Amendment 1 - RFP 1136 - Administrative Document.docx
DOCX document 200 KB Posted
- Solicitation number
- 1136
- Issued by
- Idaho
About this file
Amendment 1 - RFP 1136 Summary
This is Amendment 1 to a Request for Proposal (RFP) issued by the State of Idaho Division of Purchasing on behalf of the Division of Occupational and Professional Licenses (DOPL). The RFP solicits proposals from qualified firms to provide ARELLO-accredited exam delivery services for Real Estate Commission (REC) examinations and fingerprinting services for multiple boards across DOPL's three bureaus. The scope of work encompasses full-service exam development, administration, scoring, and reporting; electronic fingerprinting services at designated locations; candidate support and customer service; security and compliance procedures; and ongoing system maintenance and continuous improvement. The pre-proposal conference is scheduled for June 9, 2026 at 10:00 am Mountain Time; the deadline for submitting written questions is June 16, 2026 at 11:59 pm Mountain Time; and proposals must be submitted electronically through the IPRO system by July 14, 2026 at 10:30 am Mountain Time, with public opening via Microsoft Teams. The initial contract term is four years, with an anticipated total contract term of eight years upon mutual written agreement for renewal, extension, or amendment. Historical examination data from 2020-2025 shows significant annual volumes, including broker and salesperson exams with both national and state components, and fingerprinting services have been provided since October 2022.
The contract is not funded by the State; instead, the Contractor bills candidates directly for exam fees (capped at $150 pursuant to Idaho Code 54-2014(2)) and fingerprinting services at the time of scheduling. The current incumbent contractor has provided these services since 1989, with the existing contract expiring November 15, 2026, and the new contract commencing November 16, 2026. Proposals will be evaluated on mandatory submission requirements, technical merit weighted at 800 points, and cost weighted at 200 points, for a total of 1,000 points. The contractor must maintain ARELLO certification throughout the contract term and provide compliance with Idaho Code Title 54, Chapter 20, and IDAPA 24.36.01. Critical performance requirements include 99.5% system uptime, resolution of 90% of candidate inquiries within 48 hours, score transmittal within 48 hours of exam completion, and maintenance of secure, legally defensible exam programs with validated item banks and psychometrically sound testing protocols.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 1136 Consolidated Questions_Final.docx | DOCX document | |
| RFP 1136 Modifications & Exceptions_Final.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF IDAHO
DIVISION OF PURCHASING
FOR
DIVISION OF OCCUPATIONAL AND PROFESSIONAL LICENSES
Request For Proposal
Exam Development, Exam Delivery, Fingerprint Collection
RFP Number: 1136
Amendment 1
Table of Contents
| RFP Section 1 - Administrative Information & Overview |
| Page 3 |
| RFP Section 2 - Format & Submission Requirements |
| Page 6 |
| RFP Section 3 - Proposal Contents |
| Page 9 |
| RFP Section 4 - Evaluation & Award Procedures |
| Page 12 |
| Exhibit 1 - Background Information |
| Page 14 |
| Exhibit 2 - General Requirements |
| Page 16 |
| Exhibit 3 - Scope of Work (SOW) |
| Page 19 |
| Exhibit 4 - Pre-Proposal Conference Registration Form |
| Page 25 |
| Exhibit 5 - Questions |
| Page 26 |
| Exhibit 6 - Contract Modifications and Exceptions |
| Page 28 |
| Exhibit 7 - Deliverables |
| Page 30 |
| Submittal Form A - Background, Declarations, and Certifications |
| Page 32 |
| Submittal Form B - Technical Proposal |
| Page 35 |
| Submittal Form C - Cost Proposal |
| Page 43 |
Section 1 Administrative Information and Overview
1.1 Purpose
The State of Idaho’s (“State”) Division of Purchasing (“DOP”), on behalf of the Division of Occupational and Professional Licenses (“DOPL”) is issuing this Request For Proposal (“RFP”) to solicit Proposals from qualified and experienced firms (“Offerors”), that can provide ARELLO accredited exam delivery for Real Estate Commission (“REC”) exams, and provide fingerprinting services for multiple boards across DOPL’s three bureaus. Background information is provided in Exhibit 1. General Requirements are provided in Exhibit 2. The complete scope of work is provided in Exhibit 3.
1.2 Procurement Schedule
Pre-Proposal Meeting:
Deadline to submit questions:
Closing Date (deadline to submit Proposal):
Public Opening Date:
Bid Opening Link:
The State will make every effort to adhere to the schedule below, but reserves the right, at its sole discretion, to adjust the schedule.
Tuesday, June 9, 2026 @ 10:00 am MT Tuesday, June 16, 2026 @ 11:59 pm MT See IPRO Event Main Page for current closing date and time.
Tuesday, July 1424, 2026 @ 10:30 am MT Microsoft Teams Meeting
1.3 RFP Lead
Name:
Title & Agency:
Email:
The individual listed below (referred to as “RFP Lead”) is responsible for the conduct of this procurement. From the issue date of this RFP, until a contract is awarded, or the RFP is cancelled, Offerors are prohibited from communicating with any State employee, Official, or Evaluators regarding this RFP or procurement.
Alex Limber Buyer, Division of Purchasing Alex.Limber@adm.idaho.gov
1.4 Pre-Proposal Conference
Link:
A non-mandatory pre-proposal conference will be held to provide an overview of the RFP process, the scope of work, and submission requirements. While attendance is highly encouraged, it is not mandatory. The meeting will be conducted virtually, with the access link provided below. To inform the State of your planned interest and attendance, please complete and submit Exhibit 4.
Microsoft Teams Meeting
1.5 IPRO eProcurement System
This Solicitation is issued by the State via the State’s eProcurement system, IPRO. It is the Offeror’s responsibility to monitor IPRO for any updates or amendments.
