Appendix C - G Fire Suppression Systems.xlsx

XLSX spreadsheet 49 KB Posted

Attached to
Fire Suppression Inspection, Testing and Maintenance for the Watervliet Arsenal (Base & Two Option Years)
Solicitation number
W911PT22Q0061
Issued by

View the file

Other files

File Type Posted
Appendix H - Base Year.pdf PDF
Appendix H - Option Years.pdf PDF
W911PT-22-Q-0061 0001.pdf PDF
W911PT22Q0061.pdf PDF
21PW045 PWS - Fire Suppression IT AND M.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix C Chapters 4 (General Requirements), 5 (Sprinkler Systems) and 12 (Valves, Valve Components, and Trim) of the National Fire Protection Association (NFPA) Fire Protection Code (FPC) 25 (Standard for the Inspection, Testing and Maintenance of Water-Based Fire Protection Systems), latest Edition.

BldgLocationQuantitySizeManufacturerApprox. Coverage (SF)
10North End Basement1
6 InchFirematic Viking66,900 (Basement, 1st Floor, 2nd Floor, Attic)
10North End Basement14 InchFirematic Viking
21East End, Basement Level16 InchFirematic16,700 (Basement, 1st Floor)
22South East Basement14 InchSRI10,250 (Attic and Appartatus Bays)
24North End, Ground Floor14 InchGem11,800 (Basement, 1st Floor, 2nd Floor, Attic)
38Center Sprinkler Room26 InchVictaulic18,000
38Center Sprinkler Room22-1/2 InchVictaulic
40-1Security, Backroom26 InchFirematic14,800 (1st Floor, 2nd Floor, Attic)
40-2Center, Sprinkler Room Under Stairs26 InchFirematic56,800 (1st Floor, 2nd Floor, Attic)
40-2Center, Sprinkler Room Under Stairs14 InchViking
40-3Southeast, Sprinkler Room36 InchFirematic52,200 (1st Floor, 2nd Floor, Attic)
40-4Health Clinic, Ladies Room14 InchFirematic43,500 (1st Floor, Attic of 40-4, and 1st Floor, Attic of most of 40-5)
41East Side, Utility Room14 InchSRI4,000 (Attic Space)
108South End, Backroom18 inchSRI2,400
114West Wall14 InchFireLock1,500
116Northeast Corner16 InchReliable (Deluge Type)2,700
120East Side, North and South26 InchGlobe96,600 (1st Floor, Mezzanine, 2nd Floor, 3rd Floor)
124First Floor, South Side Corner Mech Room16 InchFirematic18,600 (1st Floor, 2nd Floor, Rafters above 2nd Floor)
125West End of Building18 InchFireLock
130Center, East Side, Exterior Door16 InchFirematic30,900
135Center, East Side16 InchFirematic41,300 (Only Some Bays)
145Northeast, Northwest, Southeast, and Southwest46 InchFirematic113,500
Total32

&"Times New Roman,Bold"APPENDIX C: Dry Pipe Systems &"Times New Roman,Regular"Building Locations

Appendix C-2

FrequencyComponentTasks
Base Year, Option Year 1, and Option Year 21. Control Valves (locked or supervised)1. Verify valve position.
2. Waterflow Alarm Devices1. Operate to verify initiation and receipt of alarm. 2. Verify alarm test valve alignment and tamper switch (if supervised).
3. Dry Pipe Alarm Valve and Trim1. Trip test. 2. Visually inspect exterior of valves, gauges, trim alignment. 3. Verify valve pressure and legibility of hydraulic nameplate.
4. Main Drain1. Conduct main drain test to verify supply (valve position).
5. Fire Department Connection1. Verify accessibility and condition. 2. If caps removed or missing, check for obstructions.
6. Dry Pipe Alarm Valve Enclosure Heating1. Verify operability at beginning of heating season (for constant cold areas annually).
7. Low Temperature Alarm1. Verify initiation and receipt of alarm at beginning of heating season.
8. Low Point Drains1. Drain all low points to remove condensation prior to cold season.
9. Entire SystemVisually check: 1. Pipe hangers. 2. Heads for obstruction. 3. Piping for leaks. 4. Riser condition. 5. Sprinkler spares.
Option Year 2 (Only)1. Control Valves/Quick Opening Devices1. Full flow trip test. 2. Trip valve to verify operability. 3. Inspect internal condition before resetting and clean valve seat. 4. Check priming water level (before and after trip test).
Option Year 1 (Only)1. Control Valves1. Operate valve through entire travel to verify function. 2. Lubricate valve stem.
2. Quick Opening Devices1. Test to verify operability.
3. Low Air Pressure Alarm1. Test to verify initiation and receipt of supervisory alarm.
4. Automatic Air Pressure Maintenance Devices1. Inspect to verify proper operation.
Base year1. Strainers1. Internal inspection and cleaning to verify condition.

