Amended RFP - Classroom Technology Project (1).pdf

PDF 950 KB Posted

Attached to
Classroom Technology Project State and local contract opportunity
Solicitation number
RFP-MANC-250000001724-2
Issued by
Washtenaw County, Michigan

About this file

The document is a Request for Proposal (RFP) issued by Manchester Community Schools located in Manchester, Michigan for a Classroom Technology Project. The district seeks to upgrade classroom technology by replacing existing projector infrastructure with adjustable height touch panel displays and upgrading audio systems across their facilities. The project includes procuring 25 75-inch screens for classrooms, two 86-inch screens for the media center, five 65-inch screens for office spaces, 26 classroom audio systems with two pendant microphones per room, additional 10 space pendant microphones, and four new wall-mounted speakers per classroom. The RFP was released on March 5th, 2025, with a pre-bid site walk scheduled for March 24th, proposals due on April 14th, 2025, and a planned full installation to be completed by August 15th, 2025.

The RFP requires bidders to submit detailed pricing for each component, including video displays, touch panel installations, adjustable height mounts, and audio systems. Bidders must provide a minimum 5-year warranty for equipment and management software, and include professional development and training (minimum 12 hours) for staff. Additional requirements include providing operation and maintenance manuals, completing necessary audio wiring and installation, and submitting various compliance forms such as Iran Economic Sanctions Act certification, familial relationship disclosures, and confirmation of not being a suspended or debarred vendor. The district reserves the right to adjust quantities up to 10% without affecting unit pricing and to select proposals based on overall evaluation beyond just the lowest bid.

View the file

Other files for this state and local contract opportunity

Other files attached to Classroom Technology Project, newest first.
File Type Posted
Amended RFP - Classroom Technology Project (2).pdf PDF
Amended RFP - Classroom Technology Project.pdf PDF
RFP - Classroom Technology Project.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Manchester Community Schools Sandra Wiitala, President Dr. Brad Bezeau, Superintendent Michael Tindall, Vice President Board of Education Colleen Schoenfeld, Secretary 710 Main Street Jennifer Caszatt, Treasurer Manchester, MI 48158 Rebecca Harvey, Trustee

(734) 428-9711 Sarah Roth, Trustee

Brandon Woods, Trustee

Request for Proposal: Classroom Technology Project The Manchester Community School District (MCS) is looking to upgrade our classroom technology including moving from existing projector infrastructure to adjustable height touch panel displays. MCS is also looking to upgrade the audio systems in each of the classrooms. The work will be broken out into multiple buckets and proposals can be any combination of the following.

1. Classroom Video - Google Certified Touch Displays with (minimum) 5 year warranty and management software.

a. Twenty-Five 75 inch screens for classroom spaces.

b. Two 86 inch screens for our Media Center.

c. Five 65 inch screens for our office spaces and conference room.

2. Classroom Audio - Audio Enhancement solution for classroom spaces with a minimum one aux audio input, and support for up to 2 pendant microphones.

a. 26 Classroom Audio Systems

b. 2 Pendant Microphones per room and all necessary charging accessories.

c. Additional 10 space pendant microphones.

d. 4 New Wall Mounted speakers per classroom space.

3. Classroom Audio Wiring

a. With the new layout of the classroom systems, we will be moving the connections for the audio system. Where wire can be salvaged, moving the wiring to the new locations. Otherwise, new audio wire being run and terminated for use by the new speakers and amplification system.

(Version 2 3/25/2025) 1

Board of Education Colleen Schoenfeld, Secretary 710 Main Street Jennifer Caszatt, Treasurer Manchester, MI 48158 Rebecca Harvey, Trustee

(734) 428-9711 Sarah Roth, Trustee

Brandon Woods, Trustee

1. Bid Documents The bid documents are available to bidders electronically without charge at the following link:

https://www.manchesterschools.us/district/public-notice/

In addition to this Request for Proposals - Classroom Technology Project, the following supplemental document is for reference.

1. Attachment A Klager Classroom Technology Needs

2. Attachment B Klager Sound Locations

3. Attachment C Klager Touch Panel Locations

4. Attachment D Change Summary

2. Schedule The schedule for this proposal is as indicated below. It may be modified at the discretion of the Manchester Community Schools Director of Technology.

Milestone Date/Time

Release of RFP Wednesday, March 5th, 2025

Pre-Bid Site Walk (Optional) Monday, March 24th 2025 at 10:00 AM EST.