Link: IPRO POWERED BY LUMA
| 1.6 Initial Term and Contract Renewal |
| The initial term of this Contract will be for four (4) years. Upon mutual, written agreement, the Contract may be renewed, extended or amended. The anticipated total Contract term is eight (8) years. |
THE ADMINISTRATIVE FEE DETAILED IN ARTICLE 5 OF THE STATE’S STANDARD CONTRACT TERMS AND CONDITIONS WILL NOT APPLY TO THE CONTRACT(S) THAT RESULT FROM THIS SOLICITATION.
1.7 Questions
The Offeror must review this entire RFP solicitation, including associated documents. All questions, requests for clarification, or other correspondence must be submitted in writing via email to the RFP Lead. See Exhibit 5 for additional instructions. Questions must be submitted using the table provided within Exhibit 5.
1.8 Modifications and Exceptions to Requirements, Terms, and Conditions
1.8.1 Vendors are strongly encouraged to submit any proposed modifications to the requirements, terms, or conditions of the RFP on Exhibit 5 - Bidder Questions prior to the deadline to submit questions. Questions regarding these requirements must contain the following:
1.8.1.1 The rationale for the specific requirement being unacceptable to the party submitting the question (define the deficiency).
1.8.1.2 Recommended verbiage for the State’s consideration that is consistent in content, context, and form with the State’s requirement that is being questioned.
1.8.1.3 Explanation of how the State’s acceptance of the recommended verbiage is fair and equitable to both the State and to the party submitting the question.
1.8.2 In the event that a Bid contains modifications or exceptions to any Solicitation requirements, terms, or conditions which are not addressed during the question and answer period, they must be identified and submitted on Exhibit 6 – Contract Modifications and Exceptions and must contain the same information outlined in Section 1.8.1, above. The State will not consider any modifications or exceptions that are not identified specifically on Exhibit 6.
1.8.3 The State has sole discretion to determine if the modifications or exceptions submitted by an Bidder would result in a material change or otherwise threaten the integrity of the procurement process. Pursuant to IDAPA 38.05.01.084.e, the State may only negotiate non-material modifications or exceptions. Modifications or exceptions which the State determines to be material, or which otherwise threaten the integrity of the procurement process, will not be accepted or negotiated. If the Bidder has conditioned its Bid on the State’s acceptance or negotiation of its proposed modifications or exceptions, and the modifications or exceptions are deemed material, the Bidder will be given the opportunity to retract the proposed modifications or exceptions from its Bid. Failure to do so will result in the Bidder’s Bid being found non-responsive, after which it will receive no further consideration.
1.8.4 Non-material modifications or exceptions may be discussed with the apparent successful Bidder, at the discretion of the State; however, the State will have the right to reject any and all such modifications and/or exceptions, or to call an end to such discussions, and to instruct the Bidder to amend its Bid and remove the modifications and/or exceptions. Failure to do so may result in the State finding the Bid non-responsive.
Except as otherwise provided within the Solicitation, the State will not consider modifications or exceptions to the requirements, terms, or conditions which are proposed after the RFP Closing Date.
1.9 Amendments
The State may issue amendments to make changes to the RFP, or to respond to any questions. Amendments will be posted on IPRO. Offerors are responsible for monitoring IPRO for updates and amendments. All published amendments must become part of this RFP, and must be considered by the Offeror in its Proposal. Oral interpretations or clarifications of this RFP are not binding and should not be relied upon. Any verbal responses provided by the State during the pre-proposal conference are considered unofficial, and will not be binding.
1.10 Authority
This procurement is conducted in accordance with IDAPA 38.05.01 and pursuant to Title 67, Chapter 92 of the Idaho Code.
Section 2 Format & Submission Requirements
2.1 Adherence to Requirements
The Proposal must be submitted in accordance with the requirements set forth in this document. Any Proposal that does not adhere to the requirements may be deemed non-responsive and rejected. The State reserves the right, in its sole discretion, to overlook any minor informalities that may be non-compliant.
2.2 Deadline to Submit
All Proposals are due at the date and time specified in the Procurement Schedule (Section 1.2). Late Proposals will not be accepted or considered. The State will not be responsible for any technical issues, difficulties, or delays. Offerors are strongly encouraged to begin the process of submitting the Proposal response far enough in advance of the Closing Date/Time to allow for resolution of any technical difficulties.
2.3 Submittal Form Templates
The Offeror must ensure that their response meets all requirements detailed within this RFP. This RFP contains Submittal Forms, which must be used by the Offeror to submit their Proposal. Offerors must not re-create these Submittal Forms, create their own Submittal Forms, or edit the format structure of the Submittal Forms. An electronic copy of each Submittal Form is posted along with this RFP. The Offeror must download, complete, and submit each Submittal Form in their response.
2.4 General Format Requirements
The Proposal response must meet the following requirements:
2.4.1 Be made on standard 8.5” x 11” paper size.
2.4.2 Use a minimum font size of ten (10) (images, figures, graphs, charts, are excluded from this font size).
2.4.3 Use a font style such as: Calibri, Arial, New Times Roman, or similar.
2.4.4 The Offeror must not embed information, embed files, or embed any links within the Submittals.
2.4.5 The Offeror must not attach additional information to any Submittal Form (unless it has been explicitly requested). Any additional attachments submitted will not be considered in the evaluation process.
2.4.6 Cost information must only be contained within the Pricing Schedule Submittal Form. No other document or Submittal Form may contain cost or pricing information.
