Appendix C - G Fire Suppression Systems.xlsx
XLSX spreadsheet 49 KB Posted
- Attached to
- Fire Suppression Inspection, Testing and Maintenance for the Watervliet Arsenal (Base & Two Option Years)
- Solicitation number
- W911PT22Q0061
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix H - Base Year.pdf | ||
| Appendix H - Option Years.pdf | ||
| W911PT-22-Q-0061 0001.pdf | ||
| W911PT22Q0061.pdf | ||
| 21PW045 PWS - Fire Suppression IT AND M.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix C Chapters 4 (General Requirements), 5 (Sprinkler Systems) and 12 (Valves, Valve Components, and Trim) of the National Fire Protection Association (NFPA) Fire Protection Code (FPC) 25 (Standard for the Inspection, Testing and Maintenance of Water-Based Fire Protection Systems), latest Edition.
| Bldg | Location | Quantity | Size | Manufacturer | Approx. Coverage (SF) |
| 10 | North End Basement | 1 | |||
| 6 Inch | Firematic Viking | 66,900 (Basement, 1st Floor, 2nd Floor, Attic) | |||
| 10 | North End Basement | 1 | 4 Inch | Firematic Viking | |
| 21 | East End, Basement Level | 1 | 6 Inch | Firematic | 16,700 (Basement, 1st Floor) |
| 22 | South East Basement | 1 | 4 Inch | SRI | 10,250 (Attic and Appartatus Bays) |
| 24 | North End, Ground Floor | 1 | 4 Inch | Gem | 11,800 (Basement, 1st Floor, 2nd Floor, Attic) |
| 38 | Center Sprinkler Room | 2 | 6 Inch | Victaulic | 18,000 |
| 38 | Center Sprinkler Room | 2 | 2-1/2 Inch | Victaulic | |
| 40-1 | Security, Backroom | 2 | 6 Inch | Firematic | 14,800 (1st Floor, 2nd Floor, Attic) |
| 40-2 | Center, Sprinkler Room Under Stairs | 2 | 6 Inch | Firematic | 56,800 (1st Floor, 2nd Floor, Attic) |
| 40-2 | Center, Sprinkler Room Under Stairs | 1 | 4 Inch | Viking | |
| 40-3 | Southeast, Sprinkler Room | 3 | 6 Inch | Firematic | 52,200 (1st Floor, 2nd Floor, Attic) |
| 40-4 | Health Clinic, Ladies Room | 1 | 4 Inch | Firematic | 43,500 (1st Floor, Attic of 40-4, and 1st Floor, Attic of most of 40-5) |
| 41 | East Side, Utility Room | 1 | 4 Inch | SRI | 4,000 (Attic Space) |
| 108 | South End, Backroom | 1 | 8 inch | SRI | 2,400 |
| 114 | West Wall | 1 | 4 Inch | FireLock | 1,500 |
| 116 | Northeast Corner | 1 | 6 Inch | Reliable (Deluge Type) | 2,700 |
| 120 | East Side, North and South | 2 | 6 Inch | Globe | 96,600 (1st Floor, Mezzanine, 2nd Floor, 3rd Floor) |
| 124 | First Floor, South Side Corner Mech Room | 1 | 6 Inch | Firematic | 18,600 (1st Floor, 2nd Floor, Rafters above 2nd Floor) |
| 125 | West End of Building | 1 | 8 Inch | FireLock | |
| 130 | Center, East Side, Exterior Door | 1 | 6 Inch | Firematic | 30,900 |
| 135 | Center, East Side | 1 | 6 Inch | Firematic | 41,300 (Only Some Bays) |
| 145 | Northeast, Northwest, Southeast, and Southwest | 4 | 6 Inch | Firematic | 113,500 |
| Total | 32 |
&"Times New Roman,Bold"APPENDIX C: Dry Pipe Systems &"Times New Roman,Regular"Building Locations
Appendix C-2
| Frequency | Component | Tasks |
| Base Year, Option Year 1, and Option Year 2 | 1. Control Valves (locked or supervised) | 1. Verify valve position. |
| 2. Waterflow Alarm Devices | 1. Operate to verify initiation and receipt of alarm. 2. Verify alarm test valve alignment and tamper switch (if supervised). | |
| 3. Dry Pipe Alarm Valve and Trim | 1. Trip test. 2. Visually inspect exterior of valves, gauges, trim alignment. 3. Verify valve pressure and legibility of hydraulic nameplate. | |
| 4. Main Drain | 1. Conduct main drain test to verify supply (valve position). | |
| 5. Fire Department Connection | 1. Verify accessibility and condition. 2. If caps removed or missing, check for obstructions. | |
