16PBGC18R00030002_Financial_Management_Systems_Information_Technology_Support_Services.pdf

PDF 1 MB Posted

Attached to
Financial Management Systems Information Technology Support Services (FMS-ITSS)
Solicitation number
APP_2017-0034
Issued by

About this file

Amendment 0002

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243

Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code

2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE

(x) 9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)

CODE FACILITY CODE

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

Check One

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA

(Signature of person authorized to sign)

15C. DATE SIGNED

(Signature of Contracting Officer)

16C. DATE SIGNED

Attachment Page

PAGE 2 OF 39 16PBGC18R00030002

The purpose of this amendment is to:

• Extend the Offer Due Date and Time to July 3, 2018 at 9:00 AM EST

• Update Sections B, L and M IAW the Q&As posted to FBO on June 7, 2018

• Annotate applicable clauses within FAR Clause 52.212-5

• Remove PBGC Clause 52.215-7000 IAW Q&A #3 and #136

All other Term and Conditions remain unchanged.

Table of Contents

PAGE 3 OF 39 16PBGC18R00030002

SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SERVICES AND PRICES

SECTION I CONTRACT CLAUSES

I.1 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--

COMMERCIAL ITEMS (JAN 2018)

SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L.1 INSTRUCTIONS TO OFFERORS

SECTION M EVALUATION FACTORS FOR AWARD

M.1 EVALUATION FACTORS FOR AWARD

PAGE 4 OF 39 16PBGC18R00030002

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

PAGE 5 OF 39 16PBGC18R00030002

B.1 SERVICES AND PRICES

B.1 DESCRIPTION OF SERVICES:

The Contractor shall provide the personnel, equipment, and other materials and services necessary to perform the effort described in Section C, Statement of Objectives (SOO).

B.2 GENERAL DESCRIPTION:

PBGC intends to establish a single-award IDIQ for these services. Task Orders will be issued on a Firm Fixed-Price (FFP), Time and Materials (TM), or Labor Hour (LH) basis or a hybrid of one or more of FP, LH or TM, depending upon the requirements of PBGC.

PBGC expects to award two (2) task orders concurrent with the IDIQ award.

B.3 MINIMUM AND MAXIMUM AMOUNTS:

The minimum quantity of services that the Government will acquire under this contract is $1,000,000.00 over the entire period of performance (including any options exercised).

The maximum quantity of services that the Government will acquire under this contract shall not exceed $100,000,000.00 over the entire period of performance and applies to the aggregate value of all Task Orders.

B.4 IDIQ PRICING SCHEDULE:

The offeror shall specify the hourly rate for each labor category for the given period. The hourly rate for each category shall include direct labor, all indirect costs, and profit. The offeror shall specify those cost elements which are anticipated to be charged as other direct costs (ODCs) under the contract. It is PBGC's assumption that all administrative charges (such as timekeeping, invoice preparation, etc.) shall be charged as general & administrative expenses and included in the labor rate. Offerors are required to describe the timekeeping and accounting system used by the firm to record hours worked and costs associated with a PBGC contract. The price schedule below is inclusive of all Contractor costs (direct and indirect) for performing services outlined in the SOO.

The proposed hourly rates in the IDIQ Pricing Schedule below will become part of the contract award and will be binding for future task order proposals (i.e. proposed Task Order hourly rates may not exceed those specified in the IDIQ Pricing Schedule) for the base year and four option year periods.

The FFP task orders will use the rates in the IDIQ Pricing Schedule in developing the labor price build up for the task. The contractor is encouraged to propose lower rates at the task order level.

Failure to provide pricing for every labor category will result in the Offeror’s proposal being deemed incomplete and the Offeror’s proposal will not be eligible for award.

Travel and per diem costs are not reimbursable under this IDIQ.

PAGE 6 OF 39 16PBGC18R00030002

Offerors are required to submit a price proposal which shall include prices for a base year and four option years for all labor categories established in Section H Labor Category Descriptions and Qualifications.