2.5 Page Limits
The Submittal Forms have maximum page limit requirements, as shown in the table below. The Offeror must ensure that their Proposal meets these page limit requirements. Offerors must not exceed the maximum page limits. Please note that the page limit applies exclusively to the front side of a page only (i.e. a ‘1 Page’ implies that the Offeror can only provide a response on one side of a piece of paper). Any Submittal Form that does not follow these instructions may receive a ‘0’ score for the evaluated Submittal Form, or the additional text will be removed or redacted before being provided to evaluators; only the text within the page limit will be evaluated.
| Submittal Form |
| Maximum Page Limits |
| Submittal A |
| Background, Declarations, & Certifications |
| n/a |
| Submittal B |
| Qualifications & Experience |
| n/a |
| Idaho-Specific Content Expertise |
| n/a |
| Technical Capability and Exam Delivery |
| n/a |
| Customer Service and Candidate Experience |
| n/a |
| Implementation Plan and Transition Readiness |
| n/a |
| Reporting and Data Capabilities |
| n/a |
| Obstacles, Challenges, & Risks |
| n/a |
| Mandatory SOW Responses |
| n/a |
| Submittal C |
| Pricing Schedule |
| n/a |
2.6 Electronic Submission Instructions
The Offeror must submit the Proposal as follows:
2.6.1 The Proposal must be submitted electronically through IPRO POWERED BY LUMA. The State will not accept Proposals in any other manner (i.e. facsimile, email, or hardcopy submissions). All Offerors participating in this Solicitation must establish an account in the IPRO system, as it is necessary in order to process and/or award the resulting Contract(s). Establishing an account is free.
Please make sure that the entity profile under which the Proposal is submitted in IPRO, is the same legal entity presented in the uploaded response materials. If there are any discrepancies, the entity information provided within Submittal Form A prevails.
2.6.2 The Proposal must be submitted in the following packages:
| Pkg |
| Contents |
| File Format |
| How To Name the Files |
| 1 |
| Submittal Form A |
| MS Word / PDF |
| 1 <Insert Offeror Name> |
| 2 |
| Submittal Form B |
| MS Word / PDF |
| 2 <Insert Offeror Name> |
| 3 |
| Submittal Form C |
| MS Word / PDF |
| 3 <Insert Offeror Name> |
| 4* |
| Redacted Submittal Forms* |
| 4 <Insert Offeror Name> REDACTED |
* If applicable. Applies to Proposals with trade secrets as discussed below.
2.6.3 Package 1 may include a cover page and a table of contents.
2.6.4 All electronic files must be in Adobe PDF, Microsoft Word, or Microsoft Excel format as noted in the table above.
2.6.5 The Proposal file(s) must not be password protected or locked in any way.
2.6.6 All submission materials must be submitted at the same time. If multiple submissions are received, only the latest timely submission will be considered.
2.6.7 Alternate Proposals are not allowed.
2.6.8 Note: When submitting through IPRO, enter your Cost in IPRO as “$0.01”.
2.6.9 Package 4: If your Proposal contains trade secrets (see next Section), submit an additional redacted version. This version should be labeled as Package 4 and include 'Redacted' in the file name.
2.7 Trade Secrets and Non-Public Information
The Idaho Public Records Act, Idaho Code title 74, chapter 1 (the “Act”) defines trade secrets to “include a formula, pattern, compilation, program, computer program, device, method, technique or process that derives economic value, actual or potential, from not being generally known to, and not being readily ascertainable by proper means by other persons and is subject to the efforts that are reasonable under the circumstances to maintain its secrecy.” The Act also defines other records that may be exempt from public disclosure.
In addition to marking each page of the document with a trade secret or other exemption notation (as applicable; and as provided in Paragraph 28 of the Solicitation Instructions to Vendors), Offerors must also:
2.7.1 Identify with particularity the precise text, illustration, or other information contained within each page marked “trade secret” or “exempt from disclosure” (it is not sufficient to simply mark the entire page). The specific information you deem “trade secret” or “exempt” within each noted page must be highlighted, italicized, identified by asterisks, contained within a text border, or otherwise clearly delineated from other text/information and specifically identified as a “trade secret” or “exempt from disclosure.”
2.7.2 Provide a separate document entitled “List of Redacted Trade Secret and Exempt Information” which provides a succinct list of all trade secret and exempt information noted in your Proposal; listed in the order it appears in your submittal documents, identified by Page #, Section #/Paragraph #, Title of Section/Paragraph, specific portions of text/illustrations; or in a manner otherwise sufficient to allow the State’s procurement personnel to determine the precise text/material subject to the notation. Additionally, this list must identify with each notation the specific basis for your position that the material be treated as exempt from disclosure and how the exempting the material complies with the Act.
2.7.3 Submit a redacted copy of any Proposal response document (e.g. Scope of Work Response) with all trade secret and exempt information removed or blacked out. The redacted copy must be submitted electronically in the Supplier Attachments section of IPRO, with the word “redacted” in the file name.
Section 3 Proposal Contents
3.1 Background, Declarations, and Certifications (Submittal Form A) The Offeror must complete and submit all information requested in this Submittal Form. An Offerors failure to meet these requirements may result in their Proposal being found non-responsive.
3.2 Technical Proposal (Submittal Form B)
The Offeror must complete and submit all information requested in Submittal Form B. An Offerors failure to meet these requirements may result in their Proposal being found non-responsive and given no further consideration. The Technical Proposal consists of eight (8) parts, as described below:
3.2.1 Qualifications and Experience: The Offeror should summarize their experience and qualifications as it relates to the scope of work being requested in this RFP. The Offeror should also outline the experience and qualification of the key personnel that will be assigned to this Contract. The Offeror should highlight any unique attributes that make the team especially qualified for the scope of services. Resumes are not required and should not be provided. The Offeror’s response should additionally provide the information requested below:
3.2.1.1 Relevant Experience
3.2.1.1.1 Length of time in business providing examination services.
3.2.1.1.2 Evidence of experience administering real estate or other professional licensing exams, particularly for state licensing agencies.
3.2.1.1.3 Specific experience developing and delivering state-specific exam content.
3.2.1.1.4 History of contracts with other regulatory bodies or boards (preferably within the U.S.), with references from at least three other states who currently use or have used the Offeror’s services in the past five (5) years.
