Appendix_F_-_Cost_Worksheets.xlsx
XLSX spreadsheet 57 KB Posted
- Attached to
- Office of Technology and Solutions Integration (OTSI) California Electronic Benefit Transfer (EBT)
- Solicitation number
- -74050233
- Issued by
- California
About this file
This is a Cost Worksheets appendix for a state and local Electronic Benefits Transfer (EBT) contract opportunity, containing seven comprehensive cost proposal sections with specific instructions for bidder pricing submissions. The contract involves transition-in services for Food and Cash EBT and WIC EBT programs, transition-out services, ongoing operational cost-per-case-month pricing for multiple card technology options, cost-per-benefit-load pricing for SUN Bucks programs, equipment costs, and labor rates. The transition-in period spans thirteen months from June 2027 through June 2028, with transition-out services scheduled for June 2034 through June 2035. Bidders must manually enter costs in designated yellow cells across multiple tables that calculate automatic subtotals and milestone-based payment schedules, with transition-in costs capped at $7,000,000 for Food and Cash EBT and $2,000,000 for WIC EBT, and transition-out costs not to exceed $3,000,000.
Pricing structures include cost-per-case-month rates differentiated by benefit type (Food-only, Cash-only, Food and Cash Combined), card technology (Chip EMV/Tap or Magstripe-Only), and call center location (California-based or Best Value), with separate cost-per-benefit-load pricing for SUN Bucks under four distinct configurations. The cost worksheets establish maximum fee limits for cardholder services, with most transactions specified as free, including deposits, alerts, POS purchases, and in-network ATM withdrawals, while out-of-network ATM withdrawals allow one dollar per withdrawal after six free transactions. Equipment pricing requires bidders to specify monthly costs for both wired and wireless EBT-only POS devices, and labor rates must be provided for five classifications ranging from Project Manager at $175 per hour to Programmer at $100 per hour. Transition-in payment milestones are structured across eleven achievement-based phases with percentage allocations, including a 40 percent payment upon EBT cutover and a 10 percent holdback pending successful completion, while all yellow-cell entries represent manual bidder submissions requiring financial precision and alignment with the scope of work requirements referenced in RFP Section 7.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EBT_4_RFP_Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Refer to RFP Section 7 - Cost Proposal for context and guidance for each table. | ||||
| Summary of Cost Worksheet Tables | ||||
| Cost Worksheet Part | Worksheet | Table # | Table Name | Notes |
| Part 1: Transition in Services Costs | Transition In Costs | Table 1a | Transition In Food and Cash EBT (including SUN Bucks) Costs | All Bidders - Manual entry to yellow cells |
| Transition In Costs | Table 1b | Transition In WIC EBT Costs | All Bidders - Manual entry to yellow cells | |
| TI Payment Milestones | Table 1c | Transition In Food and Cash EBT (including SUN Bucks) Payment Milestones | All Bidders - Automatic calculations, no manual entry | |
| TI Payment Milestones | Table 1d | Transition In WIC EBT Payment Milestones | All Bidders - Automatic calculations, no manual entry | |
| Part 2: Transition out Services Costs | Transition Out (TO) | Table 2 | Transition Out Costs | All Bidders - Manual entry to yellow cells |
| Part 3: Cost-Per-Case-Month | F&C (excluding SUN Bucks) CPCMs | Table 3a | Food and Cash EBT (excluding SUN Bucks) CPCM with Chip EMV/Tap Cards and California Call Centers | All Bidders - Manual entry to yellow cells |
| F&C (excluding SUN Bucks) CPCMs | Table 3b | Food and Cash EBT (excluding SUN Bucks) CPCM with Chip EMV/Tap Cards and Best Value Call Centers | All Bidders - Manual entry to yellow cells | |
| WIC EBT CPCMs | Table 3c | WIC EBT CPCM with Magstripe-Only Cards and Best Value Call Centers | All Bidders - Manual entry to yellow cells | |
| WIC EBT CPCMs | Table 3d | WIC EBT CPCM with Chip EMV/Tap Cards and Best Value Call Centers | All Bidders - Manual entry to yellow cells | |
