This Amendment No. 1 to Request for Bid 2017-1524 is issued by the Colorado Division of Reclamation, Mining & Safety under the Department of Natural Resources for the Powerline Project, a mine closure initiative located in Lake County. The amendment modifies closure methods for two features and updates project specifications. Feature 04, an adit, now requires polyurethane foam (PUF) closure with eight cubic yards of material set ten feet from the opening and extending eighteen inches minimum, followed by three-foot minimum backfill with onsite material. Feature 05, a shaft, requires eight cubic yards of PUF installed at twelve feet below ground surface with four feet of backfill above it, plus backfilling of an adjacent shallow depression for drainage purposes. Item 4.0 of the bid schedule has been revised to allow for provision and installation of up to five additional cubic yards of PUF as directed by the project manager, with measurement and payment calculated to the nearest cubic yard. The bid deadline is 4:00 p.m. on Wednesday, July 5, 2017, with submissions accepted electronically through Colorado VSS or by mail/fax to Teresa Ryan at the Division of Reclamation, Mining and Safety.

The revised bid schedule requires contractors to provide pricing for five line items: mobilization/demobilization as a lump sum job, a Safety, Health & Environmental Action Plan as a lump sum job, installation of mine closures totaling five features (shaft backfill, adit hand backfill, adit door, and two polyurethane foam closures at eight cubic yards each) as a lump sum job, additional PUF at a unit price per cubic yard for up to five cubic yards, and optional medium excavator rental at an hourly rate for up to five hours. All features are funded through Lake County sources, with Features 01 and 03 funded by FMI (Fund Management Information) and Features 02, 04, and 05 funded by FMI and BLM respectively. Contractors must acknowledge receipt and acceptance of this amendment on their bid form and submit the revised bid schedule with all line items completed; failure to return all pages and complete all items will result in bid rejection.

View the file

Other files

File Type Posted
Powerline Project_Part3.pdf PDF
Attendees Powereline Project Pre-Bid Mtg.pdf PDF
Powerline X_Y.pdf PDF
Powerline Project_Part2.pdf PDF
Powerline Project_Part1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us John W. Hickenlooper, Governor | Robert Randall, Executive Director | Virginia Brannon, Director

DATE: June 22, 2017

TO: All Bidders on the Powerline Project

FROM: Craig Bissonnette, Division of Reclamation, Mining & Safety

RE: Amendment No. 1 to 2017-1524

Thank you for your attendance at the Pre-Bid Meeting. The following clarifications and amendments should be noted and incorporated into the bid documents:

1. Feature 04 – The closure method for this feature has been changed.

New Closure Method: Polyurethane Foam, Per SWS 9 Work Description: Set a back form ten (10) feet from the opening and install eight (8) cubic yards of PUF. PUF should extend out from opening a minimum of eighteen (18) inches. Backfill the closure with onsite material a minimum thickness of three (3) feet.

2. Feature 05 – The closure method for this feature has been changed.

New Closure Method: Polyurethane Foam, per SWS 9 Work Description: Set bottom form at a depth of twelve (12) feet below ground surface and install eight (8) feet of PUF. Backfill the remaining four (4) feet. The shallow depression to the east of the feature will be also be backfilled to ensure positive drainage away from the safety closure. Eight (8) cubic yards of PUF is required for this closure.

3. Item 4.0: This Item has been changed.

Item 4.0: Provide and Install Additional Polyurethane Foam (PUF) If required, this Item is for providing and installing up to an additional five (5) cubic yards of PUF as directed by the PROJECT MANAGER. Additional PUF will be installed in accordance with SWS 9.

Measurement and payment Payment for this task will be made at the unit price established in Item 4.0 of the Bid Schedule. Measurement for payment will be made to the nearest cubic yard of PUF installed. The price bid shall include all costs for labor, materials, equipment and all other items necessary and incidental to complete the task as described in these specifications.

4. Any trees removed around the project site will be bucked into 4’-6’ lengths and scattered.

The bid submittal for this project is no later than 4:00 p.m. on Wednesday, July 5, 2017.

Please use the REVISED Bid Schedule included with this amendment when submitting your bid.

All terms and conditions of the Documented Quote other than as changed by this amendment remain the same.

Receipt and acceptance of this amendment shall be acknowledged on the bid form and by submitting the REVISED Bid Schedule.

http://mining.state.co.us/

Return by July 5, 2017 at 4:00 P.M. to: Receipt of Addenda Nos.___________ is hereby acknowledged Submit Bids Electronically at Colorado VSS (Vendor Self Service) https://codpa-vss.hostams.com/webapp/PRDVSS1X1/AltSelfService, or Mail; Fax to:

Teresa Ryan Division of Reclamation, Mining and Safety 1313 Sherman St., #215 Denver, CO 80203 Fax (303) 832-8106

Powerline Project REVISED Bid Schedule

June 22, 2017 2017-1524

ITEM

DESCRIPTION

QTY

UNIT UNIT PRICE

AMOUNT

1.0 Mobilize/Demobilize 1 Job N/A $

2.0 Safety, Health & Environmental

Action Plan (SHEAP) 1 Job N/A $

3.0 Install Mine Closures

(Total from Page 2) 1 Job N/A $

4.0 Provide Add’l PUF

(if required) 5 Cubic

Yard $ $

5.0 Provide Add’l Equip. Rental

Medium Excavator (if required) 5 Hour $ $

GRAND TOTAL $

Contractor_____________________________________ Date_________________________

Signature _____________________________ Phone________________________________

Address ____________________________________________________________________

DO NOT AMEND ANY PART OF THIS BID SCHEDULE

ALL PAGES OF THIS BID SCHEDULE MUST BE RETURNED

ALL LINES ITEMS MUST BE COMPLETED

Page 1 of 2 Pages https://codpa-vss.hostams.com/webapp/PRDVSS1X1/AltSelfService

Powerline Project REVISED Bid Schedule

June 22, 2017 2017-1524

Item 3 - Install Mine Closures:

Feature

ID

Feature Type

Closure Method

Bid Amount

County

Funding

01 Shaft Backfill $ Lake FMI

02 Adit Hand Backfill $ Lake BLM

03 Adit Adit Door $ Lake FMI

04 Adit Polyurethane Foam (8CY) $ Lake FMI

05 Shaft Polyurethane Foam (8CY) $ Lake FMI

TOTAL (Enter here and on Page 1 of Bid Schedule, Item 3) $

DO NOT AMEND ANY PART OF THIS BID SCHEDULE

ALL PAGES OF THIS BID SCHEDULE MUST BE RETURNED

ALL LINES ITEMS MUST BE COMPLETED

Page 2 of 2 Pages

Powerline - Amendment#1
Powerline - REVISEDBidSched
Contractor_____________________________________ Date_________________________

File details come from the government source that posted it. Updated .