This document is an Amendment to a Solicitation for a Shipping Container, issued by DLA Aviation at Philadelphia for a National Stock Number (NSN) 011481369. The amendment (Number 0001) extends the solicitation period to September 19, 2025, and provides detailed technical requirements for an aluminum shipping container to be manufactured in accordance with Container Research Corporation drawing number 379E001.

Key technical specifications include requirements for desiccant placement, zinc-nickel alloy finishing, welding qualifications, unique identification (UID) marking, and extensive first article testing protocols. The container must undergo rigorous testing including an initial leak test, 18-inch free fall drop test, and form/fit checks. The government will estimate a $12,000 cost for first article testing, which will be added to all offerors' prices. Contractors must produce the first article at the same facility intended for production quantities, and the container must meet precise manufacturing and quality control standards specified in the solicitation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53.243

STANDARD FORM 30 (REV. 10-83)

(a) By completing Items 8 and 15, and returning ____ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

30-105

(If required)

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

tended.

is not ex-is extended,

12. ACCOUNTING AND APPROPRIATION DATA

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)14. DESCRIPTION OF AMENDMENT/MODIFICATION appropriation date, etc.)

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(Signature of Contracting Officer)

(Specify authority)

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

10A. MODIFICATION OF CONTRACT/ORDER NO.

(SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.(No., street, county, State and Zip Code)8. NAME AND ADDRESS OF CONTRACTOR

6. ISSUED BY

PAGE OF PAGES1. CONTRACT ID CODE

3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO.

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

IN ITEM 10A.

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

(such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

(Specify type of modification and authority)D. OTHER

BY(Signature of person authorized to sign)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

CODE FACILITY CODE

CODECODE

(Type or print)16A. NAME AND TITLE OF CONTRACTING OFFICER

16B. UNITED STATES OF AMERICA

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

15B. CONTRACTOR/OFFEROR

15A. NAME AND TITLE OF SIGNER (Type or print)

(SEE ITEM 13)

(If applicable)5. PROJECT NO.4. REQUISITION/PURCHASE REQ. NO.

7. ADMINISTERED BY (If other than Item 6)

16C. DATE SIGNED15C. DATE SIGNED

Contractor is not, is required to sign this document and return ____ copies to the issuing office.

10B. DATED

9B. DATED

E. IMPORTANT:

1 9

0001 2025 SEP 10 25118-0006

SPRPA1

DLA AVIATION AT PHILADELPHIA, PA

DLR PROCUREMENT OPERATIONS (AP)

700 ROBBINS AVENUE BUILDING 26

PHILADELPHIA, PA 19111-5098

CREATOR OFC CD: APAC.32

SPRPA1-25-R-EH87

X

2025 AUG 08

X X

THE HOUR AND DATE SPECIFIED FOR RECEIPT OF OFFERS IS EXTENDED TO 2:00 PM LOCAL TIME ON 2025 SEP 19.

SEE NEXT PAGE

SPRPA1-25-R-EH87 AMEND: 0001 PAGE 2 OF 9

NOTE:

THIS AMENDMENT IS BEING ISSUED TO EXTEND THE SOLICITATION PERIOD. THIS SOLICITATION PERIOD IS HEREBY EXTENDED UNTIL 19 SEPTEMBER 2025. ALL INTERESTED PARTIES MUST SUBMIT THEIR PROPOSALS NO LATER THAN 19 SEPTEMBER 2025.

PAGES

OFPAGEREFERENCE NO. OF DOCUMENT BEING CONTINUED

NAME OF OFFEROR OR CONTRACTOR

CONTINUATION SHEET

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

SPRPA1-25-R-EH87 AMEND: 0001 3 9

0001 TECHNICAL REQUIREMENTS ARE INCORPORATED IN SECTIONS C, D, E AND ATTACHMENTS

REFERENCE NUMBERS STILL APPLY

CLIN 0001AB IS INCORPORATED

0001AB FIRST ARTICLE TEST 1 LO NSP

(GOVERNMENT - NON-DESTRUCTIVE)

SPRPA1-25-R-EH87 AMEND: 0001 PAGE 4 OF 9

PART I - THE SCHEDULE

SECTION C

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

CLIN: 0001

NIIN: 011481369 ACTIVITY USE ONLY: TDP VERSION NO.: 008

ITEM NAME: CONTAINER,SHIPPING

1. SCOPE

1.1 PRE-AWARD / POST AWARD REQUIREMENTS:

Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.

