Appendix A - General Construction Notes.pdf

PDF 260 KB Posted

Attached to
On-Call Water, Wastewater, and Stormwater Infrastructure Repairs, Replacement, and Rehabilitation Services
Solicitation number
26-280
Issued by
Dallas County, Texas

About this file

This document is the Town of Addison, Texas General Construction Notes (June 2025) applicable to all construction projects within the municipality's jurisdiction. The notes establish comprehensive standards and requirements for contractors performing work on public or private projects, including paving systems, water and wastewater infrastructure, storm drain systems, erosion control, landscaping, irrigation, traffic control, and traffic signals and street lighting. Contractors must obtain all necessary permits from the Public Works & Engineering Services Department before beginning work, provide shop drawings for Town review at least 21 calendar days in advance of construction, and notify the Town at least 48 hours prior to commencing operations. All construction, testing, and materials must comply with the Town's current standards, NCTCOG specifications, TCEQ standards, and TXDOT specifications as applicable. Contractors are responsible for construction surveying and staking, protecting survey markers and existing utilities, obtaining commercial testing laboratory certification for material testing, and maintaining a construction schedule with weekly progress reports for public projects.

The notes establish strict requirements for contractor responsibilities including site cleanliness, debris removal, dust control, utility location and protection, and damage liability for existing facilities and adjacent properties. Contractors must comply with trench safety plans, obtain approval before modifying fire hydrants or manholes, and follow specific standards for concrete pavement strength (4000-4500 PSI depending on classification), reinforcing steel specifications, and joint construction. Erosion control requirements mandate TCEQ TPDES compliance, installation of erosion devices prior to soil disturbance, weekly site inspections, and silt removal when deposits reach three inches or 25 percent device height. Traffic control must follow the Texas Manual on Uniform Traffic Control Devices, with closures requiring 72-hour advance notice and restricted timing between 9:00 a.m. and 3:30 p.m. on weekdays. Contractors must coordinate with utility companies, Parks and Recreation for landscaping and irrigation work, the Traffic Department for signal work, and must provide qualified personnel including certified arborists for tree work and IMSA Level II or TRF453 certified technicians for traffic signal operations.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOA General Construction Notes | 06/2025 1

GENERAL CONSTRUCTION NOTES

The Town of

Public Works & Engineering Services

16801 Westgrove Road

Addison, TX 75001

June 2025

TOA General Construction Notes | 06/2025 2

TABLE OF CONTENTS

1. GENERAL NOTES FOR ALL CONSTRUCTION ACTIVITIES

2. GENERAL NOTES FOR PAVING SYSTEMS

3. GENERAL NOTES FOR WATER AND WASTEWATER SYSTEMS

4. GENERAL NOTES FOR STORM DRAIN SYSTEMS

5. GENERAL NOTES FOR EROSION CONTROL

6. GENERAL NOTES FOR LANDSCAPING

7. GENERAL NOTES FOR IRRIGATION

8. GENERAL NOTES FOR TRAFFIC CONTROL

9. GENERAL NOTES FOR TRAFFIC SIGNALS AND STREET LIGHTING

The following General Notes shall apply to all construction projects, public or private. The Owner’s Engineer may supplement the General Notes with project-specific notes with Town approval.

TOA General Construction Notes | 06/2025 3

1. GENERAL NOTES FOR ALL CONSTRUCTION ACTIVITIES

1.1. ALL CONSTRUCTION, TESTING, AND MATERIALS SHALL BE IN ACCORDANCE WITH THE

TOWN’S CURRENT STANDARDS, DETAILS, AND SPECIFICATIONS. IF NOT EXPLICITLY

SPECIFIED IN TOWN DOCUMENTS, NCTCOG OR THE APPROPRIATE GOVERNING BODY’S,

STANDARDS AND DETAILS SHALL REGULATE CONSTRUCTION, TESTING, AND

MATERIALS.

1.2. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS AND

APPROVALS PRIOR TO BEGINNING ANY CONSTRUCTION. CONTACT PUBLIC WORKS &

ENGINEERING SERVICES DEPARTMENT FOR A PERMIT TO WORK WITHIN TOWN ROW.

1.3. ALL SHOP DRAWINGS, WORKING DRAWINGS OR OTHER DOCUMENTS WHICH REQUIRE

REVIEW BY THE TOWN, SHALL BE SUBMITTED BY THE CONTRACTOR SUFFICIENTLY IN

ADVANCE OF SCHEDULED CONSTRUCTION TO ALLOW NO LESS THAN 21 CALENDAR

DAYS FOR REVIEW AND RESPONSE BY THE TOWN.

1.4. CONTRACTOR SHALL PROVIDE TREE PROTECTION PER TOWN OF ADDISON LANDSCAPE

STANDARDS PRIOR TO BEGINNING CONSTRUCTION.

1.5. CONTRACTOR SHALL NOTIFY THE TOWN AT LEAST 48 HOURS PRIOR TO BEGINNING

CONSTRUCTION.

1.6. CONTRACTORS ARE ALLOWED TO MAKE CONNECTIONS TO THE TOWN WATER SYSTEM

BY OPENING AN ACCOUNT THROUGH THE ADDISON FINANCE DEPARTMENT AND

RENTING A FIRE HYDRANT METER. THE COMPANY OR INDIVIDUAL IS SOLELY

RESPONSIBLE FOR THE COST, MAINTENANCE, PROPER USE, AND SECURITY OF THE

RENTAL EQUIPMENT. THE COMPANY OR INDIVIDUAL IS ALSO RESPONSIBLE FOR THE

COST OF THE WATER USED.