PAGE 7 OF 39 16PBGC18R00030002

Sample IDIQ Pricing Schedule

The following sample should be used by the offerors as a guide to provide the minimum required information for labor pricing under the IDIQ for the base and option periods. This represents only a model. Offerors should include pricing for all labor categories and levels included as part of the proposal. Offerors may provide additional detail should that be needed to describe their pricing model (e.g. discounts, other considerations).

Labor Category

Fully-Burdened Hourly Rates Base Period Option 1 Option 2 Option 3 Option 4 G C G C G C G C G C

Program Manager – Level 1 Program Manager – Leve 2 Project Manager – Level 1 Project Manager – Level 2 Application Engineer – Level 1 [Include all labor categories and levels proposed]

G= Government Site C = Contractor Site

PAGE 8 OF 39 16PBGC18R00030002

SECTION I

CONTRACT CLAUSES

I.1 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--

COMMERCIAL ITEMS (JAN 2018)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(3) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(4) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004)(Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

X (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sep 2006), with Alternate I (Oct 1995)(41 U.S.C. 4704 and 10 U.S.C. 2402).

X (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

X (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2016) (Pub. L. 109-282) (31 U.S.C. 6101 note).

(5) [Reserved]

(6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

(7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

X (8) 52.209-6, Protecting the Government`s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).

X (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013) (41 U.S.C. 2313).

(10) [Reserved] (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C.

657a).

(ii) Alternate I (Nov 2011) of 52.219-3.

(12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

(ii) Alternate I (Jan 2011) of 52.219-4.

(13) [Reserved] (14)

(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C. 644).

(ii) Alternate I (Nov 2011) of 52.219-6.

(iii) Alternate II (Nov 2011) of 52.219-6.

(15)

(i) 52.219-7, Notice of Partial Small Business Set-Aside (Jun 2003) (15 U.S.C. 644).

(ii) Alternate I (Oct 1995) of 52.219-7.

(iii) Alternate II (Mar 2004) of 52.219-7.

X (16) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)).

(17) X (i) 52.219-9, Small Business Subcontracting Plan (JAN 2017) (15 U.S.C. 637(d)(4)).

(ii) Alternate I (Nov 2016) of 52.219-9.

(iii) Alternate II (Nov 2016) of 52.219-9.

(iv) Alternate III (Nov 2016) of 52.219-9.

(v) Alternate IV (Nov 2016) of 52.219-9.

(18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011) (15 U.S.C. 644(r)).

X (19) 52.219-14, Limitations on Subcontracting (JAN 2017) (15 U.S.C. 637(a)(14)).

(20) 52.219-16, Liquidated Damages-Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

(21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011) (15 U.S.C. 657f).

PAGE 9 OF 39 16PBGC18R00030002

X (22) 52.219-28, Post Award Small Business Program Rerepresentation (Jul 2013) (15 U.S.C.

632(a)(2)).

(23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).

(24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).

X (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

X (26) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (Jan 2018) (E.O.

13126).

X (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

X (28) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).

X (29) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).

X (30) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).

X (31) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).

X (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

X (33)(i) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O.

13627).

(ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 7 and E.O. 13627).

(34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

(35) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) (42 U.S.C.6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

(ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

(36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun, 2016) (E.O. 13693).

(37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun, 2016) (E.O. 13693).

(38) (i) 52.223-13, Acquisition of EPEAT(R) -Registered Imaging Equipment(Jun 2014) (E.O.s 13423 and 13514).

(ii) Alternate I (Oct 2015) of 52.223-13.

(39) (i) 52.223-14, Acquisition of EPEAT(R) -Registered Television (Jun 2014) (E.O.s 13423 and 13514).

(ii) Alternate I (Jun 2014) of 52.223-14.

(40) 52.223-15, Energy Efficiency in Energy-Consuming Products(Dec 2007) (42 U.S.C. 8259b).

(41) (i) 52.223-16, Acquisition of EPEAT(R)-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).

(ii) Alternate I (Jun 2014) of 52.223-16.

X (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).

(43) 52.223-20, Aerosols (Jun, 2016) (E.O. 13693).

(44) 52.223-21, Foams (Jun, 2016) (E.O. 13693).