1.2 Container shell material is <ALUMINUM> .

1.3 When discrepancies exist between these requirements and those on current manufacturer's drawings,contact code <BUYER ON PAGE 1 OF CONTRACT> or code N241.10

1.4 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with <CONTAINER RESEARCH CORPORATION> drawing number ( <05259> ) <379E001> , Revision <Latest> and all details and specifications referenced therein.

1.5 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.

1.6 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.

2. APPLICABLE DOCUMENTS

2.1

DRAWING NO. CAGE REV DOC TYPE DISTR CD SHEET NR REV TYPE SIZE

STD-153 05259 A

STD-228 05259 A

STD-230 05259 A

STD-231 05259 A

STD-251 05259 A

STD-269 05259 A

STD-273 05259 A

17D043 05259 A 379D007 05259 A 379D008 05259 A 379E001 05259 A 379E002 05259 A 379E003 05259 A 379E005 05259 A 379E006 05259 A

DOCUMENT REFERENCES

SPEC NO. SLASH NO. PART NO REV DATE DISTR CD AMEND CHG NTC SUPP

MIL-I-45208 A 24 JUL 81 A 1

3. REQUIREMENTS

3.1 One third (1/3) unit of desiccant (MIL-D-3464, Type II nondusting) per cubic foot of container interior volume shall be placed in desiccant holder of each container at time of shipment.

3.2 Reference to Cadmium plating shall be deleted and the following substituted: "Finish shall be electrodeposited alkaline Zinc-Nickel Alloy in accordance with ASTM B 841 Class 1, Type B, Grade 3." All containers must be affixed with a nameplate that includes a Unique Identification (UID) marking as referenced in the drawing package

SPRPA1-25-R-EH87 AMEND: 0001 PAGE 5 OF 9

Drawing <(80132) 15930> and IAW Mil-STD-130 latest revision. The contractor shall contact NAVICP code <CONTACT BUYER ON PAGE 1> or code 0771.10 for the alphanumeric sequential serial number group that makes up part of the UID.

The UIDwill be included on the nameplate in data matrix format. Contact code <CONTACT BUYER ON PAGE 1> or code N241.10 to arrange for First Article Test location

3.3 Welding and welder qualifications shall be in accordance with AWS D1.1 for steel, AWS D1.2 or MIL-W-22248,Class 4 for aluminum, AWS D1.3 for sheet steel and AWS D1.6 for stainless steel. Proper controls shall be used to prevent melt through or burn through. For aluminum, filler for welding 6061 alloy shall be 4043: filler for welding 5000 series alloys to themselves or to 6061 shall be 5356 or 5556. In addition,welding and weld inspection shall include:

(1) Visual inspection shall include 5X (5power) magnification when a suspect condition is to be examined beyond the capability of normal vision.

(2) Critical and major welds may be subjected to further non destructive testing (such as dye penetrant inspection)as prescribed by the buying activity.

(3) Proper documentation shall be available for review by Government personnel.

3.4 WORK INSTRUCTIONS. Work instructions shall be posted at theoperator's work station giving procedures to control the welding process, i.e., filler material, weld size, electrical and gas characteristics, including flow rate.

3.5 MATERIALS AND MATERIALS CONTROL. The quality program shall assure that the materials used in fabrication or processing, i.e., base metals and weld filler material, be inspected and conform to the applicable physical, chemical and other technical requirements (supplier's certification is sufficient).

3.6 CONTROLS. Weld filler materials shall be clearly identified and segregated from each other both when in storage and at the work station. Work station environment shall be controlled to prevent conditions adverse to proper gas shielding.

3.7 CLEANING. Parts to be welded shall be cleaned to remove surface soils such as oils, waxes, grease, inks, etc.

except that uninhibited alkaline solutions such as sodium hydroxide shall NOT be used.