1.7. CONTRACTOR MUST KEEP AVAILABLE ONSITE, AT ALL TIMES, APPROVED

CONSTRUCTION PLANS AND COPIES OF ANY/ALL REQUIRED PERMITS ALONG WITH THE

APPROPRIATE VERSIONS OF THE FOLLOWING APPLICABLE REFERENCES:

1.7.1. TOWN OF ADDISON ENGINEERING STANDARDS & DETAILS

1.7.2. NCTCOG STANDARDS & SPECIFICATIONS

1.7.3. TCEQ STANDARDS & SPECIFICATIONS

1.7.4. TXDOT SPECIFICATIONS & STANDARD DRAWINGS, AS APPLICABLE.

1.8. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED CONSTRUCTION SURVEYING

AND STAKING AND SHALL NOTIFY THE DESIGN ENGINEER OF ANY DISCREPANCIES

PRIOR TO PROCEEDING WITH ANY WORK.

1.9. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL SURVEY MARKERS

INCLUDING IRON RODS, PROPERTY CORNERS, OR SURVEY MONUMENTS WITHIN THE

LIMITS OF CONSTRUCTION AND OUTSIDE ROW DURING CONSTRUCTION. ANY SURVEY

MARKERS DISTURBED DURING CONSTRUCTION SHALL BE REPLACED BY THE

CONTRACTOR AT NO COST TO THE TOWN.

1.10. TESTING AND INSPECTION OF MATERIALS SHALL BE PERFORMED BY A

COMMERCIAL TESTING LABORATORY SPECIFIED BY OR APPROVED BY THE TOWN.

TOA General Construction Notes | 06/2025 4

CONTRACTOR SHALL FURNISH MATERIALS OR SPECIMENS FOR TESTING AND SHALL

FURNISH SUITABLE EVIDENCE THAT THE MATERIALS PROPOSED TO BE INCORPORATED

INTO THE WORK ARE IN ACCORDANCE WITH THE SPECIFICATIONS. COPIES OF

TESTING REPORTS SHALL BE FURNISHED TO THE TOWN IMMEDIATELY UPON RECEIPT

BY THE CONTRACTOR.

1.11. FOR PUBLIC PROJECTS, CONTRACTOR SHALL PROVIDE A CONSTRUCTION

SCHEDULE AND WEEKLY PROGRESS REPORTS.

1.12. CONTRACTOR IS RESPONSIBLE FOR KEEPING STREETS AND DRIVEWAYS

ADJACENT TO THE PROJECT FREE OF DIRT, MUD, AND DEBRIS AT ALL TIMES.

CONTRACTOR SHALL CLEAN UP AND REMOVE ALL LOOSE MATERIAL RESULTING FROM

CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL TAKE ALL AVAILABLE

PRECAUTIONS TO CONTROL DUST.

1.13. THE EXISTENCE AND LOCATIONS OF THE PUBLIC AND FRANCHISE UTILITIES

SHOWN ON THE DRAWINGS WERE OBTAINED FROM AVAILABLE RECORDS AND ARE

APPROXIMATE. THE CONTRACTOR SHALL DETERMINE THE DEPTH AND LOCATION OF

EXISTING UNDERGROUND UTILITIES PRIOR TO EXCAVATING, TRENCHING, OR

DRILLING AND SHALL BE REQUIRED TO TAKE ANY PRECAUTIONARY MEASURES TO

PROTECT ALL LINES SHOWN AND / OR ANY OTHER UNDERGROUND UTILITIES NOT OF

RECORD OR NOT SHOWN ON THE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE

FOR CONTACTING ALL PUBLIC AGENCIES AND FRANCHISE UTILITIES 48 HOURS PRIOR

TO CONSTRUCTION. THE CONTRACTOR MAY BE REQUIRED EXPOSE THESE FACILITIES

AT NO COST TO THE TOWN. THE CONTRACTOR WILL BE RESPONSIBLE FOR DAMAGES

TO UTILITIES IF THE DAMAGE IS CAUSED BY NEGLIGENCE OR FAILURE TO HAVE

LOCATES PERFORMED.

1.14. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING

FACILITIES OR ADJACENT PROPERTIES DURING CONSTRUCTION. ANY REMOVAL OR

DAMAGE TO EXISTING FACILITIES SHALL BE REPLACED OR REPAIRED TO EQUAL OR

BETTER CONDITION BY THE CONTRACTOR.

1.15. CONTRACTOR SHALL NOT STORE MATERIALS, EQUIPMENT OR OTHER

CONSTRUCTION ITEMS ON ADJACENT PROPERTIES OR RIGHT-OF-WAY WITHOUT THE

PRIOR WRITTEN CONSENT OF THE PROPERTY OWNER AND/OR THE TOWN, AS

APPLICABLE.

1.16. TEMPORARY FENCING SHALL BE INSTALLED PRIOR TO THE REMOVAL OF

EXISTING FENCING. TEMPORARY FENCING SHALL BE REMOVED AFTER PROPOSED

FENCING IS APPROVED BY THE TOWN. ALL TEMPORARY AND PROPOSED FENCING

LOCATIONS SHALL BE SUBJECT TO FIELD REVISIONS AS DIRECTED BY THE TOWN.

1.17. UNUSABLE EXCAVATED MATERIAL, OR CONSTRUCTION DEBRIS SHALL BE

IMMEDIATELY REMOVED AND DISPOSED OF OFFSITE AT AN APPROVED DISPOSAL

FACILITY BY THE CONTRACTOR AT HIS EXPENSE.

1.18. IT IS THE CONTRACTOR’S RESPONSIBILITY TO MAINTAIN A NEAT AND ACCURATE

RECORD OF CONSTRUCTION FOR THE TOWN’S RECORDS.

TOA General Construction Notes | 06/2025 5

2. GENERAL NOTES FOR PAVING SYSTEMS

2.1. ALL PAVING CONSTRUCTION, TESTING, AND MATERIALS, INCLUDING CONCRETE,

REINFORCEMENT, JOINTING, AND SUBGRADE PREPARATION AND TREATMENT SHALL BE

IN ACCORDANCE WITH THE TOWN’S CURRENT STANDARDS, DETAILS, AND

CONSTRUCTION SPECIFICATIONS UNLESS OTHERWISE NOTES.

