABBREVIATIONS
E101 ELECTRICAL PARTIAL BASEMENT PLANS DEMO AND NEW WORK
BOYCE ELEMENTARY SCHOOL
CHILLER REPLACEMENT
119 W. MAIN ST.
BOYCE, VA 22620
VICINITY MAPVICINITY MAP
BOYCE VA.
CODE GOVERNING NEW WORK: 2021 VIRGINIA EXISTING BUILDING CODE (VEBC)
CODE GOVERNING ORIGINAL WORK:
VIRGINIA FIRE SAFETY REGULATIONS (VSFR)
CODE MODIFICATIONS FOR EXISTING WORK: NONE KNOWN
BOILER ROOM PUMP ROOM
C W
S
C W
R
CH-1
AS
CWP
3" CWR
3" CWS
3" CWS
DEMOLITION PLAN NOTES: X
1. REMOVE CHILLER, CHILLER SUPPORTS, AND ACCESSORIES COMPLETE. REMOVE
POWER WIRING BACK TO DISCONNECT, RETAIN DISCONNECT FOR REUSE. RETAIN
BAS WIRING FOR REUSE. CONCRETE PAD AND CHAIN LINK FENCE TO REMAIN.
2. REMOVE PIPING, PIPE INSULATION, SUPPORTS, AND ACCESSORIES COMPLETE TO
POINTS INDICATED.
3. CHILLED WATER PUMP TO REMAIN FOR REUSE.
DISC
BOILER ROOM PUMP ROOM
CWP
DISC
CH-1
3" CWR
3" CWS
3" CWS
3" CWR
AS
ET
3"CWS
NEW WORK PLAN NOTES:
1. FURNISH AND INSTALL NEW CHILLER WITH VIBRATION ISOLATORS ON EXISTING
CONCRETE SLAB. PROVIDE NEW POWER WIRING AND WATER TIGHT CONDUIT
FROM EXISTING DISCONNECT TO NEW CHILLER. CONNECT EXISTING BAS WIRING
TO NEW CHILLER, EXTEND WIRING AND CONDUIT AS NECESSARY. ROUTE NEW 3"
CWS/CWR PIPING FROM NEW CHILLER THROUGH EXISTING WALL OPENINGS.
SUPPORT PIPING FROM GRADE. APPLY HEAT TRACE AND INSULATION TO NEW
PIPING.
2. FURNISH AND INSTALL NEW 3" CWS/CWR PIPING AND INSULATION. ROUTE PIPING
AS HIGH AS POSSIBLE AND CONNECT TO EXISTING AT POINTS INDICATED.
3. CHILLED WATER PUMP TO REMAIN FOR REUSE.
4. FLOOR MOUNTED EXPANSION TANK.
X
DESIGNED DRAWN
APPROVEDCHECKED
COMM. NO. DATE
SHEET
B O
Y C
E E
L E
M E
N T
A R
Y S
C H
O O
L
C H
IL
L
E R
R E
P L A
C E
M E
N T
B O
Y C
E
V
IR
G
IN
IA
REVISION DATE
26101.10 04-21-26
C O M M O
N W
EA
LTH OF
V
IR
G I N I A
P R O
F E
SS IONAL E
N G
IN
E R E
04/21/26
KEY PLAN
BASEMENT MECHANICAL
ROOM - PLAN - DEMOLITION
SCALE: 1/4" = 1'-0"
M101
M E
C H
A N
IC
A
L
P A
R T
IA
L
B A
S E
M E
N T
P L
A N
S D
E M
O A
N D
N E
W W
O R
K
RCH RCH / WBS
RCH LPA
BASEMENT MECHANICAL
ROOM - PLAN - NEW WORK
SCALE: 1/4" = 1'-0"
C W
S
HVAC CHILLED WATER FLOW PIPING SCHEMATIC (PROVIDE ALL VALVES, SWITCHES,
GAUGES AND PIPING SPECIALITIES SHOWN ON THIS SCHEMATIC)
1"
1"
CWR
1"
C W
R
CW
1"
CWR
1 1/2"1 1/2"1 1/2"
C W
S
C W
R
CWS CWS
NO SCALE
DIFFERENTIAL PRESSURE
SENSOR (INSTALLED AT THE 2/3
POINT IN THE PIPING SYSTEM
2" DRAIN TO
FLOOR DRAIN
TO BUILDING
COOLING SYSTEMS
GLOBE VALVE
BYPASS LINE
PRESSURE REDUCING VALVE (FILL)
EXTEND TO DOMESTIC COLD
WATER MAIN (SEE PLUMBING
DRAWINGS FOR CONTINUATION)
R
EXTERIOR WALL
FLEXIBLE PIPE
CONNECTOR (TYPICAL)
1/4" BALL VALVE (TYPICAL)
CHP-2
SUCTION DIFFUSER
PRESSURE
GAGE (TYPICAL)
TRIPLE DUTY
VALVE (TYPICAL)
CHILLER
(CH-1)
AIR SEPARATOR (AS)
EXPANSION TANK (ET)
CWR
CWS
C W
R
MOUNT CHILLER ON
CONCRETE PAD AND
RUBBER ISOLATORS
FLEX CONNECTOR (TYP)
3/4" HOSE END
DRAIN VALVE (TYP)
HEAT TRACE ALL ABOVE-
GRADE EXTERIOR
PIPING, 5 WATTS/LINEAR
FOOT AT 120V/1PH,
CHROMALOX, CPR, SELF-
REGULATING HEAT TRACE
OR EQUAL.
