PWS_draft.pdf
PDF 127 KB Posted
- Solicitation number
- AMS-26-1210-0162
About this file
This is a Performance Work Statement (PWS) for contractor shipboard technical support services related to High Pressure Air Compressors (HPAC) onboard Virginia Class Submarines at Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNSY&IMF) in Hawaii.
The contractor shall provide troubleshooting services, preventive maintenance, software support, and technical repairs on two oil-free compressors (Model 5R5-75B manufactured by RIX Industries) during the Depot Modernization Period. Primary performance requirements include conducting Satisfactory Operational Testing at 100 percent delivery and compliance and providing technical support for troubleshooting, software support, repairs, and testing of the No. 1 and No. 2 HPACs at 100 percent delivery and compliance. All work shall be performed shipboard within designated machinery spaces, with technical reference manuals designated as Controlled Unclassified Information (CUI) provided post-award by the Technical Point of Contact. The contractor shall furnish qualified personnel to perform all work and must comply with travel requirements based on Joint Travel Regulations and coach-class definitions, with travel originating from either the contractor's business address or technician's primary residence directly to Honolulu, Hawaii.
The contractor must be a licensed entity with documented experience in the work scope, possess current State of Hawaii vehicle permits and insurance, comply with all Federal, State, Territorial and local environmental laws, and have experience with Department of Defense directives and regulations. U.S. citizenship is required for facility access, and all personnel must undergo background investigations with favorable results. The contractor must obtain and maintain a final Confidential Defense Counterintelligence and Security Agency (DCSA) facility clearance and ensure all personnel maintain interim or final security clearances and eligibility for YELLOW Shipyard Access Control Badges (SACB) for Confidential National Security Information and Unclassified Naval Nuclear Propulsion Information (UNNPI). The government will furnish interference removal, lagging, lifting and handling, waste disposal, and clean areas as needed. All contractor personnel must comply with PHNSY&IMF safety requirements, including Personal Protection Equipment standards, radiological controls training, fire safety procedures, and electrical equipment verification, with detailed requirements outlined in the referenced appendices and attachments including NIST SP 800-171 compliance and an OPSEC Plan required at award.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
PEARL HARBOR NAVAL SHIPYARD AND INTERMIDIATE MAINTENANCE
FACILITY (PHNSY&IMF) CONTRACTOR SHIPBOARD TECHNICAL SUPPORT SERVICES FOR HIGH
PRESSURE AIR COMPRESSORS (HPAC) ONBOARD VIRGINIA CLASS SUBMARINE
1.0 Background:
1.1 This Performance Work Statement (PWS) describes tasks to be performed by awardee in support of a
Virginia class Submarine during the Depot Modernization Period (DMP) at Pearl Harbor Shipyard, Hawaii. The awardee shall provide the required work required to generate the deliverables enumerated below.
2.0 Objectives/Scope:
2.1 OVERALL OBJECTIVE: The awardee, hereafter referred to as the Contractor, shall provide troubleshooting services and preventive maintenance on oil-free compressors (Model 5R5-75B) manufactured by RIX Industries as required in accordance with reference 1. The contract will support conduction of Satisfactory Operational Testing with Ship and
Shipyard support. The contractor shall provide on-site technical support, troubleshooting and software upgrades where required. Maintenance and Operational Testing shall be within the contract duration allowed.
3.0 Performance Requirements:
3.1 The contractor shall provide technical support troubleshooting, software support, and technical support for repairs and testing of the No. 1 and No. 2 HPACs as required.
3.2 Travel: The Contractor shall perform travel to support the requirements of this PWS. For quote formulation and price evaluation purposes, the Contractor's firm-fixed-price proposal should target the maximum daily rate parameters established by the Joint Travel Regulations (JTR) and the coach-class definitions of FAR 31.205-46. For planning purposes, the basis for travel for the field service technicians shall originate from either the contractor’s business address or the technician’s primary place of residence (home station) directly to Honolulu, Hawaii (PHNSY&IMF) and return.
3.3 The Contractor’s work shall be governed by the completeness and quality of the work performed as summarized in 4.0, Table A, Service Delivery Summary.
3.4 All work shall be performed shipboard within designated machinery spaces at PHNSY&IMF. Specific onboard compartment access and technical reference manuals designated as Controlled Unclassified Information (CUI) will be provided to the
Contractor by the Technical Point of Contact (TPOC) post-award.
3.5 References:
Title Section/Notes
NAVSEA TECHNICAL MANUAL S9550-CR-MMA-010 Rev
LAT, Air Compressor, High Pressure, 4500 psig Model 5R5-75B w/ Programmable Logic Controller.
