Appendix I Note - UUT Test Specifications.pdf
PDF 469 KB Posted
- Attached to
- PUMP TEST STAND MODERNIZATION MODEL PTS-1 Federal contract opportunity
- Solicitation number
- FA8125-20-R-0027-0001
About this file
This document contains a federal contract solicitation and related technical specifications appendix. The solicitation seeks offers for a pump test stand modernization model PTS-1. Interested parties may attend an optional site visit on October 5, 2020 at the Tinker Air Force Base in Oklahoma to learn more. Offers are due by October 14, 2020. The technical specifications appendix provides test requirements for various combat support diffuser pumps used on aircraft like the A-10, B-52, B-1B, E-3A, F-15, and F-16. It lists required shaft speeds, flow rates, back pressures, and references the applicable technical orders. Access to some technical orders requires submission of a DD Form 2345.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation - FA812520R0027.pdf | ||
| Appendix A - Equipment List.pdf | ||
| SOW- H1TC01.pdf | ||
| Appendix K Note - Technical Manual Illustrated Parts Breakdown.pdf | ||
| Appendix G Note - Technical Manual for Pump Test Stand.pdf | ||
| Questions and Answers.pdf | ||
| Appendix H Note - Pump Test Stand Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW-2020-Pump Test Stand 9 July 2020
Page | 1
Appendix I – UUT Test Specifications
T.O.’s
1. A-10 CSD, 9H6-3-38-3
2. B-52H CSD, 9H6-5-5-3**
3. B-1B CSD, 9H6-3-45-3
4. E-3A/E-8 CSD, 9H6-3-39-3
5. F-15A/D CSD, 9H6-3-36-3
6. F-16A/B CSD, 9H6-3-36-13
7. F-16C/D CSD, 9H6-3-44-3
Distribution authorized to the Depart of Defense and U.S. DoD contractors only.*
Pump Testing Information
Test stand shall be able to test all CSD gerotor pumps. Sample values for UUT requirements are shown in the table below.***
Shaft Speed (rpm) Min Allowable Flow (gpm) Back Pressure (PSI)
Min UUT Requirements 3450 2.6 90
Max UUT Requirements 5900 11 410
* Copies of the T.O.'s in Appendix I are available on request from the Contracting Officer upon receipt of the Contractor’s DD Form 2345 (Militarily Critical Technical Data Agreement).
Information regarding the DD Form 2345 and certification for Contractor’s who wish to obtain access to unclassified technical data is available at https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/
**The B-52 T.O. is Distribution E and will require a request for access to the Technical Order Distribution
Office (TODO). Request will need to be made to aflcmc.ezgtp.PubSale@us.af.mil with DD Form 2345 attached.
***Provided values are non-binding. Contractor must verify actual UUT requirements from their respective TOs.
https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/ mailto:aflcmc.ezgtp.PubSale@us.af.mil
File details come from the government source that posted it. Updated .