&"Times New Roman,Bold"APPENDIX C: Dry Pipe Systems &"Times New Roman,Regular"Dry Pipe Automatic Sprinkler Systems Inspection, Testing, and Maintenance Tasks

Appendix D Chapters 4 (General Requirements), 5 (Sprinkler Systems), and 12 (Valves, Valve Components, and Trim) of the National Fire Protection Association (NFPA) Fire Protection Code (FPC) 25 (Standard for the Inspection, Testing and Maintenance of Water-Based Fire Protection Systems), latest Edition

BuildingLocationQuantitySizeManufacturerApprox. Coverage (SF)
15Center West, In Break Room – Note: Asbestos tile location diagram18 InchViking (Alarm Valve)23,000
20First Floor, Locker Room16 InchAmerican3,200 (Two Bays Bottom Floor)
21East End, Basement Level14 InchRasco3,300
22Southeast Basement14 InchSRI6,250
25First Floor, East Center Column F-014 InchCentral (Alarm Check)28,800 (Some Bays First Floor, Some Bays Second Floor)
35South Mechanical Room28 InchGem, Model A63,000 (35 Annex only, Most of First Floor, Most of Second Floor)
40-5Southwest Corner16 InchSRI13,800 ( Main Fl. and attic)
40-6North Center Rm. 6-10824 InchSRI18,375 (Main Fl. and attic)
41East Utility Rm.14 InchSRI4,000 (Main floor)
44Basement, Mechanical Room16 InchVictaulic62,000 (First Floor, Second Floor)
110South West, Crane Repair Office18 InchViking16,900 (Only Some Bays, includes Dry Pre-Action System Over Substation)
110North Wall14 InchCentral17,900 (Only Some Bays, and Butler Bldg)
110Southwest Mech. Rm., Nortwest Mech. Rm., A-26, A-39, A-9, A-52, B-25, E-38, A-65106 InchVictaulic (Firelock)196,000
112Ground Floor, East Wall14 InchViking (Alarm Valve)3,400 (Some First Floor, All Second Floor)
114West Wall16 InchVictaulic3,500
115North Vestibule Closet South Mechanical Room Note: Asbestos Tile location Diagram26 InchStar48,000
123Northeast Cage14 InchReliable (Alarm Valve)8500
125West End of Building16 InchViking (Alarm Valve)39,500 (Offices, Common Space, Vestibule, Clean room, and Manufacturing space)
125West End of Building16 InchViking (Alarm Valve)27,300 (Offices, Common Spaces, Bathrooms, and Mechanical Rooms)
125West End of Building16 InchVictaulic (FireLock)35,000
126North Center16 InchSRI6,100
126North Center12 InchSRI1,175
153East Side of Building14 Inch15,000
Total35

&"Times New Roman,Bold"APPENDIX D: Wet Pipe Systems &"Times New Roman,Regular"Building Locations&"Times New Roman,Bold"

Appendix D-2

FrequencyComponentTasks
Base Year, Option Yr 1, and Option Yr 21. Control Valves (locked or supervised)1. Verify valve position.
2. Waterflow Alarm Devices1. Operate to verify initiation and receipt of alarm. 2. Verify alarm test valve alignment and tamper switch (if supervised).
3. Alarm Valve and Trim1. Visually check exterior of valves, gauges, trim alignment. 2. Verify valve pressure and legibility of hydraulic nameplate.
4. Main Drain1. Conduct main drain test to verify supply (valve position)
5. Fire Department Connection1. Verify accessibility and condition 2. If caps removed or missing, check for obstructions.
6. Entire SystemVisually check: 1. Pipe hangers. 2. Heads for obstruction. 3. Piping for leaks. 4. Riser condition. 5. Sprinkler spares. 6. Area susceptible to freezing.
Option Year 1 (only)1. Control Valves1. Operate valve through entire travel to verify function. 2. Lubricate valves and stems to ensure operability.
Base Year1. Alarm Valve1. Clean and inspect internally to verify condition.
2. Anti-freeze Loops1. Confirm correct solution mixture

&"Times New Roman,Bold"APPENDIX E: Fire Pump Systems &"Times New Roman,Regular"Wet Pipe Automatic Sprinkler Systems Inspection, Testing, and Maintenance Tasks

Appendix E FIRE PUMP SUPPRESSION (IAW) NFPA FPC 25, Chapters 8 (Fire Pumps) and 12 (Valves, Valve Components, and Trim), latest edition. Requires written report of inspection on contractor standard form.

BuildingLocationQuantitySizeManufacturerApprox. Coverage (SF)
35Mezzanine Deck Inside Mechanical Room11000 GPMFairbanks MorseNot Applicable
110Northwest and Southwest Mechanical Rooms.2750 GPMPattersonNot Applicable
116Inside Manhole Next To Building *Confined Space Entry Permit Required11000 GPMAllis ChalmersNot Applicable
137East Mechanical Room11,000 GPMFiretrolNot Applicable
Total5

&"Times New Roman,Regular"Building Locations

Appendix E-2

FrequencyComponentTasks
Base Year and Option Year 21. Control Valve1. Operate and lubricate valves to ensure operability.
2. Controllers1. Calibrate pressure switches. 2. Exercise circuit breakers and switches to verify operability. 3. Inspect fuses.
3. Pumps1. Check coupling alignment to ensure shaft aligned. 2. Check pump shaft end play. 3. Lubricate bearings. 4. Lubricate couplings. 5. Lubricate right-angle drives.
4. Fuel (Engine-Driven Pumps)1. Sample fuel to verify quality.
5. Relief Valves1. Calibrate valves.
6. Emergency Power Supply1. Test to verify availability and capacity for pump motor.
Base Year, Option Year 1, Option Year 21. Pump1. Conduct flow test to verify pump output.

