About this file
This file contains construction specification sections for the Niagara Falls Heritage Gateways Multi-Use Pavilion project located in Niagara Falls, New York, prepared by Thornton Tomasetti as of August 2026. The specifications detail requirements for structural testing and inspection, selective demolition, concrete formwork, and concrete reinforcement and embedded assemblies. The project requires quality assurance testing and inspection services to be engaged and paid by the Owner, with the Owner negotiating inspection services based on the assumption that all fabrication work shall be performed at a single fabrication shop; costs associated with work performed in additional shops require reimbursement to the Owner. The specifications establish detailed requirements for concrete formwork design and installation, formwork removal procedures, reinforcing steel fabrication and placement, and post-installed anchor testing, with all work required to comply with applicable building codes, ACI standards, and ASTM testing procedures.
The contractor is responsible for design, erection, support, and maintenance of formwork and shoring, with design sealed and signed by a Professional Engineer licensed in New York. Testing and inspection requirements include concrete strength testing, floor flatness and levelness compliance testing, weld inspection and testing per AWS D1.1 standards, and proof testing of adhesive and mechanical anchors. The contractor must submit shop drawings, shoring/reshoring calculations, product data, and pre-demolition photographs for approval. Form removal may commence after concrete has cured for at least 12 hours at not less than 50°F, provided concrete is sufficiently hard to avoid damage. The specifications require reinforcing steel to be ASTM A615 Grade 60 or 75 as indicated on drawings, with epoxy-coated or galvanized finishes where specified, and establish comprehensive quality control and warranty requirements for all structural work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NIAGARA FALLS HERITAGE GATEWAYS CONSTRUCTION DOCUMENTS
Multi-Use Pavilion 2 August 2026
Niagara Falls, New York Thornton Tomasetti
014500-1 Structural Testing and Inspection
SECTION 014500
QUALITY ASSURANCE: STRUCTURAL TESTING AND INSPECTION
PART 1 - GENERAL
1.1 GENERAL
A. Quality assurance is testing and inspection to assist the Owner in evaluating the Contractor's performance and quality control in the fabrication shop and field. It is not a substitute for the testing and inspection which is required as part of the Contractor's quality control program.
B. Cost: Except as specifically noted otherwise, the testing agency for quality assurance shall be engaged and paid by the Owner.
1. The Owner has negotiated inspection services based upon the assumption that all fabrication work shall be performed at one single fabrication shop. Costs associated with work being performed in additional shops will require reimbursement to the Owner.
C. Definitions:
1. See Sections 033000 and 051200.
2. The term “Testing Agency” in this Specification section is defined as an independent testing and inspection service engaged by the Owner for quality assurance testing and inspection of structural construction in accordance with applicable building code provisions and any additional activities listed in the Contract Documents.
3. The term “Geotechnical Engineer” in this Specification section is defined as an independent geotechnical engineering service engaged by the Owner for quality assurance testing and inspection of the actual soil conditions to verify compliance with the geotechnical conditions, recommendations and design values described in the Project Geotechnical Report and used as the basis of design for the most current Contract Documents.
1.2 SCOPE
A. Testing Agency shall provide qualified personnel at the site to test and inspect materials installed by and work performed by the Contractor, for the following structural items as indicated in Part 3 of this Specification section:
1. Section 031000 Concrete Formwork
2. Section 032000 Concrete Reinforcement and Embedded Assemblies
3. Section 033000 Cast-In-Place Concrete
4. Section 034100 Precast Structural Concrete
5. Section 051200 Structural Steel
CONSTRUCTION DOCUMENTS
2 August 2026
Thornton Tomasetti
Multi-Use Pavilion 28 August 2026
014500-2 Structural Testing and Inspection
6. Section 316100 Footings
B. Refer to the drawings for Special Inspections requirements for the Project. The Special Inspections shown on the drawings may contain additional testing and inspection that is not listed in this specification section.
1.3 TESTING AGENCY QUALIFICATIONS
A. Testing Agency shall be an independent agency with the experience and capability to conduct testing, inspection and sampling as indicated in accordance with ASTM E 329.
B. Testing Agency shall be an agency approved by the local building official to perform Special Inspections and other related services as outlined in the governing project Building Code.
C. Testing, inspection, and sampling shall be done in accordance with the applicable ASTM standards.
D. Personnel performing visual inspection and non-destructive testing of welds shall meet the requirements of AWS D1.1 for weld inspectors and shall have current certification as an AWS Certified Welding Inspector.
1.4 TESTING AGENCY RESPONSIBILITIES
A. Provide qualified personnel at the site to test and inspect structural construction as the work progresses using the most current Contract Documents and approved shop drawings.
B. Provide additional testing and inspection as needed due to the following:
1. Work performed contrary to Drawings and Specifications
2. Work performed with improper supervision
3. Work performed without prior notice
C. Report deficiencies to Contractor, Owner, Design Professionals within 24 hours.
D. Rejection: The Testing Agency has the right to reject any material at any time, when it is determined that the material or workmanship does not conform to the Contract Documents and shall immediately notify the Owner, Design Professionals, and Contractor of deficiencies. Failure to detect any defective work or material shall not prevent later rejection when such a defect is discovered nor shall it obligate Design Professionals for final acceptance.