Entirety
4.0 Service Delivery Summary:
TABLE A
Primary Performance Requirement
Performance Threshold Section/Notes
1 Conduct Satisfactory Operational Testing 100% delivery and compliance 3.1
Provide technical support for troubleshooting, software support, technical support for repairs and testing of No. 1 and No. 2
HPACs
100% delivery and compliance 3.1
5.0 Government Furnished Utilities and Services:
5.1 Government to provide the following support services: Interference removal (structural, electrical, piping, mechanical), lagging (insulation), lifting & handling (crane and rigging), waste/hazardous waste disposal, provide clean area (if required).
6.0 Contractor Qualifications/Requirements:
6.1 The Contractor shall be a licensed Contractor with documented experience in the work scope per paragraph
2.1. The Contractor shall provide qualified equipment operators to perform all aspects of this work.
6.2 All vehicles provided for performance under this contract shall have current State of Hawaii permits, licenses, safety checks and insurance. Vehicles shall be clearly marked with the Contractor's name.
6.3 The Contractor and its representatives shall be trained in and comply with all Federal, State, Territorial and local environmental laws and regulations. In the event that the work is found non-compliant to all stated environmental laws and regulations, the contractor shall indemnify the U.S. government from any liability.
6.4 The Contractor shall comply with Public Law 105-270, Section 5(2) (A), which states that contractors will not perform inherently governmental functions. Section 5(2)(A) of this Public Law defines the term "inherently governmental function" as "a function that is so intimately related to the public interest as to require performance by Federal Government employees." Per Section 5(2) (B), inherently governmental functions include management of Government programs requiring value judgments, conduct of foreign relations, selection of program priorities, and the direction of intelligence and counter-intelligence operations. Per Section 5(2) (C), inherent governmental functions DO NOT include, (i) gathering information for or providing advice, opinions, recommendations, or ideas to Federal Government officials; or (ii) any function that is primarily ministerial and internal in nature."
6.5 The Contractor shall have experience with Department of Defense (DoD) directives, regulations, policies and procedures.
6.6 The Contractor shall not provide personal services.
6.7 Contractor personnel will make clear to all individuals they engage with that, they are Contractor employees and not
Government employees. When participating and introducing themselves during official events wherein Government, non-
Government, or foreign personnel are present, Contractor personnel will identify themselves as employees of the
Contractor. Contractor personnel must be clearly identified (i.e. company shirt, pin, visible company ID, etc.) in a visible location as to who their employer is.
7.0 Personnel
7.1 U.S. Citizenship is required for facility access. Prior to the start of work, the Contractor shall submit a formal request for access on company letterhead to the COR listing the names of all assigned personnel. Bidders should note that the shipyard's security vetting process requires personnel to provide their full name, Social Security Number, date of birth, place of birth, and citizenship to the Pass and ID Office to secure base credentials. The Contractor shall certify that all personnel information has been verified and maintain supporting records on file.
7.2 Contractor personnel shall not establish an employee-employer relationship with Government personnel under this contract.
7.3 Contractor personnel shall not manage, supervise, or task Government employees or military personnel. Contractor personnel may not make any commitment to non-DoD personnel, including a foreign official, which commits the expenditure of U.S. Government resources.
8.0 Security Requirements:
8.1 The Contractor shall conduct background investigations on personnel who are used in connection with this contract. Only those individuals with favorable investigations shall be utilized on this contract.
8.2 This contract requires the Contractor to have and maintain a final Confidential Defense
Counterintelligence and Security Agency (DCSA) granted Facility Clearance. This contract does not allow the Contractor to remove classified or Controlled Unclassified Information (CUI). All contractor personnel are required to have and maintain security access based on interim or final clearances granted by the DOD Central Adjudication Facility and be eligible for YELLOW Shipyard Access Control Badges (SACB) (i.e. Confidential National Security Information and
Unclassified Naval Nuclear Propulsion Information (UNNPI)). Contractor shall comply with the attached DD Form 254
(Attachment II). Non-compliance with the DD Form 254 will be considered a material violation of the contract. Should contractor personnel receive or suspect they have learned classified information or CUI beyond their level of clearance and/or need to know; the Contractor shall identify and immediately report suspicions to the Contracting Officer’s
Representative (COR). The Contractor will also require access to CUI including with developers or integrators.
8.3 The Contractor is required to update its employees’ DISS records with interim or final Confidential or higher security access level granted by its facility in addition to submitting a visit request form in accordance with Appendix II and
Attachment II.
8.4 Disclosure: This project, all materials provided to the Contractor by the Government, test results, conclusions, and recommendations obtained thereof from the Contractor shall be considered
Government property. The information shall not be disclosed, copied, modified, used (except to fulfill contract requirements) or otherwise disseminated to any other person or entity at any time to include, but not limited to, inclusion in any database external to the Government without Government’s express consent.
