This Request for Work Order Proposal (RFWOP) is issued by the City of Anaheim for the Anaheim Police Department Main Tenant Improvement Project located at 425 S. Harbor Blvd., Anaheim, CA 92805. The project consists of demolition, modification, and renovation of an existing café area within the main police station, including selective demolition, electrical and plumbing modifications, finishes, ceiling tile replacements, lighting upgrades, painting, and installation of new fixtures and equipment. The work encompasses two primary scopes: a café renovation converting a kitchen into a break room with vending machines, sink, coffee maker, microwaves, and ice machine; and second-floor office refresh including painting, flooring replacement, lighting control upgrades, and low voltage/data and phone cables for modular cubicle furniture in rooms 3428-3433. The bid advertisement date is July 9, 2026, with a non-mandatory pre-bid meeting scheduled for July 21, 2026, at 8:30 a.m. Questions must be submitted by July 23, 2026, at 2:00 p.m., and bids are due July 30, 2026, at 2:00 p.m. at City Hall (200 S Anaheim Blvd., Anaheim, CA 92808). The expected award date is September 29, 2026. The successful bidder must commence work within 30 working days of receiving the Notice to Proceed and complete the project in accordance with contract specifications.
Bidders must hold a California State License Board General Engineering Contractor or General Building license and must comply with all prevailing wage laws and regulations, including Davis-Bacon Act wage determinations and federal labor standards. The City will select the lowest-price responsive bidder. The bid proposal includes eleven line items for the café and second-floor offices work on a lump-sum basis, plus a $50,000 allowance for unknown and unforeseen site conditions and a 10 percent contingency line item. Bidders are required to submit a W-9 Form, Department of Industrial Relations registration number, bid bond, and designation of subcontractors. All proposals must include certifications regarding non-collusion, debarment/suspension status, equal employment opportunity compliance, conflict of interest, and anti-lobbying certifications. Proposals are valid for 60 days from submission. The City reserves the right to withdraw or reject any proposals and waive any informalities or technicalities in the RFWOP. Katherine Moncrief, Construction Contract Administrator, serves as the primary City contact at (714) 765-6890 or kmoncrief@anaheim.net.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR WORK ORDER
PROPOSAL
ANAHEIM POLICE DEPARTMENT MAIN
TENANT IMPROVEMENT PROJECT
RFP WO394115-
RFWOP SCHEDULE
BID ADVERTISEMENT DATE July 9, 2026
PRE-BID MEETING (Non-
Mandatory)
July 21, 2026, 8:30am
425 S. Harbor Blvd.; Anaheim, CA 92805
QUESTION SUBMISSION DUE
DATE
July 23, 2026, 2:00pm
BID DUE DATE July 30, 2026, 2:00pm
City Hall; 200 S Anaheim Blvd.; Anaheim, CA 92808
EXPECTED AWARD DATE September 29, 2026
CITY OF ANAHEIM
TABLE OF CONTENTS
PART I - INVITATION TO BIDDERS
1.0 WORK DESCRIPTION
2.0 IMPORTANT DATES
3.0 CITY REPRESENTATIVES
4.0 PROPOSAL SUBMISSION
PART II - GENERAL PROVISIONS
2.0 BID DOCUMENTS
3.0 QUALIFICATIONS OF BIDDERS
4.0 DISCREPANCIES, OMISSIONS, OR INTERPRETATION
5.0 PREVAILING WAGE REQUIREMENTS
6.0 EVALUATION, RATING, AND SELECTION
7.0 ADDENDA
8.0 RIGHT TO WITHDRAW OR REJECT
9.0 PROTEST PROCEDURES
PART III - EXTENDED PROVISIONS
1.0 SCHEDULE
2.0 SITE CONDITIONS
3.0 USE OF SITE AND PREMISES
4.0 SITE OCCUPANCY
5.0 PROTECTION REQUIREMENTS
6.0 TEMPORARY CONDITIONS
7.0 APD FACILITY REQUIREMENTS
PART IV - TECHNICAL SPECIFICATIONS
1.0 TECHNICAL SPECIFICATIONS
2.0 SCOPE OF WORK - CAFE
2.0 SCOPE OF WORK - 2ND FLOOR OFFICES
PART V - SITE MAPS
1.0 SITE MAPS
PART VII - BID PROPOSAL
1.0 BID ITEMS
2.0 BID FORMS
Attachments:
A - Exhibit_A_-_Federal_Regulations
B - Attachment_1_-_Layout_and_Photos
C - Electrical Panel IDF Locations
D - Cafe_Soffit
E - 2nd_Floor_Floorbox Sample
F - Site Map
G - AB 626
H - Sample PW Agreement
I - [I]_Standard_Supplement_Greenbook_2024_-_City_of_Anaheim
J - Davis-Bacon Act Wage Determinations 5.18.26
PART I - INVITATION TO BIDDERS Page 1 of 26
REQUEST FOR WORK ORDER PROPOSAL
PART I - INVITATION TO BIDDERS
1.0 WORK DESCRIPTION
1.1 SUMMARY
The Work includes, but is not necessarily limited to, Anaheim Police Department Main Tenant
Improvement Project. This project consists of the demolition, modification and renovation of an existing cafe area within the main station. Work includes selective demolition, electrical and plumbing modifications, finishes, ceiling tile replacements, lighting upgrades, painting and installation of new fixtures and equipment. All work will be done at 425 S. Harbor Blvd., Anaheim, CA 92805. Any Agreement between the City and the successful respondent would take effect following approval by the City Council and execution of the parties.
1.2 PROJECT LOCATION
1.2.1 425 S. Harbor Blvd.; Anaheim, CA 92805
2.0 IMPORTANT DATES
2.1 TIMELINE
BID ADVERTISEMENT DATE: July 9, 2026
PRE-BID MEETING (Non-Mandatory): July 21, 2026, 8:30am
425 S. Harbor Blvd.; Anaheim, CA 92805
QUESTION SUBMISSION DUE DATE: July 23, 2026, 2:00pm
BID DUE DATE: July 30, 2026, 2:00pm
City Hall; 200 S Anaheim Blvd.; Anaheim, CA 92808
EXPECTED AWARD DATE: September 29, 2026
3.0 CITY REPRESENTATIVES
3.1 OPERATING DEPARTMENT
3.1.1 ANAHEIM POLICE DEPARTMENT
3.1.2 425 S. HARBOR BLVD.; ANAHEIM, CA 92805
3.2 CONTRACT ADMINISTRATION
3.2.1 KATHERINE MONCRIEF, CONSTRUCTION CONTRACT ADMINISTRATOR
3.2.2 (714) 765-6890 / KMONCRIEF@ANAHEIM.NET
PART I - INVITATION TO BIDDERS Page 2 of 26
4.0 PROPOSAL SUBMISSION
4.1 Electronic proposals must be submitted via OpenGov, hereinafter known as the City's e-procurement portal ("portal") by the Bid Due Date.
