Appendix 2 Lot Summary.pdf

PDF 541 KB Posted

Attached to
TRADITIONAL MOWING-ABBEVILLE, EDGEFIELD
Solicitation number
5400026005
Issued by
Edgefield County, South Carolina

About this file

This document is a lot summary appendix for a traditional mowing contract in South Carolina involving the counties of Abbeville, Edgefield, Greenwood, McCormick, and Saluda. The contract encompasses four primary service categories: routine mowing, guardrail mowing, ditch mowing, and bridge mowing across both interstate and secondary routes. The scope includes 2,580.83 total acres of routine mowing distributed across the counties, with guardrail mowing consisting of approximately 620,000 linear feet and requiring a minimum of three tractors each with a minimum PTO output of 75 hp. Service cycles are scheduled quarterly throughout the year, with specific timing variations by county: Abbeville in May, July, September, and November; Greenwood in May, July, September, and November; Edgefield in April, June, August, and October; McCormick in April, June, August, and October; and Saluda in April, June, August, and October. Special attention is required for primary interstate routine mowing in Abbeville during August and Greenwood during October, as well as secondary routine mowing in Greenwood during September.

The production and equipment requirements specify a minimum daily production rate with an estimated cycle time of one complete rotation per season across all service areas. The contract details individual lot assignments for each county and route type, with lot quantities ranging from 3 to 21 items depending on the specific mowing activity and county location. No schedule information regarding bidder conferences, site visits, or award dates is included in this appendix, nor are pricing terms, set-asides, or funding sources documented. The document serves primarily as a detailed breakdown of work distribution and equipment specifications necessary for contract fulfillment.

View the file

Other files

File Type Posted
Saluda P Road List.xls XLS spreadsheet
Extension of Award Date.pdf PDF
Greenwood S Road List.xls XLS spreadsheet
Edgefield P Road List.xls XLS spreadsheet
Edgefield S Road List.xls XLS spreadsheet
McCormick P Road List.xlsx XLSX spreadsheet
Notice of Award Posting.pdf PDF
Greenwood P Road List.xls XLS spreadsheet
Abbeville P Road List.xls XLS spreadsheet
Saluda S Road List.xls XLS spreadsheet
Solicitation.pdf PDF
Abbeville S Road List.xls XLS spreadsheet
McCormick S Road List.xls XLS spreadsheet
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX 2. LOT SUMMARY

Routine Mowing (Interstate: I, R, RS) Acre

Guardrail Mowing (Interstate: I, R, RS) Linear Feet

Ditch Mowing (Interstate: I, R, RS) Acre

Bridge Mowing (Interstate: I, R, RS) Acre

1 Routine Mowing GREENWOOD (Primary: US, SC) 20 987.36 Acre 1

2 Guardrail Mowing GREENWOOD (Primary: US, SC) 8 81,575.00 Linear Feet 4

3 Routine Mowing ABBEVILLE (Primary: US, SC) 14 568.36 Acre 1

4 Guardrail Mowing ABBEVILLE (Primary: US, SC) 15 150,761.00 Linear Feet 4

5 Guardrail Mowing EDGEFIELD (Primary: US, SC) 8 71,084.75 Linear Feet 4

6 Guardrail Mowing MCCORMICK (Primary: US, SC) 10 101,074.00 Linear Feet 4

7 Guardrail Mowing SALUDA (Primary: US, SC) 8 72,154.50 Linear Feet 4

8 Routine Mowing GREENWOOD (Secondary: S, SF) 21 1,025.11 Acre 1

9 Guardrail Mowing GREENWOOD (Secondary: S, SF) 4 39,854.00 Linear Feet 4

10 Guardrail Mowing ABBEVILLE (Secondary: S, SF) 4 34,808.00 Linear Feet 4

11 Guardrail Mowing EDGEFIELD (Secondary: S, SF) 5 47,945.00 Linear Feet 4

12 Guardrail Mowing MCCORMICK (Secondary: S, SF) 3 22,941.00 Linear Feet 4

13 Guardrail Mowing SALUDA (Secondary: S, SF) 3 28,287.85 Linear Feet 4

2,580.83 Acre

50 Acre

3 Tractors*

Estimated

Number of

Cycles

Total Routine Acres

Minimum Daily Production Rate

Minimum Equipment Requirement

Cycle

Time Activity

Route

Type

I

S

PRODUCTION & EQUIPMENT REQUIREMENTS

Quantity Unit

ABBEVILLE, EDGEFIELD, GREENWOOD, MCCORMICK, SALUDA

Line

Item

*Each tractor shall have a minimum PTO output of 75 hp

SCHEDULE

N/A N/A N/A

Abbeville: May, July, September, November

Saluda: April, June, August, October

RAIL

P

Edgefield: April, June, August, October

Greenwood: May, July, September, November

McCormick: April, June, August, October

INTERSTATE N/A

PRIMARY 1 cycle primary routine mowing in Abbeville in AUGUST; 1 cycle primary routine mowing in Greenwood in OCTOBER

SECONDARY 1 cycle secondary routine mowing in Greenwod in SEPTEMBER

File details come from the government source that posted it. Updated .