ANNUAL_154_DIVE_INSP.doc

DOC document 73 KB Posted

Attached to
CGC ROBERT YERED HULL INSPECTION
Solicitation number
52000QR250019338
Issued by

About this file

This is a Statement of Work (SOW) for an underwater hull inspection and maintenance service for the US Coast Guard vessel USCGC ROBERT YERED. The work involves cleaning the vessel's underwater body, removing marine growth and debris, and renewing zinc anodes at the vessel's location in Miami Beach, FL. The contract requires the contractor to submit video highlights of underwater surfaces before and after cleaning, ensuring no damage to existing coating systems, and using only hand-held brushes for transducer surfaces.

The solicitation is a small business set-aside with a firm-fixed price contract, with a performance period from June 1-8, 2025. Contractors must submit quotes by May 27, 2025, at 10:00 AM EST, including cost breakdown, labor costs, total pricing, payment terms, and company details. Quotes should be emailed to Sandy Reed-Robinson, with technical questions directed to Contracting Officer CWO-3 Stacy Spalding. Vendors must be registered in SAM.gov, and the award will be based on best value considering specification, price, past performance, and quality.

View the file

Other files

File Type Posted
52000PR250019338 FAR CLAUSE 52.212-5.docx DOCX document
UW Hull Diver Statement of Work_Robert Yered.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11001_JLW_0220_154WPC

WORK ITEM 1: U/W Body (waterborne), Clean and Inspect

1. Scope

1.1 Intent. This work item describes the requirements for the Contractor to clean the vessel’s U/W body and to renew zinc anodes, while the vessel is moored pier side.

1.2 Government-furnished property.

MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST

($/UNIT)

N
Anode, stern tube
P/N: Z0020202H3

NIIN: 016445483

16 ea
50
N
Nut, Self-Locking
P/N: 90715A145

NIIN: 015085774

36 ea
5
N
Anode, Sea Chest Grate
P/N: GA-4

NIIN: 016476179

4 ea
30
N
Screw, Prop zinc plate
P/N: 950756

NIIN: 016340210

8 ea
5
N
Screw, Sea Chest Grate Anode,
P/N: 93190A634,

NIIN: 016197182

4 ea
5
N
Screw, stern tube covers
P/N: 90585A626

NIIN: 016161107

42 ea
5
N
Zinc plate, propeller
P/N: 950733

NIIN: 016278941

2 ea
50

2. REFERENCES

Other References

None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not Applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.2 Requirements. The Contractor shall submit video highlights of underwater body surfaces (e.g. bow thruster, propellers, rudders, transducers, heavily fouled hull areas, etc.) before and after cleaning. The Contractor shall clean the U/W body surfaces free of all marine growth, debris, and all other surface contaminants in accordance with MPC B10015.D. Renew Government-furnished components listed below paragraph 1.2. in accordance with MPC B10018.D. Ensure all transducer surfaces are cleaned with only hand held brushes, without the use of power attachments. Ensure that existing u/w body coating system or non-coated surfaces do not incur any damage during cleaning process.

4. NOTES

This section is not applicable to this work item

File details come from the government source that posted it. Updated .