X (45) (i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

(ii) Alternate I (JAN 2017) of 52.224-3.

(46) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).

(47) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C.

chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub.

L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41,112-42, and 112-43).

(ii) Alternate I (May 2014) of 52.225-3.

(iii) Alternate II (May 2014) of 52.225-3.

(iv) Alternate III (May 2014) of 52.225-3.

(48) 52.225-5, Trade Agreements (Oct 2016) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

X (49) 52.225-13, Restrictions on Certain Foreign Purchases (Jun 2008) (E.O.`s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

(50) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008;

10 U.S.C. 2302 Note).

(51) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

(52) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).

(53) 52.232-30, Installment Payments for Commercial Items (Jan 2017) (41 U.S.C. 4505, 10 U.S.C.

2307(f)).

PAGE 10 OF 39 16PBGC18R00030002

(54) 52.232-30, Installment Payments for Commercial Items (Oct 1995)(41 U.S.C. 4505, 10 U.S.C.

2307(f)).

X (55) 52.232-33, Payment by Electronic Funds Transfer - System for Award Management (Jul 2013) (31 U.S.C. 3332).

(56) 52.232-34, Payment by Electronic Funds Transfer - Other Than System for Award Management (Jul 2013) (31 U.S.C. 3332).

(57) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).

X (58) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

X (59) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(12)).

(60) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C.2631).

(ii) Alternate I (Apr 2003) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

X (1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495).

(2) 52.222-41, Service Contract Labor Standards (May 2014) (41 U.S.C. chapter 67).

(3) 52.222-42, Statement of Equivalent Rates for Federal Hires(May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

(4) 52.222-43, Fair Labor Standards Act and Service Contract Labor --Price Adjustment (Multiple Year and Option Contracts)(May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

(5)52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).

(6)52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C.

chapter 67).

(7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67).

(8) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015).

X (9) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).

(10) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42 U.S.C.

1792).

(11) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008)(31 U.S.C. 5112(p)(1)).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records- Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor`s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e)

(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause--

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(iii) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any

PAGE 11 OF 39 16PBGC18R00030002

public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(iv)52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.

(v) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

(vi) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).

(vii) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).

(viii) 52.222-36, Equal Opportunity for Workers with Disabilities(Jul 2014) (29 U.S.C. 793).

(ix) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).

(x) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(xi) 52.222-41, Service Contract Labor Standards (May 2014),(41 U.S.C. chapter 67).

(xii) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O 13627). Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O 13627).

(xiii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) 41 U.S.C. chapter 67.)

(xiv) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67)

(xv) 52.222-54, Employment Eligibility Verification (Oct 2015) (E.O. 12989).

(xvi) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015).

(xvii) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).

(xviii) (A) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

(B) Alternate I (JAN 2017) of 52.224-3.

(xix) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008;

10 U.S.C. 2302 Note).

(xx) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C.

1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xxi) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(End of Clause)

PAGE 12 OF 39 16PBGC18R00030002

SECTION L

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

PAGE 13 OF 39 16PBGC18R00030002

L.1 INSTRUCTIONS TO OFFERORS

L.1.1 RESPONSIBILITY

This contract shall be awarded only to a responsible prospective Contractor. To be determined responsible, a prospective Contractor must:

Have adequate financial resources to perform the contract, or have the ability to obtain them;

(a) Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments;

(b) Have a satisfactory performance record;

(c) Have a satisfactory record of integrity and business ethics;

(d) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, and quality control measures applicable to materials to be produced or services to be performed by the prospective Contractor and Subcontractors;

(e) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them; and

(f) Be otherwise qualified and eligible to receive an award under applicable laws and regulations.

Offerors are not required to submit information to comply with these requirements. PBGC will make this determination on its own.

L. 1.2 ADDENDUM to 52.212-1 Instructions to Offerors – Commercial Items (April 2014)

A. Addendum to Paragraph (e) “Multiple offers.” Paragraph (e) “Multiple offers” is deleted in its entirety. Multiple offers will not be accepted.