2.2. NO EARTHWORK, LIME APPLICATION, OR OTHER PREPARATION OF THE SUBGRADE FOR

PAVING OF STREETS, ALLEYS, OR FIRE LANES SHALL BE INITIATED WITHOUT

AUTHORIZATION FROM THE TOWN. THE TOWN WILL AUTHORIZE THE SUBGRADE

ENGINEERING STANDARDS WORK IN PREPARATION FOR PAVING AFTER UTILITY

TRENCH BACKFILL TESTING HAS BEEN COMPLETED AND VERIFIED TO MEET THE TOWN

REQUIREMENTS.

2.3. SUBGRADE

2.3.1. SHALL EXTEND 12" MIN. BEHIND THE BACK OF CURB.

2.3.2. SUBGRADE UNDER ALL PAVEMENT SHALL BE 6" THICK AND SHALL BE STABILIZED

WITH AT LEAST 30 LBS. PER SQ. YD. HYDRATED LIME, COMPACTED TO A DENSITY

NOT LESS THAN 95 PERCENT.

2.3.3. LABORATORY TESTS MUST BE SUBMITTED TO THE PUBLIC WORKS DEPARTMENT

FOR APPROVAL TO DETERMINE AMOUNT OF LIME REQUIRED. LABORATORY TEST

MAY BE WAIVED PROVIDED AT LEAST 36 LBS. OF LIME PER SQ. YD. IS USED. SEE

NCTCOG ITEM 301.2 "LIME TREATMENT".

2.3.4. FLEXIBLE BASE (CRUSHED STONE/CONCRETE) PER NCTCOG ITEM 301.5 MAY BE

SUBSTITUTED FOR LIME TREATMENT WITH THE APPROVAL OF THE TOWN

ENGINEER.

2.4. REINFORCING STEEL

2.4.1. BAR LAPS SHALL BE THIRTY DIAMETERS.

2.4.2. REINFORCING STEEL SHALL BE #3 REBAR (3/8’) ON 18’ CENTERS FOR 8” OR

LESS PAVEMENT THICKNESS, #4 FOR 10" OR MORE PAVEMENT THICKNESS.

2.4.3. REBAR SHALL BE SUPPORTED BY BAR CHAIRS OR OTHER DEVICES APPROVED BY

TOWN ENGINEER.

2.4.4. NO TRAFFIC ON FINISHED SUBGRADE SHALL BE PERMITTED AFTER REINFORCING

STEEL IS INSTALLED ABOVE SUBGRADE. NO TRAFFIC SHALL BE PERMITTED BEFORE

OR DURING THE PLACING OF CONCRETE.

2.5. CONCRETE PAVEMENT:

2.5.1. ALL CONCRETE STRENGTH AND MIX DESIGN SHALL BE AS SHOWN IN LATEST

EDITION OF NCTCOG SECTION 303.3

2.5.2. CLASS P1 PAVEMENT : MACHINE FINISHED: A SLIP-FORM PAVING MACHINE SHALL

BE USED FOR ALL PUBLIC STREETS AND ALLEYS UNLESS OTHERWISE APPROVED BY

THE DIRECTOR OF PUBLIC WORKS & ENGINEERING SERVICES. MIN. 4000 PSI 28-

DAY COMPRESSIVE STRENGTH.

TOA General Construction Notes | 06/2025 6

2.5.3. CLASS P2 PAVEMENT : HAND FINISHED: HAND FINISHED PAVEMENT IS

PERMITTED FOR TURN LANES, DECELERATION LANES, DRIVEWAY APPROACHES, OR

PANEL REPLACEMENT OF PUBLIC STREETS OR ALLEYS. MIN. 4500 PSI 28-DAY

COMPRESSIVE STRENGTH

2.5.4. MINIMUM PAVEMENT THICKNESS SHALL BE AS FOLLOWS:

2.5.4.1. MAJOR ARTERIAL - 10” CLASS “P1” OR “P2”

2.5.4.2. MINOR ARTERIAL – 8” CLASS “P1” OR “P2”

2.5.4.3. COMMERCIAL/ INDUSTRIAL COLLECTOR – 8” CLASS “P1” OR “P2”

2.5.4.4. RESIDENTIAL COLLECTOR – 8” CLASS “P1” OR “P2”

2.5.4.5. RESIDENTIAL LOCAL – 8” CLASS “P1” OR “P2”

2.5.4.6. SIDEWALK AND BFR’S – 4” – CLASS “A” 3600 PSI @ 28 Days

2.5.4.7. DRIVE APPROACH 8” – CLASS “P2”

2.5.4.8. ALLEY – 6” CLASS “P1” OR “P2”

2.5.4.9. FIRE LANE – 6” CLASS “P1” OR “P2”

2.5.5. CONCRETE FOR ALLEY RETURNS AND DRIVEWAYS SHALL HAVE A MINIMUM

COMPRESSIVE STRENGTH AT 28 DAYS IDENTICAL TO THAT SPECIFIED FOR THE

STREET PAVEMENT OR BASE WHEN BUILT AS COMPONENTS OF A CONCRETE

PAVING PROJECTS. WHEN BUILT SEPARATELY, THE STRENGTH SHALL BE AS

SPECIFIED ON THE CONSTRUCTION PLAN.

2.5.6. SPACING AND CONSTRUCTION OF JOINTS SHALL CONFORM TO TOWN OF

ADDISON STANDARD CONSTRUCTION DETAILS.

2.5.7. CONTRACTOR IS RESPONSIBLE FOR ENSURING ALL PEDESTRIAN WORK MEETS OR

EXCEEDS THE CURRENT AMERICAN WITH DISABILITIES ACT ACCESSIBILITY

GUIDELINES (ADAAG), THE TEXAS ACCESSIBILITY STANDARDS (TAS), AND PUBLIC

RIGHTS-OF-WAY ACCESSIBILITY GUIDELINES (PROWAG). THE CONTRACTOR SHALL

REMOVE AND REPLACE ANY CONSTRUCTED OR INSTALLED ITEMS NOT MEETING

THE CURRENT ADAAG, TAS, & PROWAG REQUIREMENTS AT NO ADDITIONAL COST

TO THE TOWN.