E. Noncompliance Log: Indicate to the Contractor where remedial work must be performed and maintain a current log of work not in compliance with the Contract Documents. This noncompliance log shall be submitted to the Design Professionals and Owner on a weekly basis.
CONSTRUCTION DOCUMENTS
2 August 2026
014500-3 Structural Testing and Inspection
F. Reports: Prepare daily inspection, observation, and/or test reports as required herein and provide an evaluation statement in each report stating whether or not the work conforms to requirements of Specifications and Drawings and shall specifically note deviations from them. The daily reports shall be collected and submitted for record to the Design Professionals, The Building Department and Owner weekly.
G. Certification: Upon completion of work and resolution of remedial items, certify in a letter to the Design Professionals and Owner, that the installation is in accordance with the requirements of the Drawings and Specifications.
1.5 CONTRACTOR RESPONSIBILITIES
A. The Contractor shall have sole responsibility for coordinating their work with the Testing Agency to assure that all test and inspection procedures required by the Contract Documents and Public Agencies are provided. The Contractor shall cooperate fully with the Testing Agency in the performance of their work and shall provide the following:
1. Information as to time and place of starting shop fabrication and field construction/erection, at least one week prior to the beginning of the work.
2. The most up to date construction schedule.
3. At least 24 hours advance notice of work requiring testing and inspection.
4. Access to areas as required for testing and inspection.
5. Site File: At least one copy of the most current Contract Documents and approved shop drawings shall be kept available in the contractor’s field office. Drawings not bearing evidence of approval and release for construction by the Design Professionals shall not be kept on the job.
Provide drawings for the work to be performed in the shop or field one week prior to the start of work.
6. Representative material samples requested by the Testing Agency for testing, if necessary.
7. Full and ample means of assistance for testing and inspection of material.
8. Facilities for proper storage of material samples as required.
9. Proper facilities, including scaffolding, temporary work platforms, safety equipment etc., for inspection of the work in shop and field.
B. Immediately notify the Owner’s Testing Agency and Design Professionals in writing of conditions that will adversely affect the work.
C. Materials and installed work may require testing and retesting at any time during progress of work, as directed by Design Professionals. Tests, including retesting of rejected materials for installed work will be done at Contractor's expense.
CONSTRUCTION DOCUMENTS
2 August 2026
014500-4 Structural Testing and Inspection
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 GENERAL
A. Testing Agency shall provide qualified personnel at site to test and inspect structural construction using the latest Contract Documents and approved submittals as indicated in the following sections.
3.2 CONCRETE FORMWORK
A. Quality Assurance:
1. Prior to placement of reinforcement, inspect formwork for grade, quality of material, absence of foreign matter, and other imperfections that might affect concrete placement and tolerances stated herein.
2. Inspect formwork for shape, location and dimensions of the concrete member being formed.
3. Inspect formwork for compliance with specified tolerances, block outs, camber, shoring ties and seal of form joints.
4. Verify condition of bond surfaces, locations and sizes of all accessories, embedment items, and anchorage for prevention of displacement.
5. Verify proper use/application of form release agents.
6. Verify in-situ concrete strength meets requirements for formwork removal in specification section 031000 prior to removal of shores and formwork from beams and structural slabs.
7. Inspect concrete surfaces immediately after removal of formwork and prior to any patching or repair work.
3.3 CONCRETE REINFORCEMENT AND EMBEDDED ITEMS
A. Quality Assurance:
1. Prior to placement, inspect reinforcement and embeds for grade, quality of material, absence of foreign matter, and for suitable storage.
2. Provide continuous inspection of reinforcement and embedded assemblies during placement and immediately prior to concreting operations for: size, quantity, vertical and horizontal spacing and location, correctness of bends and splices, mechanical splices, clearances, compliance with specified tolerances, security of supports and ties, concrete cover, and absence of foreign matter.
3. Inspect epoxy-coated reinforcement for coating damage and required applied coatings.
4. Provide continuous inspection of adhesive anchors installed in horizontal or upwardly inclined orientations and those marked (CERT) on the latest Drawings.
5. Adhesive anchors shall be proof tested in tension as follows:
CONSTRUCTION DOCUMENTS
2 August 2026
014500-5 Structural Testing and Inspection
a) Testing Agency shall submit an adhesive anchorage proof testing plan to the SER for review and approval prior to performing the anchor proof testing. The anchorage testing plan shall meet the requirements as specified in this section and indicate which anchors have been selected for testing.
b) Proof testing shall be performed as a confined tension test in accordance with the guidelines of ASTM E488 and the requirements of ACI 355.4.
c) Testing shall be performed after the minimum curing period specified by the manufacturer.
d) 5percent of each type and size of an adhesive anchor assembly and 100 percent of anchors marked (CERT) shall be proof tested in tension by the Owner’s Testing Agency.
e) All anchors selected for proof testing shall be production anchors.
