PR #:

STATEMENT OF WORK

STATEMENT OF WORK (SOW)

FOR

CG 49404 Haul out USCG Aids to Navigation Team Saugerties

Saugerties, NY

1.0 GENERAL

Conduct haul out of vessel CG 49404 with approved travel lift, pressure wash hull and provide storage for a 3 day period.

1.1 Background

CG 49404 needs to be hauled out on an annual basis to conduct required inspections. Vessel needs to be hauled from water and transported to level hard surface and placed on wood blocks in accordance with vessel docking plan. Vessel’s hull needs to be pressure washed and free from all growth and foreighn material for inspection After all inspections have been completed by CG personel vessel must be placed back in water for operational use.

1.2 Scope

CG49404 needs to be hauled out and transported to level surface and placed on wood blocks IAW vessel docking plan. Vessel needs to be pressure washed to remove all growth and foreighn material from hull for inspection When work is completed vessel needs to be removed from blocks and transported back into the water.

1.3 OBJECTIVE

CG 49404 is to be haul out, pressure washed and placed on blocks for a period up to 5 days. Provide shore power and connections for the duration of work to be completed.

1.4 APPLICABLE DOCUMENTS

1.4.1 MPC B00013.D, Boat Haul out Service

1.4.2 DWG 49A-BUSL_085_002, REV. A, Hull liones and offsets

1.4.3 DWG 49A BUSL 085-003, REV. A, Docking plan

1.4.4 MPC B10020.D, Pressure wash hull

1.4.5 TS 997, Docking Instructions for Cutters and Boats, Appendix A

2.0 SPECIFIC REQUIREMENTS/TASKS

2.1 TASK ONE. Haul out of CG 49404

Using certified and approved travel lift, remove vessel from water and safely transport to level ground for blocking.

2.1.1 Place vessel on wood blocks IAW vessel docking plan.

2.1.2 Stabalize vessel with stands.

2.2 TASK TWO. Pressure wash Hull

Pressure wash entire hull removing all marine growth and foreighn material.

2.3 TASK THREE. Launch Vessel.

2.4.1 Disconect supplied shore power connections.

2.4.2 Remove vessel from blocks and stands.

2.4.3 Transport vessel back to water.

2.4.4 Launch Vessel.

3.0 CONTRACTOR PERSONNEL

3.1 QUALIFIED PERSONNEL

The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.

3.2 PLACE OF PERFORMANCE

Contractor shall have a facility within 60 miles of the following address:

USCG ANT SAUGERTIES

154 LIGHTHOUSE DR.

SAUGERTIES NY. 12477

Facility must have all necessary equipment to perform the work outlined in this SOW.

LAST UPDATED: 04/21/2022

PAGE 1/2