Amendment #1 Silver Spades Project.pdf

PDF 2 MB Posted

Attached to
FY18, PKAA, Silver Spades Project
Solicitation number
IFB1 PKAA 2017000277 4
Issued by
Kit Carson County, Denver City, Colorado

About this file

This is Amendment No. 1 to Invitation for Bid 2017-0277 issued by the Colorado Division of Reclamation, Mining & Safety for the Silver Spades Project, an inactive mine site remediation project located in Lake County near the Mount Sherman area. The amendment provides clarifications and modifications to the original bid documents for mine closure work involving 31 features (shafts and adits) at the project site. Key services include installation of mine closures using various methods such as polyurethane foam (PUF), monolithic plugs with concrete and rockfill, backfill operations, and structural stabilization. The project scope encompasses removal and disposal of debris, timber management, drainage considerations, equipment installation, and coordination around transmission lines. The revised bid schedule requires contractors to submit separate pricing for: mobilization/demobilization, safety and environmental planning, primary mine closure installations (Item 3 with 28 features listed), additional hazardous mine openings safeguarding if required (Item 4 with 3 features), and contingency materials including PUF, rockfill, concrete, and equipment rental. A pre-bid meeting was conducted, and the bid submission deadline was 4:00 p.m. on Wednesday, July 5, 2017. Field forms and photographs were provided for features 100, 124, 129, ST-06, and ST-08 that were not visited during the pre-bid meeting.

The amendment specifies significant modifications to closure methods and material quantities for 15 features compared to original specifications. Notable changes include Feature 105 (increased to 8 cubic yards of PUF), Feature 118 (changed to 44 cubic yards of PUF), Feature 121 (changed to monolithic plug requiring 25 cubic yards of rockfill and 30 cubic yards of 4,500 psi concrete), and Feature ST-06 (addition of polyurethane foam as an alternative closure option). All work is funded through Lake County OSM (Office of Surface Mining) funding. The bid schedule requires contractors to circle their preferred closure method for Feature ST-06, acknowledge receipt and acceptance of the amendment, and return all revised bid schedule pages with all line items completed. Monument pipe installation requirements were clarified, and specific drainage and material placement specifications were detailed for multiple features.

View the file

Other files

File Type Posted
Silver Spades X_Y.pdf PDF
Attendees Silver Spades Project Pre-Bid Mtg.pdf PDF
Silver Spades Project.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us John W. Hickenlooper, Governor | Robert Randall, Executive Director | Virginia Brannon, Director

DATE: June 21, 2017

TO: All Bidders on the Silver Spades Project

FROM: Craig Bissonnette, Division of Reclamation, Mining & Safety

RE: Amendment No. 1 to 2017-0277

Thank you for your attendance at the Pre-Bid Meeting. The following clarifications and amendments should be noted and incorporated into the bid documents:

1. Feature 105 – The closure method for this closure has been changed.

New Closure Method: Polyurethane Foam (PUF), Per SWS 9 Work Description: Set bottom form at a depth of four (4) feet below the timbered section of the shaft and install PUF to a thickness of seven (7) feet. Backfill to surrounding ground surface. Eight (8) cubic yards of PUF is required for this closure.

2. Feature 110 – The total volume of rockfill required for this feature has been increased to ten (10) cubic yards. All other specifications remain the same.

3. Feature 111 – PROJECT MANAGER will determine the location of onsite material to be used for backfill. All other specifications remain the same.

4. Feature 114 – The total volume of PUF required for this feature has been increased to twenty (20) cubic yards. All other specifications remain the same.

5. Feature 118 – The closure method for this feature has been changed.

New Closure Method: Polyurethane Foam, Per SWS 9 Work Description: Set bottom form at a depth of nineteen (19) feet below ground surface and install PUF to a thickness of fifteen (15) feet. Backfill to surrounding ground surface.

Forty four (44) cubic yards of PUF is required for this closure.

6. Feature 120 – The total volume of PUF required for this feature has been increased to sixteen (16) cubic yards. Cribbed section of shaft is twenty (20) feet below ground surface.

