APPENDIX 4- AC Pre-Submission Checklist.pdf

PDF 445 KB Posted

Attached to
Supporting Moderate Education in Syria
Opportunity number
NEAAC-ACSYRIA-18-001
Issued by

About this file

Appendix 4

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-SUBMISSION CHECKLIST

Instructions: The Pre-Submission Checklist ensures that an application meets all submission requirements. Please select each item that has been completed.

Requirements to Submit an Application

Do you have a Unique Entity Identifier (UEI) Number?

Do you have an account with the System for Award Management (SAM)*?

Are you registered with Grants.gov (www.grants.gov) OR GrantSolutions.gov (www.grantsolutions.gov)?**

Required Application Documents

Federal Assistance Application Form—SF-424

Did you complete online the Federal Assistance Application Form (SF-424)?

Has the entire proposed project period been identified in item #17 on the SF-424 form?

Did you complete item #18 on the SF-424 form?

Did you check “c” in item #19 on the SF-424 form? Applicants are not covered by E.O.

12372

Did your Authorized Organization Representative (AOR) read and sign item #21 on the SF-424 form?

Federal Assistance Application Form—SF-424a

Did you complete online the Budget Information—Non-Construction Programs (SF- 424a)?

If your application includes cost sharing, did you identify this cost on the SF-424a form?

Federal Assistance Application Form—SF-424b

Did your AOR read and sign online the Assurances—Non-Construction Programs Form (SF-424b)?

Program Narrative

Did you attach your Project Narrative and is it no more than the page limit specified in the announcement?

Does your Program Narrative address all the goals and priorities outlined in the announcement?

Budget Narrative Submission

Does your Budget Narrative Submission contain the following three elements: Summary Budget, Detailed Line Item Budget, and a Budget Narrative?

Appendix 4

PRE-SUBMISSION CHECKLIST

If your application includes cost sharing, did you provide detailed information about this cost in your Budget Narrative?

Sustainability Plan (if required)

Did you attach a Sustainability Plan and is it no more than the page limit specified in the announcement?

Results Monitoring Plan (if required)

Did you attach a Results Monitoring Plan?

Optional Documents

Did you attach any optional documents and ensure that they do not exceed the page limit specified in the announcement?

If your application included partnerships, did you provide details about the roles and responsibilities for each partnership; details on how sub-grant(s) will be managed and monitored in both the program and budget narratives; and did you attach Letters of Agreements or Letter of Intent?

Did you include Biographical Sketches or Job Descriptions for key personnel and partners?

*U.S.-based and Foreign-based applicants must have an account with SAM to submit an application. All applicants selected for funding must be registered with SAM to receive an award.

**All applications must be submitted through either Grants.gov OR GrantSolutions.gov.

Appendix 4

File details come from the government source that posted it.