Technical Question Deadline Wednesday, April 2nd, 2025, 2:30 PM EST

Answers to Questions Due (Posted) Friday, April 4th, 2025, 2:30 PM EST

Proposal Due Monday, April 14th, 2025 10:00 AM EST

Bid Opening Monday, April 14th, 2025, 10:30 AM EST

Board Action Monday April 21st, 2025

Notification of Successful Proposal Tuesday April 22nd, 2025

Any Wiring Install Begin Late June / Early July

Any Equipment Install Begin July 28th, 2025

Full Install Complete August 15th 2025

(Version 2 3/25/2025) 2 https://www.manchesterschools.us/district/public-notice/

Board of Education Colleen Schoenfeld, Secretary 710 Main Street Jennifer Caszatt, Treasurer Manchester, MI 48158 Rebecca Harvey, Trustee

(734) 428-9711 Sarah Roth, Trustee

Brandon Woods, Trustee

3. Required Proposal Contents

1. Cover / Transmittal Letter: Cover letter must summarize key provisions of the proposal and must include name, address, office phone number, cell phone and email of the primary contact.

2. Executive Summary: Include key provisions of the proposal, including demonstration of understanding of the Manchester Community Schools’ goals, pricing, relevant experience of the company and key timeline dates.

3. Company Profile: years in business, description of company's background, quality assurance/quality control

4. Price Proposal: Provide cash purchase price for equipment and installation as detailed on the BID PROPOSAL FORM. Owner reserves the right to add or deduct item quantities from the original specification, up to 10% of the original quantities, without any effect on the unit prices submitted.

5. Standards and Safety: All work to be completed in accordance with applicable codes and standards, including the Michigan school building and safety codes.

Please include a brief description of the safety practices of your firm.

6. Disclosure affidavit: Each bid shall be accompanied by a sworn and notarized Disclosures found at the end of the RFP including:

○ IRAN ECONOMIC SANCTION ACT 517 OF 2012 BIDDER CERTIFICATION

FORM

○ FAMILIAL RELATIONSHIP Form

○ Suspended or Debarred Vendor Form

(Version 2 3/25/2025) 3

Board of Education Colleen Schoenfeld, Secretary 710 Main Street Jennifer Caszatt, Treasurer Manchester, MI 48158 Rebecca Harvey, Trustee

(734) 428-9711 Sarah Roth, Trustee

Brandon Woods, Trustee

4. Proposal Submission All proposals must be delivered sealed and marked “Proposal for Classroom Technology Project” on the proposal package and delivered to 710 E Main Street, Manchester MI, 48158 Attn: Technology Director.

Oral, E-Mail or Facsimile Proposals will not be accepted. Any proposals received after the Due Date listed above will not be accepted or considered and will be made available to the respective vendor, unopened, for pick-up at the vendor’s sole expense.

From the issue date of this RFP until a vendor is selected and the selection announced, a prospective vendor shall not communicate about the subject of this RFP or a vendor’s proposal with the School District, its Board of Education, or any individual member, administrators, faculty, staff, students, or employees, except for Benjamin Bruursema, Manchester Community Schools Director of Technology.

Requests for clarification or questions on bidding procedures or specifications may be directed to Benjamin Bruursema, Director of Technology by EMAIL ONLY at bbruursema@mcs.k12.mi.us.

A recipient of this RFP is responsible for any and all costs and liabilities incurred by it or others acting on its behalf in preparing or submitting a proposal, or otherwise responding to this RFP, or any negotiations incidental to its proposal or this RFP.

Each vendor certifies that their proposal is made without any previous understanding, agreement or connection with any person, firm or corporation making a proposal for the same subject matter and is in all respects fair, without outside control, collusion, fraud or otherwise illegal action.

Proposals must: (i) demonstrate an understanding of the scope of services desired under this RFP; (ii) services, including the features of each, proposed by the vendor; and

(iii) include all necessary information to enable the School District to thoroughly evaluate each vendor’s overall experience, expertise, qualifications and ability to deliver the services in accordance with the requirements and obligations of this RFP. Each proposal shall also include any other information or explanations that the vendor feels

(Version 2 3/25/2025) 4 mailto:bbruursema@mcs.k12.mi.us

Board of Education Colleen Schoenfeld, Secretary 710 Main Street Jennifer Caszatt, Treasurer Manchester, MI 48158 Rebecca Harvey, Trustee

(734) 428-9711 Sarah Roth, Trustee

Brandon Woods, Trustee is/are significant with respect to the School District making an informed decision relative to its proposal.