Sacrificial anchors are not acceptable for inclusion in the proof testing plan unless specifically approved by the SER prior to performance of the testing.
f) The adhesive anchors proof tension loads shall be as specified in the general notes of the structural drawings.
g) Anchors shall have no visible indications of displacement or damage during or after proof load application. Concrete cracking in the vicinity of the anchor after loading shall be considered a failure.
h) If more than 10% of the tested adhesive anchors fail to achieve the specified proof load, 100% of the anchors of the same diameter and type as the failed anchor shall be proof tested, unless otherwise direct in writing by the SER. Immediately notify the SER of all failed proof tests.
6. Mechanical post-installed anchors shall be proof tested as follows:
a) Testing Agency shall submit a mechanical anchorage proof testing plan to the SER for review and approval prior to performing the anchor proof testing. The anchorage testing plan shall meet the requirements as specified in this section and indicate which anchors have been selected for testing.
b) 5 percent of each type and size of mechanical anchor shall be proof tested by the Owner’s Testing Agency. The required proof test for the anchors is as follows:
c) For torque-controlled mechanical anchors, a proof torque shall be applied to the anchor using a calibrated torque wrench and the proof torque shall be achieved with no more than one-half turn of the anchor nut.
d) [For displacement-controlled mechanical anchors, proof of set is to be achieved by inserting the proper setting tool into the anchor and verifying that full set has been achieved.]
e) The required proof torque load for torque-controlled mechanical anchors shall be as specified in the general notes of the structural drawings.
CONSTRUCTION DOCUMENTS
2 August 2026
014500-6 Structural Testing and Inspection
f) All anchors selected for proof testing shall be production anchors.
Sacrificial anchors are not acceptable for inclusion in the proof testing plan unless specifically approved by the SER prior to performance of the testing.
g) Concrete cracking in the vicinity of the anchor during or after proof torque load application shall be considered a failure.
h) If more than 10% of the tested mechanical anchors fail to achieve the specified proof torque load or set, 100% of the anchors of the same diameter and type as the failed anchor shall be proof tested, unless otherwise direct in writing by the SER. Immediately notify the SER of all failed proof tests.
7. Periodic inspection for post-installed adhesive and mechanical anchors shall be provided in accordance with the building code except that continuous inspection shall be provided for the conditions identified in section A.4. The inspector shall observe all aspects of the anchor installation and shall, at a minimum, verify the following items:
a) Hole drilling method in accordance with the Manufacturer’s Published Installation Instructions (MPII) and these installation requirements.
b) Anchor spacing and edge distance.
c) Hole diameter and depth.
d) Hole cleaning in accordance with the MPII.
e) Anchor element type, material, diameter, and length.
f) For adhesive anchors, adhesive identification and expiration date.
g) For adhesive anchors, adhesive installation in accordance with the
MPII.
h) For torque-controlled mechanical anchors, the number of turns required to achieve the anchor set torque per the MPII.
i) For displacement-controlled mechanical anchors, the proper setting tool is used to achieve the anchor set per the MPII.
3.4 CAST-IN-PLACE CONCRETE
A. Quality Assurance:
1. Monitor concrete placement as follows:
a) Verify use of required design mix
b) Record location of point of concrete discharge of each batch truck tested, cross referenced to grid lines.
c) Record temperature of concrete at time of placement.
d) Record weather conditions at time of placement, including temperature, wind speed, relative humidity, and precipitation.
e) Record types and amounts of admixtures added to concrete at the project site.
f) Record amount of water added at the site and verify that total water content does not exceed amount specified in the mix
CONSTRUCTION DOCUMENTS
2 August 2026
014500-7 Structural Testing and Inspection design. Addition of water at the site is subject to prior approval by the Design Professional.
g) Monitor consistency and uniformity of concrete.
h) Monitor preparation for concreting operations, placement of concrete, and subsequent curing period for conformance with Specifications for following procedures:
i. Concrete curing.
ii. Hot weather concreting operations.
iii. Cold weather concreting operations.
2. Conduct tests of concrete as follows and in accordance with ASTM C 1077:
a) Testing frequency: Sample sets for all tests listed below of each concrete design mix placed each day shall be taken not less than once a day, nor less than once for each 100 cubic yards. (75 cubic meters) of concrete, nor less than once for each 5000 square feet (500 square meters) of surface area for slabs or walls. Additional tests shall be performed if deemed necessary by the Owner’s Testing Agency and Design Professionals
b) Obtain each test sample from different batches selected on a strictly random basis before commencement of concrete placement. Record location in structure of sampled concrete.
c) Determine air content of normalweight concrete in accordance with either ASTM C 231 or ASTM C 138. Determine air content of lightweight concrete in accordance with ASTM C 173. Conduct one test for air content for each strength test required or for every 50 cubic yards (40 cubic meters) of fly ash concrete placed, whichever is less.
d) Determine unit weight of lightweight concrete in accordance with
ASTM C 567.
e) Test water content of freshly mixed concrete on a random basis, a minimum of once per 100 cubic yards (75 cubic meters) or every 5000 square feet (500 square meters) of concrete placement, during placement in accordance with AASHTO T 318 for the following concrete types:
i. Hard troweled slabs exposed to view
ii. Slab to receive a bonded finish floor material
iii. Slabs with specified concrete compressive strength exceeding 6000 psi (42MPa)
f) Conduct slump tests in accordance with ASTM C 143.
g) Slump indicated in mix designs shall be achieved at point of placement. Correlation between slump at point of initial discharge from truck and point of placement must be established to determine amount of slump loss which occurs between initial discharge and point of placement. Adjustment may be necessary to achieve slump indicated in mix designs at point of placement.
