Appendix A Proposal Pricing List.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Repair and Maintenance of the Trolley Track System
Solicitation number
6913G620R200006
Issued by

About this file

This document includes a solicitation for track repair and maintenance services at the Lowell National Historical Park, as well as an appendix with pricing details. The federal agency issuing the solicitation is the Department of Transportation Immediate Office of the Secretary of Transportation. The solicitation seeks a firm fixed price construction contract to repair and maintain 0.5 miles of trolley track. Services include ballast replacement, tie replacement, drainage improvements, electrical bonding repairs, rail modifications and removals. The appendix provides unit pricing details for ties, ballast, and other materials. Offerors are required to submit pricing details and responses by the specified due date. The selected contractor will be responsible for all labor, materials, equipment, permits, reports and other deliverables to complete the track maintenance and repair work according to the standards outlined in the solicitation documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Appendix A: Proposal Pricing List

CLIN/SLINDescriptionUnitQuantityUnit PriceAmount
00100Track Repair and Maintenance, in accordance with Statement of Work in Section C for Lowell National Historic Park.JOB1$$
Tasks Under CLIN 00100Breakdown Description of MaterialsUnitQuantityUnit PriceAmount
Task 01TiesEach$$
Task 01Switch TiesEach$$
Multiple TasksRailFoot$$
Multiple TasksBallastCubic Yard$$
Task 02Bonding StrapsEach$$

00200 Option 1 – Prepare/install new drainage trough between Pole #6 and Pole #10 between the existing track and Dutton Street retaining wall. The trough shall be pitched to allow water to drain toward Dutton Street. The trough area shall be restored to match surrounding conditions. JOB 1 $ $

TOTAL FIRM FIXED PRICE
CLIN 00100 and 00200 Combined$

&"-,Bold"&12

Sheet2

Task 01Ties Unit price per unit:400E/A
$________________
Task 01Switch Ties price per unit:125E/A
$________________
Multiple TasksBallastYard
$________________
Multiple TasksCross Timbers price per unit:E/A
$_________________
Multiple TasksRail prices per foot:Per Foot
$_________________
Task 02Bonding Straps price per unit:40E/A
$________________

File details come from the government source that posted it. Updated .