PART II - GENERAL PROVISIONS Page 3 of 26
PART II - GENERAL PROVISIONS
2.0 BID DOCUMENTS
2.1 The following documents are hereby incorporated into this Request For Work Order
Proposal (“RFWOP”):
2.1.1 Invitation to Bidders
2.1.2 General Provisions
2.1.3 Extended Provisions
2.1.4 Technical Specifications
2.1.6 Site Map
2.1.7 Bid Proposal
3.0 QUALIFICATIONS OF BIDDERS
3.1 Bidder must hold and maintain the following license: A General Engineering Contractor;
OR B - General Building (CSLB).
4.0 DISCREPANCIES, OMISSIONS, OR INTERPRETATION
4.1 The Bidder shall promptly notify the City of any ambiguity, inconsistency, or error which he may discover upon examination of the Bid Documents, Contract Documents, the Site, and/or local conditions. Bidders requiring clarification or interpretation of any of the documents shall make a written request to the City electronically via the portal's Question and Answer function at least seven (7) calendar days prior to the date for receipt of
Bids. Such requests shall be directed to the CITY address provided in the Invitation to
Bidders.
4.2 Any interpretation, correction, or change of documents will be made by an addendum issued by the City (hereinafter, "Addendum"). Interpretations will not be made orally. Interpretations, corrections, or changes to the documents made in any manner other than through an Addendum will not be binding, and Bidders shall not rely upon such interpretations, corrections and/or changes.
5.0 PREVAILING WAGE REQUIREMENTS
5.1 Bidder must comply with all prevailing wage laws and regulations.
6.0 EVALUATION, RATING, AND SELECTION
City shall select the Bidder who submits the lowest Price. Following the evaluation and selection, City shall issue a Notice to Proceed (“NTP”) to the Successful Bidder.
7.0 ADDENDA
Any changes in the RFWOP from the date of release to the due date of submittal will result in an addendum or amendment. Notification of such addendum or amendment shall be posted via the portal.
PART II - GENERAL PROVISIONS Page 4 of 26
8.0 RIGHT TO WITHDRAW OR REJECT
City reserves the right to withdraw this RFWOP or reject any or all submitted Proposals when such rejection is in the best interest of City to reject the Proposal of the Bidder who has not met the prerequisites of the RFWOP, who has previously failed to perform properly or complete on time contracts of a similar nature; and to reject the Proposal of the Bidder who is, in the opinion of the City, in a position unable to perform. The City reserves the right to waive any information and technicalities in the RFP. All costs incurred in the preparation of the Proposal, in the submission of additional information and/or in any other aspect of a Proposal prior to the award/notice to proceed will be borne by the Bidder. City shall not be responsible for any other cost or obligation that may be incurred by the
Bidder. All Proposals submitted to City shall become City’s property. City shall not, be liable for any pre-contractual expenses incurred by the Bidder in the preparation of its Proposal.
9.0 PROTEST PROCEDURES
Any actual or prospective bidder or proposer who alleges an error or impropriety in the solicitation or award of a contract may submit a protest to the appropriate Procurement Contact as set forth herein.
Protest Instructions
All protests shall be typed under the protester’s letterhead and submitted in accordance with the provisions stated herein and emailed to the Assigned Buyer/Purchasing Liaison. All protests shall include, at a minimum, the following information:
A. The name, address, telephone number, and email address of the protester;
B. The signature of the protester or the protester’s representative;
C. The solicitation number;
D. A detailed statement of the legal and/or factual grounds for the protest; and
E. The form of relief requested.
Protest of the Solicitation Specifications
All protests related to the solicitation specifications must be submitted to the appropriate soliciting department’s Assigned Buyer/Purchasing Liaison no later than three (3) business days prior to the close of the solicitation.
A. Protests received after the three (3) business days deadline will not be considered by the City.
B. In the event the protest of specifications is denied, and the protester wishes to continue in the solicitation process, they must still submit a bid or proposal prior to the close of the solicitation in accordance with the solicitation submittal procedures provided in the solicitation.
Protest of Award of Contract
PART II - GENERAL PROVISIONS Page 5 of 26
A protest for an award of contract in relation to a solicitation must be received no later than three
(3) business days after the Notice of Award is posted on the City’s online bidding system.
A. Protests relating to a proposed contract award received after the three (3) business day deadline will not be considered by the City.
B. If the three (3) business day period expires without the receipt of a protest, the department may move forward with the Contract award or if necessary, file the item for approval by the City Council.
Protest Process
In the event of a timely protest, the City shall not proceed with the solicitation or award of the contract until the Procurement Contact issues a decision on the protest.
A. Upon receipt of a timely protest, the Assigned Buyer/Purchasing Liaison will within five
(5) business days of the receipt of the protest, issue a decision in writing which shall state the reason for the actions taken.
B. The City may, after providing written justification to be included in the purchasing file, make the determination that an immediate award of the contract is necessary to protect the substantial interests of the City. The award of a contract shall in no way compromise the protester’s right to the protest procedures outlined herein.
C. If the protester disagrees with the decision of the Procurement Contact, the protester may submit a written notice to the City of Anaheim Purchasing Agent requesting an appeal.
Appeal Process
A. If the protester wishes to appeal the decision of the Procurement Contact, the protester must submit, within three (3) business days from the receipt of the Procurement Contact decision, a written appeal to the City of Anaheim Purchasing Agent.