CONSTRUCTION DOCUMENTS
2 August 2026
014500-8 Structural Testing and Inspection
h) Conduct slump tests for Self Consolidating Concrete (SCC) as follows
i. In accordance with ACI 237, where SCC is used, perform slump flow and visual stability index tests in accordance with ASTM C1611 on the first batch of SCC, and then consecutive batches until two consecutively produced batches are within specification. SCC with a visual stability index value of 2 or 3 shall be stabilized, where possible, with a viscosity modifying admixture or rejected at the discretion of the Engineer and Ready Mix Quality Control Representative. The Ready Mix Producer shall be responsible for adjusting the mix to provide desired flow and stability. After establishing the consistency of the SCC mix, testing shall continue in accordance with the requirements of the above paragraph.
ii. In accordance with ACI 237, where SCC is used, perform slump flow tests in accordance with ASTM C1621 using a J-ring to determine the passing ability of the SCC mix around reinforcement. If the reinforcing bars retain the coarse aggregates inside the ring, the mixture has a high potential for blocking and should be reproportioned at the direction of the Engineer and Ready Mix Quality Control Representative.
i) Conduct strength tests of concrete as follows:
i. Secure sample sets in accordance with ASTM C 172.
ii. Mold cylinders in accordance with ASTM C 31 and cure under standard moisture and temperature conditions in accordance with ASTM C 31, Section 7 (a). Quantity of cylinders listed below is based on a cylinder size of 4 inch (100mm) diameter x 8 inches (200mm) long. If 6 inch (150mm) diameter by 12 inch (300mm) long cylinders are used, the total quantity of cylinders may be reduced by one with two cylinders instead of three tested at the age designated for determination of f’c.
iii. Test cylinders in accordance with ASTM C 39. For specified concrete strength of 10,000 psi (70MPa) and above, cylinders shall be ground and not capped.
iv. For 28 day mixes mold six cylinders. Test two cylinders at seven days and three cylinders at 28 days. The 28 day strength shall be the average of the three 28 day cylinders.
One cylinder shall be retained in reserve for later testing if required.
v. For 56 day mixes mold seven cylinders. Test one cylinder at seven days, two cylinders at 28 days, and three cylinders at 56 days. The 56 day strength shall be the
CONSTRUCTION DOCUMENTS
2 August 2026
014500-9 Structural Testing and Inspection average of the three 56 day cylinders. One cylinder shall be retained in reserve for later testing if required.
vi. For 90 day mixes mold eight cylinders. Test one cylinder at seven days, one at cylinder at 28 days, two cylinders at 56 days, and three cylinders at 90 days. The 90 day strength shall be the average of the three 90 day cylinders.
One cylinder shall be retained in reserve for later testing if required.
vii. When early age concrete strength verification is required by the Contractor for formwork removal or stressing of post-tensioning tendons, strength shall be verified, at the Contractor’s expense, by additional compression tests of field-cured cylinders or by the maturity method in accordance with ASTM C1074.
viii. If one cylinder in a test manifests evidence of improper sampling, molding or other damage, discard cylinder and base test results on that of remaining cylinder.
3. Evaluate concrete for conformance with Specifications as follows:
a) Slump:
i. Maintain a slump moving average, comprised of the average of all batches or most recent five (5) batches tested, whichever is fewer.
b) Strength test:
i. Maintain a compressive strength moving average, comprised of three (3) consecutive strength test results, for each mix design used in work.
ii. Strength level of concrete will be considered satisfactory provided averages of all sets of three (3) consecutive strength test results (i.e. moving average) equal or exceed specified 28-day strength, and no individual strength test result falls below specified 28-day strength by more than 500 psi (3.5MPa).
iii. If strength tests fail to meet minimum requirements, concrete represented by such tests shall be considered questionable and shall, if deemed appropriate by the SER, be subject to further evaluation by core testing as specified herein or other testing methods.
iv. Maintain a log that contains the results of all concrete strength tests. The log shall include the results of each test performed, be in electronic spreadsheet format, and updated and submitted along with concrete test data. See example log attached at the end of this Specification Section.
CONSTRUCTION DOCUMENTS
2 August 2026
014500-10 Structural Testing and Inspection
c) Conduct core tests on questionable concrete in accordance with ACI 318 and ASTM C 42.
i. Location of cores shall be coordinated with Design Professionals so as to least impair strength of structure.