All other specifications remain the same.

http://mining.state.co.us/

7. Feature 121 – The closure method for this feature has been changed.

New Closure Method: Monolithic Plug, Per SWS 7 Work Description: Remove timbers and place neatly to the side. Install twenty five (25) cubic yards of imported rockfill and thirty (30) cubic yards of 4,500psi concrete. Rockfill must be angular, durable and a minimum of eighteen (18) inches in diameter. Surface dimension of the feature measures thirty-five (35) feet in diameter. Bridge decking or other rigid form may be required for this closure. PROJECT MANAGER will determine onsite material to be used for backfill.

8. Feature 125 – CONTRACTOR is only required to remove and dispose of one (1) load of trash - Approx. three (3) cubic yards/full-size pickup truck. All other specifications remain the same.

9. Feature 132 – The work description for this feature has been changed.

New Work Description: Place large (8in to 15in) onsite rockfill to a thickness of two (2) feet and then install eight (8) cubic yards of PUF. Backfill to surrounding ground surface ensuring positive drainage to the north.

10. Feature 135 – All existing timbers and any removed during backfilling operations may remain onsite. CONTRACTOR is not required to remove or disposed of any timbers. All other specifications remain the same.

11. Feature 138 – The work description for this feature has been changed.

New Work Description: Set bottom form at a depth of four (4) feet below the timbered section of the shaft and install PUF to a thickness of seven (7) feet. Backfill to surrounding ground surface. Total volume of PUF required for this closure has been increased to eight

(8) cubic yards.

12. Feature 139 – The total volume of rockfill required for this closure has been increased to ten (10) cubic yards. All other specifications remain the same.

13. Feature 144 – Remove timbers and place neatly to the side. Backfill feature to ensure positive drainage to the southwest. The dry-stacked rock walls must not be disturbed. All other specifications remain the same.

14. ST-06 – A closure option has been added to this feature.

Alternate Closure Method: Polyurethane Foam, Per SWS 9 Work Description: Set the bottom form at a depth of ten (10) feet below ground surface and install PUF to a thickness of seven (7) feet. Backfill to surrounding ground surface ensuring positive drainage to the north. Eight (8) cubic yards of PUF is required for this closure. Dimensions for steel grated shaft closure measure 4’x8’. A footer is not required.

CONTRACTOR must circle the preferred closure method on the Bid Schedule.

15. All polyurethane foam closures will require drainage pipes as specified in SWS 9.

16. Features 102, 105, 116, 125, and 134 with a small, secondary closure specified only require one (1) monument pipe. Monument pipe will be installed on the primary closure.

17. Features 100, 124, 129, ST-06 and ST-08 were not visited during the pre-bid meeting.

Field forms and photos of these feature have been provided on the Vendor Self Service (VSS) System.

18. Any trees removed around the project site will be bucked into 4’-6’ lengths and scattered.

19. All clearance requirements must be observed when working around transmission lines and noted on the SHEAP.

The bid submittal for this project is no later than 4:00 p.m. on Wednesday, July 5, 2017.

Please use the REVISED Bid Schedule included with this amendment when submitting your bid.

All terms and conditions of the Invitation for Bid other than as changed by this amendment remain the same.

Receipt and acceptance of this amendment shall be acknowledged on the bid form and by submitting the REVISED Bid Schedule.

