Appendix_1_-_Pricing_Schedule.pdf

PDF 147 KB Posted

Attached to
Big Desert Fuel Break Drill Seeding Federal contract opportunity
Solicitation number
140L2625Q0082
Issued by
Department of the Interior Bureau of Land Management Idaho Region

About this file

This document is a Pricing Schedule for the 2025 Big Desert Fuel Break Drill Seeding project. The contract involves seeding 1,935 acres across six different road areas (Coffee Point Road, Big Butte Road, Cox's Well Road, Number 2 Well Road, Packsaddle Road, and Stage Road) with Siberian wheatgrass at a rate of 17 bulk lbs. per acre. The period of performance is 61 calendar days, with an estimated start date of October 1, 2025, and the contractor must begin work within three days of notification by the Contracting Officer Representative.

The pricing schedule allows for bidding on the entire project, with specific acreage breakdowns for each road segment ranging from 135 to 510 acres. The document notes potential challenges with early winter conditions, including possible limited road access due to muddy, wet, or snow-covered terrain, and specifies that work will not be permitted if conditions could damage soils or non-treatment vegetation. Bidders are expected to provide unit pricing for the entire project, with the total estimated acres being 1,935 acres.

View the file

Other files for this federal contract opportunity

Other files attached to Big Desert Fuel Break Drill Seeding, newest first.
File Type Posted
Attachment_4_-_WD___2015-5515_rev_26_8_JUL_25_Blaine_County.pdf PDF
Attachment_1_-_2025_Big_Desert_Fuel_Break_Drill_Seeding_PWS.pdf PDF
Attachment_3_-__WD___2015-5517_rev_26_8_JUL_25_Power__Bingham_County.pdf PDF
Appendix_2-_FAR_52_212-3_(MAY_2024)(DEVIATION_FEB_2025).pdf PDF
Sol_140L2625Q0082.pdf PDF
Attachment_2_-_Maps.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICING SCHEDULE

2025 BIG DESERT FUEL BREAK DRILL SEEDING

Item no. Item Description Estimated Quantity*

Unit of Measure Unit Price Total

0001 Big Desert Fuel Breaks Rangeland Drill Seeding 1,935 ac. $ $

Cost Breakdown per Work Element

Item no. Item Description Estimated Quantity*

Unit of Measure Unit Price Total

0001A Coffee Point Road. 322 ac. $ $ 0001B Big Butte Road 280 ac. $ $ 0001C Cox’s Well Road 312 ac. $ $ 0001D Number 2 Well Road 510 ac. $ $ 0001E Packsaddle Road 135 ac. $ $ 0001F Stage Road 376 ac. $ $

TOTAL (ALL OR NONE) $

*GIS Calculated Quantity ac = acre

PERIOD OF PERFORMANCE:) 61 Calendar Days (including holidays and weekends) ESTIMATED START DATE: October 1, 2025 TOTAL ESTIMATED ACRES: 1,935 ac.

• 1,935 acres will be seeded at a rate of 17 bulk lbs./ac. The species to be seeded will be Siberian wheatgrass (Stabilizer).

• The period of performance may coincide with early winter conditions. Roads may not be passable, and access may be limited due to muddy, wet, or snow-covered conditions.

• Work will not be permitted if conditions will result in damage to soils and nontreatment vegetation.

• The contractor will be required to start work within three days after being notified by the

Contracting Officer Representative (COR).

(END OF SUPPLIES/SERVICES AND PRICES/COSTS)