Appendix I_note.pdf
PDF 469 KB Posted
- Attached to
- PUMP TEST STAND MODERNIZATION Federal contract opportunity
- Solicitation number
- FA8125-20-R-0027
About this file
This document contains a statement of work and technical specifications for the modernization of a pump test stand. The government is requesting a one-time purchase to upgrade the electrical and control systems, repair or replace mechanical systems, and conduct functional testing on an existing Model PTS-1 Pump Test Stand. The modified test stand must be able to test gerotor pumps from various aircraft Constant Speed Drives and Integrated Drive Generators. It must meet the performance specifications in the statement of work and the technical requirements in the most current pump technical orders listed. The technical orders provide details on allowable flow rates, back pressures, and other parameters the test stand must be capable of achieving when testing the different pump units under test.
The solicitation is seeking these modernization services from the Department of the Air Force Materiel Command Air Force Sustainment Center for the pump test stand located at Tinker Air Force Base. Responses are due by the date specified in the solicitation. The upgraded test stand will support the continued maintenance and repair of aircraft hydraulic pumps.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW- H1TC01.pdf | ||
| Appendix K_note.pdf | ||
| Solicitation - FA812520R0027.pdf | ||
| Appendix A - Equipment List.pdf | ||
| Appendix H_note.pdf | ||
| Appendix G_note.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW-2020-Pump Test Stand 9 July 2020
Page | 1
Appendix I – UUT Test Specifications
T.O.’s
1. A-10 CSD, 9H6-3-38-3
2. B-52H CSD, 9H6-5-5-3**
3. B-1B CSD, 9H6-3-45-3
4. E-3A/E-8 CSD, 9H6-3-39-3
5. F-15A/D CSD, 9H6-3-36-3
6. F-16A/B CSD, 9H6-3-36-13
7. F-16C/D CSD, 9H6-3-44-3
Distribution authorized to the Depart of Defense and U.S. DoD contractors only.*
Pump Testing Information
Test stand shall be able to test all CSD gerotor pumps. Sample values for UUT requirements are shown in the table below.***
Shaft Speed (rpm) Min Allowable Flow (gpm) Back Pressure (PSI)
Min UUT Requirements 3450 2.6 90
Max UUT Requirements 5900 11 410
* Copies of the T.O.'s in Appendix I are available on request from the Contracting Officer upon receipt of the Contractor’s DD Form 2345 (Militarily Critical Technical Data Agreement).
Information regarding the DD Form 2345 and certification for Contractor’s who wish to obtain access to unclassified technical data is available at https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/
**The B-52 T.O. is Distribution E and will require a request for access to the Technical Order Distribution
Office (TODO). Request will need to be made to aflcmc.ezgtp.PubSale@us.af.mil with DD Form 2345 attached.
***Provided values are non-binding. Contractor must verify actual UUT requirements from their respective TOs.
https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/ mailto:aflcmc.ezgtp.PubSale@us.af.mil
File details come from the government source that posted it. Updated .