AMG _ CIP FY 2025_29.pdf

PDF 87 KB Posted

Attached to
Airport Planning Consulting Services
Solicitation number
PE-77005-NONST-2025-000000004
Issued by
Bacon County, Georgia

About this file

The provided document is a Capital Improvement Program (CIP) for the Bacon County Airport (AMG) in Alma, Georgia for fiscal years 2025-2029. The CIP outlines various projects and their associated costs, including the construction of runway and taxiway lighting, an aboveground fuel facility, a corporate/maintenance hangar, taxiway and T-hangar construction, pavement rejuvenation, an Airport Layout Plan update, and design-build of a corporate hangar. The total estimated cost for the five-year CIP is $8,225,291, with funding sources including the Federal Aviation Administration, the Georgia Department of Transportation, and local contributions. A related state and local contract opportunity has been identified for on-call airport planning and consulting services, with a deadline for Statement of Qualifications submissions on August 30th, 2024.

The CIP document provides detailed project descriptions, cost breakdowns by federal, state, and local shares, and a timeline for the proposed improvements at the Bacon County Airport. The consulting services contract opportunity seeks a qualified aviation firm to assist with project planning, design, and administration over the five-year period covered by the CIP. Responding firms must possess specific GDOT pre-qualifications in airport master planning and aviation design.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BACON COUNTY AIRPORT (AMG)

ALMA, GEORGIA

FY 2025-2029 CIP

10/30/2023

9:11 PM

NPE AIP BIL

2025 1. CONSTRUCT RUNWAY AND TAXIWAY LIGHTING REPLACEMENT, BEACON REHABILITATION, AND APRON LIGHTING, INCLUDING CA/CI SERVICES 950,000$ 438,838$ 80,162$ 336,000$ 47,500$ 47,500$

2. DESIGN ABOVEGROUND AVGAS AND JETA FUEL FACILITY WITH CANOPY AND DECOMMISSION THE EXISTING

UNDERGROUND TANKS 60,000$ -$ 54,000$ -$ 3,000$ 3,000$

3. REIMBURSEMENT FOR 3-YEAR DBE PLAN UPDATE (FY2024-2026) (LOCAL SHARES PAID 2024) 9,791$ 8,812$ -$ -$ -$ 979$

TOTAL, FY 2025 1,019,791$ 447,650$ 134,162$ 336,000$ 50,500$ 51,479$

2026 1. CONSTRUCT ABOVEGROUND AVGAS AND JETA FUEL FACILITY WITH CANOPY AND DECOMMISSION THE EXISTING UNDERGROUND TANKS, INCLUDING CA/CI SERVICES 600,000$ 150,000$ 280,000$ 110,000$ 30,000$ 30,000$

2. DESIGN T-HANGAR TAXIWAY & CONCRETE SLAB FOR 8-UNIT T-HANGAR BUILDING 70,000$ -$ -$ -$ 52,500$ 17,500$

3. CONSTRUCT CORPORATE/MAINTENANCE HANGAR WITH AIRPORT OFFICE; INCLUDES DEMOLITION, SITE WORK, AND

CA/CI SERVICES 2,807,000$ -$ -$ -$ 1,000,000$ 1,807,000$

TOTAL, FY 2026 3,477,000$ 150,000$ 280,000$ 110,000$ 1,082,500$ 1,854,500$

2027 1. DESIGN AND CONSTRUCT CRACK SEAL AND PAVEMENT REJUVENATION OF TAXIWAY AND REMARK AIRFIELD, INCLUDING CA/CI SERVICES 265,000$ 150,000$ -$ 88,500$ 13,250$ 13,250$

2. CONSTRUCT T-HANGAR TAXIWAY & CONCRETE SLAB FOR 8-UNIT T-HANGAR BUILDING, INLCUDING CA/CI SERVICES 800,000$ -$ -$ 600,000$ 200,000$

3. DESIGN-BUILD 8-UNIT T-HANGAR BUILDING, INCLUDING CA/CI SERVICES 550,000$ -$ 473,500$ 21,500$ 27,500$ 27,500$

4. UPDATE 3-YEAR DBE PLAN (FY 2027-2029) 13,500$ -$ -$ -$ -$ 13,500$

TOTAL, FY 2027 1,628,500$ 150,000$ 473,500$ 110,000$ 640,750$ 254,250$

2028 1. AIRPORT LAYOUT PLAN UPDATE 160,000$ 144,000$ -$ -$ 8,000$ 8,000$

2. DESIGN TAXIWAY AND SITE WORK FOR CORPORATE HANGAR 80,000$ -$ -$ -$ 60,000$ 20,000$

3. REIMBURSEMENT FOR 3-YEAR DBE PLAN UPDATE (FY2027-2029) (LOCAL SHARES PAID 2027) 13,500$ 6,000$ 6,150$ -$ -$ 1,350$

TOTAL, FY2028 253,500$ 150,000$ 6,150$ -$ 68,000$ 29,350$

2029 1. CONSTRUCT TAXIWAY AND SITE WORK FOR CORPORATE HANGAR, INCLUDING CA/CI SERVICES 1,000,000$ -$ -$ -$ 750,000$ 250,000$

2. DESIGN-BUILD CORPORATE HANGAR (100'x100') WITH 80'x22' BI-FOLD HANGAR DOOR, INCLUDING CA/CI SERVICES 1,100,000$ 150,000$ 840,000$ -$ 55,000$ 55,000$

TOTAL, FY2029 2,100,000$ 150,000$ 840,000$ -$ 805,000$ 305,000$

TOTAL, FY 20245-2029 8,225,291$ 897,650$ 1,727,662$ 556,000$ 2,578,750$ 2,465,229$

Approved by: To be received by November 10, 2023 at:

Shane Taylor, Chairman Georgia Department of Transportation-Aviation Programs 600 W. Peachtree St NW, 2nd floor

Atlanta, Georgia 30308

LOCAL COSTFY PROGRAM DESCRIPTION TOTAL COST STATE COSTFEDERAL COST

Sheet1

File details come from the government source that posted it. Updated .