| Part 4: Cost-Per-Benefit-Load | SUN Bucks CPBLs | Table 4a | SUN Bucks CPBL with Magstripe-Only Cards and California Call Centers | All Bidders - Manual entry to yellow cells |
| SUN Bucks CPBLs | Table 4b | SUN Bucks CPBL with Magstripe-Only Cards and Best Value Call Centers | All Bidders - Manual entry to yellow cells | |
| SUN Bucks CPBLs | Table 4c | SUN Bucks CPBL with Chip EMV/Tap Cards and California Call Centers | All Bidders - Manual entry to yellow cells | |
| SUN Bucks CPBLs | Table 4d | SUN Bucks CPBL with Chip EMV/Tap Cards and Best Value Call Centers | All Bidders - Manual entry to yellow cells | |
| Part 5: Paycard Cardholder Fees | Paycard Cardholder Fees | Table 5 | Paycard Cardholder Fees | All Bidders - Manual entry to yellow cells |
| Part 6: Equipment | Equipment | Table 6 | EBT-Only POS Device Costs | All Bidders - Manual entry to yellow cells |
| Part 7: Other EBT Services | Labor Rates | Table 7 | Labor Rates for Operational Contingency Costs | All Bidders - Manual entry to yellow cells |
Transition In Costs
| Table 1a - Transition In Food and Cash EBT (including SUN Bucks) Costs | |||||||||||||||||
| SFY 26 -27 | SFY 27 -28 | ||||||||||||||||
| Jun, 2027 | Jul, 2027 | Aug, 2027 | Sep, 2027 | Oct, 2027 | Nov, 2027 | Dec, 2027 | Jan, 2028 | Feb, 2028 | Mar, 2028 | Apr, 2028 | May, 2028 | Jun, 2028 | |||||
| Line Item # | SOW | Requirement Section | Month 1* | Month 2 | Month 3 | Month 4 | Month 5 | Month 6 | Month 7 | Month 8 | Month 9 | Month 10 | Month 11 | Month 12 | Month 13* | Total | |
| 1 | TIN.1 | Project and Workplan Management | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 2 | TIN.2 | Cash Access | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 3 | TIN.3 | Retailer Management | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 4 | TIN.4 | Business Continuity | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 5 | TIN.5 | Document Management | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 6 | TIN.6 | Capacity Management | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 7 | TIN.7 | Training | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 8 | TIN.8 | Transaction Processing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 9 | TIN.9 | Third-Party Processors | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 10 | TIN.10 | Cardholder and Retailer ARUs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 11 | TIN.11 | Cardholder and Retailer Call Centers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 12 | TIN.12 | EBT Cards and PINs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 13 | TIN.13 | Settlement and Reconciliation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 14 | TIN.14 | EBT Database Conversion | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 15 | TIN.15 | State EBT Administrative Network | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 16 | TIN.16 | Food and Cash EBT Disaster Services | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 17 | TIN.17 | Reports | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 18 | TIN.18 | Testing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 19 | TIN.19 | Administrative Applications | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 20 | TIN.20 | Administrative Application Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 21 | TIN.21 | Food and Cash Data Warehouse Application | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 22 | TIN.22 | Ticket Management Application | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 23 | TIN.23 | Food and Cash Cardholder Website | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 24 | TIN.24 | Food and Cash Card Printers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 25 | TIN.25 | PIN Selection Devices | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 26 | TIN.26 | Balance Inquiry-Only POS Devices | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 27 | TIN.27 | Other WIC EBT Services | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 28 | TIN.28 | Staffing Qualifications | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 29 | Totals | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 30 | Total TIN Food and Cash EBT Costs | ||||||||||||||||
| (Not to exceed $7,000,000) | $ - 0 |
