APACE ZONE Road Materials_SOW SOI.pdf
PDF 215 KB Posted
- Attached to
- AGGREGATE ROCK SUPPLY APACH SITGREAVES NF Federal contract opportunity
- Solicitation number
- 127EAU23Q0054
About this file
This solicitation is for the supply of crushed aggregate rock materials to be used on two districts of the Apache-Sitgreaves National Forests in Arizona. The contractor will be required to produce and stockpile 1"-minus surface coarse aggregate according to specifications at designated pit locations within 35 miles of the forest boundaries. The base line items are for crushed rock quantities of approximately 1835 tons along with a compliance test by an independent lab. An option line allows for additional rock if funding is available. Pricing is to be provided per ton, with all applicable taxes and permits included. The period of performance is 365 days from notice to proceed. Submissions must include technical statements demonstrating production capability as well as experience remodeling structures. The award will be made to the lowest priced technically acceptable offer.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SITGREAVES ZONE NAVAJO Road Materials_SOW SOI.docx | DOCX document | |
| CONT 030128 ENG Road Materials_Exhibit 1 Specifications.pdf | ||
| 127EAU23Q0054-7.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I – THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
Contract Line # AGGREGATE SUPPLY
Estimated Quantities
Task Offer Price ($ /
TON)
Total
TON
B1 Crushed rock, surface coarse aggregate, stockpiled, 1”-minus (Table 31-2, Grading G)
TON
B2 Compliance test, per AASHTO and ASTM standards and certified third-party independent testing agency
1 EA
EA
Option Line #
O.B1* Crushed rock, surface coarse aggregate, stockpiled, 1”minus (Table 31-2, Grading G)
TON
Pit Location(s) for Apache County – include address or latitude/longitude. Multiple pit locations are acceptable
Pit Location:__________________________________ Nearest Town/City:____________________________
Pit Location:__________________________________ Nearest Town/City:____________________________
Pit Location(s) for Greenlee County - include address or latitude/longitude. Multiple pit locations are acceptable
Pit Location:__________________________________ Nearest Town/City:____________________________
Pit Location:__________________________________ Nearest Town/City:____________________________
This line for Contracting Officer use
*The quantity of Option Item O.B1 will be determined by funding available upon award of base items. All additional quantities will be awarded at the rate in O.B1.
CONTRACTOR NAME: _________________________ DUNS#: ________________________
CONTRACT NUMBER: _________________________
CONTRACTOR AUTHORIZED SIGNATURE___________________________________________________
SECTION C – STATEMENT OF WORK/DESCRIPTIONS
C.1 – GENERAL DESCRIPTION OF WORK
Furnish Materials: Crushed Aggregate Supply – In accordance with the plans and specifications (see Exhibit 1).
Delivery is not required and shall not be included in cost of aggregate supply. All taxes (Federal, State, or local), operating permits, or other miscellaneous expenses shall be incorporated in the pricing submitted with the offer.
Limitations: This solicitation does not include hauling or delivery of aggregate. This solicitation is intended to provide the Government with access (through task orders) to stockpiles of aggregate, as described herein, stored at the awarded contractor’s designated pit location. Due to the government supplying the hauling mechanism for the aggregate, the locations of designated pits shall not be more than 35 miles from the boundary of the Apache-Sitgreaves National Forests, specifically the Springerville and Alpine Districts.
C.2 – LOCATION OF PROJECT
Materials generated under this contract will be used on the Springerville and Alpine districts of the Apache- Sitgreaves National Forests. This includes portions of both Alpine and Greenlee counties.
C.3 – SPECIFIC SCOPE OF WORK
C3.1 Base Line Item B1 This item includes the production of 1 “- minus surface coarse aggregate. Material shall be produced according to Table 31-2, Grading G of specifications.
C3.2 Base Line Item B2 Contractor shall have one compliance test taken on crushed material in item B1. Test shall be in accordance with AASHTO and ASTM standards and shall be done by a certified third party independent testing agency. Test shall be done within 48 hours of request by the Contracting Officer. Contractor shall provide test results to the Contracting Officer. See section 3.1 Testing in specifications.
C3.3 Option Line Item B1 See C3.2 Base Line Item B1. Material produced under this line item will only be produced if funding is available.
SECTION D – PACKAGING AND MARKING
D1—GENERAL INFORMATION:
See Section J for Exhibits that are incorporated as part of the statement of work:
Reference Section J for Exhibits:
Exhibit 1 – Specifications
SECTION F – DELIVERIES OR PERFORMANCE
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives notice-to-proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 calendar days from issuance of notice-to-proceed. The time stated for completion shall include final cleanup of the premises.
SECTION G – CONTRACT ADMINISTRATIVE DATA
Government Furnished Items:
The Government will provide the following items:
• None
PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J – LIST OF ATTACHMENTS
EXHIBIT 1 SPECIFICATIONS
SECTION M--EVALUATION FACTORS FOR AWARD
M1.0 BASIS FOR AWARD:
BEST VALUE – LPTA (LOWEST PRICE TECHNICALLY ACCEPTABLE). Offers will be reviewed for conformance to the requirements of this RFQ. Award will be made based on the Lowest Price Technically Acceptable (LPTA) offer that meets or exceeds the acceptability standards for technical factors. Failure to provide adequate information for Technical subfactors a & b, will result in the offer not being placed in the eligibility group of technically acceptable, which will remove the offer from further consideration.
Under LPTA:
1. Evaluation factors and significant subfactors that establish the requirements of acceptability shall be set forth in the solicitation.
2. Tradeoffs are not permitted.
3. Offers are evaluated for acceptability but not ranked using non-cost/price factors.
M2.0 TECHNICAL CAPABILITY REQUIREMENTS:
Technical Capability shall be submitted in the form of a statement or document that demonstrates the contractor’s capability to perform the work to meet or exceed the requirements of this solicitation. In order to meet the Technical Capability Requirements, offers shall address the following factors:
Factor a - tools, equipment, training, and general business practices should be developed in the statement or document to satisfy an evaluation panel that you the contractor has a level of technical capability that meets or exceeds the requirements to perform this work.
Factors b - Provide specific information to gain a better understanding of the requirements to remodel residential houses, that documents and addresses your firm’s experience and capability. You may provide your own drawings, illustrations, documents, or photos to support your capability to perform the work. Specifically address the following:
b.1) Remodeling wet areas (bathrooms, showers) b.2) Trade experience with electrical, plumbing, and finish work for remodel projects
Failure to provide adequate information for Technically Capability may result in the offer being removed from the competitive range.
M3.0 PRICES:
Competitive offers will establish price reasonableness. Therefore, when contracting on a firm-fixed-price basis, comparison of the proposed prices will satisfy the requirement to perform a price analysis (cost analysis need not be performed). Contracting Officer intends to award without discussions, offerors shall provide their best prices up front. Pricing will serve as a final determining factor for award under LPTA.
(If the Contracting Officer elects to consider Past Performance as an additional evaluation factor, it shall be evaluated in accordance with FAR Subpart 15.305).
EXHIBIT 1 SPECIFICATIONS
File details come from the government source that posted it. Updated .