AMENDMENT 0005 SPECIFICATIONS DOCUMENT - ANTOC one section 09 24 00.pdf

PDF 1 MB Posted

Attached to
Amendment 0005 for Aquora National Training & Operational Center (ANTOC) for a Design Bid Build contract
Solicitation number
W912ER21R0024_Amendment_0005
Issued by

About this file

This document contains an amendment to a solicitation for a design-bid-build contract. Amendment 0005 provides additions and revisions to specifications for Portland cement plastering work required for the construction of the Aqoura National Training and Operational Center in Lebanon. The specifications outline requirements for materials, installation, and execution of plastering work. Product and system requirements are defined for accessories, fasteners, cement, lime, aggregates, bonding agents, and factory prepared finish coats. Installation and application procedures are specified according to industry standards.

View the file

Other files

File Type Posted
Amendment 0005 W912ER21R0024 ANTOC.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Aqoura National Training and Operations Center (ANTOC) LEBANON 496243

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK - REVISED BY AMENDMENT NO. 0001

01 14 00 WORK RESTRICTIONS

01 15 00.12 10 SUPPLEMENTARY REQUIREMENTS - REVISED BY AMENDMENT NO. 0001

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 17.12 10 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)

01 33 00 SUBMITTAL PROCEDURES

01 33 00.12 10 SUBMITTAL PROCEDURES FOR DESIGN-BUILD PROJECT -- ADDED BY

AMENDMENT 0001

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 42 15 METRIC MEASUREMENTS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19.12 10 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 80 00.12 10 TECHNICAL REQUIREMENTS

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 11 13 BITUMINOUS DAMPPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 41 63 FABRICATED ROOF PANEL ASSEMBLIES

07 42 13 METAL WALL PANELS

07 60 00 FLASHING AND SHEET METAL

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 71 00 DOOR HARDWARE

DIVISION 09 - FINISHES

PROJECT TABLE OF CONTENTS Page 1

W912ER21R0024 AMENDMENT 0005

09 22 16 NONSTRUCTURAL METAL FRAMING

09 24 00 PORTLAND CEMENT PLASTERING -- ADDED BY AMENDMENT NO. 0005

09 29 00 GYPSUM BOARD

09 51 00 ACOUSTICAL CEILINGS

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 73 SEISMIC CONTROL FOR MECHANICAL EQUIPMENT

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 30 00 HVAC AIR DISTRIBUTION

DIVISION 26 - ELECTRICAL

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT

32 11 20 BASE COURSE FOR RIGID PAVING

32 13 14.13 CONCRETE PAVING FOR HEAVY DUTY PAVEMENTS

32 15 00 AGGREGATE SURFACING

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2

SECTION TABLE OF CONTENTS

DIVISION 09 - FINISHES

SECTION 09 24 00

PORTLAND CEMENT PLASTERING -- ADDED BY AMENDMENT NO. 0005

PART 1 GENERAL

1.1 DESCRIPTION

1.2 RELATED WORK

1.3 TERMINOLOGY

1.4 SUBMITTALS

1.5 PROJECT CONDITIONS

1.6 APPLICABLE PUBLICATIONS

PART 2 PRODUCTS

2.1 ACCESSORIES FOR CEMENT PLASTER (STUCCO)

2.2 FASTENERS

2.3 CEMENT

2.4 LIME

2.5 AGGREGATES (SAND)

2.6 BONDING AGENT

2.7 FACTORY PREPARED FINISH COAT FOR CEMENT PLASTER (STUCCO)

PART 3 EXECUTION

3.1 APPLYING METAL PLASTERING BASES

3.2 INSTALLING PLASTERING ACCESSORIES

3.3 SURFACE PREPARATION OF SOLID BASES

3.4 PORTLAND CEMENT BASED PLASTER

3.5 CURING AND PROTECTION

3.6 PATCHING AND POINTING

3.7 TOLERANCES

-- End of Section Table of Contents --

SECTION 09 24 00 Page 1

SECTION 09 24 00

PORTLAND CEMENT PLASTERING -- ADDED BY AMENDMENT NO. 0005

PART 1 GENERAL

1.1 DESCRIPTION

This section specifies Portland cement plastering.