B. All appeals must be emailed to purchasing@anaheim.net.
C. Within ten (10) business days, the City of Anaheim Purchasing Agent will review all materials in connection with the appeal, assess the merits of the appeal and provide a written determination that shall contain their decision. The decision of the City of
Anaheim Purchasing Agent will be final.
mailto:purchasing@anaheim.net
PART III - EXTENDED PROVISIONS Page 6 of 26
PART III - EXTENDED PROVISIONS
1.0 SCHEDULE
1.1 Successful Bidder must submit a Preliminary Critical Path Method (“CPM”) Schedule within 10 days of executing the Notice to Proceed. Schedule must be formatted as a gantt chart with itemized activities according to the approved schedule of values (“SOV”) that identifies the first workday of each week. Allow space to update. Only an approved SOV may be utilized for progress payments. Sequence of Listings: Chronological order at the start of each item of work. Provide a two week look-ahead schedule updated weekly.
1.2 Required submittals: Submit initial schedules within ten (10) days of executing the
Contract. If requested, resubmit required revisions within seven (7) days of the request.
2.0 SITE CONDITIONS
2.1 Successful Bidder shall be responsible for understanding the requirements contained herein, prior to submitting a Proposal. By submitting a Proposal, Successful Bidder accepts all site-conditions have been evaluated, regardless of whether or not the Successful Bidder visited such sites. Failure to inspect applicable sites shall not relieve the Successful Bidder from fulfilling the obligations contained herein.
2.2 Installation equipment, materials, and product will ONLY be allowed to be kept in specified areas. Hallways, office areas lobbies etc. are not suitable for storage and City will
NOT be held liable for missing or stolen equipment. Successful Bidder shall exercise reasonable care to avoid damaging City facilities. Successful Bidder shall be responsible for timely repair of damage to City facilities due to acts arising out of completion of Work.
In the event Successful Bidder fails to repair such damage, after 48-hour notice from City;
furthermore, City may repair such damage and back charge Successful Bidder for all time and material, plus 15% markup for administration.
2.3 Successful Bidder shall must immediately report any damage to the Site that may exist or may occur during the occupancy of the quarters. At the end of each shift or workday, Successful Bidder shall remove trash, debris, spent reels, and all other refuse arising from completing the Work, and at a minimum broom clean work areas. Successful Bidder shall obtain City’s written permission before cutting into or through any part of the building structure such as beams, girders, concrete, or tile floors, partitions and ceilings, such permission does not constitute acceptance of potential damaged caused by Successful
Bidder. Any work that will cause noticeable dust near the work area, e.g. indoor core-boring, Successful Bidder must provide protection to prevent dust from migrating from the work area into other areas of the building e.g. provide a temporary structure/enclosure is to be erected to contain all indoor core-boring locations. Timely cleanup of debris related to boring is the responsibility of the Successful Bidder. Work area is to be cleaned and returned to an “as found” condition. This will include but not be limited to water control and abatement, floor washing, vacuuming, carpet cleaning, furniture dusting, furniture cleaning and furniture washing by a professional cleaning service as needed.
3.0 USE OF SITE AND PREMISES
3.1 Provide access to and from site as required by law and requested by City
Representatives: Emergency Building Exits during construction: Keep all exits required by
PART III - EXTENDED PROVISIONS Page 7 of 26 code open during construction period; provide temporary exit signs if exit routes are temporarily altered. Do not obstruct roadways, sidewalks, or other public ways without permit.
3.2 MATERIAL STORAGE & HANDLING: Existing building spaces may not be used for storage. Contractor is responsible for all material handling included but not limited to storage, disposal, and recycling of all new and removed for the project.
3.3 TIME RESTRICTIONS: None.
3.4 CLEANING: Successful Bidder shall properly clean the work site as it progresses, as directed during construction; rubbish shall be removed and, at completion, the whole work site shall be cleaned and all temporary construction, equipment, and rubbish shall be removed from the site, with all areas being left in a clean and safe condition satisfactory to the City.
4.0 SITE OCCUPANCY
4.1 Successful Bidder shall arrange use of Site to allow occupancy to City Representatives, employees, City’s consultants, and agents. Successful Bidder shall cooperate with City to minimize conflict and to facilitate City's operations.
4.2 Construction Occupancy Areas: Successful Bidder agrees to accommodate the continual use of the Site during the construction period.
4.3 Successful Bidder agrees that City shall occupy the Site prior to Substantial Completion and such occupancy shall not limit the warranty.
5.0 PROTECTION REQUIREMENTS
5.1 Limited Access: The Successful Bidder shall prevent access by the public to materials, tools and equipment during the course of the project.
5.2 Debris Removal: All debris shall be removed daily from the project site, and shall be taken to a legal dumping area authorized to receive such materials.
5.3 Site condition: All job site clean-up, including building interior, exterior and landscaping, where affected by the construction, shall be completed to the City’s satisfaction.
6.0 TEMPORARY CONDITIONS
6.1 STAGING: Successful Bidder is responsible for providing its own staging area for this project, including secured storage facilities for all materials.
7.0 APD FACILITY REQUIREMENTS
7.1 Due to the nature of this location, Contractor and anyone working at this facility is subject to
LiveScan and background check. LiveScan will be done at the police department and will be paid for by the City.
7.2 Do not prop open any secure doorways.
7.3 Contractor must wear appropriate identification at all times.
7.4 For security purposes, do not allow any person(s) into your work area, or into any other Building area. Do not open doors to allow person(s) access into your work area, or any other Court Building
PART III - EXTENDED PROVISIONS Page 8 of 26 area. As you go through doors, be sure to securely pull them closed behind you. Don’t let person(s) come through a door along with you.
PART IV - TECHNICAL SPECIFICATIONS Page 9 of 26
PART IV - TECHNICAL SPECIFICATIONS
1.0 TECHNICAL SPECIFICATIONS
2.0 SCOPE OF WORK - CAFE
SCOPE OF WORK - CAFE
APD is converting a kitchen into a break room for staff. It is anticipated that there will be three (3) vending machines, a single basin sink, coffee maker, two (2) microwaves and an ice machine.
Photos and layout attached to this bid as Attachment 1 - Layout and Photos.
A. Demolition & Removal
1. Remove existing sink and associated appliances.
2. Demolish soffits along designated wall(s).
3. Cap existing plumbing lines inside wall after fixture removal.
4. Remove and dispose of window blinds. They will not be reinstalled.
5. Remove existing wallpaper throughout the room.
6. Remove 3’ pony wall and pony wall along wall.
7. Remove and dispose window blinds.
B. Electrical
1. Redistribute and provide three (3) dedicated electrical circuits for new vending machines. Each vending machine requires a dedicated 115 volt, 60Hz, 1.2AMPS, three prong grounded GFCI outlet.