Before testing cores, discard and replace any that show evidence of having been damaged subsequent to or during removal from structure or which have reinforcement present.
ii. Cores from structure exposed to soil or constant moisture in service (e.g. basement walls, retaining walls, slab-on-grade, piers, footings, etc.) shall be tested in a fully saturated condition. Cores for all other concrete may be tested dry. Prior to commencement of coring, verify with Design Professionals whether cores are to be tested wet or dry.
iii. Fill core holes with low slump concrete or mortar with a strength equal to or greater than that specified for area cored.
d) Concrete in area represented by core test will be considered adequate if average strength of cores is equal to at least 85% of, and if no single core is less than 75% of specified strength.
4. Floor flatness and levelness tolerance compliance testing is to be performed within 72 hours of concrete placement by Testing Agency, and prior to the removal of shores and forms.
A) Testing Agency to test and report flatness (FF), levelness (FL) prior to shoring removal. For slabs that include camber, do not test for levelness (FL). Perform FF/FL testing in accordance with ASTM E 1155 requirements.
CONSTRUCTION DOCUMENTS
2 August 2026
014500-11 Structural Testing and Inspection
EXAMPLE CONCRETE STRENGTH SPREADSHEET LOG
A V
E R
A G
E
C O
M P
R E
S S
IV
S T
R E
N G
H
(P
I)
B R
E A
K
Y
P E y p e
E A
K
IN
G L
O
D
(L
V
E R
A
O S
S
S E
C T
IO
N
L
E A
IN
.5
V
E R
A
IA
M E
T E
R
IN
E
(D
Y S
S T
/8
/2
U
Y
P
I, M
IX
I .D
H
P
A C
E M
E N
O
C A
T
IO
F ir st F lo o r S la b s an d
B ea m s
IC
K
U
M B
E C
IM
E
N I
.D
S
*F
IE
L D
C U
R
IN
G C
O N
D
IT
IO
N
S N
C B
N
O C
U R
IN
G
B O
X
C B
C
U R
IN
G
B O
X I=
IN
S
U L A
T E
D
C O
C
O O
L E
D
H E
H
E A
T E
D C
A
C A
P P
E D
IC
IC
E D
O
O
T H
R E
A K
T Y
P E
S
A S
C L A
S S
IF
IE
D B
Y A
S T
M C
O J E
C T
D
A T
E
A R
C H
IT
E
C T
S
T R
U C
T U
R A
L E
N G
IN
E
E R
CONSTRUCTION DOCUMENTS
2 August 2026
014500-12 Structural Testing and Inspection
3.5 PRECAST STRUCTURAL CONCRETE
A. Field Inspection: Acceptance of erected precast concrete will be made by the Design Professionals for general conformance with the plans and specifications.
B. Defective Work: Precast concrete units which do not conform to specified requirements, including strength, tolerances, and finishes, shall be repaired or replaced with precast concrete units that meet requirements of this section as directed by the Design Professionals. The Contractor shall also be responsible for the cost to any other work affected by or resulting from corrections to precast concrete work.
C. Acceptance Criteria of Concrete Strength: The compressive strength level of an individual class of concrete shall be considered satisfactory if the following requirements are met:
1. The average of all sets of three consecutive strength tests equal or exceed the required f’c.
2. No individual strength test falls below the required f’c by more than 500 psi.
3. If criteria 1 above is not met but criteria 2 above has been, the Contractor shall immediately notify the Design Professionals and take immediate steps to increase the average of subsequent strength tests.
D. Testing and Inspection will be in accordance with PCI MNL-116 Requirements.
E. Precast producer shall allow Testing Agency access to material storage areas, concrete production equipment, concrete placement, and curing facilities.
Cooperate with Testing Agency and provide samples of materials and concrete mixes as may be requested for additional testing and evaluation.
F. Compressive strength shall be based on tests of cylinders made and tested in accordance with the CAST-IN-PLACE CONCRETE section of this Specification.
G. Quality Assurance:
1. Evaluate precast producer’s quality control and testing methods. Quality control inspection and testing shall occur during the manufacture of the components.
2. Precast producer shall allow Testing Agency access to material storage areas, concrete production equipment, concrete placement, and curing facilities. Cooperate with Testing Agency and provide samples of materials and concrete mixes as may be requested for additional testing and evaluation
3. Before shipment, all precast components shall be inspected to make certain the materials and workmanship conform to the requirements of the contract documents and shop drawings. Copy of the written inspection
CONSTRUCTION DOCUMENTS
2 August 2026
014500-13 Structural Testing and Inspection reports shall be submitted for record to the Contractor and Design Professional.
4. Strength of precast concrete units will be considered potentially deficient when precast concrete units fail to comply with requirements, including the following:
a) Fail to meet compressive-strength test requirements. Concrete strength will be considered deficient if a cylinder strength test falls more than 500 psi below the required f’c. All units cast from the concrete that is represented by the low strength test shall be considered potentially deficient and subject to tests or replacement.
b) Failure to meet split cylinder strength requirements for lightweight concrete.
c) Reinforcement, and pretensioning and detensioning tendons of prestressed concrete do not conform to fabrication requirements.
d) Visual evidence of cracks exceeding .02 inches wide, excessive negative camber, or deflection in excess of calculated anticipated amounts.
e) Concrete curing and protection of precast units not as specified.
f) Concrete curing and protection of precast units against extremes in temperature fail to meet requirements.
g) Precast units are damaged during handling and erecting.