1.2 RELATED WORK

A. Steel framing members for attachment of plaster bases: Section 05 40 00, COLD-FORMED METAL FRAMING, and Section 09 22 16, NON-STRUCTURAL

METAL FRAMING.

B. Room finish schedule and color.

1.3 TERMINOLOGY

A. Definitions and description of terms to be in accordance with ASTM C11-13 , C847-12 , and C926-12a and as specified.

B. Underside of Structure Overhead: In spaces where steel trusses or bar joists are shown, the underside of structure overhead to be the underside of the floor or roof construction supported by beams, trusses, and bar joists.

C. Solid Backing or Solid Bases: Concrete, masonry, sheathing, rigid insulation, and similar materials to which plaster is directly applied.

1.4 SUBMITTALS

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

Manufacturer's Literature and Data:

1. Accessories for plaster, each type.

2. Metal plastering bases, each type.

3. Fasteners.

4. Bonding compounds, including application instructions.

5. Admixtures, including mixing and application instructions.

1.5 PROJECT CONDITIONS

A. Comply with ASTM C926.

B. Maintain work areas for interior work at a temperature of not less than 4 degrees C (40 degrees F) for not less than 48 hours prior to application of plaster, during application of plaster and until plaster is completely dry.

C. Exterior plaster must not be applied when the ambient temperature is less than 4 degrees C (40 degrees F).

D. Exterior plaster must not be applied to frozen surfaces or surfaces

SECTION 09 24 00 Page 2 containing frost.

E. Frozen materials must not be used in the mix.

F. Plaster coats must be protected against freezing for a period of not less than 24 hours after application.

1.6 APPLICABLE PUBLICATIONS

Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

A65 3/ A6 53M-ll Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

C11-13 Terminology Relating to Gypsum and Related Building Materials and Systems

C150/C150M-12 Portland Cement

C206-03(2009) Finishing Hydrated Lime

C841-03(2008)el Installation of Interior Lathing and Furring

C847-12 Metal Lath

C897-05(2009) Aggregate for Job-Mixed Portland Cement Based Plasters

C926-12a Application of Portland Cement-Based Plaster

C932-06 Surface-Applied Bonding Compounds for Exterior Plastering

C933-13 Welded Wire Lath

C979-05 Pigments for Integrally Colored Concrete

C1063-12c Installation of Lathing and Furring to Receive Interior and Exterior Portland Cement-Based Plaster

PART 2 PRODUCTS

2.1 ACCESSORIES FOR CEMENT PLASTER (STUCCO)

A. Provide products fabricated to compliance with ASTM C1063.

B. Accessories include, but not limited to:

1. Control Joints: ASTM C841-03(2008)el , zinc.

2. Corner Bead.

SECTION 09 24 00 Page 3

3. Casing Bead.

2.2 FASTENERS

Comply with ASTM C1063-12c .

2.3 CEMENT

Portland Cement: ASTM C150/C150M-12 , Type I.

2.4 LIME

ASTM C206-03(2009) , Type S.

2.5 AGGREGATES (SAND)

ASTM C897-05(2009) , graded as required to suit texture of finish specified.

2.6 BONDING AGENT

ASTM C932-06 .

2.7 FACTORY PREPARED FINISH COAT FOR CEMENT PLASTER (STUCCO)

A. Factory prepared dry blend of materials, integrally colored, designed for exterior finish coat application.

B. Pigments: ASTM C979-05 , lime proof mineral oxide.

C. Mix: Not more than 35 percent, by weight, of all ingredients (cement, aggregate, hydrated lime, admixture and coloring pigment) can pass a number 100 sieve.

PART 3 EXECUTION

3.1 APPLYING METAL PLASTERING BASES

In accordance with ASTM C1063-12c , except as otherwise specified or shown.

