The provided document is a Capital Improvement Program (CIP) for the Bacon County Airport (AMG) in Alma, Georgia for fiscal years 2025-2029. The CIP outlines various projects and their associated costs, including the construction of runway and taxiway lighting, an aboveground fuel facility, a corporate/maintenance hangar, taxiway and T-hangar construction, pavement rejuvenation, an Airport Layout Plan update, and design-build of a corporate hangar. The total estimated cost for the five-year CIP is $8,225,291, with funding sources including the Federal Aviation Administration, the Georgia Department of Transportation, and local contributions. A related state and local contract opportunity has been identified for on-call airport planning and consulting services, with a deadline for Statement of Qualifications submissions on August 30th, 2024.
The CIP document provides detailed project descriptions, cost breakdowns by federal, state, and local shares, and a timeline for the proposed improvements at the Bacon County Airport. The consulting services contract opportunity seeks a qualified aviation firm to assist with project planning, design, and administration over the five-year period covered by the CIP. Responding firms must possess specific GDOT pre-qualifications in airport master planning and aviation design.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BACON COUNTY AIRPORT (AMG)
ALMA, GEORGIA
FY 2025-2029 CIP
10/30/2023
9:11 PM
NPE AIP BIL
2025 1. CONSTRUCT RUNWAY AND TAXIWAY LIGHTING REPLACEMENT, BEACON REHABILITATION, AND APRON LIGHTING, INCLUDING CA/CI SERVICES 950,000$ 438,838$ 80,162$ 336,000$ 47,500$ 47,500$
2. DESIGN ABOVEGROUND AVGAS AND JETA FUEL FACILITY WITH CANOPY AND DECOMMISSION THE EXISTING
UNDERGROUND TANKS 60,000$ -$ 54,000$ -$ 3,000$ 3,000$
3. REIMBURSEMENT FOR 3-YEAR DBE PLAN UPDATE (FY2024-2026) (LOCAL SHARES PAID 2024) 9,791$ 8,812$ -$ -$ -$ 979$
TOTAL, FY 2025 1,019,791$ 447,650$ 134,162$ 336,000$ 50,500$ 51,479$
2026 1. CONSTRUCT ABOVEGROUND AVGAS AND JETA FUEL FACILITY WITH CANOPY AND DECOMMISSION THE EXISTING UNDERGROUND TANKS, INCLUDING CA/CI SERVICES 600,000$ 150,000$ 280,000$ 110,000$ 30,000$ 30,000$
2. DESIGN T-HANGAR TAXIWAY & CONCRETE SLAB FOR 8-UNIT T-HANGAR BUILDING 70,000$ -$ -$ -$ 52,500$ 17,500$
3. CONSTRUCT CORPORATE/MAINTENANCE HANGAR WITH AIRPORT OFFICE; INCLUDES DEMOLITION, SITE WORK, AND
CA/CI SERVICES 2,807,000$ -$ -$ -$ 1,000,000$ 1,807,000$
TOTAL, FY 2026 3,477,000$ 150,000$ 280,000$ 110,000$ 1,082,500$ 1,854,500$
2027 1. DESIGN AND CONSTRUCT CRACK SEAL AND PAVEMENT REJUVENATION OF TAXIWAY AND REMARK AIRFIELD, INCLUDING CA/CI SERVICES 265,000$ 150,000$ -$ 88,500$ 13,250$ 13,250$
2. CONSTRUCT T-HANGAR TAXIWAY & CONCRETE SLAB FOR 8-UNIT T-HANGAR BUILDING, INLCUDING CA/CI SERVICES 800,000$ -$ -$ 600,000$ 200,000$
3. DESIGN-BUILD 8-UNIT T-HANGAR BUILDING, INCLUDING CA/CI SERVICES 550,000$ -$ 473,500$ 21,500$ 27,500$ 27,500$
4. UPDATE 3-YEAR DBE PLAN (FY 2027-2029) 13,500$ -$ -$ -$ -$ 13,500$
TOTAL, FY 2027 1,628,500$ 150,000$ 473,500$ 110,000$ 640,750$ 254,250$
2028 1. AIRPORT LAYOUT PLAN UPDATE 160,000$ 144,000$ -$ -$ 8,000$ 8,000$
2. DESIGN TAXIWAY AND SITE WORK FOR CORPORATE HANGAR 80,000$ -$ -$ -$ 60,000$ 20,000$
3. REIMBURSEMENT FOR 3-YEAR DBE PLAN UPDATE (FY2027-2029) (LOCAL SHARES PAID 2027) 13,500$ 6,000$ 6,150$ -$ -$ 1,350$
TOTAL, FY2028 253,500$ 150,000$ 6,150$ -$ 68,000$ 29,350$
2029 1. CONSTRUCT TAXIWAY AND SITE WORK FOR CORPORATE HANGAR, INCLUDING CA/CI SERVICES 1,000,000$ -$ -$ -$ 750,000$ 250,000$
2. DESIGN-BUILD CORPORATE HANGAR (100'x100') WITH 80'x22' BI-FOLD HANGAR DOOR, INCLUDING CA/CI SERVICES 1,100,000$ 150,000$ 840,000$ -$ 55,000$ 55,000$
TOTAL, FY2029 2,100,000$ 150,000$ 840,000$ -$ 805,000$ 305,000$
TOTAL, FY 20245-2029 8,225,291$ 897,650$ 1,727,662$ 556,000$ 2,578,750$ 2,465,229$
Approved by: To be received by November 10, 2023 at:
Shane Taylor, Chairman Georgia Department of Transportation-Aviation Programs 600 W. Peachtree St NW, 2nd floor
Atlanta, Georgia 30308
LOCAL COSTFY PROGRAM DESCRIPTION TOTAL COST STATE COSTFEDERAL COST