ANNEX A Turbo SOW PR.docx

DOCX document 15 KB Posted

Attached to
INSPECT/REPAIR THE GLOBE TURBOCHARGER CUTLER ME
Solicitation number
N7027223Q0034
Issued by

About this file

This statement of work outlines requirements for a federal contractor to inspect, refurbish, test and return a Globe Model 1215 3-1-LSV turbocharger. The contractor will inspect the turbocharger recently removed from a Cooper-Bessemer LSV-16V emergency power generation engine at the NCTS HR Detachment Cutler Power Plant due to suspected lube oil leakage from the shaft seal after accumulating over 10,775 operational hours. The contractor must verify the cost of refurbishment does not exceed replacement, then rebuild the turbocharger to meet or exceed original specifications. The contractor will furnish all required parts and materials, perform refurbishment at their facility, test the turbocharger, and return it to Cutler along with test data and a list of replaced parts. The contractor must exercise quality control to ensure functionality for a reasonable period and assist Cutler if shipping damage occurs during return. This statement of work corresponds to solicitation N7027223Q0034 issued by the Department of the Navy Naval Supply Systems Command to inspect, repair and return the specified Globe turbocharger.

View the file

Other files

File Type Posted
23Q0034 RFQ.docx DOCX document
ANNEX B TECH EVAL FACTORS.docx DOCX document
ANNEX C PRICE BREAKDOWN.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANNEX A

STATEMENT OF WORK

NCTS HR DET Cutler Power Plant Globe Turbocharger Refurbishment

1.0 INTRODUCTION: NCTS HR Det Cutler Power Plant is charged with all power switching and emergency power generation for the VLF transmitter at Cutler.

2.0 BACKGROUND: The emergency power generation equipment consists of turbocharged Cooper –Bessemer LSV-16V engines, and the facility maintains spare turbochargers to facilitate timely repairs.

3.0 SCOPE OF WORK:

3.1 The contractor will inspect and refurbish the Globe Model 1215 3-1-LSV, serial # 010 recently removed from main engine 3. The turbo is suspected to be leaking lube oil from the shaft seal and has over 10775 operational hours since the last rebuild. The bid response will include information from the contractor that verifies to the TPOC adequate experience, training, and equipment to successfully complete the SOW.

3.2 Location of Performance: Det Cutler will ship the turbo to the contractors shop for repair and upon completion the contractor will ship the turbo back to Det Cutler.

3.3 Proposed Period of Performance: TBD

3.4 Work hours - N/A

3.5 The purpose of this contract request is for the vendor to inspect the turbocharger, verify that the cost of refurbishment does not exceed the cost of a replacement, and rebuild the turbo to meet or exceed original specifications. The contractor shall refurbish and test the turbo, then return the turbo to Det Cutler. The metric for successful completion of the contract requirement will include data from the final testing of the turbo, along with a list of replaced parts and a brief narrative of what services were performed.

3.6 Government Furnished Material – N/A

3.7 Contractor Furnished Material – The contractor will provide all seals, bearings, bushings gaskets and other required parts and materials for the refurbishment of the turbocharger. The contractor will provide data from the final testing of the turbo prior to return, and supply a listing of parts replaced along with warrantee statements.

3.8 CDRL’s – N/A

4.0 APPLICABLE DOCUMENTS

4.1 OEM manual(s) as may apply to Globe Turbocharger model # 1215 3-1-LSV, Serial # - 010, Part # 1215220, original manufacture date 3Oct1989.

5.0 QUALITY CONTROL SURVEILLANCE PLAN (QASP)

5.1 Contractor Quality Control methods - Contractor shall exercise quality control procedures to ensure that the turbocharger will function as designed for a reasonable period of time upon return.

5.2 Government Quality Assurance – Det Cutler will inspect the turbocharger upon return, verifying no shipping damage or obvious defects.

5.3 Corrective Action – The contractor (as the shipper) will assist Det Cutler in the event of shipping damage during the return.

5.4 Conditions Found:

5.4.1 If while performing services there are conditions found that require repair/replacement and tie to this scope of work, the contractor shall submit a Condition Found Report to the COR and the Contracting Officer. Condition Found Report shall identify the conditions with a statement identifying the discrepancy along with a full price quote of required additional service. No additional service shall take place prior to Contracting Officer approval.

5.4.2 If COR or Contracting Officer determines the Condition Found does not warrant additional services, contractor shall continue with original scope of work.

5.5 Safety section.

5.6 Contract deliverable

5.7 Sanitation and space cleanliness directions

6.0 BASE ACCESS/SECURITY

6.1 N/A

7.0 POINTS OF CONTACT

7.1 Technical Point of Contact TBD