2.5.8. ALL MEDIANS AND PARKWAYS SHALL BE PROVIDED WITH GROUND COVER. TYPE

OF GROUNDCOVER SHALL BE DETERMINED BY THE PARKS & RECREATION

DEPARTMENT, OR SHALL BE RESTORED TO MATCH EXISTING PLANT MATERIALS IN

EQUAL OR BETTER CONDITION. ALL TURF AREAS SHALL BE SOLID SOD, AND

GROUNDCOVER SHALL BE MINIMUM ONE (1) GALLON PLANT MATERIAL.

TOA General Construction Notes | 06/2025 7

3. GENERAL NOTES FOR WATER AND WASTEWATER SYSTEMS

3.1. ALL WATER AND WASTEWATER CONSTRUCTION, TESTING, AND MATERIALS SHALL BE

IN ACCORDANCE WITH THE MORE RESTRICTIVE OF THE CURRENT TCEQ REGULATIONS

OR THE TOWN’S CURRENT STANDARDS, DETAILS, AND SPECIFICATIONS, UNLESS

OTHERWISE NOTED.

3.2. TRENCH SAFETY

3.2.1. PRIVATE DEVELOPMENT: CONTRACTOR SHALL SUBMIT A TRENCH SAFETY PLAN

TO THE DESIGN ENGINEER FOR REVIEW AND APPROVAL PRIOR TO THE PRE-

CONSTRUCTION MEETING.

3.2.2. PUBLIC PROJECTS: CONTRACTOR AND/OR DESIGN ENGINEER SHALL SUBMIT A

TRENCH SAFETY PLAN AS PART OF THE CIVIL CONSTRUCTION DOCUMENTS

PACKAGE.

3.3. CONTRACTOR SHALL NOT OPERATE ANY WATER VALVES THAT ARE PART OF THE

ACTIVE TOWN OF ADDISON WATER SYSTEM. CONTACT THE TOWN’S PUBLIC WORKS &

ENGINEERING SERVICES TO REQUEST VALVE CHANGES.

3.4. ANY EXISTING FIRE HYDRANT THAT IS TO BE MODIFIED AND HAS A DATE THAT

EXCEEDS 8 YEARS IN AGE SHALL BE REPLACED AND THE OLD FIRE HYDRANT

RETURNED TO THE PUBLIC WORKS & ENGINEERING SERVICES BY THE CONTRACTOR AT

HIS EXPENSE.

3.5. ANY EXISTING MANHOLE WITH AN OPENING SMALLER THAN 30” DIAMETER THAT IS

MODIFIED SHALL HAVE THE CONE SECTION, RING, AND COVER REPLACED WITH A

MINIMUM OF 30” DIAMETER CONE SECTION, RING, AND COVER BY THE CONTRACTOR

AT HIS EXPENSE.

3.6. CONTRACTOR SHALL PROVIDE DOMESTIC, IRRIGATION, AND FIRE BACKFLOW

DETECTION METERS. CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF METERS IN

APPROVED BOXES AND CONNECTING PUBLIC TO PRIVATE WATER LINES.

TOA General Construction Notes | 06/2025 8

4. GENERAL NOTES FOR STORM DRAIN SYSTEMS

4.1. ALL STORM DRAIN CONSTRUCTION, TESTING, AND MATERIALS SHALL BE IN

ACCORDANCE WITH THE LATEST EDITON OF NCTCOG’S SPECIFICATIONS AND DETAILS,

AND THE TOWN’S CURRENT STANDARDS, DETAILS, AND SPECIFICATIONS UNLESS

OTHERWISE NOTED.

4.2. TRENCH SAFETY

4.2.1. PRIVATE DEVELOPMENT: CONTRACTOR SHALL SUBMIT A TRENCH SAFETY PLAN

TO THE DESIGN ENGINEER FOR REVIEW AND APPROVAL PRIOR TO THE PRE-

CONSTRUCTION MEETING.

4.2.2. PUBLIC PROJECTS: CONTRACTOR AND/OR DESIGN ENGINEER SHALL SUBMIT A

TRENCH SAFETY PLAN AS PART OF THE CIVIL CONSTRUCTION DOCUMENTS

PACKAGE.

4.3. ALL CONCRETE DRAINAGE STRUCTURES SHALL BE MINIMUM CLASS C CONCRETE.

4.4. ALL CRUSHED STONE SHALL BE ¾”, PASSING #4 SIEVE (GRADE 4).

4.5. ALL FIELD JOINTS WILL BE APPROVED BY THE TOWN ENGINEER IF NECESSARY. FIELD

JOINTS SHALL BE WIPED ON THE INSIDE AND OUTSIDE AND PROVIDE FOR SMOOTH

FLOW OF WATER.

4.6. RAMNECK COMPOUND OR APPROVED EQUAL SHALL BE USED FOR JOINT SEALS.

4.7. CLEANING & INSPECTION

4.7.1. ALL STORM SEWER PIPE SHALL BE CAMERA INSPECTED AFTER THE INSTALLATION

OF ALL PAVING AND UTILITIES AND PRIOR TO FINAL ACCEPTANCE OF THE

PROJECT.

4.7.2. CONTRACTOR SHOULD INSPECT ALL STORM DRAIN OUTFALLS NO EARLIER THAN

ONE WEEK PRIOR TO FINAL INSPECTION AND REMOVE ALL SILT AND DEBRIS.

TOA General Construction Notes | 06/2025 9

5. GENERAL NOTES FOR EROSION CONTROL

5.1. ALL OPERATORS AND/OR CONTRACTORS SHALL CONFORM TO THE TERMS &

CONDITIONS OF THE TCEQ TPDES GENERAL PERMIT NO. 150000.

5.1.1. THE NOTICE OF INTENT (NOI), AS REQUIRED BY THE GENERAL PERMIT, MUST BE

PROPERLY DISPLAYED ON THE SITE AT ALL TIMES BY EACH OPERATOR. A COPY OF

THE NOI MUST BE PROVIDED TO THE PUBLIC WORKS & ENGINEERING SERVICES

PRIOR TO START OF CONSTRUCTION.