5. When there is evidence that the strength of precast concrete units may be deficient or may not meet requirements, the Testing Agency will obtain, prepare, and test cores drilled from hardened concrete to determine compressive strength according to ASTM C 42.
a) A minimum of 3 representative cores will be taken from precast concrete units of suspect strength, from locations directed by Design Professionals.
b) Cores will be tested in an air-dry condition per ACI 301 when precast concrete units will be dry under service conditions.
c) Strength of concrete for each series of 3 cores will be considered satisfactory if the average compressive strength is at least 85 percent of the 28-day design compressive strength and no core compressive strength is less than 75 percent of the 28-day design compressive strength.
d) Test results will be made in writing on the same day that tests are made, with copies to Design Professionals, Contractor, and precast fabricator. Test reports will include the Project identification name and number, date, name of precast concrete fabricator, name of concrete testing agency; identification letter, name, and type of precast concrete unit or units represented by core tests; design compressive strength, compressive strength at break and type of break, corrected for length-diameter ratio, and direction of applied load to core with respect to horizontal plane of concrete as placed.
CONSTRUCTION DOCUMENTS
2 August 2026
014500-14 Structural Testing and Inspection
e) Where core test results are satisfactory and precast concrete units meet requirements, solidly fill core holes with patching mortar and finish to match adjacent concrete surfaces.
6. Visually inspect all field welds and test according to ASTM E 165 or ASTM E 709. High-strength bolted connections will be subject to inspections.
H. X-Rays: The Design Professionals may order x-rays taken of any member if there is sufficient doubt about the proper existence or location of reinforcing steel, embedded items, or strands.
I. Load Tests: The Design Professionals may order a load test of the member in the plant or in the field if there is sufficient evidence to question the structural integrity of the member.
J. Except as specifically approved, the following is a partial list of finish defects and/or problems which are not acceptable in high quality exposed precast concrete and are means for rejection and replacement of precast pieces. These items must be corrected in manufacturing or design procedures.
1. Ragged or irregular edges.
2. Excessive air pits and voids evident on exposed surface.
3. Adjacent flat and return surfaces with more than slight difference in exposure.
4. Casting lines evident from different placements.
5. Visible form joints or irregular surfaces.
6. Rust staining on surfaces.
7. Components not matching approved sample or non-uniformity of color within a component.
8. Areas of light or heavy aggregate concentration.
9. Blocking or acid stains evident on surface.
10. Non-uniformity of texture.
11. Embedded foreign material.
12. Reinforcement shadow lines.
13. Damaged edges and surfaces.
3.6 STRUCTURAL STEEL
A. Quality Assurance:
1. Shop inspection shall include alignment and straightness of members, camber, preparation for connections, dimensional checks, testing of shop bolts, witnessing of welding procedures, testing of cuts, weld access holes and copes of Heavy Sections as defined in this Specification, examination and testing of completed welds, headed studs and deformed bar anchors, cutting of Heavy Sections, finishing of column ends, cleaning, painting and storage of material. All shop fabrication shall be inspected in the shop. Camber shall be verified in a minimum of 10% of all members requiring camber. If, in the opinion of the SER and Testing
CONSTRUCTION DOCUMENTS
2 August 2026
014500-15 Structural Testing and Inspection
Agency this testing discloses a large ratio (10% or more) of unacceptable cambers, the required percentage of tested cambers may be increased by the SER to 100% at no expense to the Owner. Where testing is required for less than 100% of locations, select test locations at random and throughout the project.
2. Field inspection shall include connections, proper tensioning of bolts, levelness, plumbness and alignment of the frame, conformance to AWS welding methods, examination of surface before welding, examination and testing of completed welds, headed studs and deformed bar anchors and field painting, including touch-up. Where testing is required for less than 100% of locations, select test locations at random and throughout the project.
3. Review the following items in the shop and field:
a) Welding certificates, procedures, and personnel
b) Stud welding setup and operators; bolting procedure and crew
c) Bolting procedure and crew
d) Visually inspect seam welds of tube and pipe for evidence of cracking or lack of fusion. At each end piece of tube or pipe, inspect interior face of seam weld for evidence of cracking, lack of fusion, or less than full flashing.
e) Mill certifications for compliance with the Contract Documents.
4. Inspect high strength bolted construction in accordance with RCSC "Specification for Structural Joints using ASTM A 325 or A 490 Bolts," including but not limited to:
a) Surface preparation and bolt type conforms to plans and Specifications prior to start of bolting operations.
b) Proper bolt storage and handling procedures per codes and standards referenced by this Specification are being followed.
c) Visually inspect all bolted connections.
d) For all bolted connections that are indicated as snug tight, connections are properly compacted and brought to the snug tight condition progressing outward from the most rigid part.
e) For all bolted connections that are indicated as pretensioned or slip critical, pre-installation verification testing is performed by the inspector in cooperation with the contractor in accordance with RCSC section 9.2 and section 7.
f) For all bolted connections that are indicated as pretensioned or slip critical, through routine observation, as defined in RCSC 9.2.1, 9.2.3 or 9.2.4, that the pretensioning methods of RCSC 8.2.1, 8.2.3, or 8.2.4, as appropriate, are performed.
i. "Routine observation" is defined as observation of 10 bolts for every 100 bolts with a minimum of 2 bolts per connection.
g) Retest bolted connections that fail initial inspection after correction by the Fabricator or Erector.