| 6. Dry Pipe Alarm Valve Enclosure Heating | 1. Verify operability at beginning of heating season (for constant cold areas annually). | |
| 7. Low Temperature Alarm | 1. Verify initiation and receipt of alarm at beginning of heating season. | |
| 8. Low Point Drains | 1. Drain all low points to remove condensation prior to cold season. | |
| 9. Entire System | Visually check: 1. Pipe hangers. 2. Heads for obstruction. 3. Piping for leaks. 4. Riser condition. 5. Sprinkler spares. | |
| Option Year 2 (Only) | 1. Control Valves/Quick Opening Devices | 1. Full flow trip test. 2. Trip valve to verify operability. 3. Inspect internal condition before resetting and clean valve seat. 4. Check priming water level (before and after trip test). |
| Option Year 1 (Only) | 1. Control Valves | 1. Operate valve through entire travel to verify function. 2. Lubricate valve stem. |
| 2. Quick Opening Devices | 1. Test to verify operability. | |
| 3. Low Air Pressure Alarm | 1. Test to verify initiation and receipt of supervisory alarm. | |
| 4. Automatic Air Pressure Maintenance Devices | 1. Inspect to verify proper operation. | |
| Base year | 1. Strainers | 1. Internal inspection and cleaning to verify condition. |
&"Times New Roman,Bold"APPENDIX C: Dry Pipe Systems &"Times New Roman,Regular"Dry Pipe Automatic Sprinkler Systems Inspection, Testing, and Maintenance Tasks
Appendix D Chapters 4 (General Requirements), 5 (Sprinkler Systems), and 12 (Valves, Valve Components, and Trim) of the National Fire Protection Association (NFPA) Fire Protection Code (FPC) 25 (Standard for the Inspection, Testing and Maintenance of Water-Based Fire Protection Systems), latest Edition
| Building | Location | Quantity | Size | Manufacturer | Approx. Coverage (SF) |
| 15 | Center West, In Break Room – Note: Asbestos tile location diagram | 1 | 8 Inch | Viking (Alarm Valve) | 23,000 |
| 20 | First Floor, Locker Room | 1 | 6 Inch | American | 3,200 (Two Bays Bottom Floor) |
| 21 | East End, Basement Level | 1 | 4 Inch | Rasco | 3,300 |
| 22 | Southeast Basement | 1 | 4 Inch | SRI | 6,250 |
| 25 | First Floor, East Center Column F-0 | 1 | 4 Inch | Central (Alarm Check) | 28,800 (Some Bays First Floor, Some Bays Second Floor) |
| 35 | South Mechanical Room | 2 | 8 Inch | Gem, Model A | 63,000 (35 Annex only, Most of First Floor, Most of Second Floor) |
| 40-5 | Southwest Corner | 1 | 6 Inch | SRI | 13,800 ( Main Fl. and attic) |
| 40-6 | North Center Rm. 6-108 | 2 | 4 Inch | SRI | 18,375 (Main Fl. and attic) |
| 41 | East Utility Rm. | 1 | 4 Inch | SRI | 4,000 (Main floor) |
| 44 | Basement, Mechanical Room | 1 | 6 Inch | Victaulic | 62,000 (First Floor, Second Floor) |
| 110 | South West, Crane Repair Office | 1 | 8 Inch | Viking | 16,900 (Only Some Bays, includes Dry Pre-Action System Over Substation) |
| 110 | North Wall | 1 | 4 Inch | Central | 17,900 (Only Some Bays, and Butler Bldg) |
| 110 | Southwest Mech. Rm., Nortwest Mech. Rm., A-26, A-39, A-9, A-52, B-25, E-38, A-65 | 10 | 6 Inch | Victaulic (Firelock) | 196,000 |
| 112 | Ground Floor, East Wall | 1 | 4 Inch | Viking (Alarm Valve) | 3,400 (Some First Floor, All Second Floor) |
| 114 | West Wall | 1 | 6 Inch | Victaulic | 3,500 |
| 115 | North Vestibule Closet South Mechanical Room Note: Asbestos Tile location Diagram | 2 | 6 Inch | Star | 48,000 |
| 123 | Northeast Cage | 1 | 4 Inch | Reliable (Alarm Valve) | 8500 |
| 125 | West End of Building | 1 | 6 Inch | Viking (Alarm Valve) | 39,500 (Offices, Common Space, Vestibule, Clean room, and Manufacturing space) |
| 125 | West End of Building | 1 | 6 Inch | Viking (Alarm Valve) | 27,300 (Offices, Common Spaces, Bathrooms, and Mechanical Rooms) |