5.1.2. ALL RELEASES OF REPORTABLE QUANTITIES OF HAZARDOUS SUBSTANCES SHALL

BE REPORTED IMMEDIATELY TO THE FACILITY OPERATOR, EPA, AND TCEQ.

5.1.3. IF ANY CONTRACTOR SEES A VIOLATION BY AN OPERATOR OR ANOTHER

CONTRACTOR, THAT OPERATOR OR CONTRACTOR IN VIOLATION SHALL BE

NOTIFIED AS WELL AS THE FACILITY OPERATOR.

5.2. EROSION CONTROL DEVICES SHALL BE INSTALLED ON ALL PROJECTS PRIOR TO ANY

SOIL DISTURBANCE AND SHALL BE MAINTAINED THROUGHOUT THE PROJECT IN A

CONDITION ACCEPTABLE TO THE TOWN.

5.2.1. IT SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO CONTROL AND LIMIT SILT

AND SEIDMENT LEAVING THE SITE. SPECIFICALLY , THE CONTRACTOR SHALL

PROTECT ALL PUBLIC STREETS, ALLEYS, STREAMS, AND STORM DRANAGE SYSTEMS

FROM EROSION DEPOSITS.

5.2.1.1. QUALIFIED OPERATOR PERSONNEL MUST INSPECT THE SITE WEEKLY, AND

WITHIN 24 HRS (BEFORE AND AFTER) A STORM EVEN OF 0.5 INCHES OR

GREATER.

5.2.1.2. ACCUMULATED SILT DEPOSITS SHALL BE REMOVED FROM SILT FENCES

AND HAY BALE DIKES WHEN SILT DEPTH REACHES THREE INCHES (3”) OF 25%

OF THE HEIGHT OF THE DEVICE (WHICHEVER IS LESS). THE SILT SHALL BE

DISPOSED OF AT AN APPROVED SITE AND IN SUCH A MANNER SO AS NOT TO

CONTRIBUTE TO ADDITIONAL SILTATION.

5.2.2. THE CONTRACTOR SHALL ADD OR DELETE EROSION PROTECTION AT THE

REQUEST AND DIRECTION OF THE OPERATOR OR TOWN.

5.2.3. MODIFICATIONS TO THE SWPPP SHALL BE IMPLEMENTED AND IN-PLACE WITHIN

A SEVEN CALENDAR DAY PERIOD. ANY MAJOR MODIFICATIONS SHALL BE

REVIEWED AND APPROVED BY THE DESIGN ENGINEER AND PUBLIC WORKS &

ENGINEERING SERVICES PRIOR TO IMPLEMENTATION.

5.3. CONSTRUCTION ENTRANCES AND WASHOUTS

5.3.1. ASPHALT BAGS SHALL BE PLACED AT CONSTRUCTION ENTRANCES TO PREVENT

CURB DAMAGE.

5.3.2. GEOTEXTILE FABRIC SHALL BE PLACED ON SUBGRADE PRIOR TO STONE

PLACEMENT FOR CONSTRUCTION ENTRANCES.

5.3.3. NO EQUIPMENT SHALL BE CLEANED ON-SITE, OR OTHER LIQUIDS DEPOSITED

AND ALLOWED TO FLOW OVERLAND OR SUBTERRANEAN WITHIN THE LIMITS OF

TOA General Construction Notes | 06/2025 10

THE CRITICAL ROOT ZONE OF TREES THAT REMAIN ON SITE. THIS INCLUDES

PAINT, OIL, SOLVENTS, ASPHALT, CONCRETE, CONCRETE EQUIPMENT WASH

WATER, MORTAR OF SIMILAR MATERIALS.

5.4. WASTE DISPOSAL

5.4.1. CONTRACTOR SHALL PROVIDE WASTE DISPOSAL CONTAINERS ON THE SITE FOR

DISPOSAL OF ALL NON-HAZARDOUS CONSTRUCTION WASTE MATERIALS. THE

CONTAINERS SHALL BE HAULED TO THE APPROPRIATE DISPOSAL LOCATION BY THE

CONTRACTOR.

5.4.2. ALL HAZARDOUS MATERIALS SHALL BE HANDLED AND DISPOSED OF BY THE

CONTRACTOR IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS.

5.5. AFTER INSTALLATION OF PAVEMENT, FINAL LOT BENCHING, AND GENERAL CLEANUP,

THE CONTRACTOR SHALL ESTABLISH GRASS GROUNDCOVER IN ALL STREET

PARKWAYS, LOTS, AND ALL OTHER DISTURBED AREAS. SODDING SHALL BE DONE AS

SPECIFIED BY THE MORE RESTRICTIVE OF CURRENT NCTCOG OR TOWN STANDARDS.

5.6. SILT FENCE NOTES.

5.6.1. POSTS WHICH SUPPORT THE SILT FENCE SHALL BE INSTALLED ON A SLIGHT

ANGLE TOWARD THE ANTICIPATED RUNOFF SOURCE. THE POST MUST BE

EMBEDDED A MINIMUM OF 18”. STEEL POSTS SHALL NOT BE USED TO INSTALL

EROSION CONTROL MEASURES WITHIN TOWN ROW.

5.6.2. THE TOE OF THE SILT FENCE SHALL BE TRENCHED IN WITH A SPADE OR

MECHANICAL TRENCHER SO THAT THE DOWNSLOPE FACE OF THE TRENCH IS FLAT

AND PERPENDICULAR TO THE LINE OF FLOW.

5.6.2.1. THE TRENCH MUST BE A MINIMUM OF SIX INCHES (6”) DEEP AND SIX

INCHES (6”) WIDE TO ALLOW FOR THE SILT FENCE FABRIC TO BE LAID IN THE

GROUND AND BACKFILLED WITH COMPACTED MATERIAL.