3.2.1.1.5 Contact information for the exam program manager.
3.2.1.1.6 Examples of prior implementations of similar scope, including transition from legacy vendors.
3.2.1.2 Organizational Capacity & Infrastructure
3.2.1.2.1 Organizational chart showing key personnel and reporting lines for the project.
3.2.1.2.2 Number of staff dedicated to exam development, fingerprint services, administration, technical support, and customer service.
3.2.1.2.3 Description of physical infrastructure (e.g., number of test centers – proprietary and third party, locations) with information on which of the sites can capture electronic fingerprints, and technological capacity (e.g., remote testing platform, security systems).
3.2.1.3 Key Personnel Qualifications
3.2.1.3.1 Bios and qualifications of proposed project team members (e.g., project manager, psychometricians, IT security lead, customer support lead).
3.2.1.3.2 Summary of certifications, credentials, and professional experience (e.g., degrees, PMP, ISO certification).
3.2.1.3.3 Identification of Idaho-based staff or resources, if applicable.
3.2.1.4 Staffing Plan
3.2.1.4.1 Staffing structure and coverage for key functions: content development, scheduling, tech support, customer service, and compliance.
3.2.1.4.2 Approach to staff training, retention, site issue resolution, and knowledge continuity.
3.2.1.4.3 Plan for scaling staff capacity during peak testing periods or during implementation.
3.2.1.5 Subcontractors
3.2.1.5.1 Identification and disclosure of any subcontractors proposed to be involved in service delivery.
3.2.1.5.2 Identification of the physical address, roles, qualifications, an explanation of how and when each subcontractor will be involved, and management oversight of subcontracted entities.
3.2.1.5.3 Vendor accountability for subcontractor performance.
3.2.1.5.4 Must include a statement acknowledging that subcontractors will not be used unless they receive advanced approval, in writing, prior to any subcontractor services being provided.
3.2.1.6 Business Continuity & Succession
3.2.1.6.1 Plan to ensure uninterrupted service delivery in the event of staffing changes, turnover, or emergencies.
3.2.1.6.2 Description of internal succession planning and documentation procedures.
3.2.2 Idaho-specific Content Expertise: The Offeror should address their ability to develop and maintain state-specific exam content. The Offeror should also address their willingness to work with Idaho subject matter experts (“SMEs”) and align exam items that allow applicants to establish their competency to practice in Idaho with Idaho Code Title 54, Chapter 20, and IDAPA 24.36.01 as outlined in Idaho Code 67-9409(4). Accurate Idaho-specific content is essential for ensuring licensees are tested on the correct laws and standards to establish their competency to practice in Idaho — this requirement directly affects public protection and legal compliance.
3.2.3 Technical Capability and Exam Delivery: Secure, seamless delivery of exams protects exam integrity and ensures equitable access statewide. The Offeror should address the following in their response to this section:
3.2.3.1 Reliability and scalability of testing and fingerprinting systems.
3.2.3.2 Availability of in-person and remote testing options across Idaho including the number of seats available for each location.
3.2.3.3 Availability of in-person and remote testing options outside of Idaho, with particular emphasis on surrounding states.
3.2.3.4 The number of vendor owned sites and those that are third party sites contracted to administer the exam.
3.2.3.5 ADA compliance and accessibility.
3.2.3.6 Security protocols and fraud prevention tools.
3.2.4 Customer Service & Candidate Experience: The Offeror should address their helpdesk availability, multilingual support, and responsiveness, as well as any candidate satisfaction tools and processes. The Offeror should also provide information on their dispute resolution or escalation protocols. Positive candidate experiences reflect well on DOPL/REC and the State. Poor vendor service leads to complaints and unnecessary work for DOPL staff.
3.2.5 Implementation Plan & Transition Readiness: The Offeror should provide a realistic timeline for going live, and their risk mitigation and continuity planning that would help avoid service disruptions. The Offeror should also outline any experience they may have in transitioning from a prior vendor. Smooth implementation avoids service disruptions, especially if switching vendors.
3.2.6 Reporting and Data Capabilities: The Offeror should demonstrate their ability to produce timely, accurate, and customized reports. The Offeror should also provide information on dashboard functionality and access for DOPL/REC staff, and any available support for data audits and performance reviews. Real-time insight into testing data supports compliance, operational planning, and trust in the system.
3.2.7 Obstacles, Challenges, & Risks: The Offeror should identify and address issues, concerns, challenges, obstacles, or risks that may impact the successful delivery of this project or service. This statement should include areas that may cause the project to not be completed on time, not finished within budget, generate any change orders, or may be a source of dissatisfaction for the Agency. The Offeror should rely on and use their past experience and knowledge of completing similar projects to identify these potential risks, issues, or challenges.
Each item should be described in non-technical terms and should contain enough information to describe to a reader why the item is a valid risk/concern. The Offeror should also explain how it will avoid or minimize the risks from occurring. The Offeror should consider:
3.2.7.1 Controllable Items: This term includes risks, activities, or tasks that are controllable by the Offeror, or by entities/individuals that are contracted to by the Offeror. This term includes things that are part of the technical scope of what the Offeror is being hired to do. This term may also include risks that have already been minimized before the project begins due to the Offeror’s expertise (i.e. risks that are no longer risks due to the Offeror’s expertise in delivering this type of project). All controllable risks and strategies to mitigate them MUST be included in the Offeror’s base Proposal cost and schedule (if there are any impacts at all).
3.2.7.2 Non-Controllable Items: This term includes risks, activities, or tasks that are not controllable by the Offeror. This term may include risks, issues, challenges, or obstacles attributed by the Agency, Agency personnel, parties hired by Agency, risks that are caused by other agencies, or completely uncontrollable risks. These can also be areas/risks that can contribute to contingency. Although these risks may not be controlled by the Offeror, the Offeror should identify a strategy that can be followed or used to mitigate these risks. All non-controllable risks and strategies to mitigate them MUST NOT be included in the Offeror’s base Proposal cost or schedule.
