Appendix A-(i) WB_fuel tank SHOP drawing.pdf
PDF 176 KB Posted
- Solicitation number
- W91QVN22R0261-0002
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
O
Sheet of
S E
O U
L
T H
O M
A S J
D A
V
IS
I
N C
J
U N
G I L A
S S
O C
IA
T E
D A
R C
H
IT
E C
T S
E
N G
IN
E E
R S a u t o s c a le a u t o s h o r t d e s ig n a u t o s y t im e
W A
R R
IO
R B
A S
E A
N D S
T O
R Y L
F C
A R
E A I
K O
R E
F Y O
M A
R A
N G
E S
U P
P O
R T F
A C
IL
IT
IE
S P
H A
S E I I, A N
S I
D
W
U M
C
FAR EAST DISTRICT
S E
O U
L ,K
O R
E A
NOT TO SCALE
F U
E L I S
S U
E P
O
IN
T
W A
R R
IO
R B
A S
E
F E
W R N
O
G -6 J
S K
S K
J G
S K
PP6H2
D
IS
P E
N S
IN
G S
Y S
T E
M S S
C H
E M
A T
IC
D
IA
G R
A M
D
IE
S E
L A
N D M
O G
A S V
E H
IC
L E F
U E
L S
T O
R A
G E a u t o d e s ig n a u t o u s e r n a m e
S E
T
ID
PARTS LIST
ITEM QTY NAME
DISPENSER
HOSE REEL
80mm DRYBREAK FILL POINT
MONITORING SYSTEM
INTERNAL FIRE VALVE
80mm OVERFILL PREVENTION VALVE
100mm EXTRA PORT
100mm PROBE PORT
200mm EMERGENCY VENT
50mm UPDRAFT VENT
250mm INSPECTION PORT
600mm MANWAY
50mm GAUGE STICK PORT
25mm FROST PROOF DRAIN
TANK LADDER
CONTAINMENT DRAIN
DISPENSER SHEAR VALVE
LEVEL GAUGE (WIRED TO PANEL INDICATOR)
OVERFILL PREVENTION ALARM & LIQUID
DISPENSER LEAK DETECTOR UNIT
P L A N
CONCRETE MOUNTING PAD (REFER TO CIVIL)
18925 Liters (5,000 GAL)
ELEVATION
MONITORING AND KEY CARD SYSTEM PANEL
ITEM QTY NAME
I
A
B
C
D
E
F
G
H
J
N
K
L
M
O
P
Q
FUEL DISPENSER (FACTORY INSTALLED)
BURIED CONDUIT BY ELECTRICAL
FT
FT
NTS
NTS
NTS
DIESEL x 2 TANKS
DIESEL VEHICLE FUEL STORAGE/DISPENSING SYSTEMS SCHEMATIC DIAGRAM
SCHEMATIC KEY NOTES
NOTE:
AND GOVERNMENT OPERATED VEHICLES ONLY.
SHALL BE USED FOR GOVERNMENT OWNED
THIS FUEL STORAGE/DISPENSING SYSTEM
KEY CARD DISPLAY & CONTROL PANEL + ATG
F
1R
DISPENSER LEAK DETECTION SENSOR/SYSTEM (FACTORY INSTALLED)
EMERGENCY ALARM HORN (FACTORY INSTALLED)
DISPENSER LEAK DETECTION PANEL (FACTORY INSTALLED)
DISPENSER AND PUMP CONTROL PANEL (FACTORY INSTALLED)
EMERGENCY SHUT DOWN SYSTEM (FACTORY INSTALLED)
EMERGENCY SHUT DOWN BUTTON (FACTORY INSTALLED)
MASTER LEVEL INDICATOR AND ALARM PANEL (FACTORY INSTALLED)
MONITORING AND ALARM PANEL (FACTORY INSTALLED)
FUEL ELECTRONIC LEVEL INDICATOR (FACTORY INSTALLED)
IN BURIED CONDUIT
CONDUIT FROM FUEL DISPENSING SYSTEM TO REMOTE MOUNTED MODEM
FIELD ROUTED COMMUNICATION WIRING (PHONE LINE) TO BE RUN IN
KEY CARD CONTROL PANEL (REFER TO SPECIFICATION FOR DETAILS)
COMMUNICATION SYSTEM.
CAPABILITY TO COMMUNICATE VIA TELEPHONE LINE TO A CENTRAL
FURNISHED AND CONTRACTOR INSTALLED) ATG SYSTEM TO HAVE THE
ATG (AUTOMATIC TANK GAUGING SYSTEM) TO BE GFCI (GOVERMENT
ELECTRICAL DRAWINGS FOR ROUTING AND WIRING TYPE
COMMUNICATION SYSTEM. INSTALLED BY MECHANICAL AND REFER TO
COMMUNICATION WIRING FROM MODEL TO RELAY TO EXISTING
AND WIRING REQUIREMENTS.
TO EXISTING TELEPHONE PEDESTAL, SEE ELECTRICAL FOR LOCATION
1S
AND INSTALLATION DETAILS.
BUILDING, REFER TO ELECTRICAL DRAWINGS FOR INSTALLTION LOCATION
WIRING FROM PEDESTAL CONNECTION TO WORK STATION IN RANGE CONTROL
STORAGE TANK
K
BUILDING
RANGE CONTROL
R
Q
S
P
O
L
N
J
I
H
G
C
D
E
B
AREA LIGHT(2@ 400 WATTS METAL HALIDE)
THE ATG SUPPLIER.
PRINTER. SYSTEM SHALL BE HAVE LOADED THE INTERFACE SOFTWARE FROM
WRITER, REWRITE CD-ROM DRIVE WITH SOFTWARE COMPLETE WITH MODEM AND
FLOPPY DRIVE, 48X INTERNAL CD ROM DRIVE AND A 16X INTERNAL READ,
RESOLUTION, 101 CHARACTER KEYBOARD, A 1.4 MEGABYTE 3 1/2 INCH
2 USB PORTS, 17 INCH MONITOR WITH 740x1024 AND 0.28 DPI MINIMUM
GIGA-BYTE HARD DISC, 128 MEGABYTE RAM, 1 SERIAL AND 1 PARALLEL PORT,
INTEL PENTIUM III PROCESSOR, RUNNING AT 600 MEGAHERTZ SPEED, 18
USE MICROSOFT WINDOWS 98, 2000, OR NT AND SHALL NOT HAVE LESS THAN
OFFICER FOR LOCATION AND COMMUNICATION WIRE ROUTING. COMPUTER SHALL
COMMUNICATION SYSTEM. CONTRACTOR TO COORDINATE WITH CONTRACTING
AND FURNISHED BY THE CONTRACTOR TO BE COMPATIBLE WITH THE ATG
WORK STATION LOCATED IN THE RANGE CONTROL BUILDING TO BE PROVIDED
SINGLE POINT POWER CONNECTION (120 V, 1 PH, 20A, 60 Hz)
File details come from the government source that posted it. Updated .