This file is a pricing template and work breakdown appendix required for submission with bids on a federal construction contract for HVAC replacement services at the John Cochran VA Medical Center in St. Louis, Missouri. The appendix establishes pricing and subcontracting requirements specific to Service-Disabled Veteran-Owned Small Business (SDVOSB) contractors under VAAR 852.219-73 regulations.

Offerors in the Plumbing, Heating, and Air-Conditioning contracting category (NAICS 238220) must not exceed 75% subcontracting of the adjusted contract amount, with the remaining work performed by the SDVOSB itself or other similarly situated SDVOSBs. Bidders must complete the template for each bid item, providing itemized breakdowns of personnel costs, material and equipment costs, and total costs across 27 specification divisions including General Requirements, Demolition, Concrete, Masonry, Steel, Carpentry, Thermal and Moisture Protection, Openings, Finishes, HVAC, Electrical, Communications, and various other construction categories. The template requires calculation of the adjusted contract amount, maximum allowable subcontracting amount, total SDVOSB-performed work, total subcontractor payments, and percentage allocations to demonstrate compliance with the 75% subcontracting cap. An authorized representative must certify the accuracy of all representations. Profit, home office overhead, and bond costs are added after subtotals of personnel and material/equipment costs are calculated.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX 1- PRICE BREAKDOWN AND CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK

Solicitation:

Project:

Offerors for Plumbing, Heating, and Air-Conditioning Contractors (NAICS code 238220) will not pay more than 75% ("Applicable %") of the amount paid by the government to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in VAAR 852.219-73.

Provide a breakdown of material and personnel costs, by specification division listed for the project. Home office overhead, profit/fee, and bond cost shall be added after a subtotal of personnel and material/equipment cost has been calculated. Clearly identify the personnel cost you will be self-performing, and the personnel cost of other similarly situated service disabled veteran owned small business concerns. Below is the required format.

THIS DOCUMENT MUST BE COMPLETED FOR EACH BID ITEM.

Specification Section
SDVOSB (Y or N)
Personnel Cost
Material/ Equipment Costs
Total

Division 01 General Requirements

Division 02 Demolition

Division 03 Concrete

Division 04 Masonry

Division 05 Misc. Steel

Division 06 Carpentry

Division 07 Thermal and Moisture

Division 08 Openings

Division 09 Finishes

Division 10 Specialties

Division 11 Equipment

Division 12 Furnishings

Division 13 Special Construction

Division 14 Conveying Systems

Division 21 Fire Suppression

Division 22 Plumbing

Division 23 HVAC

Division 25 Integrated Automation

Division 26 Electrical

Division 27 Communications

Division 28 Electronic Safety and Security

Division 31 Earthwork

Division 32 Exterior Improvements

Division 33 Utilities

Division 34 Transportation

Division 35 Waterway & Marine Construction

Division 40 Process Integration

Guarantee Period Services

Sub Totals:

$
$
$

Sub Total (Personnel Costs and Material/Equipment Costs)

Profit:

Home Office Overhead:

Bond:

Grand Total :

CALCULATION OF SELF PERFORMED WORK

1. Adjusted Contract Amount (Grand Total less Sub Total of All Material and Equipment Costs):

2. Maximum Subcontracting Amount (Not To Exceed Applicable % of Adjusted Contract Amount ): (Line 1 x Applicable %)

3. Total Amount to be performed by SDVOSB's (Self and any Similarly Situated Entities Personnel Cost + Profit, Overhead, Bond)

4. Total Amount Paid Out to Subcontractors (Line 1-Line 3)

5. Percentage of Adjusted Contract Amount considered to be Self Performed ((Line 3/Line 1) x 100):

6. Percentage of Adjusted Contract Amount Paid to Subcontractors- Not to Exceed Applicable % (Line 4/ Line 1)

Solicitation:

Project:

I certify the above representations are true and correct to the best of my knowledge.

Signed: _________________________________

Date

(Typed Name of Authorized Representative)

(Title of Authorized Representative)