L.1.3 PROPOSAL SUBMISSION INSTRUCTIONS

Proposals shall be submitted electronically.

L.1.4 ELECTRONIC SUBMISSION

Proposals must also be submitted electronically via the PBGC Secure Proposal site. To submit your proposal, follow the steps below:

1. Encrypt your file(s) (password protect).

2. Go to https://pbgc.leapfile.com.

3. Select "Secure Upload."

4. Enter the email address of the Contract Specialist Dan Swart at swart.dan@pbgc.gov and copy to mcfarlane.patrick@pbgc.gov and click "Start."

5. Enter your contact information.

6. Enter your message and a description of the submission (this information will be included in the notification to the Procurement Officer.) Click the notification checkbox

PAGE 14 OF 39 16PBGC18R00030002

to ensure you receive notification when the file is downloaded by the Procurement Officer.

7. Select the upload method, Regular or Enhanced. Regular upload works with all browsers and enhanced upload works with Java enabled browsers.

8. Select the file(s) to send (use the Browse buttons).

9. Press the Upload & Send button.

10. Send a separate email to the Procurement Officer with your encryption password.

You will receive an automated system confirmation of a successful upload, and an automated system email when the Procurement Officer downloads your submission.

L.1.5 FACSIMILE SUBMISSION

Proposals submitted via facsimile will not be considered.

L.1.6 LATE PROPOSALS

Complete electronic versions must be received before the time and date specified for receipt. If the proposal is received at the destination after the time and date specified for receipt, the proposal will be considered late and will be dealt with in accordance with the late proposal provision of FAR 52.212-1.

L.1.7 PROPOSAL FORMAT AND COMPOSITION

General Instructions:

The Written Proposal shall use the specific format below. These directions assist in providing a fair and equitable evaluation of all proposals. The Government may determine those proposals not following the directions as unacceptable and may reject such offers from further consideration. The Written Proposals shall use:

• 8.5 by 11-inch paper.

• 12 pitch print or larger, Times New Roman style font.

o 10 pitch print or larger for graphics, figures and tables.

• 1.25 inch left hand margin, .75 inch right hand margin and 1 inch margins at both the top and bottom for each page.

• All pages single spaced.

• Every page sequentially numbered; and

• Page numbers shall be centered in the bottom margin.

The written proposal shall be accompanied by a cover letter (letter of transmittal) prepared on the company’s letterhead stationery. The cover letter (letter of transmittal) shall acknowledge receipt of all amendments, state validity of offer IAW L.6, and identify all enclosures being transmitted.

The cover letter shall be used only to transmit the proposal and shall include no other information.

PAGE 15 OF 39 16PBGC18R00030002

The Offeror shall submit a Written Proposal addressing the evaluation factors listed in Section M. All offers shall be evaluated preliminarily to ensure compliance with the requirements set forth in this solicitation, which include the following:

• Timely receipt of the offer.

• Determination of contractor and subcontractor responsibility in accordance with FAR 9.104.

• Information presented in the manner required by Section L

The written proposal shall be submitted in three (3) separate volumes:

Each of the volumes must be prepared and submitted in separate electronic files, so the evaluation of each part may be conducted independently.

Volume I – Technical Volume Part A – IDIQ Response Part B – Task Order One Response Part C – Task Order Two Response Part D – Sample Development Task Scenario Response Volume II – Price/Business Volume Part A – IDIQ Business/Price Proposal Part B – Task Order One Price Proposal Part C – Task Order Two Price Proposal Volume III – Small Business Participation

L.1.8 PAGE COUNT LIMITATION:

Below are the page limits associated with each section of the contractor proposal. PBGC will not evaluate or consider any pages that exceed the page limits listed for each item in the table below.

Resumes are limited to 2 pages each are not included in the page limits listed in the below table.

Cover pages, table of contents, list of acronyms, list of figures, glossary of terms, cross reference/compliance matrix, executive summaries, , letters of commitment, Table of Labor Categories, PWSs with QASPs, Quality Control Plans and tabs are not included in the count.