TO FLOOR
DRAIN
RELIEF VALVE
FLOW SWITCH
1/4" BALL
VALVE (TYP)
PRESSURE GAUGE (TYP.)
THERMOMETER (TYP.)
SERVICE VALVE (TYP.)
BAS TEMPERATURE
SENSOR (TYP.)
GLOBE VALVE
BYPASS CHEMICAL FEEDER
PIPE INSULATION
(WHERE REQUIRED)
WALL
GALVANIZED STEEL
PIPE SLEEVE
WALL
PIPE
1/4" SPACE BETWEEN
SLEEVE & INSULATION
NOTE:
WHERE PIPES PENETRATE FIRE-RATED WALLS, FILL
SPACE BETWEEN PIPE AND SLEEVE WITH A
FIRE-RESISTANT MATERIAL WITH SUFFICIENT RATING TO
MAINTAIN THE FIRE RATING OF THE WALL. WHERE PIPE
PENETRATE EXTERIOR WALLS, FILL SPACE BETWEEN
PIPE AND SLEEVE WITH FIBERGLASS INSULATION.
WALL PIPE SLEEVE DETAIL
NO SCALE
PIPE SUPPORT DETAIL
NO SCALE
PIPE
VAPOR BARRIER
(WHERE REQUIRED)
12" LONG, HALF-SECTION OF
HYDROUS CALCIUM SILICATE
AT EACH HANGER SUPPORT
HEAVY DUTY
CLEVIS HANGER
HANGER ROD, SUPPORT
FROM BUILDING STRUCTURE
INSULATION
16 GAGE ZINC COATED
SHEET STEEL SADDLE
AT LEAST 12" LONG
NOTE:
SADDLE AND HALF-SECTION OF HYDROUS CALCIUM SILICATE
SHALL BE INSTALLED AT THE SAME TIME THAT THE PIPE AND
PIPE HANGERS ARE INSTALLED.
SEE SPECIFICATIONS FOR LOCATIONS WHERE HYDROUS
CALCIUM SILICATE SHALL BE REQUIRED.
COLD WATER MAKE-UP DETAIL
NO SCALE
3/4" PIPE TO
EXPANSION TANK
3/4" PIPE FROM
AIR SEPARATOR
3/ 4"
3/4" COLD
WATER MAKE-UP
3/4" CW BYPASS
FILL VALVE
FEEDER BODY
NOTE:
SIZE FILTER FEEDER AS RECOMMENDED BY UNIT MANUFACTURER.
BYPASS CHEMICAL FEEDER
NO SCALE
LID
GLOBE VALVE
3/4" FROM PUMP
DISCHARGE
3/4"
REMOVABLE BASKET
AND FILTER
HOSE END
DRAIN VALVE
3/4" TO PUMP
INTAKE
DESIGNED DRAWN
APPROVEDCHECKED
COMM. NO. DATE
SHEET
B O
Y C
E E
LE
M
E N
T A
R Y
S C
H O
O L
C H
IL
LE
R R
E P
LA
C
E M
E N
T B
O Y
C E
, V
IR
G
IN
IA
REVISION DATE
26101.10 04-21-26
C O M M O
N W
EA
LTH OF
V
IR
G I N I A
P R O
F E
SS IONAL E
N G
IN
E R E
04/21/26
M102
M E
C H
A N
IC
A
L D
E T
A
IL
S A
N D
D
IA
G R
A M
S
RCH RCH / WBS
RCH LPA
1 PLAN NOTE DESIGNATION.
NOTES (ELECTRICAL LEGEND):
1. THESE ARE STANDARD ELECTRICAL SYMBOLS AND MAY NOT ALL APPEAR ON THE PROJECT DRAWINGS. HOWEVER, WHEREVER AN ELECTRICAL SYMBOL APPEARS ON THE PROJECT DRAWINGS, THE ITEM SHALL BE FURNISHED AND INSTALLED.
