About this file
This document is Amendment #2 Vendor Q&A for RFP EFAA 27-75, the Methane Seep Program, issued by the State of Colorado. The solicitation seeks contractor services to identify, monitor, and mitigate natural methane seeps, primarily in the San Juan and Raton Basins. The scope includes pre-implementation monitoring with a minimum of two events at least 30 days apart, site screening and selection utilizing both Colorado's initial site identification and independent field measurements, and post-implementation verification and reporting of avoided methane emissions. The project will involve Task 3.5.3 site selection activities, which must include field reconnaissance to verify seep presence, and contractors are expected to propose their own screening methodologies and site prioritization criteria for CEO approval. The CEO will provide the offeror with an initial site list and underlying data to support site screening efforts. Monitoring cadence post-implementation has not been formally determined but will not extend past one year following project implementation.
The engagement is structured as a firm-fixed-price contract with milestone-based payments requiring a detailed cost breakdown for evaluation purposes, though the solicitation does not mandate approved or audited labor rates as long as rates are reasonable and allocable. The project is federally funded through the EPA, which precludes the use of foreign subcontractors; however, there is no specific evaluation preference for Colorado-based personnel, though the evaluation team may consider travel cost allocations and associated project impacts. No specific SDVOSB subcontracting requirement applies to this solicitation, though Colorado maintains a statewide contracting goal of awarding at least 3% of contracts by dollar value to Service-Disabled Veteran-Owned Small Businesses. The methodology for methane detection and quantification will be developed and incorporated into the QAPP, with the flux chamber method identified as typical strong practice; however, alternative methodologies are considered acceptable if they undergo independent quantitative and reproducibility review by a second subject matter expert prior to final submission. Success criteria will encompass greenhouse gas avoidance, co-benefits, technology validation, and proof of concept.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix A Administrative Information.docx | DOCX document | |
| Appendix F Federal Provisions.docx | DOCX document | |
| Appendix C Vendor Accessibility Checklist 6_2026.docx | DOCX document | |
| Appendix B PERSONAL SERVICES MODEL CONTRACT.docx | DOCX document | |
| Appendix E AI Disclosure and Use Requirements.docx | DOCX document | |
| RFP EFAA 27-75 Methane Seep Program.docx | DOCX document | |
| Appendix D Vendor Disclosure Statement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP EFAA 27-75
Amendment #2 Methane Seep Program Q&A
1. Is continuous monitoring expected, or may an offeror propose periodic screening, including an aerial/drone methodology?
Answer: Periodic screening may be proposed.
2. For the pre-implementation requirement of at least two monitoring events at least 30 days apart, should the offeror propose the specific method and cadence for approval through the QAPP?
Answer: This would be preferred.
3. Is there a required minimum cadence for post-implementation verification and reporting of avoided methane emissions.
Answer:. Minimum cadence has not been formally determined, but will not extend past one year post-implementation.
4. Section 4 states that the Company Profile is excluded from the 10-page limit, but no requirements or details are provided for the Company Profile, and the Executive Summary also requests company-related information. Please clarify what should be included in the Company Profile and what company information should instead be included in the Executive Summary.
Answer: The Company Profile is part of the Executive Summary. All requested information in Section 4.1 should be included.
5. Appendix A references Colorado’s goal of awarding at least 3% of contracts by dollar value to qualifying Service-Disabled Veteran-Owned Small Businesses (SDVOSBs). Does this solicitation have a specific SDVOSB subcontracting or participation requirement, or is the 3% provision a statewide contracting goal only?
Answer: No. This solicitation does not have a specific SDVOSB requirement . The 3% goal is a statewide goal.
6. Because the project is federally funded, are Offerors required to provide any documentation supporting or validating the proposed labor rates, such as approved or audited rates, or may standard commercial billing rates be used?
Answer: Though it is best practice, it is not mandatory to outline in an Offeror’s RFP response.
7. What do you anticipate to be the primary drivers for site selection? For example, would mitigation of methane around existing structures be a priority or would addressing the highest methane emission sources take precedence ?
Answer: Site prioritization would be determined based on multiple variables, including but not limited to the ability to secure property owner consent, the size of the seep, and topographical considerations. The CEO expects the offeror to propose additional criteria for consideration.