Section Page Limit Cover Letter N/A Volume I – Technical Volume 65 Pages Table of Contents N/A Part A – IDIQ Response 20 Pages LCAT Table N/A Past Performance Rating Articles N/A Part B – Task Order One Response 15 Pages

PWS N/A

Transition Plan N/A

QASP N/A

Quality Control Plan N/A

PAGE 16 OF 39 16PBGC18R00030002

Part C – Task Order Two Response 15 Pages

PWS N/A

QASP N/A

Quality Control Plan N/A Part D – Sample Development Task Scenario Response 15 Pages

PWS N/A

QASP N/A

Quality Control Plan N/A Volume II – Business Price Volume N/A Part A – IDIQ Business/Price Proposal N/A Part B – Task Order One Price Proposal N/A Part C – Task Order Two Price Proposal N/A Volume III – Small Business Participation N/A Volume IV – Small Business Subcontracting Plan (other than small businesses only N/A

L.2 - EVALUATION OF TECHNICAL VOLUME

The Offeror shall respond to the IDIQ and each Sample Task Order independently as outlined in the L.1.7 above. For each Technical Volume Part, the Offeror shall fully address the following evaluation factors and subfactors. The offeror shall provide responses which address the evaluation factors and subfactors for the IDIQ, Task Orders and Sample Development Task Scenario Response as listed Below. In order that the technical proposal may be evaluated strictly on the merit of the material submitted, no pricing information is to be included in the technical proposal. No materials shall be incorporated by reference that are not included in the technical proposal. Each proposal section should stand alone.

PAGE 17 OF 39 16PBGC18R00030002

L.2.1 - PART A – IDIQ RESPONSE

Factor 1 – Approach and Understanding of Requirements

Offerors must describe their approach to addressing each area as outlined in the IDIQ for FMS Information Technology Systems Support (FMS-ITSS) for PBGC. Offerors must also describe their approach to responding to and managing future Task Orders. An Offeror who simply states they will perform the work and complete the requirement will be considered non-responsive and subsequently will be determined technically non-compliant and be eliminated from further consideration for award. Additionally, simply repeating the language set out in the solicitation will be considered insufficient.

For program and task order management under the IDIQ, the offeror must clearly describe its approach to those program management activities listed in the SOO Section 2.1

Factor 2 – Key Personnel

Provide personnel with expertise in developing, administering, and analyzing proposed IDIQ tasks. Provide a description of the experience, skills, and capabilities of each of the key personnel. Descriptions shall include the quality and depth of experience of proposed personnel in working on similar projects in terms of background, education, work experience, and accomplishments. Descriptions shall demonstrate the knowledge that key personnel have gained through completed and ongoing efforts on similar programs. "Similar programs" is meant to convey similarity in subject matter, dollar value, and complexity as related to work described in the IDIQ task areas.

In order to meet the requirements of the IDIQ, the contractor should assess and propose the Key Personnel deemed appropriate. The contractor is not limited in the number of Key Personnel they can offer, but shall propose at least one IDIQ Program Manager as key personnel.

Factor 3 – Staffing and Management Approach

The offeror will describe its approach to staffing the overall IDIQ and task orders as they are issued. The offeror should not assume that the CLIN structure or task structure is an indication that separate teams should be established. It is anticipated that resources will be shared across areas and tasks. The offeror shall identify the minimum labor categories and associated experience/education levels. Additional labor categories can be included beyond the minimum listed. The staffing plan should include its management approach and, at a minimum, address the following:

1. Overall approach strategy to be used for staffing and task order management across tasks

2. Approach to staffing task orders as they are issued or completed. For example, as new tasks are awarded, how will the offeror quickly bring on new, experienced staff to ensure consistency of delivery. As projects are completed, how will the offeror ensure transition to operations and maintenance activities

PAGE 18 OF 39 16PBGC18R00030002

3. Describe the offeror’s reach back capability

4. While Task Order #1 and Task Order #2 include the initial transition, operations and release development for three FMS systems, it is anticipated that additional task orders will be issued to provide for operations and maintenance of all systems, multiple releases and potentially concurrent large IT development efforts. The Offeror must describe what a full staffing model would look like should task orders be issued covering operations for all systems with multiple concurrent release and development efforts.