2. MOUNTING HEIGHTS NOTE IN THIS SCHEDULE ARE FROM FINISHED FLOOR TO TOP OF OUTLET OR EQUIPMENT, UNO. WHERE
THE MOUNTING HEIGHT INDICATED ON THE DRAWINGS IS DIFFERENT FROM THE LEGEND, THE DRAWING TAKES PRECEDENT.
SEE DRAWINGS FOR MOUNTING HEIGHTS NOT INDICATED IN THE LEGEND. MOUNTING HEIGHT NOTED ON THE DRAWINGS ARE
FROM FINISHED FLOOR TO TOP OF DEVICE.
3. SEE ELECTRICAL ABBREVIATIONS FOR ALPHABETIC SUBSCRIPT WITH SYMBOL, UNO.
4. REFER TO DETAILS ON DRAWINGS FOR ADDITIONAL INFORMATION.
1 REVISION DESIGNATION.
ASTERISK DENOTES BOTTOM OF OUTLET BOX MOUNTED 8 IN. ABOVE TOP OF COUNTER.
DISTANCE INCLUDES HEIGHT OF BACKSPLASH.
MTG. HGT. SYMBOL DESCRIPTION
NEW CONNECTED TO EXISTING AT THIS POINT.
EXISTING REMOVED FROM THIS POINT.
208/120 VOLT SURFACE OR FLUSH MOUNTED PANELBOARD.6'-0" TO TOP
480/277 VOLT SURFACE OR FLUSH MOUNTED PANELBOARD.6'-0" TO TOP
CIRCUIT DESIGNATION. DESIGNATION SHOWN INDICATES PANEL NLA1A AND CIRCUIT
NUMBER 3.
NLA1A-3
ELECTRICAL LEGEND - GENERAL
NOTE (ELECTRICAL ABBREVIATIONS):
ELECTRICAL ABBREVIATIONS
1. ALL ABBREVIATIONS LISTED MAY NOT APPLY TO THIS PROJECT. REFER TO OTHER ABBREVIATION
LISTS ELSEWHERE IN THESE DOCUMENTS FOR ABBREVIATIONS NOT LISTED HERE.
AIC
GND
C
EF
A OR AMP GROUND
CONDUIT
EXHAUST FAN
AMPERES INTERRUPTING CAPACITY
AMPERE
MAIN LUGS ONLY
WATT OR WIRE
PHASE
MLO
PH
WEXIST TO REMAINER
VOLTV
ATS AUTOMATIC TRANSFER SWITCH
MAIN CIRCUIT BREAKERMCB
KILOVOLT-AMPEREKVA
GENERAL NOTES:
1. ALL VFD'S WILL BE FURNISHED BY THE MECHANICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR SHALL MOUNT THE
VFD'S (UNLESS THEY ARE INTEGRAL TO THE EQUIPMENT SERVED). CONNECT THE LINE SIDE POWER WIRING AND THE
LOAD SIDE POWER WIRING FROM THE VFD'S TO THE EQUIPMENT. ALL CONTROL AND INTERLOCK WIRING FOR THE VFD'S
WILL BE BY THE CONTROL SYSTEM CONTRACTOR.
2. LOAD SIDE CONDUCTOR AND CONDUIT SIZES FROM DISCONNECT SWITCHES, STARTERS AND VFD'S TO EQUIPMENT SHALL
BE THE SAME AS LINE SIDE CONDUCTORS AND CONDUIT.
3. CAREFULLY COORDINATE ALL ELECTRICAL EQUIPMENT LOCATIONS WITH DUCTWORK, PIPING AND MECHANICAL
EQUIPMENT. MAINTAIN ALL CLEARANCES AND SPACES REQUIRED BY THE NEC.
4. WHERE MULTIPLE CIRCUITS ARE COMBINED IN A SINGLE CONDUIT, DERATE CONDUCTORS PER THE NEC.
5. WHERE RE-USE OF EXISTING CONDUIT, WIRING AND/OR OUTLET BOXES IS INDICATED, ALSO PROVIDE NEW MATERIALS IF
NECESSARY. IF NEW EXPOSED MATERIALS ARE NEEDED, USE SURFACE RACEWAY (SINGLE-CHANNEL EXCEPT WHERE
SPECIFICALLY INDICATED OTHERWISE), EXCEPT EXPOSED CONDUIT AND BOXES MAY BE USED IN UNFINISHED AREAS
(MECHANICAL/ELECTRICAL/IT ROOMS, STORAGE AND HOUSEKEEPING CLOSETS, ETC.).