2. Install three (3) data drops for the vending machines.
3. Install ten (10) new SWISHFA2X4/D10 2x4 LED troffer light fixtures. Contractor to confirm exact number in field.
4. Provide and install two (2) Lutron D10 three-way dimmers at existing lighting control locations.
5. Replace any damaged electrical receptacles.
6. Remove or abandon any non-functioning electrical devices within walls.
7. Install two (2) new electrical outlets by each door.
8. Install new wall plates. Color: Black.
C. Plumbing & Fixtures
1. Remove owner supplied existing ice maker and relocate to new location within the room. Ice maker should drain into sink.
PART IV - TECHNICAL SPECIFICATIONS Page 10 of 26
2. Install new stainless steel utility sink. Brand: Uline, Model H-10304, dimensions 30 x
30 x 45”, and 10” Swivel Faucet. Brand: Uline, Model H-10305. Contractor to provide sink.
3. Provide and install white, smooth-surface Fiberglass Reinforced Plastic (FRP) wall panels at the new sink and ice maker location. Panels shall extend floor to ceiling along the entire wall (approximately 18 LF)
4. Install Bobrick soap dispenser (model B-2111) and Bobrick paper towel dispenser
(model W991C) at sink location.
D. Walls and Finishes
1. Remove all wall coverings.
2. Patch all walls impacted by demolition and new installations.
3. Skim coat, prime, and paint all interior walls to Level 4 finish.
4. Wall paint colors must be Dunn Edwards Whisper grey. Door frames will be Dunn
Edwards Celluloid.
E. Ceilings
1. Paint existing T-bar ceiling grid flat bright white.
2. Install new 2x4 ARMSTRONG Ceiling Tile: 755B, Fissured, 24 in x 48 in, Square
Lay-In, 15/16 in Grid Size or equivalent.
F. Flooring
1. Grind and prepare existing floors for new flooring installation.
2. Install approximately 800 square feet of CPI – Avalon Series Luxury Vinyl Tile (LVT) or equivalent. City must approve a sample prior to purchase and installation.
3. Install 4” commercial wall base PVC Vinyl molding. Color: Black
2.0 SCOPE OF WORK - 2ND FLOOR OFFICES
SCOPE OF WORK - SECOND FLOOR OFFICES
This project is a general office refresh including painting, flooring replacement, lighting control upgrades, and low voltage/data and phone cables to support new modular cubicle furniture.
Rooms 3428, 3429, 3430, 3431, 3433. This area consists of an interview room, waiting area, storage closet, sergeant office, conference room and homicide investigation room. Layout attached to this bid as Attachment 1 - Layout and Photos.
A. Walls & Finishes
1. Patch, repair, and prepare all existing walls to a smooth, paint-ready finish.
2. Paint all interior walls. Color: Dunn Edwards Whisper Grey; Accent wall: Dunn
Edwards Admiral Blue.
PART IV - TECHNICAL SPECIFICATIONS Page 11 of 26
3. Paint door frames. Color: Dunn Edwards: Celluloid.
B. Flooring
1. Remove and dispose of existing carpet and baseboards.
2. Install 4” commercial wall base PVC Vinyl molding. Color: Black. Miter corners.
3. Install Bentley “Multiplay II” Carpet Tile on Nexstep Cushion. Color: Clans 400066.
C. Ceilings
1. Paint existing T-bar ceiling grid flat bright white.
2. Install new 2x4 ARMSTRONG Ceiling Tile: 755B, Fissured, 24 in x 48 in, Square
Lay-In, 15/16 in Grid Size or equivalent.
3. Paint existing HVAC returns and registers flat bright white.
D. Electrical
1. Install new SWISHFA2X4/D10 2x4 LED troffer light fixtures. Contractor to confirm exact number, but there are approximately 35 fixtures.
2. Provide and install Lutron D10 three-way dimmers at existing lighting control locations. Each office is operated by it’s own switch. It must remain the same after the tenant improvement.
3. Replace any damaged electrical receptacles.
4. Install new wall plates. Color: Black.
5. Each workstation will require an additional electrical outlet for the electrical height adjustable desk and will require an electrical outlet.
E. Low voltage – data and communication
1. Provide and install new data drops to support the modular cubicle furniture. These rooms have raised access floor. Contractor will need to move approximately six (6) floor boxes for data to accommodate new furniture. Awarded contractor will work with furniture vendor to determine exact locations.
PART V - SITE MAPS Page 12 of 26
PART V - SITE MAPS
1.0 SITE MAPS
PART VII - BID PROPOSAL Page 13 of 26
PART VII - BID PROPOSAL
1.0 BID ITEMS
CAFE / 2ND FLOOR OFFICES
Line Item Description Quantity Unit of
Measure Unit Cost Total
CAFE
1 Demolition, Removal and Disposal 1 LS
2 Electrical 1 LS
3 Plumbing & Fixtures 1 LS
4 Walls & Finishes 1 LS
5 Ceilings 1 LS
6 Flooring 1 LS
SECOND FLOOR OFFICES
7 Walls & Finishes 1 LS
8 Flooring - Carpet & Baseboards 1 LS
9 Ceilings 1 LS
10 Electical 1 LS
11 Low Voltage - Data and
Communication
1 LS
TOTAL
ALLOWANCE
Line Item Description Quantity Unit of
Measure Unit Cost Total
12 Allowance to Accommodate
Unknown and Unforeseen Site
Conditions as Directed by COA
1 Allowance $50,000.00
PART VII - BID PROPOSAL Page 14 of 26
Line Item Description Quantity Unit of
Measure Unit Cost Total
TOTAL
CONTINGENCY
Line Item Description Unit of
Measure Unit Cost
13 10% of Total Contract Bid Percent
2.0 BID FORMS
The Bid shall include the following filled-out and executed forms as provided in the project
Contract Documents on or before the bid opening date and time, otherwise the bid will be deemed non-responsive.