| *Transition Period goes from June 6, 2027 to June 5, 2028 | |||||||||||||||||
| Table 1b - Transition In WIC EBT Costs | |||||||||||||||||
| SFY 26 -27 | SFY 27 -28 | ||||||||||||||||
| Jun, 2027 | Jul, 2027 | Aug, 2027 | Sep, 2027 | Oct, 2027 | Nov, 2027 | Dec, 2027 | Jan, 2028 | Feb, 2028 | Mar, 2028 | Apr, 2028 | May, 2028 | Jun, 2028 | |||||
| Line Item # | SOW | Requirement Section | Month 1* | Month 2 | Month 3 | Month 4 | Month 5 | Month 6 | Month 7 | Month 8 | Month 9 | Month 10 | Month 11 | Month 12 | Month 13* | Total | |
| 1 | TIN.1 | Project and Workplan Management | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 2 | TIN.2 | Cash Access | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 3 | TIN.3 | Retailer Management | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 4 | TIN.4 | Business Continuity | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 5 | TIN.5 | Document Management | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 6 | TIN.6 | Capacity Management | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 7 | TIN.7 | Training | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 8 | TIN.8 | Transaction Processing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 9 | TIN.9 | Third-Party Processors | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 10 | TIN.10 | Cardholder and Retailer ARUs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 11 | TIN.11 | Cardholder and Retailer Call Centers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 12 | TIN.12 | EBT Cards and PINs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 13 | TIN.13 | Settlement and Reconciliation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 14 | TIN.14 | EBT Database Conversion | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 15 | TIN.15 | State EBT Administrative Network | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 16 | TIN.16 | Food and Cash EBT Disaster Services | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 17 | TIN.17 | Reports | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 18 | TIN.18 | Testing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 19 | TIN.19 | Administrative Applications | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 20 | TIN.20 | Administrative Application Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 21 | TIN.21 | Food and Cash Data Warehouse Application | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 22 | TIN.22 | Ticket Management Application | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 23 | TIN.23 | Food and Cash Cardholder Website | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 24 | TIN.24 | Food and Cash Card Printers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 25 | TIN.25 | PIN Selection Devices | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 26 | TIN.26 | Balance Inquiry-Only POS Devices | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 27 | TIN.27 | Other WIC EBT Services | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 28 | TIN.28 | Staffing Qualifications | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 29 | Totals | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 30 | Total TIN WIC EBT Costs | ||||||||||||||||
| (Not to exceed $2,000,000) | $ - 0 |
*Transition Period goes from June 6, 2027 to June 5, 2028
TIN Payment Milestones
| Table 1c - Transition In Food and Cash EBT (including SUN Bucks) Payment Milestones | ||||||
| Line Item # | Transition-In Payment Milestones | % of Transition Cost | Transition Cost | Holdback 10% | Contractor Milestone Payments | |
| 1 | Food and Cash Transition Services Workplan Milestone Payment | 2% | $ - 0 | $ - 0 | $ - 0 | |
| 2 | Project Startup Milestone Payment | 5% | $ - 0 | $ - 0 | $ - 0 | |
| 3 | General Design Milestone Payment | 6% | $ - 0 | $ - 0 | $ - 0 | |
| 4 | Conversion Planning Milestone Payment | 6% | $ - 0 | $ - 0 | $ - 0 | |
| 5 | Detailed Design Milestone Payment | 6% | $ - 0 | $ - 0 | $ - 0 | |
| 6 | Testing Milestone Payment | 6% | $ - 0 | $ - 0 | $ - 0 | |
| 7 | Operations Setup Milestone Payment | 6% | $ - 0 | $ - 0 | $ - 0 | |
| 8 | Acceptance of Transition Services User Acceptance Test Milestone Payment | 5% | $ - 0 | $ - 0 | $ - 0 | |
| 9 | Operations Processes Milestone Payment | 6% | $ - 0 | $ - 0 | $ - 0 | |