6. PROVIDE ALL 120-VOLT POWER NEEDED BY THE BAS. COORDINATE WITH THE CONTROLS SPECIFICATIONS AND
CONTRACTOR.
7. MODIFY EXISTING PANEL SCHEDULES TO ACCURATELY REFLECT ALL CHANGES MADE AS PART OF THIS CONTRACT. ALL
NEW BREAKERS IN EXISTING PANELS SHALL MATCH EXISTING AIC. PROVIDE NEW "TYPED" AS-BUILT PANEL SCHEDULES, HANDWRITTEN PANEL SCHEDULES WILL NOT BE ACCEPTED.
8. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTING BID IN ORDER TO VERIFY ALL EXISTING CONDITIONS, TO
DETERMINE THE FULL EXTENT OF DEMOLITION WORK REQUIRED, AND TO DETERMINE THE FULL EXTENT OF RELOCATION
AND MODIFICATION WORK REQUIRED FOR ELECTRICAL WORK (DUE TO OTHER DISCIPLINES INTERFERING OR ANY OTHER
REASON). EXISTING SPACE IS TIGHT IN MANY AREAS (PARTICULARLY ABOVE CEILINGS), AND THE CONTRACTOR SHALL BE
FULLY RESPONSIBLE TO COORDINATE ALL ELECTRICAL WORK WITH BOTH NEW AND EXISTING PIPING, DUCTWORK, CONDUIT, ETC. NO CHANGE ORDERS WILL BE APPROVED FOR ADDITIONAL WORK DUE TO THE CONTRACTOR NEGLECTING
TO VISIT THE SITE AND GATHER ALL NECESSARY INFORMATION.
9. THE CONTRACTOR SHALL PROVIDE COVERPLATES ON ALL EXISTING JUNCTION BOXES ABOVE THE ACCESSIBLE CEILING
SPACES AND ANY WALL MOUNTED BOXES IN THE AREA OF RENOVATIONS WHERE EXISTING COVERPLATES ARE MISSING.
THE CONTRACTOR SHALL ALSO PROVIDE ADDITIONAL SUPPORTS FOR EXISTING CONDUIT AND JUNCTION BOXES IN THE
AREA OF RENOVATIONS THAT CURRENTLY DO NOT MEET CODE REQUIREMENTS.
10. WHERE EXISTING CIRCUITS ARE SPECIFIED TO BE REUSED FOR THE AREA OF RENOVATIONS AND THE CONTRACTOR
DISCOVERS IN THE FIELD THAT THE CIRCUITS DO NOT MEET CODE, OR THEY HAVE SHARED NEUTRALS, OR THEY ARE
MISSING A GROUND CONDUCTOR THE CONTRACTOR SHALL PROVIDE NEW CONDUIT AND WIRING FROM THE PANEL TO
THE EXISTING AND NEW ELECTRICAL EQUIPMENT. ALL NEW CIRCUITS SHALL MEET SPECIFICATIONS FOR VOLTAGE DROP
FOR SINGLE-PHASE WIRING.
GENERAL DEMOLITION NOTES:
1. SCOPE : THE SCOPE OF ELECTRICAL DEMOLITION IS DEFINED IN THE FOLLOWING NOTES AND IN LIMITED FASHION ON THE
DRAWINGS; THE DRAWINGS ARE ONLY INTENDED TO BE A PARTIAL REPRESENTATION OF THE ACTUAL DEMOLITION WORK
REQUIRED. THESE NOTES ONLY APPLY TO THE AREAS OF RENOVATION. IN GENERAL, THE DEMOLITION SCOPE IS THE
REMOVAL OF THE ELECTRICAL CONNECTIONS TO THE EXISTING CHILLER AND THE EXISTING CHILLED WATER PUMPS, EXCEPT AS NOTED OTHERWISE IN THESE NOTES AND ON THE DRAWINGS.
2. MECHANICAL EQUIPMENT : DISCONNECT EXISTING MECHANICAL EQUIPMENT THAT IS BEING REMOVED, AND REMOVE ALL
ASSOCIATED STARTERS, DISCONNECTS, ETC. CONDUIT AND CONDUCTORS TO REMOVED MECHANICAL EQUIPMENT SHALL BE
REUSED ONLY WHERE SPECIFICALLY INDICATED. SEE MECHANICAL DRAWINGS FOR MORE INFORMATION. UNLESS
SPECIFICALLY INDICATED OTHERWISE, EXISTING WIRING TO EXISTING-TO-REMAIN EQUIPMENT SHALL REMAIN.