3.8 DEOXIDIZING. The cleaned parts shall be chemically deoxidized NO MORE THAN 10 DAYS PRIOR TO WELDING to remove thick surface oxide films. (If the material or work is exposed to an outdoor environment, this time limit shall be reduced to a maximum of 3 days, to account for atmospheric effects.) Mechanical cleaning methods shall be applied just prior to the actual start of welding, to remove any reoxidation or residual thin oxide films.

3.8.1 CHEMICAL TREATMENT. An acid deoxidizing treatment shall be applied by either immersion or brushing/wiping.

Deoxidizers acceptable for use shall include nitric acid, sulfuric chromic, phosphoric chromic, or equivalent solutions. Sodium hydroxide solutions shall not be used. Care shall be taken to assure 100% solution coverage of the area to be welded. To allow an adequately sized deoxidized area for good welding, the solution shall be applied to an area extending at least 2 inches from the weld site, or ending at any closer adjacent edge.

3.8.2 MECHANICAL MEANS. Immediately prior to welding, mechanical cleaning methods shall be applied to the weld areas previously chemically treated to assure removal of residual or reformed oxides, if any. Acceptable methods of mechanical cleaning include stainless steel wire brushing, scraping, filing, or sanding. However, abrasives containing iron and its oxides, steel wool and wire, and copper alloy based wire, which may become embedded with galvanically active metals and accelerate corrosion of aluminum alloys shall NOT be used. Mechanical methods shall be vigorous enough to adequately remove any residual oxide films, but gentle enough to avoid forming an excessively rough surface in the comparatively soft metal underneath.

3.9 At faying surfaces, discontinuous welds, or other areas where atmospheric liquids may be retained by capillary action, the crevice shall be sealed using Sealing Compound MIL-S-81733 or equivalent.

3.10 The shock mount listed in the drawing package (whether identified as sole source, recommended, or suggested) has been tested and approved for the shock mitigation system of this container. No other shock mount may be substituted without written permission of Naval Inventory Control Point, Philadelphia unless an alternate is specifically indentified in this contract. <NO OTHER PART NUMBER> is an approved alternate mount. Welding and welder qualifications shall meet current AWS D1.1 and AWS D1.3 and for stainless steel, AWS D1.6 standards. Welding and welder qualifications shall meet current AWS D1.2 standards.

Additionally, cleaning preperations shall be in accordance with MIL-C-5541 and the cleaning paragraph located in the welding requirements section of the contract When a First Article is required, the contractor shall submit a paper copy of the drawings (size 11" X 17"), contracts and approved ECP's ECO's, deviations waivers, and modifications in the records recepticle or inside the container submitted for the First Article. If serial numbers are required for this contract: Each container shall be assigned a serial number, with the first on contract being "0001," then "0002,"and so on. If a nameplate drawing exists that establishes an acronym conventionthe serial numbers will replace the "XXXX." If an acronym has not been explicitly defined, the acronym placeholder may be omitted from the serialnumber line, leaving only the four-digit serial number. FOR FMS CONTAINER BUYS NAMEPLATE "PROPERTY OF" STATEMENT WILL DIFFER.CONTACT BUYER ON PAGE 1 OF CONTRACT FOR UPDATED

NAMEPLATE INFORMATION.

SPRPA1-25-R-EH87 AMEND: 0001 PAGE 6 OF 9

PART I - THE SCHEDULE

SECTION D

PACKAGING AND MARKING

CLIN: 0001

NIIN: 011481369 ACTIVITY USE ONLY: TDP VERSION NO.: 008

ITEM NAME: CONTAINER,SHIPPING

5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE

PART I - THE SCHEDULE

SECTION E

INSPECTION AND ACCEPTANCE

CLIN: 0001

NIIN: 011481369 ACTIVITY USE ONLY: TDP VERSION NO.: 008

ITEM NAME: CONTAINER,SHIPPING

4. QUALITY ASSURANCE

4.1 100% PRODUCTION LEAK TEST. Each container, uninstrumented and without dummy load, shall be raised to a height of 18 inches and allowed to fall freely to a concrete or similarly hard surface, landing flat on its base. The container shall then be prepared for testing by sealing all breathing devices and inserting suitable pressurized fittings and gauges. The container shall be closed and sealed in a normal manner. The pneumatic-pressure technique of method 5009 of Federal Test Method Standard No. 101C shall be used to detect leakage. An initial pressure setting equal to 1.0 + 0.1 - 0 PSIG shall be used. After stabilization, pressure shall be monitored for thirty minutes. Any loss in pressure in excess of 0.05 PSIG (adjusted for changes in temperature and barometric pressure) shall be cause for rejection.