Silver Spades Project REVISED Bid Schedule

June 21, 2017 2017-0277

ITEM

DESCRIPTION

QTY

UNIT UNIT PRICE

AMOUNT

1.0 Mobilize/Demobilize 1 Job N/A $

2.0 Safety, Health &

Environmental Action Plan 1 Job N/A $

3.0 Install Mine Closures

(Total from Page 3) 1 Job N/A $

4.0 Install Add’l Mine Closures

(if required, Total from Page 4) 1 Job N/A $

5.0 Provide Add’l PUF

(if required) 5 Cubic

Yard $ $

6.0 Provide Add’l Rockfill

(if required) 5 Cubic

Yard $ $

7.0 Provide Add’l Concrete

(if required) 5 Cubic

Yard $ $

8.0 Provide Add’l Equip. Rental -

Medium Excavator (if required) 5 Hour $ $

GRAND TOTAL (Enter here and on Invitation and Bid Sheet) $

DO NOT AMEND ANY PART OF THIS BID SCHEDULE

ALL PAGES OF THIS BID SCHEDULE MUST BE RETURNED

ALL LINES ITEMS MUST BE COMPLETED

Page 1 of 4 Pages

June 21, 2017

Item 3 - Install Mine Closures:

Feature

ID

Type

Closure Method

Bid Amount

County

Funding

100 Shaft Polyurethane Foam (6CY) $ Lake OSM

101 Shaft Backfill $ Lake OSM

102 Shaft Monolithic Plug (25CY rockfill; 30CY concrete) $ Lake OSM

103 Shaft Backfill $ Lake OSM

104 Shaft Polyurethane Foam (6CY) $ Lake OSM

105 Shaft Polyurethane Foam (8CY) $ Lake OSM

110 Shaft Monolithic Plug (10CY rockfill; 8CY concrete) $ Lake OSM

111 Shaft Monolithic Plug (60CY rockfill; 30CY concrete) $ Lake OSM

113 Shaft Backfill $ Lake OSM

114 Shaft Polyurethane Foam (20CY) $ Lake OSM

115 Shaft Polyurethane Foam (7CY) $ Lake OSM

116 Shaft Rockfill & Polyurethane Foam (2CY rockfill; 2CY PUF) $ Lake OSM

117 Shaft Monolithic Plug (25CY rockfill; 30CY concrete) $ Lake OSM

118 Shaft Polyurethane Foam (44CY) $ Lake OSM

119 Shaft Polyurethane Foam (6CY) $ Lake OSM

120 Shaft Polyurethane Foam (16CY) $ Lake OSM

121 Shaft Monolithic Plug (25CY rockfill; 30CY concrete) $ Lake OSM

125 Adit Backfill $ Lake OSM

Page 2 of 4 Pages

Item 3 cont. - Install Mine Closures:

132 Shaft Backfill w/ PUF (8CY) $ Lake OSM

134 Shaft Backfill $ Lake OSM

135 Adit Backfill $ Lake OSM

136 Shaft Polyurethane Foam (20CY) $ Lake OSM

138 Shaft Polyurethane Foam (8CY) $ Lake OSM

139 Shaft Monolithic Plug (10CY rockfill; 10CY concrete) $ Lake OSM

141 Adit Backfill $ Lake OSM

142 Shaft Backfill $ Lake OSM

143 Shaft Backfill $ Lake OSM

144 Shaft Backfill $ Lake OSM

145 Shaft Backfill $ Lake OSM

ST-06 Shaft

Contractor’s Option:

Steel Grated Shaft Closure or

Polyurethane Foam (8CY)

Please Circle Preferred Option

$ Lake OSM

ST-08 Adit Backfill $ Lake OSM

ST-18 Shaft Polyurethane Foam (6CY) $ Lake OSM

TOTAL (Enter here and on Page 1 of Bid Schedule, Item 3) $

Page 3 of 4 Pages

Item 4 - Safeguard Additional Hazardous Mine Openings, if required:

124 Shaft Steel Grated Shaft Closure w/ Access $ Lake OSM

129 Shaft Backfill $ Lake OSM

140 Shaft Backfill $ Lake OSM

TOTAL (Enter here and on Page 1 of Bid Schedule, Item 4) $

Page 4 of 4 Pages

Colorado Division of Reclamation, Mining, and Safety

Inactive Mine Site Field Form Brasscap Project #: 587 OSM Project #: 587

Project: Silver Spades ID: 100 County: Lake

Mine Name: Project Mgr: CB1 Date: October 21, 2015

Claim Name: Little Prince MLS No: 551 AMLIS No:

Quad Name: MOUNT SHERMAN Owner: FC.Owner_Name

Field Description: Just above 5th Street (to south), past Adelaide Park across from turnout at ore shed on 5th.