| 10 | Go/No-Go Decision Point Milestone Payment | 12% | $ - 0 | $ - 0 | $ - 0 | |
| 11 | Food and Cash EBT Cutover Milestone Payment | 40% | $ - 0 | $ - 0 | $ - 0 | |
| 12 | Totals | 100% | $ - 0 | $ - 0 | ||
| 13 | Transition in Holdback Payment | $ - 0 | ||||
| 14 | Total TIN Food and Cash Costs | |||||
| (Not to exceed $7,000,000) | $ - 0 |
| Table 1d - Transition In WIC EBT Payment Milestones | ||||||
| Line Item # | Transition-In Payment Milestones | % of Transition Cost | Transition Cost | Holdback 10% | Contractor Milestone Payments | |
| 1 | WIC EBT Transition Services Workplan Milestone Payment | 2% | $ - 0 | $ - 0 | $ - 0 | |
| 2 | Project Startup Milestone Payment | 5% | $ - 0 | $ - 0 | $ - 0 | |
| 3 | General Design Milestone Payment | 6% | $ - 0 | $ - 0 | $ - 0 | |
| 4 | Conversion Planning Milestone Payment | 6% | $ - 0 | $ - 0 | $ - 0 | |
| 5 | Detailed Design Milestone Payment | 6% | $ - 0 | $ - 0 | $ - 0 | |
| 6 | Testing Milestone Payment | 6% | $ - 0 | $ - 0 | $ - 0 | |
| 7 | Operations Setup Milestone Payment | 6% | $ - 0 | $ - 0 | $ - 0 | |
| 8 | Acceptance of Transition Services User Acceptance Test Milestone Payment | 5% | $ - 0 | $ - 0 | $ - 0 | |
| 9 | Operations Processes Milestone Payment | 6% | $ - 0 | $ - 0 | $ - 0 | |
| 10 | Go/No-Go Decision Point Milestone Payment | 12% | $ - 0 | $ - 0 | $ - 0 | |
| 11 | WIC EBT Cutover Milestone Payment | 40% | $ - 0 | $ - 0 | $ - 0 | |
| Totals | 100% | $ - 0 | $ - 0 | |||
| 12 | Transition in Holdback Payment | $ - 0 | ||||
| 13 | Total TIN WIC EBT Costs | |||||
| (Not to exceed $2,000,000) | $ - 0 |
Transition Out (TO)
| Table 2 - Transition Out Service Costs | ||||||||||||||||
| SFY 33-34 | SFY 34-35 | |||||||||||||||
| Jun, 2034 | Jul, 2034 | Aug, 2034 | Sep, 2034 | Oct, 2034 | Nov, 2034 | Dec, 2034 | Jan, 2035 | Feb, 2035 | Mar, 2035 | Apr, 2035 | May, 2035 | Jun, 2035 | ||||
| Line Item # | Transition Out Service Areas* | Month 1 | Month 2 | Month 3 | Month 4 | Month 5 | Month 6 | Month 7 | Month 8 | Month 9 | Month 10 | Month 11 | Month 12 | Month 13 | Total | |
| ex.1 | Example: Administrative Equipment Recovery | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 2,000.00 | $ 2,000.00 | $ 2,000.00 | $ 6,000.00 | |
| 1 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 2 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 3 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 4 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 5 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 6 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 7 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 8 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 9 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 10 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 11 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 12 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 13 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 14 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 15 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 16 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 17 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 18 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 19 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 20 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 21 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 22 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 23 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 24 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 25 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 26 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 27 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 28 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 29 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 30 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 31 | <add transition out service area> | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 32 | Totals | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 33 | Total Transition Out Costs | |||||||||||||||
| (Not to exceed $3,000,000) | $ - 0 |
*Transition out service areas should align with the Bidder's transition out services workplan from RFP Section 6.