WARNING

Container may explode or fasteners may fail during test. Use protective barriers to avoid injury to personnel.

4.2 PAINTING OF CONTAINER INTERIOR STEEL SURFACES.

Steel surfaces (excluding stainless steel) shall be cleaned and pretreated for painting in accordance with TT-C-490 (salt spray test requirements excluded). Paint coating shall consist of 2 coats of primer in accordance with MIL-P-53022, MIL-P-53030, TT-P-664, or MIL-E-52891B. The total paint thickness shall be 1.5 mils (0.015 inches) minimum. To comply with ozone depleting substance regulation, whenever cleaning in accordance with TT-C-490 is required, the use of Trichlorethylene (MIL-T-81533) is deleted.

4.3 The tests to be performed under the First Article approval clause (FAR 52.209-4) of the contract are listed below.

4.3.1 Dimensional test (special)

<APPLIES>

4.3.2 Requirements of:

<(05259) 379E001>

4.3.3 Form:

<APPLIES>

4.3.4 Fit:

<APPLIES>

4.3.5 Function

<APPLIES>

4.3.6 Compliance with drawing ( <05259> ) <379E001> , Revision <LATEST> and specifications referenced therein.

4.4 In addition to the above tests, the First Article(s) to be delivered hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with contract requirements requirements.

4.5 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during testing.

SPRPA1-25-R-EH87 AMEND: 0001 PAGE 7 OF 9

4.6 The cost of the Government testing effort set forth in this solicitation is estimated to be $ <12000> for the first article testing. This cost factor will be added, for solicitation purposes, to the price of all offerors for whom the government will require such testing.

4.7 Disposition of FAT samples

4.7.1 <NONE> Sample(s) shall not be returned to the contractor because they shall be destroyed during testing.

4.7.2 <ALL> Unless otherwise provided for in the contract, sample(s) shall be returned to the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval from the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment.

<N/A> Sample(s) shall be returned to the contractor but shall not be considered as production due.

4.8 Test Sample Coating Instructions

4.8.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative.This paragraph does NOT apply to shipping containers.

4.9 FAT Approval Criteria

4.9.1 FAR 52.209-4 applies

(A) The contractors shall deliver <ONE(1)> > unit(s) of the following CAGE ( <05259> > ) Part Number <379E001> > , Revision <LATEST> > within <120> > calendar days from the date of this contract to the Government at

<CONTACT BUYER ON PAGE 1 OF THE CONTRACT> >

Marking of test sample(s) shipping container shall be as follows, citing this contract number: "FOR FIRST ARTICLE

TESTING. NOT RFI MATERIAL. DO NOT TAKE UP IN STOCK CONTRACT NUMBER:____________"

For First Article Test, the shipping documentation shall contain this contract number and lot/item identification.

The characteristics that the First Article must meet and the testing requirements are specified elsewhere in this contract.

(B) Upon shipment of First Article sample(s), two (2) copies of the Material Inspection and Receiving Report (DD Form 250) bearing the QAR's signature and indication of preliminary inspection shall be forwarded to the NAVICP- Philadelphia code cited in Block 10.a of SF33, with duplicate copies to NAVICP code 072 and to the designated test facility. The envelopes shall be clearly marked: "DO NOT OPEN IN MAIL ROOM".

Within <90> > days after receipt of the samples, the test site shall complete testing/evaluation and submit two (2) copies of their test report with conclusions and recommendations to the NAVICP code cited in Block 10.a of the SF33.

(C) Within <120> > calendar days after the Government receives the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval.

(D) If the First Article is disapproved, the contractor, upon Government request, shall submit an additional First Article for testing. After each request, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall furnish any additional First Article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this First Article within the time limit specified in paragraph (B) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.