3.2 INSTALLING PLASTERING ACCESSORIES

A. Install accessories in accordance with ASTM C1063-12c , except as otherwise specified.

B. Corner Beads: Install at all vertical and horizontal external plaster corners, as required to establish grounds, and where shown.

C. Casing Beads: Install where shown and at transitions to dissimilar materials.

D. Control Joints:

1. Where control joints are placed parallel to framing members, install joints within 100 mm of the framing member.

2. Install control joints only to the edges of abutting sheets of lath so that the lath is not continuous or tied across the joint.

SECTION 09 24 00 Page 4

3. Extend joints the full width and height of the wall or length of soffit/ceiling plaster membrane.

3.3 SURFACE PREPARATION OF SOLID BASES

Prepare and condition surfaces that are to receive plaster in accordance with ASTM C926-12a , except as otherwise specified.

3.4 PORTLAND CEMENT BASED PLASTER

A. Apply stucco in three coats to a thickness of not less than 25 mm (1 inch) as measured from the back plane of metal reinforcement, exclusive of ribs or dimples or from the face of solid backing or support, with or without metal reinforcement, to the finished stucco surface, including moderate texture variations.

B. Conform to the applicable requirements of ASTM C926-12a and the following:

1. Evenly dampen masonry surfaces to receive stucco immediately prior to application of stucco.

2. Apply each stucco coat continuously in one general direction, without allowing mortar to dry at edges. Where it is impossible to work the full dimensions of a wall surface, in a continuous operation, jointing to be made at a break, opening, or other natural division of the surface.

3. Dampen edges to be jointed to produce a smooth confluence.

4. Slightly round exterior corners.

5. Pitch Portland cement plaster on soffit surfaces forward to form a drip.

6. Scratch Coat:

a. Apply not less than 10 mm (3/8 inch) thick under sufficient pressure to form good keys and to completely embed the reinforcement.

b. Lightly scratch before the scratch coat has set, in one direction; scratch vertical surfaces in the horizontal direction only.

c. Fog cure scratch coat for a minimum of 72 hours.

7. Brown Coat:

a. Dampen the scratch coat evenly to obtain uniform suction before the brown coat is applied; there cannot be visible water on the surface when the brown coat is applied.

b. Apply the brown coat to the scratch coat with sufficient pressure to force the stucco into the scratches and brought to a plumb, true, even plane with rod or straightedge.

c. Uniformly float brown coat with dry float when set sufficiently, to promote densification of the coat and to provide a surface receptive to bonding of the finish coat.

d. Fog cure brown coat for a minimum of 72 hours.

SECTION 09 24 00 Page 5

8. Finish Coat:

a. Dampen surfaces of the brown coat not more than one hour before the finish coat is to be applied to a uniform wetness with no free-standing water on the surface.

b. The finish coat to have a smooth trowel finish and matching the approved sample.

c. Fog cure finish coat for a minimum of 48 hours; take care to prevent staining.

3.5 CURING AND PROTECTION

A. Perform fog curing by applying a fine mist of water to the Portland cement plaster.

B. Exercise care during fog curing to avoid erosion damage of the stucco surfaces.

C. Do not use a solid stream of water.

D. Frequency of fogging cannot be less than three times daily.

E. Protect the stucco from the direct rays of the sun during severe drying conditions using canvas, cloth, or other approved sheet material, when directed.

3.6 PATCHING AND POINTING

A. Replace or patch loose, cracked, damaged, or defective work as directed.

B. Patching must match existing work in texture and color; finished flush.

3.7 TOLERANCES

A. Do not deviate more than 6 mm in 3 m (1/4 inch in 10 feet) from true plane in finished plaster surfaces as measured with a 3 m (10 foot) straightedge.

B. Finish plaster flush with metal accessory surfaces and other built-in items unless otherwise directed.

-- End of Section --

SECTION 09 24 00 Page 6

TABLE OF CONTENTS
09 24 00 - PORTLAND CEMENT PLASTERING -- ADDED BY AMENDMENT NO. 0005

File details come from the government source that posted it. Updated .