3. ELECTRICAL SERVICE : THE EXISTING ELECTRICAL SERVICE SHALL BE RE-USED, BUT SOME DOWNTIME WILL LIKELY STILL BE
REQUIRED. ALL ELECTRICAL SERVICE DOWNTIME REQUIRED SHALL BE COORDINATED WITH OWNER AND SHALL BE AT THE
OWNER'S CONVENIENCE. DOWNTIME SHALL BE KEPT TO THE MINIMUM. ALL EXTENDED DOWNTIME REQUIRED SHALL BE
COORDINATED WITH OWNER AND SHALL BE OUTSIDE OF NORMAL SCHOOL HOURS.
4. PANELBOARDS : ALL EXISTING PANELBOARDS ARE TO REMAIN. EXISTING PANELBOARDS ARE TO BE MODIFIED AS INDICATED
ON FLOOR PLANS AND PANEL SCHEDULES. WHERE EXISTING PANELBOARDS ARE TO REMAIN UPDATE THE CIRCUIT
DIRECTORIES TO REFLECT ALL AS-BUILT/EXISTING CIRCUIT CHANGES, ALL REVISED CIRCUIT DIRECTORIES SHALL BE "TYPED"
NOT HANDWRITTEN. CIRCUIT CHANGES INCLUDE, BUT IS NOT LIMITED TO, MOVING EXITING LOADS IN EXISTING PANELS, REMOVING EXISTING LOADS FROM AN EXISTING PANELS, ADDING NEW LOADS TO EXISTING PANELS, CHANGING BREAKERS IN
EXISTING PANELS, ETC. EXISTING CIRCUITS NO LONGER BEING USED AFTER DEMOLITION WORK SHALL BE MADE "SPARES"
AND SHALL BE PLACED IN THE "OFF" POSITION. PROVIDE BLANK PLATES FOR ALL EXISTING CIRCUIT BREAKERS BEING
REMOVED.
5. CONDUIT : ALL ACCESSIBLE UNUSED CONDUIT SHALL BE REMOVED; ALL INACCESSIBLE UNUSED CONDUIT SHALL BE
ABANDONED. ALL CONDUIT TO NEW DEVICES AND EQUIPMENT SHALL BE NEW, UNLESS NOTED OTHERWISE TO BE REUSED.
6. WIRING : ALL WIRING TO DEMOLISHED DEVICES AND EQUIPMENT SHALL BE REMOVED, UNLESS NOTED OTHERWISE. ALL
EXISTING WIRING TO EXISTING-TO-REMAIN DEVICES AND EQUIPMENT SHALL REMAIN, UNLESS NOTED OTHERWISE. ALL
ACCESSIBLE UNUSED WIRING SHALL BE REMOVED; ALL INACCESSIBLE UNUSED WIRING SHALL BE ABANDONED. ALL WIRING
TO NEW DEVICES AND EQUIPMENT SHALL BE NEW, UNLESS NOTED OTHERWISE.
7. MAINTAIN CIRCUIT CONTINUITY AS NECESSARY IN ALL DEMOLITION WORK.
8. THE CONTRACTOR SHALL INFORM THE OWNER'S REPRESENTATIVE OF ELECTRICAL EQUIPMENT REMOVED FROM THE
BUILDING. IF THE OWNER DESIRES TO RETAIN EQUIPMENT, HE WILL REMOVE IT FROM THE SITE. ALL EQUIPMENT NOT
RETAINED BY THE OWNER SHALL BECOME PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE SITE.
DISPOSAL OF ALL EQUIPMENT CONTAINING HAZARDOUS MATERIALS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR, AND THE COST OF DISPOSAL SHALL BE INCLUDED.
9. INFORMATION ON DEMOLITION DRAWINGS DOES NOT INDICATE ALL EXISTING EQUIPMENT AND DEVICES. REFER TO
ARCHITECTURAL AND MECHANICAL DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION.
10. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTING BID AND SHALL VERIFY ALL DEMOLITION REQUIRED.
ADDITIONAL COMPENSATION WILL NOT BE ALLOWED FOR DEMOLITION DUE TO CONTRACTOR NOT VISITING SITE AND
DETERMINING FULL SCOPE OF DEMOLITION REQUIRED.
11. SEE THE DEMOLITION FLOOR PLANS FOR ADDITIONAL DEMOLITION REQUIREMENTS. ON THE DEMOLITION FLOOR PLANS AND
RISERS, ALL DASHED ITEMS SHALL BE REMOVED AND ALL SOLID ITEMS SHALL REMAIN, UNLESS NOTED OTHERWISE. SOME
DEMOLITION ITEMS ARE AFFECTED BY ADD ALTERNATES, AS INDICATED IN THE FLOOR PLANS. NEW WORK FLOOR PLANS
MAY CONTAIN ADDITIONAL DEMOLITION INFORMATION IN SOME LOCATIONS.
