Appendix I Note - UUT Test Specifications.pdf

PDF 469 KB Posted

Attached to
PUMP TEST STAND MODERNIZATION MODEL PTS-1 Federal contract opportunity
Solicitation number
FA8125-20-R-0027-0001
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This document contains a federal contract solicitation and related technical specifications appendix. The solicitation seeks offers for a pump test stand modernization model PTS-1. Interested parties may attend an optional site visit on October 5, 2020 at the Tinker Air Force Base in Oklahoma to learn more. Offers are due by October 14, 2020. The technical specifications appendix provides test requirements for various combat support diffuser pumps used on aircraft like the A-10, B-52, B-1B, E-3A, F-15, and F-16. It lists required shaft speeds, flow rates, back pressures, and references the applicable technical orders. Access to some technical orders requires submission of a DD Form 2345.

View the file

Other files for this federal contract opportunity

Other files attached to PUMP TEST STAND MODERNIZATION MODEL PTS-1, newest first.
File Type Posted
Solicitation - FA812520R0027.pdf PDF
Appendix A - Equipment List.pdf PDF
SOW- H1TC01.pdf PDF
Appendix K Note - Technical Manual Illustrated Parts Breakdown.pdf PDF
Appendix G Note - Technical Manual for Pump Test Stand.pdf PDF
Questions and Answers.pdf PDF
Appendix H Note - Pump Test Stand Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW-2020-Pump Test Stand 9 July 2020

Page | 1

Appendix I – UUT Test Specifications

T.O.’s

1. A-10 CSD, 9H6-3-38-3

2. B-52H CSD, 9H6-5-5-3**

3. B-1B CSD, 9H6-3-45-3

4. E-3A/E-8 CSD, 9H6-3-39-3

5. F-15A/D CSD, 9H6-3-36-3

6. F-16A/B CSD, 9H6-3-36-13

7. F-16C/D CSD, 9H6-3-44-3

Distribution authorized to the Depart of Defense and U.S. DoD contractors only.*

Pump Testing Information

Test stand shall be able to test all CSD gerotor pumps. Sample values for UUT requirements are shown in the table below.***

Shaft Speed (rpm) Min Allowable Flow (gpm) Back Pressure (PSI)

Min UUT Requirements 3450 2.6 90

Max UUT Requirements 5900 11 410

* Copies of the T.O.'s in Appendix I are available on request from the Contracting Officer upon receipt of the Contractor’s DD Form 2345 (Militarily Critical Technical Data Agreement).

Information regarding the DD Form 2345 and certification for Contractor’s who wish to obtain access to unclassified technical data is available at https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/

**The B-52 T.O. is Distribution E and will require a request for access to the Technical Order Distribution

Office (TODO). Request will need to be made to aflcmc.ezgtp.PubSale@us.af.mil with DD Form 2345 attached.

***Provided values are non-binding. Contractor must verify actual UUT requirements from their respective TOs.

https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/ mailto:aflcmc.ezgtp.PubSale@us.af.mil

File details come from the government source that posted it. Updated .