1. COMPANY INFORMATION
1.1. Company Legal name and DBA, if applicable**
*Response required
1.2. Full Name and Title of RESPONDENT’s Authorized Official* *Response required
1.3. I certify that I, the individual responding to this RFWOP (prospective primary participant), am an Authorized Official with the authority to certify and submit the following legally binding statements in this RFWOP Response on behalf of my company (Contractor).*
☐ Please confirm
*Response required
1.4. In executing this proposal the bidder certifies being properly licensed and registered to do the work and under penalty of perjury under the laws of the State of California.*
☐ Please confirm
*Response required
1.5. Business Address*
*Response required
1.6. Telephone Number*
*Response required
1.7. Email Address*
*Response required
PART VII - BID PROPOSAL Page 15 of 26
1.8. Federal Tax ID No*
*Response required
1.9. W-9 Form*
Please upload your W-9 Form here
*Response required
1.10. Contractor State License Number*
Ref: https://www2.cslb.ca.gov/onlineservices/checklicenseII/checklicense.aspx
*Response required
1.11. Department of Industrial Relations (DIR) Number:*
No contractor or subcontractor may be awarded a contract for public work on a Public Works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial
Relations pursuant to Labor Code section 1725.
*Response required
2. CERTIFICATIONS
2.1. Conflict of Interest Statement*
The Political Reform Act (Government Code sections 81000 - 91014) and Government Code section 1090 prohibit any City public official or officer from involvement in a governmental decision or contract in which he or she has a financial interest.
It is the responsibility of the contractor, contractor’s employees, and subcontractors who perform work under contract with the City to evaluate any potential conflict of interests. Be advised that a prohibited conflict of interest may void any award where a conflict exists.
I, the undersigned, hereby certify that I have reviewed and understand the above paragraphs, and in furtherance of the foregoing, I have evaluated and caused my company’s employees and subcontractors to evaluate any potential conflict of interests. Based on this evaluation, I hereby further certify that no such conflict of interests exists.
☐ Please confirm
*Response required
2.2. Byard Anti-Lobbying (31 U.S.C. 1352)*
Contractors that apply or bid for an award exceeding $100,000 must file the required certification.
Each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant or any other award covered by 31 U.S.C. 1352. Each tier must also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier up to the non-Federal award.
• Non_Lobbying_Certification
*Response required https://www2.cslb.ca.gov/onlineservices/checklicenseII/checklicense.aspx https://government-project.s3.us-west-2.amazonaws.com/278551/713e2cb8-3f3e-4a3a-87e6-ea99f0906346_Non_Lobbying_Certification.docx
PART VII - BID PROPOSAL Page 16 of 26
2.3. 24 CFR Part 570* Please download the below documents, complete, and upload. This project is subject to Federal
Labor standards, including Davis-Bacon in addition to all State Prevailing Wage Requirements.
• DBRA_BID_Specs_-_Over_300K_...
*Response required
2.4. EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATES OF COMPLIANCE*
As used in this Certificate, the word "Contract" shall mean either "Contract", or "Subcontract". The word "Contractor" shall mean either "Contractor" or "Subcontractor".
The Contractor certifies the following to the City of Anaheim:
1. COMPLIANCE REPORTS:
That if the Contractor has participated in a previous Contract subject to the rules and regulations on Equal Opportunity set forth in 41 Code of Federal Regulations Part
60-1, he has filed with the Joint Reporting Committee, the Director of the Office of
Federal Contract Compliance of the United States Department of Labor, the appropriate Government Agencies or the Equal Employment Opportunity
Commission all reports due under the applicable filing requirements, or if he has not he agrees to do so promptly and before any Contract is awarded.
2. NON-DISCRIMINATION:
During the performance of any Contract placed with him by the City of Anaheim, the
Contractor agrees as follows:
a. The Contractor will not discriminate against any employee or applicant for employment because of, race, religion, sex, creed, color, or national origin. The
Contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, religion, sex, creed, color, or national origins. Such action shall include, but not be limited to, the following: employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff of termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship.
b. The Contractor will, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, religion, sex, creed, color or national origin.
c. The Contractor will send to each labor union or representative of workers with which he has a Collective Bargaining Agreement or other Contract or understanding, a notice advising the labor union or worker's representative of the
Contractors commitments under Section 202 of Executive Order Number 11246 of September 24, 1965, as amended, and shall post copies of the notices in conspicuous places available to employees and to applicants for employment.
https://government-project.s3.us-west-2.amazonaws.com/278551/e42e5a25-bf2e-4abb-b029-08a26b7e85fb_DBRA_BID_Specs_-_Over_300K_-_Updated_05-18-2026.pdf
PART VII - BID PROPOSAL Page 17 of 26
d. The Contractor will comply with all provisions of Executive Order Number 11246 of September 24, 1965, as amended, and with the rules, regulations, and relevant orders of the Secretary of Labor.
e. The Contractor will furnish all information and reports required by Executive
Order Number 11246 of September 24, 1965, as amended, and by the rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the Contracting Agency and the Secretary of Labor for purposes of investigations to ascertain compliance with such rules, regulations, and orders.
f. In the event of the Contractor's non-compliance with the nondiscrimination clauses of this Contract or with any of such rules, regulations, or orders, this
Contract may be canceled, terminated, or suspended in whole or in part and the
Contractor may be declared ineligible for further City Executive Order Number
11246 of September 24, 1965, as amended, and such other sanctions may be imposed and remedies invoked as provided in Executive Order Number 11246 of
September 24, 1965, as amended, or by rule, regulation, or order of the
Secretary of Labor, or as otherwise provided by law.
3. AFFIRMATIVE ACTION PROGRAM:
Contractor's attention is directed to Section 60-1.40 of title 41 of the Code of Federal
Relations, related to Affirmative Action Compliance Programs, and applying to each
Subcontractor with a Subcontract of $50,000 or more and 50 or more employees.
Contractor certifies that he has developed and has on file at each of his establishments a written Affirmative Action Compliance Program, as is called for in section 60-1.40 of and pursuant to part 60-2 of Title 41 of the code of Federal
Regulations, and that such Affirmative Action Compliance Program is current, or if it is not, within 120 days after receipt of any order, the undersigned firm agrees to develop and maintain a written Affirmative Action Compliance Program, for each of his facilities unless such firm is not required by law or regulation to develop such program.