5. Communications Plan

The contractor shall also propose labor categories, labor category descriptions and associated credentials required for each labor category and level. At a minimum the offeror shall include the labor categories included with the labor category template included with the solicitation.

Factor 4 – Past Performance

Describe the experience and capability of your organization in conducting relevant work.

“Relevant" is meant to convey similarity in subject matter, dollar value, duration, and complexity. This includes specific experience supporting financial services or financial regulatory clients. Additionally, experience should demonstrate efforts utilizing similar technologies supporting FMS systems.

Provide a summary of at most three (3) similar contracts performed by your organization during the last three years consistent with all task areas detailed in the IDIQ. Past Performance may be provided for significant subcontractors but at least one must be from the prime contractor.

Include a brief description of the project, project title, contract number, period of performance, performance ratings, contract amount, and client identification including Agency or company name, and point-of-contact with e-mail and telephone number. Contact information must be current. For similar IDIQs, the past performance shall include performance ratings across all tasks under the IDIQ as support for the IDIQ performance. This shall be no longer than one page for each reference.

PAGE 19 OF 39 16PBGC18R00030002

L.2.2 PART B – TASK ORDER ONE RESPONSE

Offerors must describe their approach to addressing each objective as outlined in Task Order #1 and address the associated constraints in meeting those objectives.

Offerors must include in their technical approach a performance work statement (PWS) that includes, as defined in Task Order #1, Section 3, the following:

• Tasks required to meet task order objectives and associated performance standards

• Deliverable and performance standards that incorporate minimum deliverable and performance standards as set out in the task order.

• Quality Assurance Surveillance Plan (QASP)

• Quality Control Plan

These must detail and address how they will successfully complete all requirements identified in TO #1 (i.e., who is doing what when and how, and what are the expected results). In addition, offerors shall propose the methodology and the framework for the IT services and associated performance metrics they will be utilizing and measured on under this task order. A successful approach must include how quality deliverables will be produced through effective technical writing.

The approach shall be simple, easy to read, and shall clearly and concisely describe task responsibilities and personnel, relevant communication and coordination, scheduling of all tasks and subtasks, meetings, and deliverables. All staff needed to conduct the work and produce all required products and deliverables must be identified in a project organizational chart. In meeting deliverables, Offerors shall elaborate on how they plan to measure their efforts to ensure the highest quality of performance.

An offeror who simply states they will perform the work and complete the requirement will be considered non-responsive and subsequently will be determined technically non-compliant and be eliminated from further consideration for award. Offerors technical approach must demonstrate a thorough understanding of the context of the work to be performed and must possess the ability to perform all task requirements and have a clear value proposition that attempts to differentiate itself from other potential offerors.

The Contractor shall provide a detailed plan and schedule describing how they will transition all services to be provided from the implementation contractor under this contract. The transition plan shall detail all specific actions that need to be taken and their expected completion dates.

First, the transition plan shall identify all critical steps needed to be completed to transition all the services, second the plan shall identify all the steps for knowledge transfer and staffing approach. The transition plan shall be detail on how the contractor shall perform implementation and elaborate on how they will address transition issues and risks. The plan shall be comprehensive and assure the Government that the work can be transitioned to the new Contractor by the end of the Transition POP.

PAGE 20 OF 39 16PBGC18R00030002

Provide personnel with expertise in developing, administering, and analyzing proposed Task Order #1 objectives. Provide a description of the experience, skills, and capabilities of each of the key personnel. Descriptions shall include the quality and depth of experience of proposed personnel in working on similar projects in terms of background, education, work experience, and accomplishments. Descriptions shall demonstrate the knowledge that key personnel have gained through completed and ongoing efforts on similar efforts. "Similar efforts" is meant to convey similarity in subject matter, dollar value, and complexity as related to work described in the task objectives.