| 125 | West End of Building | 1 | 6 Inch | Victaulic (FireLock) | 35,000 |
| 126 | North Center | 1 | 6 Inch | SRI | 6,100 |
| 126 | North Center | 1 | 2 Inch | SRI | 1,175 |
| 153 | East Side of Building | 1 | 4 Inch | 15,000 | |
| Total | 35 |
&"Times New Roman,Bold"APPENDIX D: Wet Pipe Systems &"Times New Roman,Regular"Building Locations&"Times New Roman,Bold"
Appendix D-2
| Frequency | Component | Tasks |
| Base Year, Option Yr 1, and Option Yr 2 | 1. Control Valves (locked or supervised) | 1. Verify valve position. |
| 2. Waterflow Alarm Devices | 1. Operate to verify initiation and receipt of alarm. 2. Verify alarm test valve alignment and tamper switch (if supervised). | |
| 3. Alarm Valve and Trim | 1. Visually check exterior of valves, gauges, trim alignment. 2. Verify valve pressure and legibility of hydraulic nameplate. | |
| 4. Main Drain | 1. Conduct main drain test to verify supply (valve position) | |
| 5. Fire Department Connection | 1. Verify accessibility and condition 2. If caps removed or missing, check for obstructions. | |
| 6. Entire System | Visually check: 1. Pipe hangers. 2. Heads for obstruction. 3. Piping for leaks. 4. Riser condition. 5. Sprinkler spares. 6. Area susceptible to freezing. | |
| Option Year 1 (only) | 1. Control Valves | 1. Operate valve through entire travel to verify function. 2. Lubricate valves and stems to ensure operability. |
| Base Year | 1. Alarm Valve | 1. Clean and inspect internally to verify condition. |
| 2. Anti-freeze Loops | 1. Confirm correct solution mixture |
&"Times New Roman,Bold"APPENDIX E: Fire Pump Systems &"Times New Roman,Regular"Wet Pipe Automatic Sprinkler Systems Inspection, Testing, and Maintenance Tasks
Appendix E FIRE PUMP SUPPRESSION (IAW) NFPA FPC 25, Chapters 8 (Fire Pumps) and 12 (Valves, Valve Components, and Trim), latest edition. Requires written report of inspection on contractor standard form.
| Building | Location | Quantity | Size | Manufacturer | Approx. Coverage (SF) |
| 35 | Mezzanine Deck Inside Mechanical Room | 1 | 1000 GPM | Fairbanks Morse | Not Applicable |
| 110 | Northwest and Southwest Mechanical Rooms. | 2 | 750 GPM | Patterson | Not Applicable |
| 116 | Inside Manhole Next To Building *Confined Space Entry Permit Required | 1 | 1000 GPM | Allis Chalmers | Not Applicable |
| 137 | East Mechanical Room | 1 | 1,000 GPM | Firetrol | Not Applicable |
| Total | 5 |
&"Times New Roman,Regular"Building Locations
Appendix E-2
| Frequency | Component | Tasks |
| Base Year and Option Year 2 | 1. Control Valve | 1. Operate and lubricate valves to ensure operability. |
| 2. Controllers | 1. Calibrate pressure switches. 2. Exercise circuit breakers and switches to verify operability. 3. Inspect fuses. | |
| 3. Pumps | 1. Check coupling alignment to ensure shaft aligned. 2. Check pump shaft end play. 3. Lubricate bearings. 4. Lubricate couplings. 5. Lubricate right-angle drives. | |
| 4. Fuel (Engine-Driven Pumps) | 1. Sample fuel to verify quality. | |
| 5. Relief Valves | 1. Calibrate valves. | |
| 6. Emergency Power Supply | 1. Test to verify availability and capacity for pump motor. | |
| Base Year, Option Year 1, Option Year 2 | 1. Pump | 1. Conduct flow test to verify pump output. |
&"Times New Roman,Regular"Fire Pump Inspection, Testing, and Maintenance Tasks
Appendix F Chapter 6 (Standpipe and Hose Systems) of the National Fire Protection Association (NFPA) Fire Protection Code (FPC) 25 (Standard for the Inspection, Testing and Maintenance of Water-Based Fire Protection Systems), latest Edition.