4. CERTIFICATION OF NON-SEGREGATED FACILITIES:
The Contractor certifies that it does not maintain or provide for its employees any segregated facilities at any of its establishments, and that it does not permit its employees to perform their services at any locations, under its control, where segregated facilities are maintained. The bidder, offerer, applicant, or Subcontractor agrees that a breach of this Certification is a violation of the Equal Opportunity
Clause of any Contract placed with it. As used in this Certification, the term
"Segregated Facilities" means any waiting rooms, work areas, restrooms and washrooms, restaurants and other eating areas, timeclocks, locker rooms, and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees, which are segregated by explicit directive or in fact segregated on the basis of race, PART VII - BID PROPOSAL Page 18 of 26 religion, sex, creed, color, or national origin because of habit, local custom or otherwise.
Contractor further certifies that it will obtain identical certifications from proposed
Subcontractors prior to the award of Subcontracts exceeding $10,000 covering the procurement if personal property and non-personal services (including construction).
☐ Please confirm
*Response required
2.5. NON-COLLUSION DECLARATION*
I, the Authorized Official, represent the party (“Respondent”) making the foregoing bid (“Bid”) and declare as follows:
• The Bid is not made in the interest of or on the behalf of any undisclosed person, partnership, company, association, organization, or corporation;
• The Bid is genuine and not collusive or a sham;
• The Respondent has not directly or indirectly induced or solicited any other respondent to put in a false or sham Bid and has not directly or indirectly colluded, conspired, connived, or agreed with any other respondent or anyone else to put in a sham Bid or withhold from submitting a Bid;
• The Respondent has not in any manner directly or indirectly sought by agreement, communication, or conference with anyone to fix the Bid price of the Respondent or of any other respondent or to fix any overhead profit or cost element of the Bid price, or of that of any other respondent, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; and
• All statements contained in the Bid are true, and further, that Respondent has not directly or indirectly submitted its Bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid and will not pay any fee in connection therewith, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, or to any other individual except to any person or persons as have a partnership or other financial interest with Respondent in the general business.
☐ Please confirm
*Response required
2.6. DEBARMENT/SUSPENSION CERTIFICATE
INSTRUCTIONS ON CERTIFICATION REGARDING DEBARMENT AND SUSPENSION
1. By signing and/or electronically certifying and submitting this proposal, the prospective primary participant is providing the certification set out below.
PART VII - BID PROPOSAL Page 19 of 26
2. The inability of a person to provide the certification required below will not necessarily result in denial of participation in this covered transaction. The prospective participant shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective primary participant to furnish a certification or an explanation shall disqualify such person from participation in this transaction.
3. The certification in this clause is any material representation of fact upon which reliance was placed when the department or agency determined to enter into this transaction. If it is later determined that the prospective primary participant knowingly rendered an erroneous certification, in addition to other remedies available to the
Federal Government, the department or agency may terminate this transaction for cause or default.
4. The prospective primary participant shall provide immediate written notice to the department or agency to whom this proposal is submitted if at any time the prospective primary participant learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.
5. The terms covered transaction, debarred, suspended, ineligible, lower tier covered transaction, participant, person, primary covered transaction, principal, proposal, and voluntarily excluded, as used in this clause, have the meanings set out in the
Definitions and Coverage sections of the rules implementing Executive Order 12549.
You may contact the department or agency to which this proposal is being submitted for assistance in obtaining a copy of those regulations.
6. The prospective primary participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency entering into this transaction.
7. The prospective primary participant further agrees by submitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion - Lower Tier Covered Transaction," provided by the department or agency entering into this covered transaction, without modification, in all lower tier covered transactions.
8. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that it is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant may decide the method and frequency by
PART VII - BID PROPOSAL Page 20 of 26 which it determines the eligibility of its principals. Each participant may, but is not required to, check the Nonprocurement List.
9. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.
10. Except for transactions authorized under paragraph 6 of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency may terminate this transaction for cause or default.
☐ Please confirm
2.7. Certification*
1. The prospective primary participant certifies to the best of its knowledge and belief, that it and its principals: (a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from a covered transaction by any Federal department or agency; (b) Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; (c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offenses enumerated in paragraph (1)(b) of this certification; and (d) Have not within a three-year period preceding this application/proposal had one or more public transactions (Federal, State or local) terminated for cause or default.
2. Where the prospective primary participant is unable to certify to any of the statements in this certification, such prospective participant shall include an explanation with this proposal.
☐ Please confirm
*Response required
2.8. Statement of Compliance*
A. (Yes): Proposer certifies it is in strict compliance with this RFWOP, including, but not limited to the terms and conditions set forth in the Model Contract and its Attachments, PART VII - BID PROPOSAL Page 21 of 26 and no exceptions are proposed. Model Agreement is attached as "I - Sample PW
Agreement".
B. (No): Proposer certifies it is in strict compliance with this RFWOP, including the terms and conditions set forth in the Model Contract and its Attachments and Exhibits, except for those exceptions expressly listed as required by this RFWOP and attached hereto. Attachments for each proposed exception to this RFWOP, including, but not limited to the Model Contract, must include:
1. The complete provision Bidder is taking exception to.
2. The RFP page number and section of the provision Proposer is taking exception to.
3. The suggested rewording (i.e., Microsoft Word track changes)
4. Reason(s) for submitting the proposed exception.
5. Any impact the proposed exception may have on the services to be provided.
☐ Yes
☐ No
*Response required
2.9. Identify Contract Exceptions to be Considered Below:*
*Response required
2.10. Proposal will be valid for a period of 60 days*
☐ Yes
☐ No
*Response required
3. BID DOCUMENTS
3.1. DESIGNATION OF SUB-CONTRACTORS*
Please download the below documents, complete, and upload.
• Designation_of_Subcontracto...
*Response required
3.2. BID SECURITY/BID BOND*
Please, execute fully, and upload here.