BAS BUILDING AUTOMATION SYSTEM
DESIGNED DRAWN
APPROVEDCHECKED
COMM. NO. DATE
SHEET
B O
Y C
E E
LE
M
E N
T A
R Y
S C
H O
O L
C H
IL
LE
R R
E P
LA
C
E M
E N
T B
O Y
C E
, V
IR
G
IN
IA
REVISION DATE
26101.10 04-21-26
04/21/26
C O M M O
N W
EA
LTH OF
V
IR
G I N I A
P R O
F E
SS IONAL E
N G
IN
E R E
E001
E
LE
C T
R
IC
A L
LE
G
E N
D , N
O T
E S
A N
D A
B B
R E
V
IA
T
IO
N S
MAR MAR
WAM LPA
PUMP ROOM
CH-1
CWP-1
M M M
M M M
EM
ER
PANEL "A"
EM
A-8
ER
A-1
BOILER ROOM
ER
7 9
BOILER ROOM PUMP ROOM
CWP-1
AS
ET
ER
PANEL "A"
ER
MM
MM
A-8
8 6 6
DESIGNED DRAWN
APPROVEDCHECKED
COMM. NO. DATE
SHEET
B O
Y C
E E
LE
M
E N
T A
R Y
S C
H O
O L
C H
IL
LE
R R
E P
LA
C
E M
E N
T B
O Y
C E
, V
IR
G
IN
IA
REVISION DATE
26101.10 04-21-26
04/21/26
KEY PLAN
C O M M O
N W
EA
LTH OF
V
IR
G I N I A
P R O
F E
SS IONAL E
N G
IN
E R E
BASEMENT ELECTRICAL
ROOM - PLAN - DEMOLITION
SCALE: 1/4" = 1'-0"
E101
E
LE
C T
R
IC
A L
P A
R T
IA
L
B A
S E
M E
N T
P
LA
N S
D E
M O
A N
D N
E W
W O
R K
MAR MAR
RCH LPA
BASEMENT ELECTRICAL L
ROOM - PLAN - NEW WORK
SCALE: 1/4" = 1'-0"
GENERAL NOTES:
A. CONTRACTOR IS RESPONSIBLE FOR REVIEWING THE ENTIRE CONTRACT DOCUMENTS TO HAVE A
COMPLETE UNDERSTANDING OF THE PROJECT SCOPE OF WORK AND SHALL COORDINATE WITH ALL
DISCIPLINES AND THE OWNERS REPRESENTATIVE PRIOR TO ANY WORK.
B. ELECTRICAL DEMOLITION IS DEFINED IN THE FOLLOWING NOTES AND IN LIMITED TO FIELD OBSERVATION
AND ACCESSIBILITY TO THE EXISTING CONDITIONS. THE DRAWINGS ARE ONLY INTENDED TO BE A
PARTIAL REPRESENTATION OF THE ACTUAL DEMOLITION WORK REQUIRED. THESE NOTES ONLY APPLY
TO THE AREAS OF RENOVATION. IN GENERAL, THE DEMOLITION SCOPE IS THE REMOVAL OF EXISTING
LIGHTING AND ASSOCIATED CONTROLS IN THE AREAS OF RENOVATION, EXCEPT AS NOTED OTHERWISE IN
THESE NOTES AND ON THE CONTRACT DOCUMENTS.
C. CONTRACTOR SHALL COORDINATE ALL REQUIRED SHUTDOWNS WITH PROJECT MANAGER/GC AND
OWNER'S REPRESENTATIVE.
D. ALL WIRING FOR ALL SIZES WILL BE SIMPUL OR EQUAL TO IMPREGNATED COLOR CODED INSULATION, FOR EACH VOLTAGE AND PHASES - NO COLOR TAPE WILL BE ACCEPTED - THIS IS TYPICAL FOR THE
ENTIRE SCOPE OF WORK, THIS INCLUDES THE NEW CHILLER AND ASSOCIATED PUMPS.AGAIN COLOR
TAPE WILL NOT BE ACCEPTABLE.