The School District reserves the right, in its sole and absolute discretion (for this provision and all other provisions contained in this RFP), to accept or reject, in whole or in part, any or all proposals with or without cause. The School District further reserves the right to waive any irregularity or informality in the RFP process or any proposal, and the right to award the contract to other than the lowest bidder. The School District reserves the right to request additional information from any or all bidders. All proposals shall be considered firm for ninety (90) days after the due date for proposals.

This RFP packet will be available on our website at the following link, https://www.manchesterschools.us/district/public-notice/ or by navigating from https://manchesterschools.us and selecting District then Public Notice from the drop down at the top.

5. Equipment Technical Specifications

Classroom Video System - Google EDLA Certified Interactive Flat Panel (Smart Board)

1. Size: 65, 75, 86” Class

2. Resolution: 4K UHD (3840x2160)

3. Aspect Ratio: 16:9

4. Video Inputs: 3 HDMI in, 1 VGA, 1 USB-C

5. Outputs: 1 HDMI out, audio (3.5mm)

6. Speakers: 2X 15W minimum

7. Network: 10/100/1000 Ethernet and 802.11ac WiFi

8. Google EDLA Certified

9. OPS Slot: Yes

10. Touch Points: Minimum 30

11. User Interface: Both multi-touch and precise pen control

12. Warranty: Warranty/extended warranty to provide 5-year warranty (minimum)

13. Management Software (MDM): Minimum 5-year license

14. Connectivity: USB-C to the teacher computer and compatible streaming software that works across subnets for screen sharing

Adjustable Height Mount

(Version 2 3/25/2025) 5

Board of Education Colleen Schoenfeld, Secretary 710 Main Street Jennifer Caszatt, Treasurer Manchester, MI 48158 Rebecca Harvey, Trustee

(734) 428-9711 Sarah Roth, Trustee

Brandon Woods, Trustee Install Adjustable Height Mounts that allow for in class adjustment. BalanceBox® 650-II or equivalent alternate at district designated classroom, media center, and office locations. These should be mounted to the wall and not be mobile with the goal that students at the age of 4 all the way up to 7 as well as adults would be able to utilize the screen.

Classroom DECT Audio System (Minimum Specifications)

1. One 3.5mm Audio Input

2. New Wall Mounted Classroom Speakers. Four per classroom to provide coverage across the whole classroom.

3. Two Pendant Microphones and necessary charging accessories

4. Warranty/Extended warranty to provide 5-year warranty

5. Additional 10 microphone spares.

6. Supports 4 minimum 4 outputs to speakers in the classroom.

7. Lightspeed T25 or equivalent alternate

Classroom Audio Wire

1. Any necessary conduit/raceway to cover exposed wiring.

2. Where needed replacement audio cable with low-voltage cabling compatible with the sound system.

Professional Development / Training

Minimum of 12 hours of training or professional development for usage of touch panel, touch panel management, and sound system for use in increments of minimum 1 hour.

Must provide minimum 2 hours of training on the morning of August 20th, 2025 or August 21st, 2025 for staff back to school orientation of new classroom technology.

Exact time needed will be determined once the professional development schedule for the 2025-2026 school calendar is finalized.

(Version 2 3/25/2025) 6

Board of Education Colleen Schoenfeld, Secretary 710 Main Street Jennifer Caszatt, Treasurer Manchester, MI 48158 Rebecca Harvey, Trustee

(734) 428-9711 Sarah Roth, Trustee

Brandon Woods, Trustee Operation and Maintenance Manuals

Contractor shall supply Component Operation and Maintenance manuals in writing AND electronically as a pdf file on a thumb drive or CD. The information shall be sufficient for Manchester Community Schools to evaluate and ensure appropriate Operation and Maintenance is being completed over the life of the system. Components include interactive flat panels, classroom audio systems, raceway, etc.

6. Install Demolition/Deinstallation Specifications All materials and supplies to be provided by the bidder for deinstallation/demolition existing wiring and the installation of the new equipment. Attachment A provides details by classroom. Except for those items (if any) specifically noted to be excluded as defined below, this proposal shall include all of the work and contract requirements as follows.

Installation of Classroom Video Panel: Install the adjustable height mount on the designated wall space by Manchester Community Schools. This should be done with anchors to the concrete wall to ensure the displays remain on the wall.

Installation of Classroom Audio: Install audio equipment behind the panel against the wall. Connect audio cable from audio out on Touch Panel into Input 1 on audio device with either 3.5mm phono cable or S/PDIF optical cable as applicable. The speaker wiring should run from the ceiling down the wall to plug into the audio system behind the panel.

