This document is a Performance Work Statement (PWS) for a task order to replace a door and door frame at the ANT Port O'Connor building. The purpose is to replace a corroded door and frame that can no longer be properly closed. The contractor must provide a qualified project manager and personnel to remove the existing door, install a new 38" x 84" grey powder coated door with corrosion-resistant accessories, and clean up the site. The work must be completed within 30 working days and is subject to final inspection and acceptance by the government. The contractor will provide a one-year warranty on all products and services.

The related federal contract opportunity is a solicitation by the U.S. Coast Guard for this door replacement project at ANT Port O'Connor in Texas. It is a 100% small business set-aside with a firm-fixed price award to the lowest technically-acceptable bidder. Proposals are due by 3:00 PM CT on May 27, 2024. Offerors are required to visit the site and become familiar with the existing conditions prior to submitting a quote.

View the file

Other files

File Type Posted
70Z02924QNEWO0021_SF1442.pdf PDF
Construction Clauses Provisions FAR.doc DOC document
WAGE DETERMINATION DBA PORT OCONNOR.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR SUPPORT SERVICES FOR THE

ANT Port O’Connor – ANT building 1st floor Door/Frame Renewal

TASK ORDER

PERFORMANCE WORK STATEMENT

1.0 GENERAL.

1.1 Scope. The purpose of this task order, under Sector Corpus Christi Engineering Support Division, is to replace 1 door and door frame on the ANT Port O’Connor building 1st floor.

1.2 Background. The door/frame has corroded on the lower section of the door and the mounting bracket. Unit is unable to close the door properly; door swings in both directions and can causes injury if positive control is lost.

1.3 CONTRACTOR PERSONNEL.

1.3.1 Project Manager. The Contractor shall provide a Project Manager who shall be responsible for all Contractor work performed under this task order. The Project Manager is further designated as Key by the Government (see PWS 1.4).

1.3.1.1 The Project Manager shall be available via telephone between the hours of 0730 and 1530 EST, Monday through Friday, and shall respond to a request for discussion or resolution of technical problems within 24 hours of notification.

1.3.2 Qualified Personnel. The Contractor shall provide qualified personnel to perform all requirements specified in this task order. All Contractor employees supporting this task order shall also be citizens of the United States.

1.3.4 Insurance. Any Contractor or sub-contractor shall be properly insured throughout the entire contract period.

1.3.5 Employee Identification. Contractor employees visiting Government facilities shall wear an identification badge that, at minimum, displays the Contractor name, the employee’s photo, name, clearance-level and badge expiration date. Visiting Contractor employees shall comply with all Government escort rules and requirements. Contractor employees working on-site at Government facilities shall wear a Government issued identification badge. All Contractor employees shall identify themselves as Contractors when their status is not readily apparent and display the Government issued badge in plain view above the waist at all times.

1.3.6 Employee Conduct. Contractor’s employees shall comply with all applicable Government regulations, policies, and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of military uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor shall ensure contractor employees present a professional appearance at all times and that their conduct shall not reflect discredit on the United States, the Department of Homeland Security, or the U.S. Coast Guard.

1.3.7 Removing Employees for Misconduct or Security Reasons. The Government may, at its sole discretion, direct the Contractor to remove any Contractor employee from U.S. Coast Guard facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under any task order awarded. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.

1.3.8 Conflict of Interest. The Contractor shall not employ any person who is an employee of the United States Government if that employment would cause or could appear to cause a conflict of interest.

1.4 Key Personnel.

Before replacing any individual designated as Key by the Government, the Contractor shall notify the Contracting Officer no less than 5 business days in advance, submit written justification for replacement, and provide the name and qualifications of any proposed substitute(s). All proposed substitutes shall possess qualifications equal to or superior to those of the Key person being replaced. The Contractor shall not replace Key Contractor personnel without acknowledgment from the Contracting Officer. The Government may designate additional Contractor personnel as Key at the time of award.

1.5 SECURITY.

Contractor access to classified or sensitive information is not required and will not be authorized under this task order. All personnel shall check in with the Front Gate and receive access. All contracted employees are required to be escorted by a Coast Guard representative at all times.

1.6 Period of Performance.

The period of performance for this task order is 30 working days from the date of award.

1.7 PLACE OF PERFORMANCE.

The primary place of performance will be at Station Port O’Connor at 2307 A West Maple Street, Port O’Connor, TX 77982.

1.8 HOURS OF OPERATION.

Contractor employees shall generally perform all work between the hours of 0730 and 1530 EST, Monday through Friday (except Federal holidays). All work hours shall be to minimize disruption to crew rest.

1.9 Travel.

Contractor travel is not applicable under this task order.

1.10 GENERAL SITE CONDITIONS

1.10.1 General Condition. Contractor is responsible for the daily cleanliness and condition of the site including cleanup, safety supervision, and management. Contractor shall remove any debris that may inadvertently spread throughout the space.

1.10.2 Debris Removal. The contractor will be responsible for the removal and disposal of all debris produced in accordance with federal, state, and local regulations.

1.11 INTELLECTUAL PROPERTY.

All documentation, photography and electronic data and information collected by the Contractor and entered into or generated in support of this task order shall be considered Government property, and shall be returned to the Government at the end of the performance period.

1.12 PROTECTION OF INFORMATION.

Contractor access to information protected under the Privacy Act is required under this task order. Contractor employees shall safeguard this information against unauthorized disclosure or dissemination in accordance with the law and Government policy and regulation.

1.13 QUALITY CONTROL, FINAL INSPECTION, AND ACCEPTANCE

The Contractor shall be responsible for all work, materials, and the final product provided under this contract. When the work is complete and ready for final inspection, the Contractor shall notify their local Coast Guard representative.

1.13.1 Warranty. The Contractor will provide a full warranty for all products and services covering a one year period after project completion.

2.0 GOVERNMENT TERMS & DEFINITIONS.

2.1 COR ( Contracting Officer’s Representative

2.2 KO ( Contracting Officer

2.3 NLT ( No later than

2.4 PWS ( Performance Work Statement

2.4 PRS ( Performance Requirement Summary

2.5 KTR ( Contractor

3.0 GOVERNMENT FURNISHED RESOURCES.

3.1 Utilities. The Government will make available to the Contractor at existing connections and outlets, all reasonably required amounts of water and electricity.

4.0 CONTRACTOR FURNISHED RESOURCES.

At a minimum, The Contractor shall furnish all tools, materials, equipment, labor, and supervision to fulfill the requirements of this task order. All materials shall be lead and asbestos free and designed for external use and shall be coated as appropriate for use in a marine environment.

5.0 BASE CONTRACT REQUIREMENTS.

5.1 Remove and dispose of existing door, door frame and hinges.

5.2 Provide and install new grey powder coated door, approximately 38” x 84” by 1 ¾”. Contractor shall field verify measurements prior to ordering materials.

5.3 All door accessories to include, but not limited to hinges, door closer, door lever, and closer shall be made of aluminum or other corrosion-resistant material.

5.4 Contractor is responsible for the clean-up of the site and is responsible for repairing any damage caused during construction at no-cost to the Government.