Provide a brief description of each item (background of how the concern/issue may impact the project or service if it occurs), and a strategy to prevent/minimize the issue/concern from occurring, or strategy to minimize the impact of the risk if it does occur.
3.2.8 Mandatory SOW Responses: The Offeror must provide the information requested in the following sections from Exhibit 3 – Scope of Work. An Offerors failure to provide the requested information may result in their Proposal being found non-responsive and given no further consideration.
3.2.8.1 Exhibit 3, Section 3.2.2 – Additional Service Locations
3.2.8.2 Exhibit 3, Section 3.4 – Extended Business Hours
3.2.8.3 Exhibit 3, Section 3.5.1 – Saturday/Sunday Offerings
3.2.8.4 Exhibit 3, Section 6.2 – Testing Site Directory
3.2.8.5 Exhibit 3, Section 6.3 – Customer Service Plan
3.2.8.6 Exhibit 3, Section 8.1 – Exam Security Plan
3.2.8.7 Exhibit 3, Section 10.1.2 – Annual Plan for Continuous Improvement
3.3 Pricing Schedule (Submittal Form C)
The Offeror must complete and submit all information requested in Submittal Form C. The Offeror is not permitted to adjust or modify this form, and may not include additional rates, amounts, costs, information, exceptions, or limitations to their cost proposal. An Offerors failure to meet these requirements may result in their Proposal being found non-responsive and given no further consideration.
Section 4 Evaluation & Award Procedures
4.1 Mandatory Submission Requirements
All Proposals will be reviewed on a "pass" or "fail" basis to ensure compliance with all mandatory submission requirements. Proposals determined by the State, at its sole discretion, to be responsive in this regard will proceed to the evaluation process outlined in this Section. Proposals that do not meet the mandatory submission requirements will be deemed non-responsive. Mandatory submission requirements include, but are not limited to, the following:
4.1.1 The Proposal was submitted prior to the specified Closing Date and Time.
4.1.2 The Proposal complies with the submission instructions detailed in Section 2.6.
4.1.3 The Proposal includes a fully completed and signed Submittal Form A.
4.1.4 The Proposal includes all required Submittal Forms listed in Section 3.
4.2 Evaluation Criteria
The objective of the State in soliciting and evaluating Proposals is to ensure the selection of a firm or individual that will produce the best possible results for the funds expended. Responsive Proposals will be evaluated as described in the table below.
| Criteria |
| Weight |
| Mandatory Submission Requirements |
| Pass/Fail |
| Submittal A – Background, Declarations, & Certifications |
| Pass/Fail |
| Submittal B – Technical Proposal |
| 800 |
| Submittal C – Cost Proposal |
| 200 |
| Total Points: |
| 1,000 |
4.3 Evaluation Committee
The Technical Proposal will be evaluated and scored utilizing one (1) or more Technical Proposal Evaluation Committee(s). The scores for the Technical Proposal will be normalized as described in Section 4.4.
4.4 Calculations
The following approach will be used to normalize and calculate scores:
Written Proposal Calculations For each document that is evaluated and scored by the evaluation committee, the RFP Lead will:
4.4.1 Average evaluator scores for each Proposal.
4.4.2 Identify the highest raw average score among all Proposals.
4.4.3 Assign normalized points as follows:
4.4.3.1 The Proposal with the highest raw score will receive the maximum available points for Submittal B.
4.4.3.2 All other Proposals will receive a proportional share of the available points using the formula:
Cost Calculations Points for the Cost Proposal will be normalized as follows:
4.4.4 The Proposal with the lowest total evaluated cost will receive the maximum available points.
4.4.5 All remaining Proposals will receive a proportional share of the available points using the following formula:
4.5 Clarification Discussions
The RFP Lead may, in the State’s sole discretion, perform clarification discussions with the Offeror(s) to verify and validate that the Proposal will meet the needs of the Agency. At any time during this period, if it is discovered that the Offeror has not met a mandatory requirement, or has failed to adequately respond to an item below, the State may find the Offeror non-responsive.
4.4.6 The Offeror may be required to provide documentation to demonstrate its responsibility. Failure to provide the requested documentation may result in the Offeror being deemed non-responsible. IDAPA 38.05.01.81.
4.9.1 If requested, provide any additional documentation that may be requested, which may include a detailed project/work plan, testing and commissioning plan, training, change management plan, safety plan, staffing plan, operational plan, maintenance plans, warranties, bonding and insurance, background checks, etc.
The clarification discussion cannot materially alter the Proposal. The State does not expect to negotiate any terms or conditions requested by the Offeror, unless they were submitted by the Offeror prior to the deadline for submitting questions (see Section 1.8), or they provide the State an opportunity to secure more advantageous terms or pricing.
4.6 Best-And-Final-Offer (BAFO)
The State reserves the right to request Best and Final Offers (BAFOs) from Offerors. If BAFOs are requested, the State will issue written instructions to the selected Offerors identifying the scope of the BAFO request and the deadline for submission. Offerors must not modify any aspect of their Proposal except as specifically requested by the State. BAFO responses must be submitted in accordance with the instructions provided. Failure to submit a BAFO, if requested, may result in the Offeror’s original Proposal being considered as its final offer.
4.7 Award
Award of Contract will be made to the responsive, responsible Offeror whose Proposal receives the highest number of total normalized points. Although the State will not pay the Offeror, the Offeror will receive business and revenue that are generated because of the State’s program. Because the State is not paying the Offeror, the cost portion of the evaluation must be defined as the lowest cost to participants and the program. The Offeror with the lowest total cost will receive the highest cost evaluation score, while the technical proposal will be evaluated in the standard weighted manner as outlined above.