5.6.2.2. WHERE THE FENCE CANNOT BE TRENCHED IN (E.G. PAVEMENT), WEIGHT

FABRIC FLAP WITH WASHED GRAVEL ON THE UPHILL SIDE TO PREVENT FLOW

UNDER FENCE.

5.6.3. WIRE REINFORCEMENT SHALL BE USED ON ALL SILT FENCE USED FOR EROSION

CONTROL. SILT FENCE SHALL BE SECURELY FASTENED TO EACH SUPPORT POST.

THERE SHALL BE A SIX INCH (6”) DOUBLE OVERLAP, SECURELY FASTENED, WHERE

ENDS OF FABRIC MEET.

5.6.4. SILT FENCE SHALL BE REMOVED WHEN THE SITE IS COMPLETELY STABILIZED SO

AS NOT TO BLOCK OR IMPEDE STORM FLOW OR DRAINAGE.

TOA General Construction Notes | 06/2025 11

6. GENERAL NOTES FOR LANDSCAPING

6.1. ALL LANDSCAPING CONSTRUCTION, INSTALLATION, TESTING, AND MATERIALS SHALL

BE IN ACCORDANCE WITH THE TOWN’S CURRENT STANDARDS, DETAILS, AND

SPECIFICATIONS UNLESS OTHERWISE NOTED.

6.2. CONTRACTOR SHALL AVOID DAMAGE TO EXISTING TREES. WHEN NECESSARY, TREES

AND SHRUB TRIMMING FOR CONSTRUCTION SHALL BE PERFORMED BY CERTIFIED TREE

WORKER OR UNDER THE DIRECTION OF A REGISTERED LANDSCAPE ARCHITECT OR

CERTIFIED ARBORIST.

6.3. CONTRACTOR SHALL LOCATE AND PROTECT ALL EXISTING LANDSCAPE IRRIGATION

SYSTEMS. DAMAGE TO EXISTING IRRIGATION SYSTEMS AND LANDSCAPE MATERIALS

SHALL BE RESTORED TO EQUAL OR BETTER CONDITION AT NO COST TO TOWN.

6.4. EXCAVATION OR GRADE CHANGES BELOW THE DRIPLINE OF EXISTING TREES IS NOT

ALLOWED UNLESS A TREE PROTECTION PLAN WHICH CONTAINS SPECIFIC

INFORMATION ON THE ROOTS OF EACH TREE IS PROVIDED, AND APPROVED BY THE

PARKS & RECREATION DEPARTMENT.

6.5. PRIOR TO OBTAINING A GRADING PERMIT OR SCHEDULING A PRE-CONSTRUCTION

MEETING:

6.5.1. WHERE TRANSPLANTING OR TREE REMOVAL IS REQUIRED, CONTRACTOR MUST

APPLY FOR A TREE REMOVAL PERMIT. CONTACT PARKS & RECREATION

DEPARTMENT FOR TREE REMOVAL PERMIT.

6.5.2. ALL TREE MARKINGS AND PROTECTIVE FENCING MUST BE INSTALLED BY THE

CONTRACTOR PER THE TOWN STANDARD DETAIL AND BE INSPECTED BY THE

TOWN’S LANDSCAPE ARCHITECT.

6.5.3. COORDINATE WITH PARKS DEPARTMENT ON ANY TREES THAT REQUIRE BEING

TRANSPLANTED OR REMOVED FROM MEDIANS.

6.6. ANY TREE DESIGNATED “TO REMAIN” THAT IS WITHIN FIFTY FEET (50’) OF PROPOSED

CONSTRUCTION ACTIVITY, WHETHER ON-SITE OR OFF-SITE, SHALL HAVE TREE

PROTECTION PER THE TOWN OF ADDISON STANDARD DETAIL.

6.7. TREES TO BE REMOVED MAY BE CHIPPED AND USED FOR MULCH ON SITE OR HAULED

OFF-SITE. BURNING OF REMOVED TREES, STUMPS, OR FOLIAGE REQUIRES WRITTEN

APPROVAL BY THE FIRE DEPARTMENT.

6.8. PLANT MATERIALS SHALL NOT IMPEDE OR OBSTRUCT VISION OR ROUTE OF TRAVEL

FOR VEHICULAR, PEDESTRIAN, OR BICYCLE TRAFFIC ALONG TOWN RIGHT-OF-WAY,

VISIBILITY EASEMENTS, SIDEWALKS OR OTHER EASEMENTS.

6.9. NO SIGNS, WIRES, OR OTHER ATTACHMENTS OTHER THAN THOSE OF A PROTECTIVE

NATURE SHALL BE ATTACHED TO ANY TREE TO REMAIN ON SITE.

6.10. IF TOPSOIL IS TO BE ADDED TO A ROUGH GRADE, TILL 3 TO 4 INCHES DEEP,

THEN ADD TOPSOIL FOR BETTER BINDING AND ELIMINATE LAYING.

6.11. SOD INSTALLATION

TOA General Construction Notes | 06/2025 12

6.11.1. SPRAY EXISTING WEEDS WITH NON-SELECTIVE HERBICIDE PRIOR TO SOD

INSTALLATION.

6.11.2. ON PUBLIC PROJECTS, THE TOWN’S REPRESENTATIVE RESERVES THE

RIGHT TO INSPECT SOD FARM TO SELECT SOD TO BE HARVESTED. INSPECTION OF

TURFGRASS SOD BY THE TOWN’S REPRESENTATIVE MAY BE MADE AT THE

GROWING SITE, BUT SUCH INSPECTION WILL NOT PRECLUDE REJECTIONS AFTER

DELIVERY TO THE JOB SITE.

6.11.3. NO MORE TURFGRASS SOD SHALL BE DELIVERED TO THE JOB SITE ON ANY

DAY THAN CAN BE PLACED AND WATERED ON THAT DAY.

6.11.4. THE IRRIGATION SYSTEM SHOULD BE FULLY OPERATIONAL AT THE SITE

PRIOR TO INSTALLATION OF THE TURFGRASS SOD.