8. For the COI check, are we to assume that the natural seeps are void of commercial liability holders? If available, please provide any additional information regarding known commercial liability holders or responsible parties associated with the potential sites?
Answer: Some seep sites in the Raton Basin, as outlined in the SB23-186 report’s Table 1, may have commercial or residential surface right ownership. Given these are natural seeps, liability is not expected to be a factor.
9. Ground surface topography varies significantly at natural seep sites. Is it a reasonable assumption that this project will focus on seeps occurring on unconsolidated soil surfaces with light vegetation and generally flat topography?
Answer: Seep locations will be determined through completion of Task 3.5.3. They may or may not meet the assumption included in this question.
10. Please clarify the basic expectations of the mitigation systems in terms of mechanical equipment and electrical demand?
Answer:
11. What level of communication/reporting is required by the contractor for any governing regulatory agency(ies)?
Answer: Outlined in Section 3.5.
12. Are there any restrictions or additional requirements associated with using foreign or non-local subcontractors or technical personnel on this project?
Answer: Foreign subcontractors would not be allowable on this project given the EPA funding source.
13. Additionally, is there any evaluation preference or scoring consideration for the use of Colorado-based personnel, subcontractors, or local partners?
Answer: There are no specific evaluation preferences given to in-state vs. out-of-state personnel. However, the evaluation team may consider how much of the proposed budget is allocated to travel and if this is in the best interest of the project. Also, other factors that may affect the project as a result of out-of-state personnel may be considered during the evaluation.
14. Fixed price vs. cost reimbursement: Sec. 4.5 describes a firm-fixed-rate engagement, but the Payment and Invoicing language in Sec. 3.5 refers to “reasonable, allocable, and allowable costs” and Sec. 3.4 refers to “reimbursement.” Please confirm whether payment will be fixed-price (milestone-based) or cost-reimbursable.
Answer: In this instance, fixed price indicates that this rate is for the entire engagement and does not change. We require a breakdown of costs in order to better determine cost allocation and how reasonable the pricing is. Invoicing and payments are made according to the contracted terms and conditions.
15. What are the CEO’s expectations for the Offeror’s process to screen and identify target sites?
Answer: CEO expects the Offeror to propose a process to complete Task 3.5.3 in the RFP response.
16. Sec. 3.5.3.A states the CEO has initially identified potential high-value opportunities in the San Juan and Raton Basins. Will the CEO provide the Offeror with the site list and/or underlying data supporting those opportunities?
Answer: Yes
17. Will this include independently developing data (e.g., field measurements) to support the site screening?
Answer: Yes, field measurements would be conducted.
18. What are the CEO’s expectations for field reconnaissance to be performed in the site selection process?
Answer: Verification of Seep presence must be determined during the site selection process. This can oftentimes be met via field reconnaissance.
19. Cross-cutter and NEPA support: will cultural resource, biological, wetland, or historic surveys be included in the scope of work?
Answer: EPA will make the NEPA determination, once EPA decides, if they flag anything, there could be additional requirements for the contractor.
20. What methodologies have been used for methane detection in the past and what has the overall success rate been for methane detection and quantification?
Answer: CEO has not conducted methane seep detection activities. However, per SB23-186, Energy and Carbon Management Commission sponsored work used Areal and ground-based surveys to identify and measure seeps in the Raton Basin.
21. Is there a proposed methodology to be used for methane detection and quantification written into the QAPP?
Answer: A proposed methodology will be written into the QAPP.
22. Sec. 3.5.4.A sets a minimum of two pre-implementation monitoring events at least 30 days apart, with the validation method to be pre-approved through the QAPP. Beyond that, does the CEO have specific quantitative targets, success criteria, or objectives (e.g., a minimum emissions reduction) that the monitoring program and mitigation projects must meet?
Answer: Success criteria may include GHG avoidance (MT), co-benefits (economic, environmental, health, etc.), mitigation technology/method validation, and proof of concept, others as identified.
23. Methane avoidance verification: is there a preferred methodology, is there a minimum post-installation monitoring frequency, and does it need third-party verification?
Answer: The Flux chamber method is typical and considered strong practice. However, we will consider other proposed verification methods. Methods, calculations, and datasets will need to undergo independent quantitative and reproducibility review by a second subject matter expert prior to final submission.