4.8 Resulting Contract
If the State awards Contract(s) from this solicitation, it will do so by issuing a Contract Purchase Order (CPO) Contract document(s) from Luma, the State’s ERP system. The State anticipates issuing a single contract from this solicitation, incorporating the Terms and Conditions, Scope of Work, Appendices, and some or all of the Offeror’s Technical Proposal.
EXHIBIT 1
Background Information
1. About The Department / Agency The Division of Occupational and Professional Licenses (DOPL) provides consumer protection and public safety through its regulation of more than two hundred and fifty thousand (250,000) licensees within more than forty-four (44) Boards and Commissions here in the great State of Idaho. DOPL purchases and contracts for a wide variety of exam services for these Boards and Commissions.
2. Background Information DOPL requires an Association of Real Estate License Law Officials (ARELLO) accredited exam delivery Contractor for Real Estate Commission exams. The Contractor must be able to offer fingerprinting services for multiple boards across the Division’s three Bureaus. DOPL is unable to develop or administer exams in-house, as DOPL does not have the capacity or skill to do so effectively. DOPL requires a Contractor who will assist with ongoing exam development, administration, and delivery of the exams. The Contractor will handle all candidate registrations, including the collection of exam and fingerprint fees, and provide DOPL with exam result reporting on a regular basis. Upon successful completion of a passing exam score for both portions of the exam, the Contractor will check the ARELLO disciplinary action data bank for any disciplinary action the candidate has in other states or jurisdictions.
The overall intent is to ensure candidates entering the real estate industry are competent to act as real estate salespersons or brokers. The primary objectives are to provide a professional occupational licensing exam service for real estate license candidates, and to determine minimum competency levels of license candidates for both salespersons and brokers.
The following statistics are examinations that have been delivered over the past six (6) years.
| YEAR |
| BROKER EXAMINATIONS |
| SALESPERSON EXAMINATIONS |
| NATIONAL |
| STATE |
| NATIONAL |
| STATE |
| First Time |
| Repeats |
| First Time |
| Repeats |
| First Time |
| Repeats |
| First Time |
| Repeats |
| 2020 |
| 92 |
| 47 |
| 296 |
| 227 |
| 1,900 |
| 940 |
| 2,221 |
| 1,262 |
| 2021 |
| 152 |
| 90 |
| 324 |
| 350 |
| 2,650 |
| 1,265 |
| 3,184 |
| 2,160 |
| 2022 |
| 22 |
| 25 |
| 47 |
| 37 |
| 229 |
| 152 |
| 300 |
| 270 |
| 2023 |
| 108 |
| 100 |
| 207 |
| 236 |
| 1,156 |
| 890 |
| 1,431 |
| 1,308 |
| 2024 |
| 84 |
| 82 |
| 184 |
| 267 |
| 1,050 |
| 794 |
| 1,320 |
| 1,464 |
| 2025 |
| 72 |
| 43 |
| 175 |
| 250 |
| 1,256 |
| 898 |
| 1,509 |
| 1,657 |
The following statistics are fingerprint services that have been delivered since 10/01/2022 through the current exam Contractor.
| YEAR |
| FINGERPRINT APPOINTMENTS |
| ELECTRONIC TRANSMISSION |
| HARD CARDS |
| Boise |
| Spokane |
| Pocatello |
| 2022 |
| - |
| - |
| - |
| 357 |
| 2023 |
| - |
| 2 |
| - |
| 1,847 |
| 2024 |
| 773 |
| 263 |
| 194 |
| 531 |
| 2025 |
| 1,092 |
| 367 |
| 259 |
| 327 |
3. Summary of Scope The Idaho Real Estate Commission (REC), as incorporated into the Division of Occupational and Professional Licenses (DOPL), seeks a qualified exam Contractor to develop, administer, score, and report licensing examinations for Idaho real estate professionals.
4. Objectives and Expectations The Offeror must be responsible for maintaining a secure, legally defensible exam program aligned with Idaho Code Title 54, Chapter 20, and IDAPA 24.36.01. Services must include maintaining a current, psychometrically validated item bank that reflects Idaho-specific practice, laws, and rules, offering both national and state competency portions of the exam. The Offeror must provide convenient scheduling options, ADA-compliant testing accommodations, and secure exam delivery through in-person testing centers throughout Idaho and online testing if feasible.
The selected Contractor will work closely with DOPL/REC to ensure the Idaho-specific competency portion of the examination remains current and relevant to state licensing requirements. The provider will be expected to offer timely transmission of exam results to DOPL/REC, support for candidates, regular performance and statistical reports, and proactive item analysis and updates. Security and data privacy protocols must meet state standards, and the Contractor should demonstrate the ability to scale operations to support examination demand statewide. Exceptional customer service, responsive technical support, and ongoing collaboration with Idaho’s regulatory team are essential to the success of this contract.
5. Existing Data DOPL has contracted with the current incumbent for the real estate exam, beginning in 1989 as a pencil and paper exam. The current incumbent has been the successful bidder and contracted exam Contractor for these services from 1989 to present with the only exception from 1995 – 1999 when another was selected. The current contract originated 11/16/2017 and expires on 11/15/2026.
6. Budgetary Expectations Per Idaho Code 54-2014(2), the exam fee is capped at $150. DOPL does not pay these costs, the cost is recouped from candidates when they schedule the exam. Fingerprinting services are an add on service that is also paid for by the candidate at the time of appointment scheduling.
7. Unique Considerations Participation in the ARELLO certification program is required to allow the successful Contractor to complete a query against the ARELLO disciplinary action data bank upon successful completion of a passing exam score for both portions of the exam, for any disciplinary action the candidate has in other states or jurisdictions that DOPL would need to investigate further prior to licensing the candidate. For candidates who qualify for a waiver of the national portion of the exam, the ARELLO disciplinary action data bank query will occur after the candidate has successfully passed the state portion of the exam.
8. Vision for Future Contract Based on DOPL experiences under this contract, DOPL wants to ensure that requirements are included to process fingerprints for background checks, and the requirement that the successful Contractor maintains both electronic and hard card fingerprinting options throughout the contract.