6.11.5. ANY TURFGRASS SOD SO REJECTED SHALL BE REMOVED FROM THE SITE

IMMEDIATELY AND REPLACED WITH ACCEPTED TURFGRASS SOD.

6.11.6. CONTRACTOR SHALL PROVIDE OPTIMUM INSTALLATION TIME PERIOD FOR

SOD. NO INSTALLATION ON FROZEN SOIL. NO HARVEST OF FROZEN SOD.

6.12. PLANTING TIME FOR MEDIANS IS MARCH TO SEPTEMBER. OUTSIDE OF THIS TIME

FRAME THE MEDIAN SHALL BE STABILIZED.

6.13. ESCROW FOR THE REMOVAL OF TEMPORARY STABILIZATION AND INSTALLATION

OF SOD PER SPEC.

TOA General Construction Notes | 06/2025 13

7. GENERAL NOTES FOR IRRIGATION

7.1. ALL IRRIGATION CONSTRUCTION, INSTALLATION, TESTING, AND MATERIALS SHALL BE

IN ACCORDANCE WITH THE TOWN’S CURRENT STANDARDS, DETAILS, AND

SPECIFICATIONS UNLESS OTHERWISE NOTED.

7.2. A PERMIT FROM THE BUILDING INSPECTION DIVISION IS REQUIRED FOR EACH

IRRIGATION SYSTEM.

7.3. CONTRACTOR SHALL NOTIFY THE PARKS AND RECREATION DEPARTMENT PRIOR TO

ANY MODIFICATIONS TO THE EXISTING IRRIGATION SYSTEM.

7.4. CONTRACTOR SHALL CONTACT THE PARKS AND RECREATION DEPARTMENT TO

COORDINATE WORK PRIOR TO COMMENCING WORK ON ANY EXISTING IRRIGATION

AND PRIOR TO ANY INSTALLATION OF NEW IRRIGATION.

7.5. CONTRACTOR SHALL LOCATE AND PROTECT ALL EXISTING LANDSCAPE IRRIGATION

SYSTEMS. DAMAGE TO EXISTING IRRIGATION SYSTEMS AND LANDSCAPE MATERIALS

SHALL BE RESTORED TO EQUAL OR BETTER CONDITION AT NO COST TO TOWN.

7.6. CONTRACTOR SHALL PROGRAM EACH CONTROLLER ZONE BASED ON SPRINKLER TYPE,

PLANT VARIETY, SOIL CHARACTERISTIC, SLOPE AND SOLAR ORIENTATION AS

DESIGNATED ON THE PLANS. THE CONTRACTOR SHALL COORDINATE WITH THE TOWN

PARKS AND RECREATION DEPARTMENT FOR APPROVAL OF THE CONTROLLER

SETTINGS.

7.7. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH FRANCHISE UTILITY

PROVIDER TO PROVIDE POWER TO EACH IRRIGATION CONTROLLER. CONTRACTOR

SHALL HAVE UNDERGROUND POWER LINES INSTALLED FROM POWER SOURCE UP TO

THE CONTROLLER. CONTRACTOR SHALL MEET CONTROLLER SPECIFICATIONS FOR

POWER REQUIREMENTS.

7.8. CONTRACTOR SHALL SET TOWN-SPECIFIED/APPROVED CONTROLLER TO ESTABLISH

LANDSCAPE.

TOA General Construction Notes | 06/2025 14

8. GENERAL NOTES FOR TRAFFIC CONTROL

8.1. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL

TEMPORARY AND PERMANENT TRAFFIC CONTROL IN ACCORDANCE WITH THE MINIMUM

REQUIREMENTS OF THE LATEST REVISION OF THE TEXAS MANUAL ON UNIFORM

TRAFFIC CONTROL DEVICES (TMUTCD) AND TXDOT BARRICADE AND CONSTRUCTION

STANDARDS.

8.2. CONTRACTOR SHALL NOT IMPEDE TRAFFIC ON EXISTING STREETS, DRIVEWAYS,

ALLEYS, OR FIRE LANES OPEN TO THE PUBLIC. IN THE EVENT THE CONSTRUCTION

WORK REQUIRES THE CLOSURE OF AN EXISTING STREET, ALLEY, OR FIRE LANE, THE

CONTRACTOR SHALL REQUEST THE ROAD CLOSURE THROUGH THE PUBLIC WORKS &

ENGINEERING SERVICES A MINIMUM OF 72 HOURS IN ADVANCE OF THE REQUESTED

CLOSURE. CLOSURES WILL NOT BE ALLOWED PRIOR TO 9:00 A.M. OR AFTER 3:30 P.M.,

MONDAY THROUGH FRIDAY UNLESS OTHERWISE APPROVED BY THE TOWN.

TOA General Construction Notes | 06/2025 15

9. GENERAL NOTES FOR TRAFFIC SIGNALS AND STREET LIGHTING

9.1. ALL TRAFFIC SIGNAL AND STREET LIGHTING CONSTRUCTION, TESTING, AND

MATERIALS SHALL BE IN ACCORDANCE WITH THE TOWN’S CURRENT STANDARDS,

DETAILS, AND SPECIFICATIONS UNLESS OTHERWISE NOTED. ALL ELECTRICAL WORK

SHALL BE IN ACCORDANCE WITH THE MOST CURRENT NATIONAL ELECTRICAL CODE,

TOWN AND TXDOT SPECIFICATIONS AND STANDARDS.

9.2. CONTRACTOR SHALL NOTIFY THE TRAFFIC DEPARTMENT AT LEAST 7 BUSINESS DAYS

PRIOR TO ANY WORK, PROVIDE A CONSTRUCTION SCHEDULE AND WEEKLY PROGRESS

REPORTS TO THE TRAFFIC DEPARTMENT, AND NOTIFY THE TRAFFIC DEPARTMENT AT

LEAST 48 HOURS PRIOR TO SIGNAL TURN-ON.