CONSTRUCTION DOCUMENTS
2 August 2026
014500-16 Structural Testing and Inspection
5. Test and inspect welding and welded construction including but not limited to:
a) Review of submittals:
i. Review all Welding Procedures prepared by the Contractor’s Engineer or Certified Welding Engineer. Verify the accuracy of all essential variables of the Welding Procedure including but not limited to confirmation that weldability and heat induction for Heavy Sections and high restraint welds comply with AWS requirements.
ii. Review of welding procedures including prequalification, qualifications test and, for Heavy Sections and High Restraint Welds, the welding procedure prepared by the Contractor's Engineer or Welding Consultant
iii. Submit for record a report indicating that the Welding Procedures have been reviewed as indicated above to the Design Professionals.
b) Test all complete joint penetration welds for soundness by means of either radiographic or ultrasonic testing in accordance with AWS D1.1 and ASTM E164 procedures. All flaws in plate or flange material revealed during such tests shall be repaired and retested by the Contractor at the Contractor's expense.
c) Test all partial joint penetration welds for soundness by means of visual and magnetic particle inspection, unless other methods are specified in the Contract Documents. All flaws in plate or flange material revealed during such tests shall be repaired and retested by the Contractor at the Contractor's expense.
d) Testing of welds at Heavy Sections and High Restraint Welds shall be performed not less than 48 hours after the weld has been completed.
e) Visually inspect all fillet welds. In addition test ten percent (10%) of all fillet welds using a non-destructive method, such as dye penetrant or magnetic particle. Select test locations randomly throughout the structure, but test at least one weld in each location with 6 or more welds per connection. If, in the opinion of the SER and Testing Agency this testing discloses a large ratio (10% or more) of unacceptable welds, the required percentage of tested welds may be increased by the SER to 100%, all at the Contractor's expense.
f) Inspection and Testing by the Testing Agency of High Restraint Welds and where Heavy Sections are to be joined by partial or complete joint penetration welds in tension:
i. Joint Preparation: Monitor fit up and joint preparation (bevel angle, etc.) for conformance to the submitted welding procedures including preheat and interpass
CONSTRUCTION DOCUMENTS
2 August 2026
014500-17 Structural Testing and Inspection temperature. Monitor base metal temperature during welding operations.
ii. Test Complete Joint Penetration Welds in accordance to the requirements of this Specification section, ultrasonically in accordance with AWS D1.1 procedures. On T or corner joints, pay careful attention to the heat affected zone and base metal where the weld shrinkage stresses are in the through thickness direction.
iii. Test Partial Joint Penetration Butt Joints in accordance with this Specification section by the magnetic particle method. At T or corner joints, in addition to the magnetic particle testing, ultrasonically scan the heat affected zone and adjacent base metal from face "C" per AWS D1.1 Table 6.7 and Annex Q7 to detect lamellar tears and shall be done with a compression wave. The Testing Agency shall submit a testing procedure that includes evaluation (acceptance criterion) procedures to the Design Professionals for review.
g) At Heavy Sections and High Restraint Welds: provide pre-production sample testing of heat treatment, observe fabrication, welding and heat treatment of the samples for conformance with submitted welding procedures. Establish locations of testing coupons following AWS procedures. Test coupons following AWS procedures to verify satisfactory results using the welding procedure and heat treatment.
6. Visually inspect all headed studs and deformed bar anchors for complete fusion and full 360-degree weld flash (or fillet).
a) Check all studs with incomplete fusion, and at random five studs at each of six beams per floor, by bending to an angle of 15 degrees from its original axis (away from any missing flash). If more than twenty percent of studs fail on one member, check all studs on member. In addition, for each member with any defective studs, test an additional member.
b) Contractor to replace any studs that crack or break. Contractor to only straighten studs that would foul other work or have less than 1 inch (25mm) cover in bent position.
7. Cleaning & Painting:
a) Prior to shop painting, examine fabricated pieces to verify proper cleaning in accordance with this Specification.
b) Examine shop painting to verify conformance with this Specification.
c) Examine loading and unloading of steel to visually observe that damage does not occur during shipping and handling.
CONSTRUCTION DOCUMENTS
2 August 2026
014500-18 Structural Testing and Inspection
3.7 FOOTINGS
A. Quality Assurance by Geotechnical Engineer (or Testing Agency if the same entity):
1. Review Contractor's proposed footing installation methods, sequences, and procedures.
2. Verify bearing stratum and bearing capacity of each footing; verify levelness of footing end bearing surface.
3. Determine final bearing elevation at each footing location.
4. Observe, record, and report footing as-built plan location, footing size and final elevations of bottom (where possible) and top of completed footings.
5. Coordinate with Testing Agency.
B. Quality Assurance by Testing Agency:
1. Inspection of Batch Plant: As required to ensure that concrete delivered to job complies with Specifications and design mix. Batch plant inspection shall be required once at start of job and thereafter if concrete falls below Specifications.
