Appendix 2 Lot Summary.pdf
PDF 541 KB Posted
- Attached to
- TRADITIONAL MOWING-ABBEVILLE, EDGEFIELD
- Solicitation number
- 5400026005
- Issued by
- Edgefield County, South Carolina
About this file
This document is a lot summary appendix for a traditional mowing contract in South Carolina involving the counties of Abbeville, Edgefield, Greenwood, McCormick, and Saluda. The contract encompasses four primary service categories: routine mowing, guardrail mowing, ditch mowing, and bridge mowing across both interstate and secondary routes. The scope includes 2,580.83 total acres of routine mowing distributed across the counties, with guardrail mowing consisting of approximately 620,000 linear feet and requiring a minimum of three tractors each with a minimum PTO output of 75 hp. Service cycles are scheduled quarterly throughout the year, with specific timing variations by county: Abbeville in May, July, September, and November; Greenwood in May, July, September, and November; Edgefield in April, June, August, and October; McCormick in April, June, August, and October; and Saluda in April, June, August, and October. Special attention is required for primary interstate routine mowing in Abbeville during August and Greenwood during October, as well as secondary routine mowing in Greenwood during September.
The production and equipment requirements specify a minimum daily production rate with an estimated cycle time of one complete rotation per season across all service areas. The contract details individual lot assignments for each county and route type, with lot quantities ranging from 3 to 21 items depending on the specific mowing activity and county location. No schedule information regarding bidder conferences, site visits, or award dates is included in this appendix, nor are pricing terms, set-asides, or funding sources documented. The document serves primarily as a detailed breakdown of work distribution and equipment specifications necessary for contract fulfillment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Saluda P Road List.xls | XLS spreadsheet | |
| Extension of Award Date.pdf | ||
| Greenwood S Road List.xls | XLS spreadsheet | |
| Edgefield P Road List.xls | XLS spreadsheet | |
| Edgefield S Road List.xls | XLS spreadsheet | |
| McCormick P Road List.xlsx | XLSX spreadsheet | |
| Notice of Award Posting.pdf | ||
| Greenwood P Road List.xls | XLS spreadsheet | |
| Abbeville P Road List.xls | XLS spreadsheet | |
| Saluda S Road List.xls | XLS spreadsheet | |
| Solicitation.pdf | ||
| Abbeville S Road List.xls | XLS spreadsheet | |
| McCormick S Road List.xls | XLS spreadsheet |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX 2. LOT SUMMARY
Routine Mowing (Interstate: I, R, RS) Acre
Guardrail Mowing (Interstate: I, R, RS) Linear Feet
Ditch Mowing (Interstate: I, R, RS) Acre
Bridge Mowing (Interstate: I, R, RS) Acre
1 Routine Mowing GREENWOOD (Primary: US, SC) 20 987.36 Acre 1
2 Guardrail Mowing GREENWOOD (Primary: US, SC) 8 81,575.00 Linear Feet 4
3 Routine Mowing ABBEVILLE (Primary: US, SC) 14 568.36 Acre 1
4 Guardrail Mowing ABBEVILLE (Primary: US, SC) 15 150,761.00 Linear Feet 4
5 Guardrail Mowing EDGEFIELD (Primary: US, SC) 8 71,084.75 Linear Feet 4
6 Guardrail Mowing MCCORMICK (Primary: US, SC) 10 101,074.00 Linear Feet 4
7 Guardrail Mowing SALUDA (Primary: US, SC) 8 72,154.50 Linear Feet 4
8 Routine Mowing GREENWOOD (Secondary: S, SF) 21 1,025.11 Acre 1
9 Guardrail Mowing GREENWOOD (Secondary: S, SF) 4 39,854.00 Linear Feet 4
10 Guardrail Mowing ABBEVILLE (Secondary: S, SF) 4 34,808.00 Linear Feet 4
11 Guardrail Mowing EDGEFIELD (Secondary: S, SF) 5 47,945.00 Linear Feet 4
12 Guardrail Mowing MCCORMICK (Secondary: S, SF) 3 22,941.00 Linear Feet 4
13 Guardrail Mowing SALUDA (Secondary: S, SF) 3 28,287.85 Linear Feet 4
2,580.83 Acre
50 Acre
3 Tractors*
Estimated
Number of
Cycles
Total Routine Acres
Minimum Daily Production Rate
Minimum Equipment Requirement
Cycle
Time Activity
Route
Type
I
S
PRODUCTION & EQUIPMENT REQUIREMENTS
Quantity Unit
ABBEVILLE, EDGEFIELD, GREENWOOD, MCCORMICK, SALUDA
Line
Item
*Each tractor shall have a minimum PTO output of 75 hp
SCHEDULE
N/A N/A N/A
Abbeville: May, July, September, November
Saluda: April, June, August, October
RAIL
P
Edgefield: April, June, August, October
Greenwood: May, July, September, November
McCormick: April, June, August, October
INTERSTATE N/A
PRIMARY 1 cycle primary routine mowing in Abbeville in AUGUST; 1 cycle primary routine mowing in Greenwood in OCTOBER
SECONDARY 1 cycle secondary routine mowing in Greenwod in SEPTEMBER
File details come from the government source that posted it. Updated .