This is a Statement of Work (SOW) for a multi-office renovation project at USCG Aids To Navigation (ANT) Station Boston located at 427 Commercial Street, Boston, MA 02109, with work to be completed by August 2026.
The scope of work includes: removal and replacement of blue carpeting with wood life-proof plank flooring in command cadre offices; removal of off-white linoleum and installation of non-slip white epoxy flooring with blue flakes in the entry and crew training areas; installation of a wooden cabinet with countertop and tankless hot water heater with water filter in the crew kitchen; capping existing plumbing lines, removing the hot water heater and water filter in the 2nd Class Office utility closet, then removing false walls and installing drywall, joint compound, and two coats of latex paint with primer; removal of doors from the 2nd Class, 3rd Class, and non-rate offices with trim-work installation around openings; removal of a non-structural wall in the 3rd Class and non-rate offices with matching wood plank flooring installation; disposal of existing desks and metal storage cabinets; and installation of new matching cubicles, desks, L-shaped desk cubicles in the R&S room, Vidmars, work benches, and storage lockers. All work must begin within 30 days of contract award and be completed within 90 days, performed Monday-Friday 0700-1600 hours with COR approval required for any work outside these times. The contractor must provide its own dumpster and dispose of all waste daily at its expense, comply with OSHA and EPA regulations, maintain protective measures against damage to existing structures and utilities, and submit quote options for paint, epoxy, and cubicles for written Coast Guard approval before ordering materials. Award will be made to the low-cost responsive offeror through a firm fixed-price contract, with the contractor required to be registered in SAM prior to award, maintain REAL ID while on government property, and submit itemized invoices through the Invoice Processing Platform with requisition number, company information, UEI number, invoice number and date, and corresponding CLIN reference.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DEI_FAR_Clause.docx | DOCX document | |
| Construction CLAUSES 2026.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement Of Work For
USCG ANT BOSTON
MULTI OFFICE RENOVATION
427 COMMERCIAL ST.
BOSTON, MA, 02109
AUGUST 2026
INTRODUCTION/BACKGROUND
Coast Guard Base Boston is in need of a contractor to perform light/ medium industrial work in multiple offices. At Base Boston USCG is in need to have renovations completed. Work will include epoxy flooring in kitchen and entry-way, wood life-proof plank flooring in command cadre offices, removal of non-structural walls and unnecessary doors, installing new office cubicles, Vidmars, and work benches. Minor electrical and plumbing work needed to fix cook-top in kitchen, installing new hot water heater and water filter in kitchen. Contractor will be responsible for providing their own dumpster and disposal of all waste/ debris.
1. SCOPE OF WORK
a) In command cadre offices, contractor shall remove all blue carpeting and install new underlayment and wood flooring to match existing flooring in training room.
b) In entry area and crew training area, contractor shall remove and dispose of all off-white linoleum flooring. Inspect sub-surface flooring to ensure foundation is not degraded. After inspection and approval is complete contractor shall install non-slip epoxy flooring (color will be white epoxy with blue flakes).
c) In crew kitchen area, contractor shall install small wooden cabinet with counter top to match existing cabinets and counter tops. Inside of cabinet, contractor shall install new water filter and tankless hot water heater for kitchen sink.
d) In 2nd Class Office, contractor shall cap existing plumbing lines in utility closet and remove existing hot water heater and water filter. Space shall then be inspected to ensure that pipes are not leaking and electrical wires are not exposed. After inspection and approval is complete contractor shall remove false walls of utility closet in order to open the space to make room for more desks/ cubicles. Contractor shall install drywall and joint compound as needed where utility closet was removed. After joint compound is smooth and dry, contractor shall apply two coats of latex paint plus primer.
e) Remove doors from 2nd class office, 3rd class office, and non-rate office. Contractor will then install trim-work around door openings.
f) In 3rd class office and non-rate office there is a non-structural wall that needs to be removed. After false wall is removed contractor will install same like and kind flooring that matches existing flooring (wood plank flooring).
g) Remove and dispose of all existing desks and metal storage cabinets. Contractor will install new cubicles and desks in all offices that match. In the R&S room contractor will install “L” shaped desk cubicle. At the other end of the R&S room contractor will install Vidmars and work bench table, along with storage lockers.