&"Times New Roman,Regular"Fire Pump Inspection, Testing, and Maintenance Tasks

Appendix F Chapter 6 (Standpipe and Hose Systems) of the National Fire Protection Association (NFPA) Fire Protection Code (FPC) 25 (Standard for the Inspection, Testing and Maintenance of Water-Based Fire Protection Systems), latest Edition.

BuildingLocationQuantitySizeManufacturerApprox. Coverage (SF)
25Standpipe14 InchNot ApplicableVertical - East Stairwell, 2 Floors
110Standpipe24 InchNot ApplicableHorizontal – 1,244 LF each
135Standpipe24 InchNot ApplicableHorizontal – 605 LF each
Total5

&"Times New Roman,Bold"APPENDIX F: Stand Pipe Systems &"Times New Roman,Regular"Building Locations

Appendix F-2

FrequencyComponentTasks
Base Year, Option Year 1, and Option Year 21. Hose Connection and Pressure Reducing Valves1. Inspect for damage, leaking, missing caps, and obstruction.
2. Entire SystemVisually check: 1. Pipe hangers. 2. Connections for obstruction. 3. Piping for leaks. 4. Riser condition.
Option Year 1 (only)1. Piping1. Inspect for damage and pipe supports.
Option Year 1 (only)1. Standpipe1. Air test to ensure integrity.

&"Times New Roman,Bold"APPENDIX F: Stand Pipe Systems &"Times New Roman,Regular"Standpipe Systems Inspection, Testing, and Maintenance Tasks

Appendix G Chapters 4 (General Requirements) and 5 (Sprinkler Systems), and 12 (Valves, Valve Components, and Trim) of the National Fire Protection Association (NFPA) Fire Protection Code (FPC) 25 (Standard for the Inspection, Testing and Maintenance of Water-Based Fire Protection Systems), latest Edition.

BldgLocationQuantitySizeManufacturerApprox. Coverage (SF)
PRE_ACTION FIRE PROTECTION SYSTEMS
*** 110Bays F60 to F63 (southwest corner)14 InchUnknown1,600
*** 110East Side A-6214 InchVictaulic15,000
*** 110West Side E-2514 InchVictaulic4,700
125West End of Building14 InchVictaulic17,000 (Clean Room and Mezzanine above Clean Room)
Total4
***A-62 and E-25 IT&M will begin starting in Option year 1.
F60 to F63 IT&M is for base year only. This system will be removed once substation is relocated.

&"Times New Roman,Bold"APPENDIX G: Pre-Action Systems &"Times New Roman,Regular"Building Locations

Appendix G-2

FrequencyComponentTasks
Base Year, Option Year 1, and Option Year 21. Control Valves (locked or supervised)1. Verify valve position.
2. Waterflow Alarm Devices1. Operate to verify initiation and receipt of alarm. 2. Verify alarm test valve alignment and tamper switch (if supervised).
3. Pre-Action Valve and Trim1. Inspect exterior of valves, gauges, trim alignment. 2. Verify valve pressure and legibility of hydraulic nameplate.
4. Main Drain1. Conduct main drain test to verify supply (valve position).
5. Fire Department Connection1. Verify accessibility and condition. 2. If caps removed or missing, check for obstructions.
6. Valve and Riser Heated Enclosure (if provided)1. Verify operability at beginning of heating season (for constant cold areas annually).
7. Low Temperature Alarm1. Verify initiation and receipt of alarm at beginning of heating season.
8. Initiating Devices: Radiant Energy Detectors1. Test to verify alarm initiation and receipt. 2. Verify no facility change which affects performance.
9. Entire SystemVisually check: 1. Pipe hangers. 2. Heads for obstruction. 3. Piping for leaks. 4. Riser condition. 5. Sprinkler spares.
10. Pre-Action1. Full flow
Option Year 1 (only)1. Control Valves1. Operate valve through entire travel to verify function. 2. Lubricate valve stem.
2. Pre-Action Valve1. Trip valve to verify operation. 2. Verify manual actuators (if provided). 3. Inspect internal condition and clean valve seat before resetting.
3. Low Point Drains1. Drain all low points after pre-action valve trip test and before cold weather (if unheated area).
4. Air supply (if present)1. Test automatic air pressure maintenance device. 2. Test low air supply alarm.
Base Year1. Strainers1. Clean and inspect interior to verify condition.

&"Times New Roman,Bold"APPENDIX G: Pre-Action Systems &"Times New Roman,Regular"Pre-Action Systems Inspection, Testing, and Maintenance Tasks