Latitude: N 39 ° 15’ 03.40” UTM: 13N 392542.27 (E) 4345363.75 (N)

Zone Longitude: W 106 ° 14’ 43.30” Elevation: 11204.53

¼ ¼ NE ¼ SW Section: 20 Township: 9S Range: 79W

Type of Feature: Shaft Condition: Partially Collapsed Lining: Rock + Timber

Excavated Dimensions: 8 x 4 Eroded Dims. 8 x 4 Construction Dims: 8 x 4

Depth of Feature: 100+ Depth to Bedrock: 25 Depth to Plug: N/a Shape of Opening: Rectangular

Surficial Material: Waste rock Drainage w/ flow, ppt, pH, etc: NONE

Existing Access Deterrents: None Access Required? No Good equipment access? No

Possible Bat Habitat? No

Adjacent land Use: Rec & wildlife Mine dump volume & impacts: 1500 cuyds

Preferred Closure Method: Polyurethane Foam Alternative Closure Methods: Polyurethane Foam,Polyurethane

Foam,Bat Grate,Backfill

Structures: Shaft door/canopy in shaft. Collaspsed headframe Equipment & Debris I Conditions I Types: Very little.... bolts, timbers, broken glass

Work Description: Remove debris from shaft... open up double compartment shaft and PUF. Create “mushroom plug” with PUF.

Only one side open presently.

24K Topo

1st Before Image

Brasscap Project #: 587 OSM Project #: 587

Project: Silver Spades ID: 124 County: Lake

Mine Name: Project Mgr: CB1 Date: October 26, 2015

Claim Name: Banker MLS No: 910 AMLIS No:

Quad Name: MOUNT SHERMAN

Field Description: Above and South of Adelaide Park... accessed from intersection on “cutoff road” between 1st and 5th St.

Latitude: N 39 ° 14’ 32.83” UTM: 13N 392589.13 (E) 4344420.51 (N)

Zone Longitude: W 106 ° 14’ 40.80” Elevation: 11392.52

¼ ¼ NW ¼ NE Section: 29 Township: 9S Range: 79W

Type of Feature: Shaft Condition: Intact Lining: Timber

Excavated Dimensions: 5 x 9 Eroded Dims. 5 x 9 Construction Dims: 5 x 9

Depth of Feature: 100+ Depth to Bedrock: 15 Depth to Plug: N/a Shape of Opening: Rectangular

Surficial Material: Waste rock Drainage w/ flow, ppt, pH, etc: No

Existing Access Deterrents: Access Required? Yes Good equipment access? Yes

Possible Bat Habitat? No

Adjacent land Use: Rec & wildlife Mine dump volume & impacts: 10000 cuyds

Preferred Closure Method: Grate w/ Access Alternative Closure Methods: Grate,Grated Corrugated Steel Pipe w/Access,Polyurethane Foam,Bat Grate

Structures: Collapsed structures. Headframe isn’t too far behind... standing on three legs.

Work Description: tripod and skip still installed at site. Access ok... ATV’s and mini equip only. Stabilize headframe with new angle brace/kicker.

2nd Before Image

Brasscap Project #: 587 OSM Project #: 587

Project: Silver Spades ID: 129 County: Lake

Mine Name: Project Mgr: CB1 Date: October 29, 2015

Claim Name: Banker MLS No: 910 AMLIS No:

Quad Name: MOUNT SHERMAN Owner: FC.Owner_Name

Field Description: Approx. 600’ North of #124 (feature w/ tripod & skip)

Latitude: N 39 ° 14’ 37.53” UTM: 13N 392566.98 (E) 4344565.58 (N) Zone

Longitude: W 106 ° 14’ 41.81” Elevation: 11332.15

¼ ¼ NW ¼ NE Section: 29 Township: 9S Range: 79W

Type of Feature: Shaft Condition: Partially Collapsed Lining: Rock + Timber

Excavated Dimensions: 4 x 8 Eroded Dims. 15 x 15 Construction Dims: 15 x 15

Depth of Feature: 15 Depth to Bedrock: 20 Depth to Plug: 15 Shape of Opening: Circular