• Bid_Bond_(2).pdf
*Response required
3.3. PROPOSAL*
For the construction of: Anaheim Police Department Main Tenant Improvement Project
The bidder, declares that it has carefully examined the location of the proposed work above described, examined the Plans and Specifications and General Conditions therefore, read the https://government-project.s3.us-west-2.amazonaws.com/140908/9f53f9b2-4c14-4686-a751-84881c3ca48e_Designation_of_Subcontractors_%286%29.docx?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4K3UVLUA7%2F20260709%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260709T224700Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEN%2F%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJIMEYCIQC3cu2rX2M8Jg7sAFJcA2OUbfMuj%2BJenwk2WK9%2FiUvVogIhAMhfF%2BiE9AEk3p6%2FtEUra5dSD%2FNNN%2BSuVh0DMVc6pxXIKpUFCKj%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEQAhoMODkyMzY0Njg3NjcyIgySfeXMNYeuIduRIQIq6QSWsAX67a2jIZlvJ%2BaUPTgdubKPFZo8Hx7NhT8vTsUSMsm0RN5ZV18qoLDiAOJWX1Q2rqqVsHLq3D6xB%2FRQWwF6WbyG5KnUaV4Ts1QATO9gaf9yPnW4jgllEofmT8NtTz5q2Nt74VrOPLK%2BOziQU2PTIA6hQ0lzqHOPVRskCZpLYtB1EpZseovPJ2u4GFB8gRrqGf9FnkC07ZJSvTQkfrgJo64ctW5ZS88TXcWG4lF8NxcCW%2BNMHG%2FI8PtggsAxLUnlmMXAZvbYRXgYWAmT%2B8Kepbd%2FLTIT2vKOM39jK9wEtrp8R%2BcoXbyxoxSeYgThdZhqxsbCsBl%2BtXYOKVck56GVmb%2FRtjRn6UjiQ96c8KIsvIckfGhtHcTA9CtRPXlCFDxBkIAQgCPT1NNT7cxB3LSpLFtXQwfwp3t%2FQseEPrE6MO9pRn6rkSO2TqCCjo%2Bd6JhiB0vf8ZKYcs3ga6elIWMiZs4VbY8dDSE6g8%2B4z%2BmDoGDsIp%2BsxX%2FcBlBm1GyFqj8%2FMViMxthjWq%2Bob3vdxxJlpSlnqU16zq%2FJ5j9vdLjjPbZvNCSmrBGnqadv5cWgAIx%2ByxSwyeryTF9wJVvSirKhwxmpyglXXCSfj8qfPL%2FD379KvNQ3NF0a5wZotfsZKEc0yzVE5h1DTKw6O0ShrINBoD9d92QAiZT%2Fr8DKUEojggWwUZugVyPT3JnHlHH9Khzh8rFIivy44d%2Bwu%2FZ8eCPosPw%2F5ZErxbfXMVsGGV5sVCcAHl%2FpJPrfhOVwSGdhOKeGyO7EJXVSWLqjk8XmTduqrFaY1Xb9VTZGV6vthXcYeQttSkgO7Bt36DC1yMDSBjqYAQjqJK2gnLZ%2BWMEucjDkuwG3MATQWOHWcYTuHdgPNPptcVx9D9QUs%2BwxXlXapIs%2B%2F16wZeRBt4Vr4gerjMOinFKU4RGtRLTXoj7vVdztFNHConfPH6puuMklVzuoAf8f71nQOBtnFDNOdiP72785KdfKGTTvX13C8als5qkv2qDr8oYFNh2Oos3DhpLu0ekdqoaQgvnfJLOC&X-Amz-Signature=383e9c2ca79ec598dd4c714921bd834d96860e5f2f24b7aa7b0b29b920c9dae4&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Designation_of_Subcontractors_%286%29.docx%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/140908/c2542cc1-a2ac-4b86-bf2a-bfee369837c1_Bid_Bond_%282%29.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4K3UVLUA7%2F20260709%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260709T224700Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEN%2F%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJIMEYCIQC3cu2rX2M8Jg7sAFJcA2OUbfMuj%2BJenwk2WK9%2FiUvVogIhAMhfF%2BiE9AEk3p6%2FtEUra5dSD%2FNNN%2BSuVh0DMVc6pxXIKpUFCKj%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEQAhoMODkyMzY0Njg3NjcyIgySfeXMNYeuIduRIQIq6QSWsAX67a2jIZlvJ%2BaUPTgdubKPFZo8Hx7NhT8vTsUSMsm0RN5ZV18qoLDiAOJWX1Q2rqqVsHLq3D6xB%2FRQWwF6WbyG5KnUaV4Ts1QATO9gaf9yPnW4jgllEofmT8NtTz5q2Nt74VrOPLK%2BOziQU2PTIA6hQ0lzqHOPVRskCZpLYtB1EpZseovPJ2u4GFB8gRrqGf9FnkC07ZJSvTQkfrgJo64ctW5ZS88TXcWG4lF8NxcCW%2BNMHG%2FI8PtggsAxLUnlmMXAZvbYRXgYWAmT%2B8Kepbd%2FLTIT2vKOM39jK9wEtrp8R%2BcoXbyxoxSeYgThdZhqxsbCsBl%2BtXYOKVck56GVmb%2FRtjRn6UjiQ96c8KIsvIckfGhtHcTA9CtRPXlCFDxBkIAQgCPT1NNT7cxB3LSpLFtXQwfwp3t%2FQseEPrE6MO9pRn6rkSO2TqCCjo%2Bd6JhiB0vf8ZKYcs3ga6elIWMiZs4VbY8dDSE6g8%2B4z%2BmDoGDsIp%2BsxX%2FcBlBm1GyFqj8%2FMViMxthjWq%2Bob3vdxxJlpSlnqU16zq%2FJ5j9vdLjjPbZvNCSmrBGnqadv5cWgAIx%2ByxSwyeryTF9wJVvSirKhwxmpyglXXCSfj8qfPL%2FD379KvNQ3NF0a5wZotfsZKEc0yzVE5h1DTKw6O0ShrINBoD9d92QAiZT%2Fr8DKUEojggWwUZugVyPT3JnHlHH9Khzh8rFIivy44d%2Bwu%2FZ8eCPosPw%2F5ZErxbfXMVsGGV5sVCcAHl%2FpJPrfhOVwSGdhOKeGyO7EJXVSWLqjk8XmTduqrFaY1Xb9VTZGV6vthXcYeQttSkgO7Bt36DC1yMDSBjqYAQjqJK2gnLZ%2BWMEucjDkuwG3MATQWOHWcYTuHdgPNPptcVx9D9QUs%2BwxXlXapIs%2B%2F16wZeRBt4Vr4gerjMOinFKU4RGtRLTXoj7vVdztFNHConfPH6puuMklVzuoAf8f71nQOBtnFDNOdiP72785KdfKGTTvX13C8als5qkv2qDr8oYFNh2Oos3DhpLu0ekdqoaQgvnfJLOC&X-Amz-Signature=2ecbf5391acef04e60504ac634c698ece692479ba7b512812a87543dc91cac65&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Bid_Bond_%282%29.pdf%22&x-id=GetObject
PART VII - BID PROPOSAL Page 22 of 26
Instructions to Bidders, and is familiar with all proposal requirements, and hereby proposes and agrees, if the proposal is accepted, to complete the said construction in accordance with the
Contract Documents, as defined in the General Provisions, in the time stated herein, for the unit price or lump sum given in the BID ITEMS section of this proposal.