(E) If the contractor fails to deliver any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract

(F) Unless otherwise provided in the contract, the contractor -

(1) May deliver the approved First Article as part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing: and

(2) Shall remove and dispose of any First Article from the Government test facility at the contractors expense.

SPRPA1-25-R-EH87 AMEND: 0001 PAGE 8 OF 9

(G) If the Government does not act within the time specified in paragraph (B) or (C) above the contracting officer shall, upon timely written request from the contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(H) The contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the First Article during any First Article test.

(I) Before First Article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government

(J) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to this effect with each First Article.

(K) The contractor shall provide specific written notification to the procuring contracting officer informing him/her of the shipment of any article(s) furnished in accordance with this clause. Such notification must be addressed to the attention of the NAVICP code specified in Block 10.a of the SF33, with copies to NAVICP code 072 and to the testing activity. Failure to provide such notification shall excuse the Government from any delay in performing First Article Testing and informing the contractor of the results thereof.

(L) Fourteen (14) days prior to shipment of First Article Samples, the contractor shall notify the designated test facility in writing of the anticipated shipping date, with an information copy to the PCO, NAVICP Philadelphia, Attn:

(Cite code found in Block 10.a of the SF33). The contractor shall also arrange for preliminary inspection of test samples by the DCMC/QAR.

4.10 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate)

(A) Unless otherwise specified in the solicitation, the Naval Inventory Control Point reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that:

(I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run

Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that:

(I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause.

(NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.)

(B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements

(C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government.

Offeror's Proposed Alternate Delivery Schedule (Based on Waiver of First Article Approval Requirements)

Within Days:

Item No. _______________ Quantity:_______ After Date of Contract:__________ ALL COSTS AND RESPONSIBILITIES RELATED TO THE FIRST ARTICLE TEST SUBMISSION CONTAINER SHIPMENT TO AND FROM THE FIRST ARTICLE TEST FACILITY ARE TO BE BORNE BY THE CONTRACTOR. First Article Testing (FAT) performed by the designated test facility shall include:

- A visual and dimensional inspection performed in accordance with drawing package (05259) 379E001. - Initial Leak

SPRPA1-25-R-EH87 AMEND: 0001 PAGE 9 OF 9

Test: An air pressure fitting shall be installed in place of One of the container's inspection ports. The container shall be pressurized to 1.00 +/- 0.05 psig. Allow the container to stabilize for 30 minutes. After the stabilization period, the pressure shall be monitored for 30 minute. Any pressure loss in excess of 0.05 psi shall be cause for rejection.

- 18-inch Free Fall Drop Test: The loaded container shall be raised to a Height of 18 inches in a horizontal attitude. It shall be released from a drop hook, free falling flat on the base to an unyielding surface. Any cracked welds, deformation, or damage to the container shall be cause for rejection. - Final Leak Test: This test to be performed in the same manner as previously - Form and Fit Check (actual item): The end-item shall be placed in the container using the installation instructions provided. Any inadequacies, fit issues or interferences shall be noted and recorded. The government is responsible to provide an item to perform the form and fit test. An item may be shipped to the FAT facility location or, if the end-item cannot be moved, the FAT container may be shipped to an external location. (NIIN:01-161-8447) or equivalent (F condition is preferred) to the assigned First Article Test site upon request from N241 Engineering in order to complete First Article Testing in accordance with the terms of this contract. If item is unable to be sent to the test site, the container may be sent to item location with proper coordination. NAVSUP Supply Planner should contact NAVSUP WSS N241 Engineering for test site Point of Contact.

PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J

LIST OF ATTACHMENTS

CLIN: 0001

NIIN: 011481369 ACTIVITY USE ONLY: TDP VERSION NO.: 008

ITEM NAME: CONTAINER,SHIPPING

DOCUMENT NAME EXHBT/ATTCHMNT

NOTES ATTACHMENT 1

DD1149 ATTACHMENT

SPRPA1-25-R-EH87 AMEND: 0001

ATTACHMENT 1 PAGE: 1

CLIN: 0001

NIIN: 011481369 ACTIVITY USE ONLY: TDP VERSION NO.: 008

ITEM NAME: CONTAINER,SHIPPING

6. NOTES - NOT APPLICABLE