APPENDIX B - Installation Resposibilities.pdf

PDF 202 KB Posted

Attached to
Industrial Vending Machines
Solicitation number
2031ZA24Q00113
Issued by

About this file

This document is Appendix B - Installation Responsibilities, which outlines the responsibilities of the government and the contractor for the installation of a machine as part of a federal contract opportunity.

The key details are:

The contractor is responsible for providing the machine foundation, labor and material handling equipment for off-loading and placing the machine, anchor bolts and nuts, setting and rough leveling the machine, leveling and aligning the machine, and connecting the machine to the utilities hook-up. The government is responsible for providing unobstructed utilities hook-up within 20 feet of the machine and ensuring customer personnel do not perform any work when the contractor's representative is not present during installation and initial start-up. The contractor must also provide descriptive literature with its solicitation response to technically evaluate the offered equipment, and any literature with qualifying statements will be rejected.

View the file

Other files

File Type Posted
APPENDIX A - Materials Pricing Schedule.xls XLS spreadsheet
SOW Industrial Vending Machines.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix B Installation Responsibilities

Government Contractor

X Provide machine foundation.

X Furnish labor and material handling equipment for Off-loading and placing item on foundation.

X Provide and install anchor bolts and nuts.

X Set and rough level the machine on its foundation.

X Level and align machine.

X Connect machine to the utilities hook-up(s).

X Provide all necessary materials, tools, gauges and Instrumentation necessary to perform the required Tests.

GOVERNMENT RESPONSIBILITIES (when checked)

X Provide unobstructed utilities hook-up within 20 feet of machine.

X Customer personnel shall perform no work when the contractor's representative is not in the immediate work area during installation and initial start-up of the machine.

REQUEST FOR TECHNICAL LITERATURE

a. The contractor shall provide, with its solicitation response, descriptive literature that has previously been used to market the proposed equipment. The literature will be used to technically evaluate the response and shall describe how the equipment meets requirements of the specification;

b. The features, which must be addressed in the descriptive literature, are necessary to consider the offer responsive. If the offeror’s preprinted literature does not show all these features, the offeror must attach a letter of supplemental information to the literature describing in detail those required features.

c. The failure of descriptive literature to show that the product offered conforms to the requirements of this solicitation will require rejection of the response.

d. Descriptive literature furnished under this solicitation that contains statements similar to ‘specifications are subject to change without notice’, ‘response is subject to the following conditions’, or ‘prices are subject to change without notice’ shall not be considered for an award. The Government has no assurance the products offered will conform to the specification; therefore, the response is not considered a firm offer and will not be considered for an award.

e. Offerors who furnish a product catalog to satisfy this requirement must indicate which item is the subject of the offer by citing (highlighting, marking, etc.) model numbers and page numbers from the catalog along with the price. Offers that fail to clearly establish what item or items are will be considered as non-responsive.

File details come from the government source that posted it. Updated .