8.5 Contractor shall perform in accordance with all applicable Federal, State, County, City, and local statutes and regulations.
The contractor is required to protect critical information associated with this performance work statement, solicitation, and contract to prevent unauthorized disclosure and shall observe Operations Security (OPSEC) requirements.
8.6 The Contractor personnel shall follow all procedures in requesting and obtaining a PHNSY&IMF Camera permit for all
Contractor personnel that need to take pictures to perform the work. Sufficient time shall be allowed by the Contractor to obtain the necessary badges prior to use.
8.7 The Contractor personnel shall follow all procedures of PHNSY&IMF when training to use Personal Electronic Devices
(PEDs). Sufficient time shall be allowed by the Contractor to obtain the training prior to work.
9.0 Contractor Responsibilities:
9.1 The Contractor shall furnish sufficient qualified personnel to perform all work specified within this contract.
9.2 Place of Performance: Pier side and/or Drydock area and shipboard at Pearl Harbor Naval Shipyard.
9.3 Each contractor employee shall clearly identify themselves as contractor employees by means of company shirt, pin, or other visible company identification means in a manner that is visible at all times.
9.4 The Contractor performing services shall be required to comply with all PHNSY&IMF rules, regulations, and training that is applicable to conduct, safety, security, and procedures governing site entry and exit. See Appendix I and II of paragraph
10.0 Appendices, for details.
9.5 All Contractor travel shall be conducted as outlined in section 3.2.
9.6 Ensure that all involved workers who require access to Engineering spaces (if applicable) have attended Radiological
Controls (RADCON) training in accordance with (IAW) NAVSEA 389-0288, Article 106, paragraph 6.e within the past 12 months prior to commencement of any work. Contractor will provide a list of personnel trained in these requirements, the date they were trained and the organization who provided the training at PHNSY&IMF. PHNSY&IMF will provide training on-site.
9.7 Ensure that the on-site technical representative is in compliance with the following safety guidelines (Appendix I):
9.7.1 Safety glasses with side shields shall be worn when personnel are conducting eye hazardous operations and when in an eye hazardous area.
9.7.2 Hardhats, safety glasses and safety shoes shall be worn at all times from the outer crane rail and/or entry into the fenced area and while on board ship in accordance with PHNSY & IMF Personal Protection Equipment (PPE) policy.
9.7.3 Shall ensure its employees understand the fire safety requirements and actions to be taken when fire or an emergency occurs during work onboard the ship. Contractor shall ensure that all personnel are briefed on the Shipyard Fire Safety Plan and muster locations.
9.7.4 Eating, smoking or drinking is prohibited except for designated areas identified by the ship.
9.7.5 Hearing protection shall be used when noise exposure is at hazardous decibels.
9.8 Ensure that all portable electrical equipment has been verified electrically safe prior to use shipboard.
10.0 Appendices/Attachments
APPENDIX I: SAFETY AND HEALTH WORK PRACTICES FOR CONTRACTORS WORKING WITH PEARL HARBOR
NAVAL SHIPYARD AND INTERMEDIATE MAINTENANCE FACILITY (PHNSY & IMF) (revised
APR 2026)
APPENDIX II: CONTRACTOR SECURITY REQUIREMENTS FOR SUBMARINE ACCESS AT
PHNSY&IMF’S CONTROLLED INDUSTRIAL AREA (Rev. FEB 2026)
ATTACHMENT I: Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility Operations Security
(OPSEC) Contract Requirements (02-25)
ATTACHMENT II: Department of Defense Contract Classification Specification (DD Form 254) dated
16 November 2026
ATTACHMENT III: OPSEC Plan for Contractors
NIST SP 800-171
Notice of NIST SP 800-171 DoD Assessment is required for this procurement. See respective clauses for Instructions.
OPSEC PLAN REQUIRED: Contractors shall meet the requirements of all solicitation and award attachments.
An OPSEC Plan (Attachment III) will be required from the awardee (only) at time of award. Contractors shall not include the OPSEC
Plan with their proposal submission. Rather, once the intended awardee is known, the Government will notify the intended awardee with instructions on completing the OPSEC Plan and submitting it through DoD SAFE. The OPSEC Plan will be considered CUI once filled in. Therefore, it shall not be submitted through email.
FACILITY (PHNSY&IMF) CONTRACTOR SHIPBOARD TECHNICAL SUPPORT SERVICES FOR HIGH PRESSURE AIR COMPRESSORS (HPAC) ONBOARD VIRGINIA CLASS SUBMARINE
File details come from the government source that posted it. Updated .