Amendment 1 Description RFP 21_2257 .docx
DOCX document 24 KB Posted
- Solicitation number
- RFP 591 210000002257 2
- Issued by
- Wayne County, Detroit City, Michigan
About this file
This is Amendment 1 to Request for Proposal RFP 210000002257 issued by the State of Michigan Department of Transportation (MDOT) on July 27, 2021. The amendment modifies the original solicitation requirements and includes a mandatory pre-proposal meeting participation list. The submission deadline for the RFP was extended from July 28, 2021 to July 30, 2021. A specification change was made to Schedule A, Section 2.1.2, item (i) regarding the Concrete Secondary Containment Sump, which will have dimensions of 12 inches diameter with 24 inches depth, subject to contractor review with MDOT during the Kick Off Meeting. Bidders were required to submit a copy of this amendment with their bid submission to acknowledge receipt.
All modifications outlined in this amendment will be incorporated into any awarded contract. The remaining instructions, terms, conditions, specifications, and attachments from the original bid solicitation remain unchanged. Bidders who participated in the mandatory pre-proposal meeting were acknowledged for their participation. For additional questions regarding the amendment, bidders were directed to contact Klatra Pickett at pickettk1@michigan.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| (RFP 21_2257) Mandatory Pre Bid Participation List 21_2257.pdf | ||
| (RFP 21_2257) Schedule C Drawings AND Aerial Map of Location .pdf | ||
| RFP 210000002257 DMG Brine Tank.docx | DOCX document | |
| (RFP 21_2257) Attachement A 20SP-205A-01.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bidder Name: Request for Proposal
RFP 210000002257
Amendment 1 – July 27,2021
BIDDER should submit a copy of this Amendment with bid submission to acknowledge receipt.
Description of change to the posted solicitation:
1. Mandatory Pre-Proposal Meeting, Participation List 21_2257
Participation List attached
2. SIGMA VSS, Schedule of Events- Deadline to submit RFP
Change FROM: 07/28/2021 Change TO: 07/30/2021
Deadline to submit RFP is 7/30/2021 as indicted on RFP Coversheet.
| 3. | Schedule A, 2.1.2, item (i) Concrete Secondary Containment |
| Sump Dimensions will be 12” diameter, with 24” depth. Contractor to review with MDOT during Kick Off Meeting. |
Listed changes to Schedule A will be added to any awarded contract.
All other instructions, terms, conditions, specifications, and attachments listed within the bid solicitation remain unchanged.
Your participation in the mandatory pre-bid meeting was appreciated and very helpful.
Any questions regarding this amendment please contact me directly at pickettk1@michigan.gov
Klatra Pickett
File details come from the government source that posted it. Updated .