Audio Cabling will be scheduled when the drop ceiling is removed so access to above ceiling tile will be available.

Where not already installed, raceway should be added to conceal speaker wire, power cabling, and network cable. This can be a single raceway where individual cabling such as speaker wire exists.

(Version 2 3/25/2025) 7

Board of Education Colleen Schoenfeld, Secretary 710 Main Street Jennifer Caszatt, Treasurer Manchester, MI 48158 Rebecca Harvey, Trustee

Warranty - 24-Month Warranty on workmanship of deinstallation/demolition existing equipment and the installation of the new equipment, excluding only force majeure events, explicit Owner misuse, or third party misuse.

Forms on following pages

(Version 2 3/25/2025) 8

Board of Education Colleen Schoenfeld, Secretary 710 Main Street Jennifer Caszatt, Treasurer Manchester, MI 48158 Rebecca Harvey, Trustee

Manchester Community Schools Classroom Technology

Bid Proposal Form

This proposal has been prepared in response to the REQUEST FOR PROPOSALS -

Manchester Community Schools Classroom Technology Project.

The undersigned certifies that the proposal contained herein meets or exceeds the scope of services as outlined in the RFP, includes all responsibilities as described, and that no activities or requirements have been deleted or reduced from the requested scope of services.

The bids to provide the equipment and services including all taxes, fees, and costs as outlined within the District's RFP will be:

_______ No Bid (Check if you are not bidding on Classroom Video)

Classroom Video:

Classroom Video 65” - 5 quantity x $ __________ (each) = $_____________(total)

Classroom Video 75” - 25 quantity x $ __________ (each) = $_____________(total)

Classroom Video 86” - 2 quantity x $ __________ (each) = $_____________(total)

Touch Panel Installation - 32 quantity x $ __________ (each) = $_____________(total)

_______ No Bid (Check if you are not bidding on Adjustable Height Mounts)

Adjustable Height Mount:

Adjustable Height Mounts - 32 quantity x $ __________ (each) = $_____________(total)

Board of Education Colleen Schoenfeld, Secretary 710 Main Street Jennifer Caszatt, Treasurer Manchester, MI 48158 Rebecca Harvey, Trustee

_______ No Bid (Check if you are not bidding on Classroom Audio)

Classroom Audio:

Classroom Audio - 27 quantity x $ __________ (each) = $_____________(total)

Audio Wire - 27 quantity x $ __________ (each) = $_____________(total)

Speakers - 27(x4) quantity x $ __________ (each room) = $_____________(total)

Wiring Demo - 27 quantity x $ __________ (each) = $_____________(total)

Pendant Microphone 10 quantity x $ __________ (each) = $_____________(total)

Signed this __________day of ___________________________, 2025.

Signature: ___________________________________________________________________

Printed Name: ______________________________________ Title______________________

Firm Name: ___________________________________________________________________

Address: ______________________________________________________________________

Business phone: ______________________ Email address: _____________________________

Contact: _______________________________________ Cell Phone: _____________________

If a corporation, affix seal. Undersigned is authorized to make this proposal and bind the firm to the bid.

Witness Signature: __________________________

Name Printed: ____________________________________ Title _______________________

Board of Education Colleen Schoenfeld, Secretary 710 Main Street Jennifer Caszatt, Treasurer Manchester, MI 48158 Rebecca Harvey, Trustee

IRAN ECONOMIC SANCTION ACT 517 OF 2012

On December 28, 2012, Governor Snyder signed Public Act 517 of 2012, commonly known as the “Iran

Economic Sanctions Act” (the “Act”). The Act provides that beginning April 1, 2013 an “Iran Linked

Business” is not eligible to submit a bid on a request for proposal with a “public entity”. Under the Act, a

“public entity” includes school districts and intermediate school districts. The Act also requires that a person that submits a bid in response to a public entity’s request for proposal must certify to the public entity that it is not an Iran Linked Business. This requirement applies to all requests for proposals issued by a public entity, and not just to construction projects.

The Act defines an Iran Linked Business as: 1) a person engaging in investment activities in the energy sector of Iran, including a person that provides oil or liquefied natural gas tankers or products used to construct or maintain pipelines used to transport oil or liquefied natural gas for the energy sector of Iran;

or 2) a financial institution that extends credit to another person if that person will use the credit to engage in investment activities in the energy sector of Iran.