9.3. CONTRACTOR SHALL COORDINATE ELECTRICAL SERVICES WITH THE TOWN AND

EITHER ONCOR OR COSERV REPRESENTATIVES (ACCORDING TO THEIR RESPECTIVE

AREA).

9.4. CONTRACTOR SHALL COORDINATE WITH THE ELECTRIC COMPANY TO DE-ENERGIZE

ANY OVERHEAD OR UNDERGROUND POWER LINES. ANY COST ASSOCIATED WITH DE-

ENERGIZING THE POWER LINE AND/OR ANY OTHER PROTECTIVE MEASURES REQUIRED

SHALL BE AT NO COST TO TOWN.

9.5. THE CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE UTILITY COMPANY

AND TXDOT/NTTA (IF WITHIN TXDOT/NTTA ROW) PRIOR TO BEGINNING ERECTION OF

POLES, LUMINARIES AND STRUCTURES LOCATED NEAR ANY OVERHEAD OR

UNDERGROUND UTILITIES.

9.6. PROPOSED CONCRETE FOUNDATION AND CONDUIT ALIGNMENT SHALL BE STAKED BY

THE CONTRACTOR AND APPROVED BY THE TOWN PRIOR TO INSTALLATION.

9.7. CONTRACTOR SHALL CONTACT THE TOWN TRAFFIC DEPARTMENT (BETWEEN 8 AM –

5PM) FOR INSPECTION PRIOR TO POURING ANY CONCRETE FOUNDATION AND

DIGGING FOR CONDUIT RUNS AT LEAST 48 HOURS IN ADVANCE.

9.8. CONTRACTOR SHALL HAVE A QUALIFIED IMSA LEVEL II OR A TRF453 CERTIFIED

TECHNICIAN ON THE PROJECT SITE TO PLACE THE TRAFFIC SIGNALS IN OPERATION.

9.9. ELECTRICAL WORK SHALL BE PERFORMED BY CERTIFIED PERSONS IN ACCORDANCE

WITH THE REQUIREMENTS OF THE CONTRACT AND MAY BE REJECTED AS UNSUITABLE

FOR USE DUE TO POOR WORKMANSHIP. THE REQUIRED ELECTRICAL CERTIFICATION

COURSE IS AVAILABLE AND IS SCHEDULED PERIODICALLY BY TEEX. ALTERNATIVELY,

THE CONTRACTOR MAY PURCHASE AN ENTIRE COURSE FOR THEIR PERSONNEL TO BE

HELD AT A TIME AND LOCATION OF THEIR CHOICE AS NEGOTIATED THROUGH TEEX.

FOR MORE INFORMATION, CONTACT: TEXAS ENGINEERING EXTENSION SERVICE

(TEEX), TXDOT ELECTRICAL SYSTEM COURSE.

9.10. THE CONTRACTOR SHALL NOT PLACE PEDESTRIAN CROSSWALK AND STOP BAR

PAVEMENT MARKINGS UNTIL SIGNAL IS OPERATIONAL.

9.11. ALL LIGHTING POLES, FIXTURES, AND ARMS WHICH ARE REMOVED SHALL BE

DELIVERED TO THE TOWN PUBLIC WORKS & ENGINEERING SERVICES FACILITY BY THE

TOA General Construction Notes | 06/2025 16

CONTRACTOR AND WILL REMAIN THE PROPERTY OF THE TOWN. CONTACT THE

TRAFFIC DEPARTMENT AT LEAST 24 HOURS IN ADVANCE OF DELIVERY.

9.12. DURING THE 30-DAY TRAFFIC SIGNAL TEST PERIOD, CONTRACTOR SHALL

RESPOND TO AND DIAGNOSE ALL TROUBLE CALLS WITH QUALIFIED PERSONNEL

WITHIN A REASONABLE TRAVEL TIME FROM A DALLAS ADDRESS, BUT NOT MORE THAN

TWO (2) HOURS MAXIMUM. CONTRACTOR SHALL REPAIR ANY MALFUNCTIONS OF

SIGNAL EQUIPMENT SUPPLIED BY CONTRACTOR ON THE PROJECT. A LOCAL

TELEPHONE NUMBER (NOT SUBJECT TO FREQUENT CHANGES) WHERE TROUBLE CALLS

ARE TO BE RECEIVED ON A 24-HOUR BASIS SHALL BE PROVIDED TO THE TOWN BY THE

CONTRACTOR. APPROPRIATE REPAIRS SHALL BE MADE WITHIN 24 HOURS. THE

CONTRACTOR SHALL KEEP A RECORD OF EACH TROUBLE CALL REPORTED IN THE

LOGBOOK PROVIDED BY THE TOWN AND SHALL NOTIFY THE TOWN OF EACH TROUBLE

CALL. THE ERROR LOG IN THE MALFUNCTION MANAGEMENT UNIT (MMU) SHALL NOT

BE CLEARED DURING THE 30-DAY TEST PERIOD WITHOUT THE APPROVAL OF THE

TOWN.

9.13. TEXAS STATE LAW, ARTICLE 1436C, MAKES IT UNLAWFUL TO OPERATE

EQUIPMENT OR MACHINES WITHIN 10-FEET OF ANY OVERHEAD ELECTRICAL LINES

UNLESS DANGER AGAINST CONTACT WITH HIGH VOLTAGE OVERHEAD LINES HAS BEEN

EFFECTIVELY GUARDED AGAINST PURSUANT TO THE PROVISIONS OF THIS ARTICLE.

WHEN CONSTRUCTION OPERATIONS REQUIRE WORKING NEAR AN OVERHEAD

ELECTRICAL LINE, THE CONTRACTOR SHALL CONTACT THE OWNER/OPERATOR OF THE

OVERHEAD ELECTRICAL LINE TO MAKE ADEQUATE ARRANGEMENTS AND TO TAKE

NECESSARY SAFETY PRECAUTIONS TO ENSURE THAT ALL LAWS, ELECTRICAL LINE

OWNER/OPERATOR REQUIREMENTS AND STANDARD SAFETY PRACTICES ARE MET.