Surficial Material: Waste rock Drainage w/ flow, ppt, pH, etc: NONE

Existing Access Deterrents: Access Required? Unknown Good equipment access? No

Possible Bat Habitat? No

Adjacent land Use: Rec & wildlife Mine dump volume & impacts: 75 cuyds

Preferred Closure Method: Backfill Alternative Closure Methods: Backfill,Backfill,Polyurethane Foam

Structures: None Equipment & Debris I Conditions I Types: None

Work Description: Hand backfill. Possible access with mini equip

Aerial Image

Brasscap Project #: 587 OSM Project #: 587

Project: Silver Spades ID: ST-06 County: Lake

Mine Name: Project Mgr: CB1 Date: July 20, 2015

Claim Name: Alps No. 1 MLS No: 1952 AMLIS No:

Quad Name: MOUNT SHERMAN

Latitude: N 39 ° 14’ 29.08” UTM: 13N 395172.24 (E) 4344269.75 (N)

Zone Longitude: W 106 ° 12’ 52.98” Elevation: 11820

¼ ¼ SW ¼ NW Section: 27 Township: 09S Range: 79W

Type of Feature: Shaft Condition: Partially Collapsed Lining: Rock

Excavated Dimensions: 4 x 8 Eroded Dims. 26 x 21 Construction Dims: 26 x 21

Depth of Feature: 100 Depth to Bedrock: 8 Depth to Plug: 21 Shape of Opening: Rectangular

Surficial Material: Waste rock Drainage w/ flow, ppt, pH, etc: N/a

Existing Access Deterrents: None Access Required? Unknown Good equipment access? Yes

Possible Bat Habitat? No

Adjacent land Use: Mining and recreation Mine dump volume & impacts: 1800 cuyds

Preferred Closure Method: Grate Alternative Closure Methods: Polyurethane Foam

Structures: Collapsed structure Equipment & Debris I Conditions I Types: Shafthouse and headfram remnant; also hoist and compressor foundations

Brasscap Project #: 587 OSM Project #: 587

Project: Silver Spades ID: ST-08 County: Lake

Mine Name: Project Mgr: CB1 Date: July 22, 2015

Claim Name: Columbus MLS No: 1955 AMLIS No:

Quad Name: MOUNT SHERMAN Field Description: 50’ west of road @ run-around

Latitude: N 39 ° 14’ 36.69” UTM: 13N 395051.44 (E) 4344506.12 (N)

Zone Longitude: W 106 ° 12’ 58.15” Elevation: 11620

¼ ¼ NW ¼ NW Section: 27 Township: 09S Range: 79W

Type of Feature: Adit Condition: Partially Collapsed Lining: Rock

Excavated Dimensions: 4 x 6 Eroded Dims. 4 x 2 Construction Dims: 4 x 2

Depth of Feature: 40 Depth to Bedrock: N/a Depth to Plug: N/a Shape of Opening: Oval

Surficial Material: Waste rock, soil Drainage w/ flow, ppt, pH, etc: N/a

Existing Access Deterrents: None Access Required? Unknown Good equipment access? Yes

Possible Bat Habitat? No

Adjacent land Use: Mining and recreation Mine dump volume & impacts: 75 cuyds

Preferred Closure Method: Backfill Alternative Closure Methods: Bulkhead,Grate,Grated Corrugated Steel

Pipe,Polyurethane Foam

Structures: N/a Equipment & Debris I Conditions I Types: 1 HIC-L&S can

Silver Spades - Amendment#1
Silver Spades - REVISEDBidSched_6-21-17
MSFF_Combined (1)
SilverSpades_100_4Bid
SilverSpades_124_4Bid
SilverSpades_129_4Bid
SilverSpades_ST-06
SilverSpades_ST-08