In order to meet the requirements of the task order, the contractor should assess and propose the Key Personnel deemed appropriate. The contractor is not limited in the number of Key Personnel they can bid, but shall propose at least the following:

Project Manager/Project Managers: The contractor will identify one or more project managers with overall responsibility for delivery of tasks and deliverables identified in the PWS. The project manager will be the responsible for meeting and exceeding deliverable quality, timeliness and cost measures. He/she will have strong organizational skills, project management skills, and the ability to lead teams to deliver and implement robust IT solutions. It is highly desirable that the identified project managers have the following experience/qualifications:

5+ years demonstrated experience managing highly complex and high-visible IT projects relating to financial support systems across the entire software development lifecycle.

5+ years demonstrated experience supporting financial IT system operations and managing IT software development projects using multiple methodologies

Technical understanding and experience with the technologies identified supporting the FMS systems

Project Management Institute Project Management Professional (PMP) Certification

Demonstrated written and verbal communication skills, including experience in presenting material to senior Government officials.

Technical Lead/Leads: The contractor will identify one or more technical leads who will be responsible for architecting, deploying, and supporting all the FMS footprint. The technical lead(s) will have strong conceptual design skills, knowledge of scripting, and the ability to lead teams to envision, design, and implement robust IT solutions.

Technical lead(s) should have extensive technical leadership and IT systems development experience directly supporting financial systems. It is highly desirable that the technical lead(s) has the following experience 10+ years experience overseeing the design, development, and implementation of software and hardware solutions, systems and products Experience interfacing IT systems with Department of Treasury shared services

PAGE 21 OF 39 16PBGC18R00030002

Extensive hands on experience with technology supporting the FMS systems with specific emphasis on Oracle/Java technologies including Oracle E-Business Suite.

Experience with the following technologies highly desired:

Oracle E-Business-Suite (EBS) Release 12 (GL Module, Fed Admin, TCA, CRM, AP, PO)

Oracle SOA Suite Oracle BI Publisher and Oracle Forms and Reports Oracle RDBMS and Weblogic server Oracle Rules Engine Java Web services Oracle 11g/12C database administration UNIX shell scripting and cron jobs Java/J2EE JavaScript

PL/SQL

Spring Framework iBatis Oracle ADF

JAX-WS JAXB

.NET

Asynchronous Javascript and XML (AJAX), XHTML, and VB coding principle Bootstrap

Factor 3 – Management Approach

Offeror’s proposal must demonstrate the following:

An effective, efficient, feasible and practical level of understanding of the operating environment in accomplishing the tasks of TO #1, with minimal risk to the Government and an effective concept of operations with their team and the Government.

An effective, organizational structure, which explains handling lines of authority and communication both within the contractor’s team and with stakeholders at PBGC.

An effective, approach to risk management providing a realistic process for managing risk as well as an understanding of the risk areas encountered and approach to quality assurance.

PAGE 22 OF 39 16PBGC18R00030002

L.2.3 PART C – TASK ORDER TWO RESPONSE

Offerors must describe their approach to addressing each objective as outlined in Task Order #2 and address the associated constraints in meeting those objectives.

Offerors must include in their technical approach a performance work statement (PWS) that includes, as defined in Task Order #2, Section 3, the following:

• Tasks required to meet task order objectives and associated performance standards

• Deliverable and performance standards that incorporate minimum deliverable and performance standards as set out in the task order.

TO #2 (i.e., who is doing what when and how, and what are the expected results). In addition, offerors shall propose the methodology and the framework for the IT services and associated performance metrics they will be utilizing and measured on under this task order. A successful approach must include how quality deliverables will be produced through effective technical writing.

The approach shall be simple, easy to read, and shall clearly and concisely describe task responsibilities and personnel, relevant communication and coordination, scheduling of all tasks and subtasks, meetings, and deliverables. All staff needed to conduct the work and produce all required products and deliverables must be identified in a project organizational chart. In meeting deliverables, Offerors shall elaborate on how they plan to measure their efforts to ensure the highest quality of performance.

An offeror who simply states they will perform the work and complete the requirement will be considered non-responsive and subsequently will be determined technically non-compliant and be eliminated from further consideration for award. Offerors technical approach must demonstrate a thorough understanding of the context of the work to be performed and must possess the ability to perform all task requirements and have a clear value proposition that attempts to differentiate itself from other potential offerors.