If the public entity determines, using credible information available to the public, that a person or entity has submitted a false certification, the public entity must provide written notice to the person or entity of its determination and of its intent not to enter into or renew the contract. The notice must include information on how to contest the determination. The notice must also specify that the individual or entity may become eligible for future contracts with the public entity if the activities that caused it to be an Iran Linked Business are ceased.

The Attorney General may bring a civil action against any individual or entity reported to have submitted a false certification. If the civil action results in a finding that certification was false, the person or entity will be responsible for a civil penalty of not more than $250,000.00 or two times the amount of the contract for which the false certification was made, whichever is greater. In addition to the fine the individual or entity will be responsible for the cost and reasonable attorney fees incurred by the public entity. An individual or entity who has submitted a false certification will be ineligible to bid on a request for proposal for 3 years from the date the certification was determined to be false.

Board of Education Colleen Schoenfeld, Secretary 710 Main Street Jennifer Caszatt, Treasurer Manchester, MI 48158 Rebecca Harvey, Trustee

IRAN ECONOMIC SANCTION ACT 517 OF 2012

BIDDER CERTIFICATION FORM

Beginning April 1, 2013, an Iran linked business is not eligible to submit a bid on a request for proposal with a public entity.

Beginning April 1, 2013, a public entity shall require a person that submits a bid on a request for proposal with the public entity to certify that it is not an Iran linked business.

Pursuant to Michigan law, (the Iran Economic Sanctions Act, 2012 PA 517, MCL 129.311 et seq.), before accepting any bid or proposal, or entering into any contract for goods or services with a prospective

Contractor, the contractor must first certify that it is not an “IRAN LINKED BUSINESS”, as defined by law.

Each contractor submitting a bid on this project shall include a letter with their bid certifying that they have full knowledge of the requirements and possible penalties under the law MCL 129.311 et seq. that the Contractor is NOT an “IRAN LINKED BUSINESS”, as required by MCL 129.311 et seq., and as such that

Contractor is legally eligible to submit a bid and be considered for a possible contract to supply goods and/or services to Manchester Community Schools.

I certify that I am a duly authorized representative of ______________________________ and

(Name of Company)

Confirm that neither I nor the company is an “Iran Linked Business”.

Company Representative Signature________________________________________________

Company Representative Printed/Typed Name ______________________________________

Date__________________

Board of Education Colleen Schoenfeld, Secretary 710 Main Street Jennifer Caszatt, Treasurer Manchester, MI 48158 Rebecca Harvey, Trustee

Suspended or Debarred Vendor

The undersigned, the owner or authorized officer of ___________________________________(the

“Bidder”) hereby certifies and affirms that it and its principals are not debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded by any Federal department or agency from doing business with the Federal Government.

Information regarding whether or not a business is suspended or debarred is available at the Federal

System for Award Management website (www.sam.gov).

Bidder Name: __________________________________________________________

Bidder EIN #:___________________________________________________________

By: ___________________________________________________________________

Authorized Representative Name: __________________________________________

Its: ___________________________________________________________________

Date: _________________________________________________________________

___________________________________ Subscribed and sworn to before me

(Company Name)

By: ________________________________________ this _____day of ________, year _____

(Authorized Signer)

(Print/Type Name and Title of Signer) (Signature of Notary Public)

My Commission Expires

County of http://www.sam.gov

Board of Education Colleen Schoenfeld, Secretary 710 Main Street Jennifer Caszatt, Treasurer Manchester, MI 48158 Rebecca Harvey, Trustee

FAMILIAL RELATIONSHIP

Each Bidder shall complete, execute and submit with its Bid Proposal the following Familial Relationship Sworn

Statement.

SWORN STATEMENT

Date: _______________________________________________

School District: Manchester Community Schools_________________________

Project: _____________________________________________

I/we disclose below any familial relationship that exists between the Owner or any employee of Bidder and any member of the Board of Education, or the Superintendent of Manchester Community Schools.

Familial Relationships: ____ ____ Listed Below

Bidder Employee/Position Relationship School District Associate/Position

___________________________________ Subscribed and sworn to before me

(Company Name)

By: ________________________________________ this _____day of ________, year _____

(Authorized Signer)

(Print/Type Name and Title of Signer) (Signature of Notary Public)

My Commission Expires

County of

Request for Proposal: Classroom Technology Project

1. Bid Documents
2. Schedule
3. Required Proposal Contents
4. Proposal Submission
5. Equipment Technical Specifications
6. Install Demolition/Deinstallation Specifications
Forms on following pages

File details come from the government source that posted it. Updated .