ANT SAUGERTIES SOW.doc
DOC document 73 KB Posted
- Attached to
- CG 49404 Haul out ANT SAUGERTIES
- Solicitation number
- 70Z04022QSBPL49404
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FAR CLAUSES SERVICES.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR #:
STATEMENT OF WORK
STATEMENT OF WORK (SOW)
FOR
CG 49404 Haul out USCG Aids to Navigation Team Saugerties
Saugerties, NY
1.0 GENERAL
Conduct haul out of vessel CG 49404 with approved travel lift, pressure wash hull and provide storage for a 3 day period.
1.1 Background
CG 49404 needs to be hauled out on an annual basis to conduct required inspections. Vessel needs to be hauled from water and transported to level hard surface and placed on wood blocks in accordance with vessel docking plan. Vessel’s hull needs to be pressure washed and free from all growth and foreighn material for inspection After all inspections have been completed by CG personel vessel must be placed back in water for operational use.
1.2 Scope
CG49404 needs to be hauled out and transported to level surface and placed on wood blocks IAW vessel docking plan. Vessel needs to be pressure washed to remove all growth and foreighn material from hull for inspection When work is completed vessel needs to be removed from blocks and transported back into the water.
1.3 OBJECTIVE
CG 49404 is to be haul out, pressure washed and placed on blocks for a period up to 5 days. Provide shore power and connections for the duration of work to be completed.
1.4 APPLICABLE DOCUMENTS
1.4.1 MPC B00013.D, Boat Haul out Service
1.4.2 DWG 49A-BUSL_085_002, REV. A, Hull liones and offsets
1.4.3 DWG 49A BUSL 085-003, REV. A, Docking plan
1.4.4 MPC B10020.D, Pressure wash hull
1.4.5 TS 997, Docking Instructions for Cutters and Boats, Appendix A
2.0 SPECIFIC REQUIREMENTS/TASKS
2.1 TASK ONE. Haul out of CG 49404
Using certified and approved travel lift, remove vessel from water and safely transport to level ground for blocking.
2.1.1 Place vessel on wood blocks IAW vessel docking plan.
2.1.2 Stabalize vessel with stands.
2.2 TASK TWO. Pressure wash Hull
Pressure wash entire hull removing all marine growth and foreighn material.
2.3 TASK THREE. Launch Vessel.
2.4.1 Disconect supplied shore power connections.
2.4.2 Remove vessel from blocks and stands.
2.4.3 Transport vessel back to water.
2.4.4 Launch Vessel.
3.0 CONTRACTOR PERSONNEL
3.1 QUALIFIED PERSONNEL
The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.
3.2 PLACE OF PERFORMANCE
Contractor shall have a facility within 60 miles of the following address:
USCG ANT SAUGERTIES
154 LIGHTHOUSE DR.
SAUGERTIES NY. 12477
Facility must have all necessary equipment to perform the work outlined in this SOW.
LAST UPDATED: 04/21/2022
PAGE 1/2
File details come from the government source that posted it. Updated .