2. PERIOD OF PERFORMANCE
All work shall take place within thirty (30) days of contract being awarded and be completed within ninety (90) days of the contract being awarded. Work shall be performed between Monday-Friday 0700-1600. Any work that needs to be done outside these times shall be brought to the attention of the Contracting Officer’s Representative (COR) 48 hours in advance for approval. All work dates must be confirmed 24-48 hours in advance with the COR. The contractor may reschedule up to 2 business days in case of inclement weather. Scheduling of the date of repair shall be made in best efforts to avoid this. All contractor employees must carry a REAL ID on them at all times while working on U.S. Coast Guard property.
3. PLACE OF PERFORMANCE
Work will take place at ANT Boston.
427 Commercial Street Boston, MA 02109 This location is only accessible via a government employee escort.
4.1 Pre-Bid Site Visit
During bidding, contractors are highly encouraged to make a site visit to determine existing conditions and verify project elements. A site visit will be held by appointment only. All contractors attending the site visit must RSVP to the Contracting Officer’s Representative (COR).
Contracting Officer’s Representative (COR):
Colten Brown, DCC Colten.k.brown@uscg.mil
(831) 521-9668
4. WORK REQUIREMENTS
At the end of each workday, contractors shall pick-up any tools and materials. No HAZMAT or equipment shall be left on site or in the space. Contract employees shall follow all OSHA and EPA regulations to ensure a safe workspace during the project.
5. SCHEDULE
A schedule shall be decided after contract award. A pre-commencing meeting shall take place either in person or phone conference before any work is scheduled.
6. ACCEPTANCE CRITERIA
Work will not be signed as COMPLETED and ACCEPTED, until inspected by the designated COR. The COR will identify any work that is not performed in accordance with the Statement of work.
7. REMOVALS
All waste created as a result of fulfilling these specifications shall be removed from the site daily at contractor’s expense. Hazardous materials created from this job shall become the property of the contractor and shall be removed from the site at contractor expense. No flammable materials shall be left inside the buildings overnight.
8. SMOKING
Contractor/employees shall not smoke cigarettes, e-cigarettes, cigars, pipes or chewing tobacco in any of the Unit buildings. Smoking outside the building will be permitted in designated exterior areas. Contractor shall be responsible for maintaining a clean environment in the designated area.
9. PROTECTION OF EXISTING STRUCTURES AND UTILITIES
The contractor shall supply and maintain protective measures against damage to existing structures, utilities or interruption of any service. Failure to do so may result in cessation of all work. All damages or interruption of utility services resulting from failure to take necessary precautions shall be repaired or restored, at no additional cost to the government.
The contractor shall remove all scraps and debris generated by this operation by the end of each working day. Equipment or material (removed or new) shall not be stored in hallways or stairways. The area shall be cleaned upon job completion. All flooring shall be vacuumed, mopped, or swept completely. All damages to existing material condition of rooms, including walls and paint, resulting from failure to take necessary precautions shall be repaired or restored. All debris shall be removed and disposed of in accordance with applicable City, State and Federal Laws.
10. Award A. It is the government’s intent to make award to the low-cost responsive offeror through issuance of a firm fixed price contract.
1. Under FAR 4.1103 prospective contractor shall be registered in System Award Management (SAM) prior to award. Failure for contractor to be registered in (SAM) shall result in Contracting Officer proceeding with next successful registered contractor. Website: www.sam.gov
11. Invoicing A. Invoices shall be uploaded to the Invoice Processing Platform (IPP) an account can be created at https://www.ipp.gov. To ensure proper payment, all invoices shall have requisition number/purchase order number, company name and address, UEI number, invoice number and date clearly indicated on your invoice. It is recommended that the contractor attach a copy of the Purchase Order (PO)/Contract to their invoice(s).
1. The contractor shall itemize invoices with the appropriate corresponding CLIN as listed on the PO.
12 Submittals The contractor shall submit quote options for paint, epoxy, and cubicles to the COR for review. The contractor shall provide submittals as pdf or word documents. The contractor must receive in writing from the U.S. Coast Guard that the submittals are approved prior to ordering the associated materials.
13. PICTURES