2. Inspection of Reinforcement: Provide continuous visual inspection of site fabrication. Record the steel reinforcement bar sizes, grade, length, and number of bars.
3. Inspection of Concrete and Reinforcement Placement: Provide continuous visual inspection of installation of reinforcement and concrete placement including verification of laitance removal at top of footings.
4. Check ready mix delivery tickets for correct concrete mix design number.
Record batch to placement time. Check slump, temperature, and batch to placement time for each set
5. Slump Tests: ASTM C143. Make one test from each truck.
6. Concrete Compressive Strength Tests: Testing agency will take a minimum of one sample set of concrete cylinders per 20 cubic yards of concrete. See CAST-IN-PLACE CONCRETE section of this specification for requirements. Cure cylinders to simulate same curing conditions as concrete in footings. Reports of cylinder tests shall state footing location(s), laboratory or site curing, compression strength, type of fracture, age at testing, concrete supplier, mix specification strength, any other pertinent information, test results, and conclusions.
7. Additional Tests: Perform additional testing if, in the opinion of the Design Professionals, concrete of poor quality has been placed based on cylinder strengths below Specification requirements or visual defects.
Tests may be compression tests on cored cylinders, ASTM C42, and load tests as outlined in ACI 318, or as directed by the Design Professionals.
Complete continuous coring of footings will be required, at Contractor's expense, where verification of quality of concrete is not otherwise attainable.
END OF SECTION
CONSTRUCTION DOCUMENTS
2 August 2026
NIAGARA FALLS HERITAGE GATEWAYS ISSUE FOR BID
Multi-Use Pavilion 17 July 2026 Niagara Falls, NY EDR
SELECTIVE DEMOLITION 024119 - 1
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Demolition and removal of selected site elements.
2. Salvage of existing items to be reused or recycled.
3. Salvage of existing items for the Owner’s use elsewhere.
B. Related Requirements:
1. Section 017419 “Construction Waste Management & Disposal
2. Section 311000 "Site Clearing" for site clearing and removal of above and below grade improvements and for temporary protection of existing trees and plants that are affected by selective demolition.
1.3 DEFINITIONS
A. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and salvaged or removed and reinstalled.
B. Remove and Salvage: Carefully detach from existing construction, in a manner to prevent damage, and deliver to Owner ready for reuse.
C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where and how indicated.
D. Existing to Remain: Existing items of construction that are not to be permanently removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
1.4 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.
Niagara Falls, NY EDR
SELECTIVE DEMOLITION 024119 - 2
1. Carefully salvage in a manner to prevent damage and promptly return to Owner.
2. Inspect and discuss condition of construction to be selectively demolished.
3. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.
4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.
5. Review areas where existing construction is to remain and requires protection.
1.5 INFORMATIONAL SUBMITTALS
A. Proposed Protection Measures: Submit report, including drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, for dust control and, for noise control. Indicate proposed locations and construction of barriers.
B. Schedule of Selective Demolition Activities: Indicate the following:
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's on-site operations are uninterrupted.
2. Interruption of utility services. Indicate how long utility services will be interrupted.
3. Coordination for shutoff, capping, and continuation of utility services.
C. Predemolition Photographs: Submit before Work begins.
1.6 FIELD CONDITIONS
A. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
B. Notify Owner’s Representative of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
C. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.
1. Hazardous materials will be removed by Owner before start of the Work.
2. If suspected hazardous materials are encountered, do not disturb; immediately notify Owner’s Representative and Owner. Hazardous materials will be removed by Owner under a separate contract.
D. Storage or sale of removed items or materials on-site is not permitted.
E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
Niagara Falls, NY EDR
SELECTIVE DEMOLITION 024119 - 3
PART 2 - PRODUCTS
2.1 PEFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
B. Review record documents of existing construction provided by Owner if available.
Owner does not guarantee that existing conditions are same as those indicated in record documents.
C. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.
D. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to Owner’s Representative.
E. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs.
1. Inventory and record the condition of items to be removed and salvaged. Provide photographs of conditions that might be misconstrued as damage caused by salvage operations.
3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished.
1. Owner will arrange to shut off indicated services/systems when requested by
Contractor.
Niagara Falls, NY EDR
SELECTIVE DEMOLITION 024119 - 4
2. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.
3.3 PREPARATION
A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
B. Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.
3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.
4. Cover and protect furniture, furnishings, and equipment that have not been removed.
C. Temporary Shoring: Provide and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
1. Strengthen or add new supports when required during progress of selective demolition.
3.4 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Proceed with selective demolition systematically, from higher to lower level.
2. Neatly cut openings and holes plumb, square, and true to dimensions required.
Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to minimize disturbance of adjacent surfaces. Temporarily cover openings to remain.
3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
4. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
5. Dispose of demolished items and materials promptly. Comply with requirements in Section 017419 "Construction Waste Management and Disposal."
B. Removed and Salvaged Items:
1. Clean salvaged items.
Niagara Falls, NY EDR
SELECTIVE DEMOLITION 024119 - 5
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .