Amendment 2 - Deadline extension, Q&A, and Pre-proposal sign-in sheet.pdf
PDF 153 KB Posted
- Solicitation number
- RFP 591 270000000140 3
- Issued by
- Michigan
About this file
This document is Amendment 2 to Request for Proposal 270000000140 issued by the Michigan Department of Transportation (MDOT) for septic tank and vault pumping services at MDOT Grand Region rest areas and roadside parks. The amendment extends the proposal submission deadline to Monday, November 16, 2026, at 12:00 p.m. Eastern Time due to delays in publishing questions and answers. The project encompasses services at 12 rest areas and 12 roadside parks, with tank and vault locations and specifications detailed in Schedule A and Schedule B of the solicitation documents. A mandatory pre-proposal meeting was held on November 2, 2026, at 1:00 p.m. via Teams, with attendance required for bid evaluation. Two vendors attended the pre-proposal meeting: Victoria Kabluyen from AR Gov Solutions LLC and Jeff Root from GFL Environmental.
Pricing for services is based on historical expenditure data, with average costs of approximately $1,100 per septic tank pumping and $400 per vault tank pumping. The estimated 159 annual cleanings across all sites represent the average pump-outs based on past history, with on-call emergency services required to be completed within 24 hours of MDOT's request at the same per-occurrence rates as scheduled services. Subcontractors are permitted on the contract, and subcontractor EGLE septic and vehicle licenses, along with EGLE disposal permits, satisfy minimum requirements; subcontractor licenses must be attached to proposals. No performance bonds or payment bonds are required; proof of insurance will be requested from the awarded vendor after contract award. Proposals must be submitted electronically through www.michigan.gov/SIGMAVSS.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 270000000140 Proposal Instructions.docx | DOCX document | |
| Schedule C - Insurance Requirements.docx | DOCX document | |
| Schedule B - Pricing.xlsx | XLSX spreadsheet | |
| Schedule A - Statement of Work.docx | DOCX document | |
| Services and Commodities Terms and Conditions.docx | DOCX document | |
| Amendment 1 - Correction to Proposal Deadline.pdf | ||
| Confidential Treatment Form.docx | DOCX document | |
| Schedule D - Equipment List.docx | DOCX document | |
| Vendor Questions Worksheet.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 2 – Deadline Extension, Questions & Answers, and Sign-in Sheet
Request for Proposal 270000000140
Septic Tank and Vault Pumping – MDOT Grand Region Rest Areas and Roadside Parks
Due to the delay in publishing the Questions and Answers, the deadline to submit a solicitation response is extended to Monday, November 16 at 12:00 p.m. Eastern Time.
Questions asked during the Pre-proposal meeting:
Bidder’s Question State’s Answer
1. Can subcontractors be used on this contract?
Yes
2. Can the subcontractor’s EGLE septic and vehicle licenses satisfy the mandatory minimum requirements
Yes
3. Do bonds and insurance have to be submitted with the solicitation response?
No. The contract does not require bonds and proof of insurance will be requested from the awarded vendor.
4. Is there a map of where septic tanks are located on each site?
No. Tanks are not difficult to locate.
5. How accessible are the tanks? Most tanks are right by the building or near the parking areas and all lids are exposed.
6. Were the tanks previously cleaned on a regular basis or on an as-needed basis?
Previously, MDOT scheduled most tanks to be cleaned 2 or 3 times per season.
7. Will confined space entry be needed to clean tanks?
No
8. Will MDOT staff be onsite after cleaning is done.
Typically the MDOT Program Manager or the maintenance coordinator will be onsite during or following cleaning to inspect tanks.
However, this is not always the case and inspections will occur within a reasonable time after cleaning.
9. Is there any information about the budget for this contract?
Based on historical spend and average over multiple years, price was approximately $1,100 for septic tanks and $400 for vault tanks.
Additional questions submitted:
10. Confirm that a subcontractor's EGLE septage waste license, EGLE-licensed vehicles and EGLE disposal permit satisfy the Section 8 minimum requirements
See answer to above question 2.
11. Should the subcontractor's licenses be attached to our proposal?
Yes
12. Confirm that no bid, performance or payment bond is required, and that the certificate of insurance is due after award rather than with the proposal
Confirmed. See answer to above question 3.
13. Could you provide the name and address (or GPS coordinates) of each of the 13 rest areas and 11 roadside parks, along with the number and size of tanks/vaults at each site?
There are 12 Rest Areas and 12 Roadside Parks. Description of locations are stated in Schedule A, Section 4.1 and in each line item in Schedule B. GPS coordinates are not available; however, the Beginning Mile Point (BMP) and Ending Mile Point (EMP) are noted in Schedule B. Numbers and sizes of tanks/vaults are stated in Schedule B.
14. Could you share the number of pump-outs per site per year over the last three years (the 159 cleanings mentioned in the meeting), including how many were emergency calls?
The Estimated Service Occurrences per Location per Year stated on Schedule B is the average pump outs per site based on past history. Because on-call services must be performed within 24 hours, the distinction for and number of emergency calls is not available.
15. What response time is required for emergency calls?
Per Schedule A, Section 9.1, as-needed/on-call services must be completed within 24 hours of MDOT’s request. Emergency calls are considered the same as on-call requests.
16. Should emergency calls be priced at the same per-occurrence rate on Schedule B?
Yes
17. Confirm that proposals are due Thursday, November 12, 2026, at 12:00 noon Eastern.
Confirmed; as stated on the Proposal Instructions cover page.
18. Confirm the submission method As stated in the Proposal Instructions, Section 7, proposals, including all required documents/attachments, must be submitted electronically through www.michigan.gov/SIGMAVSS.
http://www.michigan.gov/SIGMAVSS
PRE-PROPOSAL MEETING/SITE VISIT
SIGN-IN SHEET
Michigan Department of Transportation
PROJECT INFORMATION
RFP # Project Description
270000000140 Septic Tank and Vault Pumping – MDOT Grand Region
Rest Areas and Roadside Parks Agency Location
MDOT Grand Region Virtual – TEAMS meeting Scheduled Date and Time (from RFP) Actual Date and Start Time
November 2, 2026, 1:00 p.m. November 2, 2026; 1:00 p.m.
☒ The Pre-Proposal Meeting/Site Visit is mandatory. Vendors who do not attend the meeting/site visit will not have their bid evaluated for award.
☐ The Pre-Proposal Meeting/Site Visit is optional. Vendors are not required to attend the meeting/site visit to have their bid evaluated for award.
Any questions regarding this procedure should be directed to:
Buyer Name
Ruth Thole
Buyer Phone Number
517-335-4972
Buyer Email Address
TholeR@michigan.gov
SIGN-IN
Attendee Name Firm Name Sign-in Time
Victoria Kabluyen AR Gov Solutions LLC 12:51 p.m.
Jeff Root GFL Environmental 12:58 p.m.
Ruth Thole MDOT 12:50 p.m.
John Paepke MDOT 12:50 p.m.
Zachary Wilson MDOT 12:50 p.m.
AGENCY VERIFICATION
Ruth Thole
Site Location Representative Signature Printed Name Date
11/2/2026
| Insert from: "Pre-Proposal Meeting Sign in sheet - RFP 270000000140.pdf" |
| PRE-PROPOSAL MEETING/site Visit |
| Sign-In Sheet |
| 2026-11-10T10:50:29-0500 | |
| Ruth Thole |
File details come from the government source that posted it. Updated .