This document provides specifications for testing centrifugal pump units (UUTs) on a pump test stand. The test stand must be capable of testing all centrifugal pumps from the technical orders listed for aircraft including the A-10, B-52, B-1B, E-3A/E-8, F-15, and F-16. Sample required flow rates and back pressures are given in the table, along with the allowable ranges for shaft speed, minimum flow, and maximum back pressure. The related federal contract opportunity is for modernization of a pump test stand designated PTS-1 to be procured by the Department of the Air Force Materiel Command Air Force Sustainment Center. Technical order documents referenced in the appendix are available upon request contingent on submission of a DD Form 2345.

View the file

Other files for this federal contract opportunity

Other files attached to PUMP TEST STAND MODERNIZATION MODEL PTS-1, newest first.
File Type Posted
SSS - Pump Test Stand - Final.pdf PDF
Appendix K_note.pdf PDF
Appendix H_note.pdf PDF
Appendix G_note.pdf PDF
SOW- H1TC01.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW-2020-Pump Test Stand 9 July 2020

Page | 1

Appendix I – UUT Test Specifications

T.O.’s

1. A-10 CSD, 9H6-3-38-3

2. B-52H CSD, 9H6-5-5-3**

3. B-1B CSD, 9H6-3-45-3

4. E-3A/E-8 CSD, 9H6-3-39-3

5. F-15A/D CSD, 9H6-3-36-3

6. F-16A/B CSD, 9H6-3-36-13

7. F-16C/D CSD, 9H6-3-44-3

Distribution authorized to the Depart of Defense and U.S. DoD contractors only.*

Pump Testing Information

Test stand shall be able to test all CSD gerotor pumps. Sample values for UUT requirements are shown in the table below.***

Shaft Speed (rpm) Min Allowable Flow (gpm) Back Pressure (PSI)

Min UUT Requirements 3450 2.6 90

Max UUT Requirements 5900 11 410

* Copies of the T.O.'s in Appendix I are available on request from the Contracting Officer upon receipt of the Contractor’s DD Form 2345 (Militarily Critical Technical Data Agreement).

Information regarding the DD Form 2345 and certification for Contractor’s who wish to obtain access to unclassified technical data is available at https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/

**The B-52 T.O. is Distribution E and will require a request for access to the Technical Order Distribution

Office (TODO). Request will need to be made to aflcmc.ezgtp.PubSale@us.af.mil with DD Form 2345 attached.

***Provided values are non-binding. Contractor must verify actual UUT requirements from their respective TOs.

https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/ mailto:aflcmc.ezgtp.PubSale@us.af.mil

File details come from the government source that posted it. Updated .