F&C (excluding SUN Bucks) CPCMs
| Chip EMV/Tap Card CPCMs | Table 3a - Food and Cash EBT (excluding SUN Bucks) CPCM with Chip EMV/Tap Cards and California Call Centers | Table 3b - Food and Cash EBT (excluding SUN Bucks) CPCM with Chip EMV/Tap Cards and Best Value Call Centers | ||||||
| Line Item # | Benefit Type | Card Type | CPCM | Line Item # | Benefit Type | Card Type | CPCM | |
| 1 | Food-only with California Call Centers | Chip EMV/Tap | $ - 0 | 1 | Food-only with Best Value Call Centers | Chip EMV/Tap | $ - 0 | |
| 2 | Cash-only with California Call Centers | Chip EMV/Tap | $ - 0 | 2 | Cash-only with Best Value Call Centers | Chip EMV/Tap | $ - 0 | |
| 3 | Food and Cash Combined with California Call Centers | Chip EMV/Tap | $ - 0 | 3 | Food and Cash Combined with Best Value Call Centers | Chip EMV/Tap | $ - 0 | |
| Line Item # | California-Based Primary and Backup Food and Cash Call Center | Location | Line Item # | Best Value Primary and Backup Food and Cash Call Center | Location | |||
| 4 | Food and Cash California-Based Primary Location | 4 | Food and Cash Best Value Primary Location | |||||
| 5 | Food and Cash California-Based Backup Location | 5 | Food and Cash Best Value Backup Location |
WIC EBT CPCMs
| Magstripe-Only Card CPCMs | Table 3c - WIC EBT CPCM with Magstripe-Only Cards and Best Value Call Centers | |||
| Line Item # | Benefit Type | Card Type | CPCM | |
| 1 | WIC EBT with Best Value Call Centers | Magstripe-Only | $ - 0 | |
| Line Item # | Best Value Primary and Backup WIC Call Center | Location | ||
| 2 | WIC EBT Best Value Primary Location | |||
| 3 | WIC EBT Best Value Backup Location |
| Chip EMV/Tap Card CPCMs | Table 3d - WIC EBT CPCM with Chip EMV/Tap Cards and Best Value Call Centers | |||
| Line Item # | Benefit Type | Card Type | CPCM | |
| 1 | WIC EBT with Best Value Call Centers | Chip EMV/Tap | $ - 0 | |
| Line Item # | Best Value Primary and Backup WIC Call Center | Location | ||
| 2 | WIC EBT Best Value Primary Location | |||
| 3 | WIC EBT Best Value Backup Location |
SUN Bucks CPBLs
| Magstripe-Only Card CPBLs | Table 4a - SUN Bucks CPBL with Magstripe-Only Cards and California Call Centers | Table 4b - SUN Bucks CPBL with Magstripe-Only Cards and Best Value Call Centers | ||||||
| Line Item # | Issuance Model | Cost Per Benefit Load | Line Item # | Issuance Model | Cost Per Benefit Load | |||
| 1 | SUN Bucks Card per eligible household - New Card Issued Annually | $ - 0 | 1 | SUN Bucks Card per eligible household - New Card Issued Annually | $ - 0 | |||
| 2 | SUN Bucks Card per eligible household - Reload Card Model | $ - 0 | 2 | SUN Bucks Card per eligible household - Reload Card Model | $ - 0 | |||
| Line Item # | California-Based Primary and Backup SUN Bucks Call Center | Location | Line Item # | Best Value Primary and Backup SUN Bucks Call Center | Location | |||
| 3 | California-Based Primary Location | 3 | Best Value Primary Location | |||||
| 4 | California-Based Backup Location | 4 | Best Value Backup Location |
| Chip EMV/Tap Card CPBLs | Table 4c - SUN Bucks CPBL with Chip EMV/Tap Cards and California Call Centers | Table 4d - SUN Bucks CPBL with Chip EMV/Tap Cards and Best Value Call Centers | ||||||
| Line Item # | Issuance Model | Cost Per Benefit Load | Line Item # | Issuance Model | Cost Per Benefit Load | |||
| 1 | SUN Bucks Card per eligible household - New Card Issued Annually | $ - 0 | 1 | SUN Bucks Card per eligible household - New Card Issued Annually | $ - 0 | |||
| 2 | SUN Bucks Card per eligible household - Reload Card Model | $ - 0 | 2 | SUN Bucks Card per eligible household - Reload Card Model | $ - 0 | |||