DOPL would also like to highlight another important function being response time and a guaranteed turnaround time for issues that occur. Having a Contractor who is responsive to DOPL’s needs and provides proactive solutions is important to help minimize staff time on the program.
EXHIBIT 2
General Requirements
In the event of conflict with the State’s Standard Terms and Conditions, or other terms, conditions or requirements contained in this RFP, the following provisions will take precedence:
1. Training The Contractor must provide training as outlined in Exhibit 3 – Scope of Work, Section 4.4.
2. Service and Support The Contractor must provide customer service per the requirements listed in Exhibit 3 – Scope of Work, Section 6.5. The Contractor’s customer service center employees must be located within the United States.
3. Reporting Requirements The Contractor must provide reports by the timeframe and/or frequency listed in Exhibit 7 – Deliverables.
4. Compliance With Laws, Rules, Regulations The Contractor’s secure, legally defensible exam program must be in compliance with Idaho Code Title 54, Chapter 20, and IDAPA 24.36.01.
5. Records Maintenance The Contractor must maintain or supervise the maintenance of all records necessary to properly account for all payments made to the Contractor pursuant to the Contract. These records must be retained by the Contractor for at least three (3) years after the Contract terminates, or until all audits initiated within the three (3) years have been completed, whichever is later.
6. Audit Rights The Contractor agrees to allow State and Federal auditors and State purchasing staff access to all the records relating to this Contract, for audit, inspection, and monitoring of services or performance. Such access will be during normal business hours or by appointment.
7. Billing Procedure The Contractor must bill candidates for the exam fee directly when an exam is scheduled. Fingerprinting services are an add-on service, the Contractor must bill candidates directly for fingerprinting services at the time of scheduling the exam.
8. ADA Accessibility Compliance
8.1. The Contractor must ensure that, at a minimum, all digital products, services, and content provided under this Agreement comply with the Americans with Disabilities Act (ADA), Section 508 of the Rehabilitation Act (as applicable), and the Web Content Accessibility Guidelines (WCAG) version 2.1, Level AA. This requirement applies, but is not limited, to:
8.1.1. Websites, web applications, and online systems;
8.1.2. Software and mobile applications;
8.1.3. PDFs, documents, and multimedia content; and
8.1.4. Any digital tools or services procured by the State of Idaho.
8.2. Accessibility Documentation
For Consumer Off the Shelf (COTS) products, including Software as a Service (SaaS), prior to an Agreement, Contractor must submit accurate Accessibility Conformance Reports (ACRs) created using the applicable sections of the Voluntary Product Accessibility Template® (VPAT®) Revised Section 508 Edition (Version 2.3 or higher) or links to ACRs located on Vendor websites for each proposed product or product family (as applicable). Instructions on how to complete this document are included in the template itself.
8.2.1. ACR must be based on the current product version.
8.2.2. ACR must be evaluated on current WCAG standards as of the date of this agreement.
8.2.3. ACRs based on earlier versions of the product must be made available to the state upon request.
For customized COTS products and solutions, Contractor must submit an ACR and complete the Vendor Accessibility Development Services Questionnaire, which documents Vendor's ability to produce accessible electronic and information resources. For non-COTS offerings (such as IT-related development services, services that include user-accessed online components, etc.), Contractor must complete a Vendor Accessibility Development Services Questionnaire, which documents Contractor’s ability to produce accessible electronic and information resources. Failure to provide a current ACR that meets these requirements may result in disqualification of the bidder/’proposers proposal, delay in Agreement execution, or cancellation of the Agreement.
8.3. Accessibility Testing
Contractor must perform accessibility testing using both automated tools and manual testing methods, including assistive technologies (e.g., screen readers). Any accessibility barriers identified must be addressed prior to final acceptance.
8.4. Remediation Responsibilities
If any accessibility violation is known or becomes known to the Contractor during the term of the Agreement, whether by notice from the State of Idaho or through Contractor’s own testing, Contractor shall remediate the violation within a time period mutually agreed upon by the parties at no additional cost to the state.
If the product or service cannot fully meet accessibility standards at the time of delivery, Contractor must:
8.4.1. Provide a detailed remediation plan with timelines;
8.4.2. Demonstrate reasonable efforts to mitigate impacts on users with disabilities;
8.4.3. Work in good faith with the purchasing agency to bring the product into compliance;
8.4.4. Provide alternative solutions upon request at no additional charge to the state; and
8.4.5. Document any undue burden or exemption with a sign-off by the Office of Information Technology ADA Manager.
8.5. Ongoing Accessibility Obligations
For any updates, patches, or content changes made during the Agreement term, Contractor must maintain accessibility compliance. The State reserves the right to request updated accessibility conformance documentation at any time.
When updates or upgrades are made to the products or services available through this Agreement, Contractor agrees to document how the changes will impact or improve accessibility and usability. This documentation must be provided to the State in advance of the change, occurring within an agreed-upon timeframe sufficient for the State to review the changes and either approve or request a remediation plan from the Contractor. If agreed-upon updates fail to improve accessibility or usability as planned, failure to comply with this requirement may be cause for Agreement cancellation or default.
8.6. Training and Support
Unless agreed to otherwise in Contractor’s Terms and Conditions, Contractor must provide training or guidance to agency staff on how to use the product or platform in an accessible manner and how to maintain accessibility in ongoing content or service delivery. In facilitating Contractor trainings, Contractor shall coordinate and cooperate with State in identifying prospective attendees who may require accommodations and provide such accommodations.
All administrator and end user documentation and training materials delivered by the Vendor must be in compliance with the WCAG 2.1, level AA.