| Building | Location | Quantity | Size | Manufacturer | Approx. Coverage (SF) |
| 25 | Standpipe | 1 | 4 Inch | Not Applicable | Vertical - East Stairwell, 2 Floors |
| 110 | Standpipe | 2 | 4 Inch | Not Applicable | Horizontal – 1,244 LF each |
| 135 | Standpipe | 2 | 4 Inch | Not Applicable | Horizontal – 605 LF each |
| Total | 5 |
&"Times New Roman,Bold"APPENDIX F: Stand Pipe Systems &"Times New Roman,Regular"Building Locations
Appendix F-2
| Frequency | Component | Tasks |
| Base Year, Option Year 1, and Option Year 2 | 1. Hose Connection and Pressure Reducing Valves | 1. Inspect for damage, leaking, missing caps, and obstruction. |
| 2. Entire System | Visually check: 1. Pipe hangers. 2. Connections for obstruction. 3. Piping for leaks. 4. Riser condition. | |
| Option Year 1 (only) | 1. Piping | 1. Inspect for damage and pipe supports. |
| Option Year 1 (only) | 1. Standpipe | 1. Air test to ensure integrity. |
&"Times New Roman,Bold"APPENDIX F: Stand Pipe Systems &"Times New Roman,Regular"Standpipe Systems Inspection, Testing, and Maintenance Tasks
Appendix G Chapters 4 (General Requirements) and 5 (Sprinkler Systems), and 12 (Valves, Valve Components, and Trim) of the National Fire Protection Association (NFPA) Fire Protection Code (FPC) 25 (Standard for the Inspection, Testing and Maintenance of Water-Based Fire Protection Systems), latest Edition.
| Bldg | Location | Quantity | Size | Manufacturer | Approx. Coverage (SF) |
| PRE_ACTION FIRE PROTECTION SYSTEMS | |||||
| *** 110 | Bays F60 to F63 (southwest corner) | 1 | 4 Inch | Unknown | 1,600 |
| *** 110 | East Side A-62 | 1 | 4 Inch | Victaulic | 15,000 |
| *** 110 | West Side E-25 | 1 | 4 Inch | Victaulic | 4,700 |
| 125 | West End of Building | 1 | 4 Inch | Victaulic | 17,000 (Clean Room and Mezzanine above Clean Room) |
| Total | 4 | ||||
| *** | A-62 and E-25 IT&M will begin starting in Option year 1. | ||||
| F60 to F63 IT&M is for base year only. This system will be removed once substation is relocated. |
&"Times New Roman,Bold"APPENDIX G: Pre-Action Systems &"Times New Roman,Regular"Building Locations
Appendix G-2
| Frequency | Component | Tasks |
| Base Year, Option Year 1, and Option Year 2 | 1. Control Valves (locked or supervised) | 1. Verify valve position. |
| 2. Waterflow Alarm Devices | 1. Operate to verify initiation and receipt of alarm. 2. Verify alarm test valve alignment and tamper switch (if supervised). | |
| 3. Pre-Action Valve and Trim | 1. Inspect exterior of valves, gauges, trim alignment. 2. Verify valve pressure and legibility of hydraulic nameplate. | |
| 4. Main Drain | 1. Conduct main drain test to verify supply (valve position). | |
| 5. Fire Department Connection | 1. Verify accessibility and condition. 2. If caps removed or missing, check for obstructions. | |
| 6. Valve and Riser Heated Enclosure (if provided) | 1. Verify operability at beginning of heating season (for constant cold areas annually). | |
| 7. Low Temperature Alarm | 1. Verify initiation and receipt of alarm at beginning of heating season. | |
| 8. Initiating Devices: Radiant Energy Detectors | 1. Test to verify alarm initiation and receipt. 2. Verify no facility change which affects performance. | |
| 9. Entire System | Visually check: 1. Pipe hangers. 2. Heads for obstruction. 3. Piping for leaks. 4. Riser condition. 5. Sprinkler spares. | |
| 10. Pre-Action | 1. Full flow | |
| Option Year 1 (only) | 1. Control Valves | 1. Operate valve through entire travel to verify function. 2. Lubricate valve stem. |
| 2. Pre-Action Valve | 1. Trip valve to verify operation. 2. Verify manual actuators (if provided). 3. Inspect internal condition and clean valve seat before resetting. | |
| 3. Low Point Drains | 1. Drain all low points after pre-action valve trip test and before cold weather (if unheated area). | |
| 4. Air supply (if present) | 1. Test automatic air pressure maintenance device. 2. Test low air supply alarm. | |
| Base Year | 1. Strainers | 1. Clean and inspect interior to verify condition. |
&"Times New Roman,Bold"APPENDIX G: Pre-Action Systems &"Times New Roman,Regular"Pre-Action Systems Inspection, Testing, and Maintenance Tasks