Said amount is to include and cover all taxes, the furnishing of all materials, the performing of all the labor requisite or proper and the providing of all necessary machinery, tools, apparatus, and other means of construction; also the performance and completion of all the work in the manner set forth, described and shown in the Specifications or on the drawings for the work.
The successful bidder shall commence work upon receipt of the "NOTICE TO PROCEED" and instructions by the Construction Contract Administrator, and to prosecute the work to completion before the expiration of THIRTY (30) WORKING DAYS, excluding Saturdays, Sundays and
Holidays, after the execution of the NOTICE TO PROCEED.
All bids are to be computed on the basis of the given Estimated Quantities of Work, as indicated in this proposal, multiplied by the unit prices as submitted by the bidders. In case of discrepancy between unit prices and the extension thereof, the unit price shall prevail and bids will be computed as indicated above and compared on the basis of corrected totals.
The estimated quantities of work indicated in this Proposal are approximate only, being given solely as a basis for comparison of bids and evaluation only. Bidders are required to perform their own take-offs of the work quantities, as well as the types of work required, from the drawings and specifications. If the plans and/or specifications require items of work be performed that are not listed in the City's estimated bid item list, the missing items and/or quantities believed to be in error shall be reported immediately to the City through the Request for Information (RFI) process, including the proposed cost impact. Contractors acknowledge that the bid item list alone may not include all of the types or quantities of work required by the plans and specifications. By submitting its bid, Contractor herewith certifies acceptance of all of the various work items required to complete the Work. It is understood by Bidder that the City has the right to reject this proposal or to award a contract to the undersigned at the prices stipulated.
☐ Please confirm
*Response required
3.4. BID ITEMS*
Confirm that the Bidder has input all bid item pricing in the BID ITEMS section.
☐ Please confirm
*Response required https://procurement.opengov.com/portal/anaheim/projects/278551/document?section=2688064
| PART I - INVITATION TO BIDDERS |
| 1.0 WORK DESCRIPTION |
| 1.1 SUMMARY |
| 1.2 PROJECT LOCATION |
| 2.0 IMPORTANT DATES |
| 2.1 TIMELINE |
| 3.0 CITY REPRESENTATIVES |
| 3.1 OPERATING DEPARTMENT |
| 3.2 CONTRACT ADMINISTRATION |
4.0 PROPOSAL SUBMISSION
| PART II - GENERAL PROVISIONS |
| 2.0 BID DOCUMENTS |
| 3.0 QUALIFICATIONS OF BIDDERS |
| 4.0 DISCREPANCIES, OMISSIONS, OR INTERPRETATION |
| 5.0 PREVAILING WAGE REQUIREMENTS |
| 6.0 EVALUATION, RATING, AND SELECTION |
| 7.0 ADDENDA |
| 8.0 RIGHT TO WITHDRAW OR REJECT |
| 9.0 PROTEST PROCEDURES |
| PART III - EXTENDED PROVISIONS |
| 1.0 SCHEDULE |
| 2.0 SITE CONDITIONS |
| 3.0 USE OF SITE AND PREMISES |
| 4.0 SITE OCCUPANCY |
| 5.0 PROTECTION REQUIREMENTS |
| 6.0 TEMPORARY CONDITIONS |
| 7.0 APD FACILITY REQUIREMENTS |
| PART IV - TECHNICAL SPECIFICATIONS |
| 1.0 TECHNICAL SPECIFICATIONS |
| 2.0 SCOPE OF WORK - CAFE |
| 2.0 SCOPE OF WORK - 2ND FLOOR OFFICES |
| PART V - SITE MAPS |
| 1.0 SITE MAPS |
| PART VII - BID PROPOSAL |
| 1.0 BID ITEMS |
| 2.0 BID FORMS |
| 1. COMPANY INFORMATION |
| 1.1. Company Legal name and DBA, if applicable** |
| 1.2. Full Name and Title of RESPONDENT’s Authorized Official* |
| 1.3. I certify that I, the individual responding to this RFWOP (prospective primary participant), am an Authorized Official with the authority to certify and submit the following legally binding statements in this RFWOP Response on behalf of my compan... |
| 1.4. In executing this proposal the bidder certifies being properly licensed and registered to do the work and under penalty of perjury under the laws of the State of California.* |
| 1.5. Business Address* |
| 1.6. Telephone Number* |
| 1.7. Email Address* |
| 1.8. Federal Tax ID No* |
| 1.9. W-9 Form* |
| 1.10. Contractor State License Number* |
| 1.11. Department of Industrial Relations (DIR) Number:* |
| 2. CERTIFICATIONS |
| 2.1. Conflict of Interest Statement* |
| 2.2. Byard Anti-Lobbying (31 U.S.C. 1352)* |
| 2.3. 24 CFR Part 570* |
| 2.4. EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATES OF COMPLIANCE* |
| 2.5. NON-COLLUSION DECLARATION* |
| 2.6. DEBARMENT/SUSPENSION CERTIFICATE |
| 2.7. Certification* |
| 2.8. Statement of Compliance* |
| 2.9. Identify Contract Exceptions to be Considered Below:* |
| 2.10. Proposal will be valid for a period of 60 days* |
| 3. BID DOCUMENTS |
| 3.1. DESIGNATION OF SUB-CONTRACTORS* |
| 3.2. BID SECURITY/BID BOND* |
| 3.3. PROPOSAL* |
| 3.4. BID ITEMS* |
File details come from the government source that posted it. Updated .