Provide personnel with expertise in developing, administering, and analyzing proposed Task Order #2 objectives. Provide a description of the experience, skills, and capabilities of each of the key personnel. Descriptions shall include the quality and depth of experience of proposed personnel in working on similar projects in terms of background, education, work experience, and accomplishments. Descriptions shall demonstrate the knowledge that key personnel have gained through completed and ongoing efforts on similar efforts. "Similar efforts" is meant to convey similarity in subject matter, dollar value, and complexity as related to work described in the task objectives.

PAGE 23 OF 39 16PBGC18R00030002

In order to meet the requirements of the task order, the contractor should assess and propose the

Project Manager/Project Managers: The contractor will identify one or more project managers with overall responsibility for delivery of tasks and deliverables identified in the PWS. The project manager will be the responsible for meeting and exceeding deliverable quality, timeliness and cost measures. He/she will have strong organizational skills, project management skills, and the ability to lead teams to deliver and implement robust IT solutions. It is highly desirable that the identified project managers have the following experience/qualifications:

• 5+ years demonstrated experience managing highly complex and high-visible IT projects relating to financial support systems across the entire software development lifecycle.

• 5+ years demonstrated experience supporting financial IT system operations and managing IT software development projects using multiple methodologies

• Technical understanding and experience with the technologies identified supporting the FMS systems

• Project Management Institute Project Management Professional (PMP) Certification

• Demonstrated written and verbal communication skills, including experience in

Technical Lead/Leads: The contractor will identify one or more technical leads who will be responsible for architecting, deploying, and supporting all the FMS footprint. The technical lead(s) will have strong conceptual design skills, knowledge of scripting, and the ability to lead teams to envision, design, and implement robust IT solutions.

Technical lead(s) should have extensive technical leadership and IT systems development experience directly supporting financial systems. It is highly desirable that the technical lead(s) has the following experience

• 10+ years experience overseeing the design, development, and implementation of software and hardware solutions, systems and products

• Experience interfacing IT systems with Department of Treasury shared services

• Extensive hands on experience with technology supporting the FMS systems with specific emphasis on Oracle/Java technologies including Oracle E-Business Suite.

• Experience with the following technologies highly desired:

• Oracle E-Business-Suite (EBS) Release 12 (GL Module, Fed Admin, TCA, CRM, AP, PO)

• Oracle SOA Suite

• Oracle BI Publisher and Oracle Forms and Reports

• Oracle RDBMS and Weblogic server

• Oracle Rules Engine

• Java Web services

• Oracle 11g/12C database administration

• UNIX shell scripting and cron jobs

PAGE 24 OF 39 16PBGC18R00030002

• Java/J2EE

• JavaScript

• PL/SQL

• Spring Framework

• iBatis

• Oracle ADF

• JAX-WS JAXB

• .NET

• Asynchronous Javascript and XML (AJAX), XHTML, and VB coding principle

Bootstrap

Factor 3 – TO Management Approach

Offeror’s proposal must demonstrate the following:

• An effective, efficient, feasible and practical level of understanding of the operating environment in accomplishing the tasks of TO #2, with minimal risk to the Government and an effective concept of operations with their team and the Government.

• An effective, organizational structure, which explains handling lines of authority and communication both within the contractor’s team and with stakeholders at PBGC.

• An effective, approach to risk management providing a realistic process for managing

PAGE 25 OF 39 16PBGC18R00030002

L.2.4 PART D – SAMPLE DEVELOPMENT TASK SCENARIO RESPONSE

The Offeror’s response to the Sample Development Task Scenario SOO (attached) is for technical evaluation purposes only. Pricing is not requested for the response to the sample development task scenario.

Factor 1 - Approach and Understanding of Requirements

Offerors must describe their approach to addressing each objective as outlined in the Sample Development Task Scenario and address the associated constraints in meeting those objectives.

Offerors must include in their technical approach a performance work statement (PWS) that includes, as defined in Sample Task…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.