ANNUAL_154_DIVE_INSP.doc
DOC document 73 KB Posted
- Attached to
- CGC ROBERT YERED HULL INSPECTION
- Solicitation number
- 52000QR250019338
About this file
This is a Statement of Work (SOW) for an underwater hull inspection and maintenance service for the US Coast Guard vessel USCGC ROBERT YERED. The work involves cleaning the vessel's underwater body, removing marine growth and debris, and renewing zinc anodes at the vessel's location in Miami Beach, FL. The contract requires the contractor to submit video highlights of underwater surfaces before and after cleaning, ensuring no damage to existing coating systems, and using only hand-held brushes for transducer surfaces.
The solicitation is a small business set-aside with a firm-fixed price contract, with a performance period from June 1-8, 2025. Contractors must submit quotes by May 27, 2025, at 10:00 AM EST, including cost breakdown, labor costs, total pricing, payment terms, and company details. Quotes should be emailed to Sandy Reed-Robinson, with technical questions directed to Contracting Officer CWO-3 Stacy Spalding. Vendors must be registered in SAM.gov, and the award will be based on best value considering specification, price, past performance, and quality.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 52000PR250019338 FAR CLAUSE 52.212-5.docx | DOCX document | |
| UW Hull Diver Statement of Work_Robert Yered.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11001_JLW_0220_154WPC
WORK ITEM 1: U/W Body (waterborne), Clean and Inspect
1. Scope
1.1 Intent. This work item describes the requirements for the Contractor to clean the vessel’s U/W body and to renew zinc anodes, while the vessel is moored pier side.
1.2 Government-furnished property.
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/UNIT)
| N |
| Anode, stern tube |
| P/N: Z0020202H3 |
NIIN: 016445483
| 16 ea |
| 50 |
| N |
| Nut, Self-Locking |
| P/N: 90715A145 |
NIIN: 015085774
| 36 ea |
| 5 |
| N |
| Anode, Sea Chest Grate |
| P/N: GA-4 |
NIIN: 016476179
| 4 ea |
| 30 |
| N |
| Screw, Prop zinc plate |
| P/N: 950756 |
NIIN: 016340210
| 8 ea |
| 5 |
| N |
| Screw, Sea Chest Grate Anode, |
| P/N: 93190A634, |
NIIN: 016197182
| 4 ea |
| 5 |
| N |
| Screw, stern tube covers |
| P/N: 90585A626 |
NIIN: 016161107
| 42 ea |
| 5 |
| N |
| Zinc plate, propeller |
| P/N: 950733 |
NIIN: 016278941
| 2 ea |
| 50 |
2. REFERENCES
Other References
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not Applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.2 Requirements. The Contractor shall submit video highlights of underwater body surfaces (e.g. bow thruster, propellers, rudders, transducers, heavily fouled hull areas, etc.) before and after cleaning. The Contractor shall clean the U/W body surfaces free of all marine growth, debris, and all other surface contaminants in accordance with MPC B10015.D. Renew Government-furnished components listed below paragraph 1.2. in accordance with MPC B10018.D. Ensure all transducer surfaces are cleaned with only hand held brushes, without the use of power attachments. Ensure that existing u/w body coating system or non-coated surfaces do not incur any damage during cleaning process.
4. NOTES
This section is not applicable to this work item
File details come from the government source that posted it. Updated .