NEW PLAN NOTES:
1. EXISTING ELECTRICAL BRANCH PANEL "A" SHALL REMAIN AS INSTALLED AND WILL SUPPORT THE PROJECT
SCOPE OF WORK. CONTRACTOR IS RESPONSIBLE FOR PROVIDING NEW NAMEPLATES ON THE PANEL -
BLACK FACE WHITE CORE - MINIMUM LETTER SIZE .25". CONTRACTOR IS RESPONSIBLE FOR PROVIDING A
NEW (TYPED) PANEL SCHEDULE REFLECTING THE SCOPE OF WORK, NO HAND WRITTEN ENTRIES WILL BE
ACCEPTED. CONTRACTOR IS NOT RESPONSIBLE FOR CONFIRMING THE EXISTING CONNECTED LOADS, BUT
IS RESPONSIBLE FOR TRANSFERRING THE NOTED EXISTING DESCRIPTION FROM THE EXISTING PANEL
SCHEDULE TO THE NEW PANEL SCHEDULE.
2. THE EXISTING CHILLED WATER PUMP (CWP-1) AND ASSOCIATED COMBINATION STARTER SHALL REMAIN AS
INSTALLED, NO WORK REQUIRED.
3. THE CONTRACTOR SHALL REMOVE THE EXISTING WESTINGHOUSE (CAT.KT3250T) 250A 3 POLE BREAKER IN
PANEL A, THAT WAS SUPPORTING THE EXISTING CHILLER UNIT. THE CONTRACTOR SHALL PROVIDE A NEW
EATON/WESTINGHOUSE (CAT.KT3300T) PLEASE CONFIRM CAT NUMBER, RATED FOR 300A 3 POLE WITH
LONG-TIME AND INSTANTANEOUS SETTINGS), 208V. 65 AKIC RATING. THE CONTRACTOR SHALL MOUNT IN
THE SAME LOCATION OF THE REMOVED 250A 3 POLE. PROVIDE ALL REQUIRED MOUNTING HARDWARE.
4. THE NEW CHILLER SHALL BE PROVIDED WITH A INTEGRAL 300A 3 POLE BREAKER FOR A LOCAL
DISCONNECTION.
5. THE CONTRACTOR SHALL PROVIDE (3) #350KCMIL W/#4 GROUND IN 3.0" CONDUIT FROM THE NEW
ASSIGNED 300A, 3 POLE BREAKER IN THE PANEL A AND TO THE NEW CHILLER'S ONE POINT POWER
SOURCE CONNECTION POINT ON THE PROVIDED INTEGRAL BREAKER, COORDINATE WITH MECHANICAL
CONTRACTOR. THE CONTRACTOR SHALL PROVIDE A MINIMUM OF 6'-0" OF SEAL-TIGHT FLEXIBLE CONDUIT
FROM THE CHILLER'S POWER CONNECTION POINT. THE CONTRACTOR SHALL REFER TO GENERAL NOTE
"D".THE CONTRACTOR SHALL PROVIDE A TECHNOLOGY DROP AT THE CHILLER CONTROL CABINET, COORDINATE WITH OWNER'S "IT" FOR AVAILABILITY.
6. THE CONTRACTOR SHALL INTERCEPT AND EXTEND THE EXISTING RETAIN POWER SOURCES (PANEL A -5)
NOTED IN THE DEMOLITION NOTES 7 TO THE NEW CHILLER'S CONTROLS PANEL. THE CONTRACTOR SHALL
MATCH THE EXISTING CONDUCTORS, CU, 75 DEGREE, ETC. THE CONTRACTOR SHALL PROVIDE A MINIMUM
OF 6'-0" OF SEAL-TIGHT FLEXIBLE CONDUIT FROM THE CONTROL PANEL'S POWER CONNECTION POINT.
7. THE CONTRACTOR SHALL INTERCEPT AND EXTEND THE EXISTING RETAIN POWER SOURCES (PANEL A
-14/16/18) NOTED IN THE DEMOLITION NOTES 8 TO THE NEW CHILLER'S HEAT TRACE SYSTEM. THE
CONTRACTOR SHALL COORDINATE WITH MECHANICAL CONTRACTOR FOR POWER CONNECTION POINTS
ON THE PROVIDED HEAT TRACE SYSTEM. THE CONTRACTOR SHALL MATCH THE EXISTING CONDUCTORS, CU, 75 DEGREE, ETC. THE CONTRACTOR SHALL PROVIDE A MINIMUM OF 6'-0" OF SEAL-TIGHT FLEXIBLE
CONDUIT FROM THE CONTROL PANEL'S POWER CONNECTION POINT.
8. THE CONTRACTOR SHALL PROVIDE A 20A SINGLE POLE BREAKER IN POSITION #41 IN EXISTING BRANCH
PANEL-A TO SUPPORT THE NEW EVAPORATOR HEATER ON THE NEW CHILLER UNIT.
