Appendix A.pdf

PDF 312 KB Posted

Attached to
Garrison Project Native Prairie Restoration Federal contract opportunity
Solicitation number
W9128F22Q0112
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This document contains a prescribed fire plan template and details for a federal contract opportunity with the Department of the Army Corps of Engineers Engineering District Omaha. The prescribed fire plan template outlines the required elements for a prescribed burn plan, including cover page information, project objectives, prescribed fire objectives and acceptable results, a project area description with details on size, elevation, slope, fuel model and vegetation, a prescribed fire description with desired flame length and fixed and variable indicators, firing techniques and equipment, pre-burn monitoring, preparation for burning, smoke management, a holding, mop-up and patrol plan, an escape contingency plan, a safety plan and activity hazard analysis, public information and involvement, a communications plan, personnel organization, a cost summary, post-burn evaluation requirements, and various maps and reports. The federal contract opportunity solicitation seeks restoration services at the Garrison Project Native Prairie site, including eliminating existing vegetation, establishing native grasses and forbs, and follow-up maintenance, to be completed through techniques such as controlled burning, mowing, haying, raking, spraying, harrowing, disking, seeding, no-till drilling.

View the file

Other files for this federal contract opportunity

Other files attached to Garrison Project Native Prairie Restoration, newest first.
File Type Posted
W9128F22Q0112.pdf PDF
Area Maps.pdf PDF
Seed Mixture Info.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX “A”

PRESCRIBED FIRE PLAN

R-1. Prescribed Fire Plan. As required, prior to implementing a prescribed fire, which includes debris burning, a prescribed burn plan shall be prepared. The prescribed burn plan will outline in detail those elements, objectives, and techniques necessary to insure that public and private resources are protected, while achieving predetermined project goals. The prescribed burn plan will adhere to guidance and policy previously established in the wildland fire management plan.

R-2. Preparation. A basic outline is provided below. The District Commander may dictate specific formats and detailed guidance. The subjects below are considerations that should be addressed and may be included in all plans.

1. Cover Page

a. Prepared By

b. Reviewed By

c. Approved By

(1) Corps of Engineers

(2) State (If Applicable)

(1) Local (If Applicable)

(2) Other Federal Government Entities (If Applicable)

d. Date Prepared

e. Fire Out Certification

2. Project Objectives (fire plan objectives i.e., fuel reduction, wildlife habitat, etc)

3. Prescribed Fire Objectives/Range of Acceptable Results

4. Project Location (proposed fire location on the project)

5. Project Area Description

a. Project Area Size

b. Fire Area Size

c. Elevation

d. Slope

e. Fuel Model System - National Fireland Fuel Model (NFFL)

f. Vegetation Type

g. Narrative

h. Test Fire Results

i. Sensitive/Protected Areas/Threatened and Endangered Species

a. Prescribed Fire DescriptionDesired Flame Length

b. Fixed Indicators

(1) Dead Fuel (%)

(2) Live Fuel Moisture (%)

(3) Average Slope

(4) Aspect

(5) Continuity of Fuels

(6) Season

c. Variable Indicators

(1) 1 Hour Timelag Fuel Moisture (%)

(2) 10 Hour Timelag Fuel Moisture (%)

(3) Relative Humidity

(4) Wind Speed/Direction

(5) Air Temperature/Stability

(6) Prescription Window – (Include fire behavior predictions and list the fuel models used for that prediction.)

6. Firing Techniques and Equipment

7. Pre-Burn Monitoring

a. Weather (existing/predicted conditions)

b. Vegetation (predominant vegetative communities present)

c. Soils (basic type present and are there any environmental/fire effect concerns)

8. Preparation for Burning (list what needs to be done and when--can serve as check list or as a Go No/Go procedure)

9. Smoke Management

a. Dispersal Direction/Mixing Height

b. Stability/Inversion Factors

c. Visibility Concerns

d. Other Conditions (proximity to residents, etc.)

e. Air Pollution Coordination and Control

10. Holding, Mop-Up, and Patrol Plan

11. Escape Contingency Plan (Includes what to do if control of the fire is lost)

12. Safety Plan and Activity Hazard Analysis

13. Public Information and Involvement

a. Pre-burn Involvement/Coordination (includes contacts, dates, and responsibility)

b. Burn Day Notification (includes agencies, phone numbers, and responsible person for making contact)

14. Communications Plan

15. Personnel Organization (Includes personnel involved and their assigned tasks)

16. Cost Summary (Include one to show cost/benefit of using fire versus other techniques)

17. Post Burn Evaluation

a. Date

b. Ignition Start Time

c. Ignition Stop Time

d. Prescribed Burn Results (accomplishments)

e. Narrative (problems, concerns, complaints, positives, etc.)

f. Weather

18. Maps

19. Prescribe Fire Report

a. Name of Burn

b. Ignition Time Date

c. State

d. County

e. Project

f. District

g. Longitude/Latitude

h. Township, Range, & Section

i. Elevation

j. Fuel Moisture

k. NFFL Fuel Model

l. Acres Planned

m. Type of Burn

(1) Planned Ignition (timber type)

(2) Planned Ignition (range type)

(3) Pile Burning

(4) Unplanned Ignition

(5) Other

n. Purpose of Burn

(1) Hazard Reduction

(2) Site Preparation

(3) Wildlife Habitat Improvement

(4) Range Improvement

(5) Ecosystem Maintenance

(6) Other

o. Land Classification

(1) Wilderness

(2) Non-wilderness

p. Fuel Loading (pre-existing in tons/acre)

q. Post Burn Information

(1) Actual Acres Burned

(2) Date Project Completed

20. Complexity Elements Worksheet

21. Prescribed Fire Summary Complexity Rating Sheet

22. Fire Weather Forecast

23. Maps

24. Coordination

a. State

b. Local

Other Federal Government Entity

File details come from the government source that posted it. Updated .