| Line Item # | California-Based Primary and Backup SUN Bucks Call Center | Location | Line Item # | Best Value Primary and Backup SUN Bucks Call Center | Location | |||
| 3 | California-Based Primary Location | 3 | Best Value Primary Location | |||||
| 4 | California-Based Backup Location | 4 | Best Value Backup Location |
Paycard Cardholder Fee
| Table 5 - Paycard Cardholder Fees | |||||
| Line Item # | Transaction Type | Maximum Fee Limit | Fee | ||
| 1 | Deposit notification | Free | |||
| 2 | Low-balance alert | Free | |||
| 3 | Purchase at POS locations | Free | |||
| 4 | Purchase with cash back | Free | |||
| 5 | In-network ATM cash withdrawal | Free | |||
| 6 | Out-of-network ATM cash withdrawal | First six (6) are free. | |||
| $1.00 for each subsequent withdrawal. | $0.00 | ||||
| 7 | ATM balance inquiry | Free | |||
| 8 | ATM decline for insufficient funds | Free | |||
| 9 | In-network bank teller cash withdrawal | Free | |||
| 10 | Web-based account access | Free | |||
| 11 | Mobile Device Application Account access | Free | |||
| 12 | Account inactivity | Free for twelve (12) months. | |||
| $1.00 for each subsequent month until $0 balance. | $0.00 | ||||
| 13 | Telephone calls to ARU | Free | |||
| 14 | Initial Card issuance | Free | |||
| 15 | Replacement Card issuance | Free for the first two (2) Card replacements in a 365 day period. | |||
| $5.00 for each subsequent Card in a 365 day period. | $0.00 | ||||
| 16 | Express Card delivery fee | $15.00 | $0.00 | ||
| 17 | PIN change | Free | |||
| 18 | International transaction | Not applicable - Prohibited by the State. | |||
| 19 | International ATM withdrawal | Not applicable - Prohibited by the State. | |||
| 20 | International ATM balance inquiry | Not applicable - Prohibited by the State. | |||
| 21 | Telephone calls to ARU placed by Cardholders outside the United States | $1.50 | $0.00 | ||
| 22 | Total Paycard Cardholder Fees | $0.00 |
Equipment
| Table 6 - EBT-Only POS Device Costs | ||
| EBT-Only Wired POS Device Fee Components | ||
| A. Purchase, distribution, and maintenance of Contractor-owned EBT-only POS devices and required peripheral Equipment provided to FNA-exempt and WIC EBT Retailers at no cost to the Retailer. | ||
| B. Retailer reimbursement for EBT-dedicated telephone lines and/or internet connections for FNA-exempt Retailers provided with EBT-only POS devices at no cost to the Retailer. | ||
| C. Manual vouchers provided to FNA-exempt Retailers provided with EBT-only POS devices at no cost to the Retailer. | ||
| Line Item #1 | EBT-Only Wired POS Device Costs (monthly cost, per device) | $0.00 |
| EBT-Only Wireless POS Device Fee Components | ||
| D. Purchase, distribution, and maintenance of Contractor-owned wireless POS devices and required peripheral Equipment provided to FNA-exempt and WIC EBT Retailers at no cost to the Retailer. | ||
| E. Wireless service for wireless POS devices provided to FNA-exempt Retailers at no cost to the Retailer. | ||
| F. Manual vouchers provided to FNA-exempt Retailers provided with wireless POS devices at no cost to the Retailer. | ||
| Line Item #2 | EBT-Only Wireless POS Device Costs (monthly cost, per device) | $0.00 |
Labor Rates
| Table 7 - Labor Rates for Operational Contingency Costs | |||
| Line Item # | Classification | Maximum Rate Limit | Rate |
| 1 | Project Manager | $175.00/hour | $0.00 |
| 2 | Technical Manager | $150.00/hour | $0.00 |
| 3 | Systems Analyst | $125.00/hour | $0.00 |
| 4 | Programmer | $100.00/hour | $0.00 |
| 5 | Business Analyst | $100.00/hour | $0.00 |