9. THE CONTRACTOR SHALL PROVIDE (2)#12 W/#12 GROUND IN .75" CONDUIT FROM THE ASSIGNED 20A
SINGLE BREAKER #41 TO THE CHILLER UNIT'S EVAPORATED HEATER'S POWER CONNECTION POINT. THE
CONTRACTOR SHALL PROVIDE A MINIMUM OF 6'-0" OF SEAL-TIGHT FLEXIBLE CONDUITS FROM THE
EVAPORATOR HEATER'S CONNECTION POINT.
10. THE CONTRACTOR SHALL MAKE ALL EXTERIOR WALL PENETRATIONS WEATHER/WATER TIGHT.
DEMOLITION PLAN NOTES:
1. EXISTING ELECTRICAL BRANCH PANEL "A" SHALL REMAIN AS INSTALLED AND WILL SUPPORT THE PROJECT
SCOPE OF WORK. CONTRACTOR IS RESPONSIBLE FOR PROVIDING NEW NAMEPLATES ON THE PANEL -
BLACK FACE WHITE CORE - MINIMUM LETTER SIZE .25". CONTRACTOR IS RESPONSIBLE FOR PROVIDING A
NEW (TYPED) PANEL SCHEDULE REFLECTING THE SCOPE OF WORK, NO HAND WRITTEN ENTRIES WILL BE
ACCEPTED. CONTRACTOR IS NOT RESPONSIBLE FOR CONFIRMING THE EXISTING CONNECTED LOADS, BUT
IS RESPONSIBLE FOR TRANSFERRING THE NOTED EXISTING DESCRIPTION FROM THE EXISTING PANEL
SCHEDULE TO THE NEW PANEL SCHEDULE.
2. THE EXISTING CHILLED WATER PUMP (CWP-1) AND ASSOCIATED COMBINATION STARTER SHALL REMAIN AS
INSTALLED, NO WORK REQUIRED.
3. THE CONTRACTOR SHALL SAFE-OFF THE EXISTING 250A, 3 POLE BREAKER SUPPORTING THE EXISTING TO
BE REMOVED CHILLER UNIT, LOCATED IN BRANCH PANEL "A" WESTINGHOUSE POW-R-LINE C PRL4, RATED
FOR 800A, 208/120V, 3 PHASE, 4 WIRE, 42AIC - MLO.
4. THE CONTRACTOR SHALL DISCONNECT AND REMOVE THE EXISTING CHILLER'S 300 KCMIL FEEDER
CONDUCTORS AND ASSOCIATED CONDUIT FROM THE ASSIGNED 250A BREAKER IN THE PANEL "A" TO THE
EXTERIOR MOUNTED NON-FUSED DISCONNECT SWITCH FROM THE LINE-SIDE.
5. THE CONTRACTOR SHALL DISCONNECT AND REMOVE THE EXISTING CHILLER'S 300KCMIL FEEDER
CONDUCTORS FROM THE LOAD-SIDE OF THE LOCAL DISCONNECT SWITCH AND FROM THE CHILLER'S
POWER CONNECTION POINT.
6. THE CONTRACTOR DISCONNECT AND REMOVE THE EXTERIOR MOUNTED NON-FUSED DISCONNECT SWITCH.
7. THE CONTRACTOR SHALL LABEL, DISCONNECT AND COIL BACK POWER SOURCE FROM THE CHILLER'S
CONTROL PANEL BACK TO THE EXTERIOR WALL MOUNTED DOUBLE GANG FS BOX. REMOVE THE CONDUIT
BACK TO THIS JUNCTION AS WELL. THE ASSIGNED CIRCUIT IS PANEL A, CIRCUIT #5, 20A SINGLE POLE. THIS
POWER SOURCE SHALL BE RETAIN AND EXTENDED TO THE NEW CHILLER'S CONTROL PANEL.
8. THE CONTRACTOR SHALL LABEL, DISCONNECT AND COIL BACK POWER SOURCE FROM THE CHILLER'S HEAT
TRACE BACK TO THE EXTERIOR WALL MOUNTED DOUBLE GANG FS BOX. REMOVE THE CONDUIT BACK TO
THIS JUNCTION AS WELL. THE ASSIGNED CIRCUIT IS PANEL A, CIRCUIT #14/16/16, 30A 3 POLE. THIS POWER
SOURCE SHALL BE RETAIN AND EXTENDED TO THE NEW CHILLER'S CONTROL PANEL.
9. THE CONTRACTOR SHALL RETAIN POWER SOURCE WIRING AND ASSOCIATED CONDUIT FROM THE
ASSIGNED PANEL A TO THE EXTERIOR WALL MOUNTED DOUBLE GANG FS BOX.
| T001 |
| M001 |
| M101 |
| M102 |
| E001 |
| E101 |
File details come from the government source that posted it. Updated .