APPENDIX 1 Structure Diagrams Conceptual 122122.pdf

PDF 859 KB Posted

Attached to
S. Fork Skanaxheen Stream Restoration Federal contract opportunity
Solicitation number
1240BF23Q0042
Issued by
Department of Agriculture Forest Service

About this file

This document contains conceptual design plans and drawings for stream restoration structures on the South Fork of Skanaxheen Creek located on Kuiu Island in the Tongass National Forest in Alaska. The designs show Formidable Multi-Faceted Large Wood Complexes, Terrace Barbs, and Bar Buddies structures that would be constructed using logs, trees, boulders, and other natural materials to restore aquatic habitat, control erosion, and improve hydrologic function. The related federal contract opportunity is for non-personal stream restoration services on the South Fork Skanaxheen and has an estimated value of $1.24 million. The opportunity was issued by the USDA Forest Service and worksites are only accessible via barge due to the remote Southeast Alaska location.

View the file

Other files for this federal contract opportunity

Other files attached to S. Fork Skanaxheen Stream Restoration, newest first.
File Type Posted
Appendix 5 Maps .pdf PDF
Attachment 1 Stream Resto Perforamnce Work Statement.pdf PDF
APPENDIX 3 CAMPSITES CAMPGROUND.pdf PDF
APPENDIX 4 FIRE PREVENTION.pdf PDF
Attachment 2 SCA WD 2015-5685 R19 12.27.22 Tongass.pdf PDF
APPENDIX 2 USDA Forest Service Land Access Permit.pdf PDF
1240BF23Q0042 S.Fork Skanaxheen Stream Restoration.pdf PDF
Attachment 3 Schedule of Items Quote Sheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Formidable Multi-Faceted Large Wood Complex

1 1

Plan View

Terrace

3 & 4

Direction of Flow

NOTES: 1) Excavate toe log trenches perpendicular to flow and into bank below bed surface at maximum predicted scour depth. Place toe logs up to stream bed elevation. 2) Excavate torsion Log trenches angled 15 - 20% to flow down to bed surface/toe log elevation. Place torsion log on top of toe log out into stream channel. 3) Place tree with rootwad in torsion trench hooking the on top of torsion log with the rootwad. 4) Continue alternating toe and torsion log placement, tapering the structure elevation up toward bank/terrace. Final log placements should exceed the Q100 elevation. 5) Place/ weave additional trees, logs, large boulders, slash or root-wads in apex of structure. 6) Place ample slash and small woody debris on the up-stream bank interface of the structure.

South Fork Skanâxheen Creek Restoration Project Tongass National Forest

STRUCTURE: FMF Complex – Plan View DESIGN: Brian Bair DRAWN BY: Brian Bair

DATE: 03/17/2010

REVIEWED: H. Whitacre Date: 12/2022

FMF Formidable Multi-faceted Terrace Barbs

Plan View

3 & 4

Constructed Terrace

NOTES:

Direction of Flow

1) Excavate toe log trenches perpendicular to flow and into bank below bed surface at maximum predicted scour depth. Place toe logs up to stream bed elevation. 2) Excavate torsion Log trenches angled 15 - 20% to flow down to bed surface/toe log elevation. Place torsion log on top of toe log out into stream channel. 3) Place tree with rootwad in torsion trench hooking the on top of torsion log with the rootwad. 4) Continue alternating toe and torsion log placement, tapering the structure elevation up toward bank/terrace. Final log placements should exceed the Q100 elevation. 5) Place/ weave additional trees, logs, large boulders, slash or root-wads in apex of structure. 6) Place ample slash and small woody debris on the up-stream bank interface of the structure.

South Fork Skanâxheen Creek Restoration Project Tongass National Forest

STRUCTURE: FMF Terrace Barbs -Plan View DESIGN: Brian Bair DRAWN BY: Brian Bair

Formidable Multi-Faceted Large Wood Complexes & Terrace Barbs Cross-Section View

Direction of Flow

Bank / Terrace

Q 100 Discharge Elevation 2

Gravel Bar

Q 1.2 Discharge Elevation

Stream Bed

Maximum Predicted Scour Depth 1

NOTES:

1) Excavate toe log trenches perpendicular to flow and into bank below bed surface at maximum predicted scour depth. Place toe logs up to stream bed elevation. 2) Excavate torsion Log trenches angled 15 - 20% to flow down to bed surface/toe log elevation. Place torsion log on top of toe log out into stream channel. 3) Place tree with rootwad in torsion trench hooking the on top of torsion log with the rootwad. 4) Continue alternating toe and torsion log placement, tapering the structure elevation up toward bank/terrace. Final log placements should exceed the Q100 elevation. 5) Place/ weave additional trees, logs, large boulders, slash or root-wads in apex of structure. 6) Place ample slash and small woody debris on the up-stream bank interface of the structure.

South Fork Skanâxheen Creek Restoration Project Tongass National Forest

STRUCTURE: FMF – X-Section View DESIGN: Brian Bair DRAWN BY: Brian Bair

Bar Structure - Bar Buddies 2 Plan View

Direction of Flow

1 4 4 3

Island

5 4 2

NOTES:

Direction of Flow

South Fork Skanâxheen Creek Restoration Project Tongass National Forest

STRUCTURE: Bar Buddy– Plan View DESIGN: Brian Bair DRAWN BY: Brian Bair

DATE: 03/17/2010

REVIEWED: H. Whitacre Date: 12/2022

1) Excavate and place toe/rack logs perpendicular to flow, below predicted maximum scour depth. 2) Excavate and place sound trees with rootwads or drive pilings to predicted maximum scour depth behind toe/rack logs. 3) Place, Integrate/interlock backer logs with toe/rack logs, and pilings. Backer/toe logs are placed in lifts, covered with cobble and gravel and then bucket compacted with the excavator. 4) Place trees with intact root wads on top of and bracing the upper most toe log, root wads facing up-stream. 5) Place ample slash and small woody debris on the up-stream interface of the structure.

Bar Buddies – Bar Structures Long-Section View

Slash/Stumps/Small Woody Debris 2

Q2-Q100 Discharge Elevation 5 2 4

Flow 4 2

Gravel Bar

NOTES:

Maximum Predicted Scour Depth South Fork Skanâxheen Creek

Restoration Project Tongass National Forest

STRUCTURE: Bar Buddy– Long-Sec View DESIGN: Brian Bair DRAWN BY: Brian Bair

DATE: 03/17/2010

REVIEWED: H. Whitacre Date: 12/2022 1) Excavate and place toe/rack logs perpendicular to flow, below predicted maximum scour depth. 2) Excavate and place sound trees with rootwads or drive pilings to predicted maximum scour depth behind toe/rack logs. 3) Place, Integrate/interlock backer logs with toe/rack logs, and pilings. Backer/toe logs are placed in lifts, covered with cobble and gravel and then bucket compacted with the excavator. 4) Place trees with intact root wads on top of and bracing the upper most toe log, root wads facing up-stream. 5) Place ample slash and small woody debris on the up-stream interface of the structure.

File details come from the government source that posted it. Updated .