8.7. Remedies
Failure to meet WCAG 2.1 Level AA may result in any remedies available under Idaho procurement law, including but not limited to:
8.7.1. Require the Contractor to cure deficiencies;
8.7.2. State‑performed testing or remediation at no cost to the State;
8.7.3. Withholding payment; or
8.7.4. Termination of the Contract.
EXHIBIT 3
Scope of Work
1. Schedule & Term Expectations The Contract Start Date is November 16, 2026. The Contractor must complete implementation such that go-live of all exam program services occurs on the Contract Start Date, subject to the dependencies in Section 4 of this Exhibit.
2. Requirements All requirements listed in this Scope of Work are mandatory Contract services. The Contractor must demonstrate the capability to perform services in a professional, organized, and self-directed manner. The State will not provide ongoing operational supervision, step-by-step instruction, or repeated corrective intervention.
2.1. The Contractor must deliver a full-service, legally defensible, and Idaho-compliant real estate licensing examination program that supports REC and DOPL. The Contractor must manage all aspects of exam development, administration, scoring, reporting, and customer support, ensuring a secure, efficient, and candidate-focused experience.
2.2. The Contractor must have ARELLO certification of the exam at the time of the proposal submittal and must maintain ARELLO certification throughout the duration of the Contract. Failure to maintain ARELLO certification through the life of the Contract may result in termination of the Contract.
2.3. The Contractor must provide electronic fingerprinting services at each of the key service locations listed in Section 3.2.1 for REC and the Real Estate Appraisers Board. DOPL desires fingerprint services at additional locations per Section 3.2.2 with extended hours of operation, or alternative service methods designed to reduce applicant burden.
2.4. The Contractor must have the capability to expand electronic fingerprint services to other Boards served by DOPL, which are required by Statute and Rule to conduct fingerprint background checks.
2.4.1. These Boards are currently being fingerprinted with hard cards and sent to DOPL for processing. DOPL seeks to engage a Contractor who will assist in streamlining this process to reduce the burden on candidates and DOPL staff caused by this hard card process.
2.4.2. Expansion of fingerprinting services to additional Boards must be mutually agreed upon in writing by the Contractor and DOPL and must be executed in an amendment to the Contract by DOP.
2.5. The Contractor must implement formal quality control and quality assurance procedures to ensure the completeness, accuracy, and compliance of all submissions, records, and communications with DOPL staff, applicants, and the public.
3. Service locations and Appointments:
3.1. The Contractor must ensure timely delivery of exams and accommodate retesting schedules within state-defined timelines.
3.2. The Contractor must provide statewide access to in-person test centers, ensuring availability in both urban and rural areas of Idaho.
3.2.1. The Contractor must provide service locations in Northern Idaho (Coeur d’Alene area), Southwest Idaho (Boise area), and Eastern Idaho (Pocatello area).
3.2.2. DOPL additionally desires service locations in Moscow or Lewiston, and Twin Falls. The Contractor must identify any additional service location availability in their proposal.
3.3. The Contractor must offer remote proctoring options with equivalent security measures, if feasible and agreed upon in writing by both parties and executed in an amendment to the Contract by DOP.
3.4. The Contractor must offer candidates flexible scheduling options through a robust online portal and call center during regular and extended business hours. The Contractor must propose a schedule for the extended business hours which will be considered as part of the evaluation criteria.
3.5. The Contractor must offer Saturday appointments at least once a month in each of the required locations, with at least twice a month in the Treasure Valley.
3.5.1. DOPL desires additional Saturday or Sunday offerings and evening appointments at required locations or additional optional locations. The Contractor must identify any additional weekend or evening appointment availability in their proposal.
4. Implementation & Onboarding
4.1. Implementation Plan
The Contractor must submit a detailed plan outlining timelines, milestones, staffing, training, risk mitigation, contingency planning, and transition steps from any current exam Contractor at least ninety (90) days prior to the Contract Start Date.
4.2. The Contractor must ensure a seamless transition from any prior exam Contractor, including:
4.2.1. Secure transfer of candidate data, historical exam results, and item banks (as applicable); and
4.2.2. No disruption in testing availability during the transition period.
4.3. Testing System Setup & Configuration
The Contractor must maintain a fully operational testing platform, configured to meet Idaho-specific requirements (including both state and national portions of the exam).
4.4. Training for DOPL/REC Staff
The Contractor must provide initial and refresher training on administrative portals, reports, and system tools for agency staff at least thirty (30) days prior to the Contract Start Date.
5. Exam Development
5.1. Validated Item Bank
The Contractor must develop a secure, psychometrically sound item bank including:
5.1.1. National exam items; and
5.1.2. Idaho-specific content for establishing an applicant’s competency to practice in Idaho, aligned with Idaho Code Title 54, Chapter 20, and IDAPA 24.36.01.
5.2. Cut Score/Passing Standard Documentation
The Contractor must maintain a defensible methodology used to establish pass/fail thresholds.
5.3. Annual Program Review
The Contractor must hold a regularly scheduled meeting annually between the Contractor and the DOPL Program Manager to conduct a strengths and weaknesses analysis review of the program. DOPL will work with the Contractor to determine the timing of this meeting after Contract award. All deliverables required ‘no later than the Annual Program Review’ must be submitted at least thirty (30) days prior to the meeting unless otherwise specified.
5.4. Regularly Scheduled Item Review
The Contractor must work with the DOPL Program Manager to coordinate and conduct Idaho-specific content review and item updates, including SME input at least annually in conjunction with Idaho Code changes that become effective the first day of the new fiscal year.
5.4.1. The Contractor must hold in person SME item development sessions on a regular basis when necessary to replenish or perform large scale revisions to the existing item bank. DOPL will work with the Contractor to determine the timing of these development sessions after Contract award.
5.4.2. The Contractor must conduct an Idaho Code review with the DOPL Program Manager no later than July 1st each year. Further SME content review work will be discussed and scheduled at that time if needed.
6. Candidate Services
6.1. Candidate Handbook/Guide
The Contractor must develop and provide a downloadable,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .