This amended Request for Quotation (RFQ1289) is issued by the Idaho Transportation Department (ITD) for the purchase and installation of twelve aluminum power lift gates on pickup trucks. The solicitation requires vendors to supply Tommy Gate model G2-60-1342-EA38 or an equal alternative, with installation completed within thirty calendar days of vehicle delivery. The specified vehicles consist of twelve 2026 Ford F350 long-bed 4x4 trucks identified by unit numbers. The RFQ was issued with a proposal deadline of May 11, 2026, allowing approximately eighteen days for bid preparation. Award will be made on an all-or-none basis to the responsive and responsible vendor submitting the lowest total cost. The contract includes a minimum two-year warranty covering all parts, labor, travel expenses, and freight for defective items, with warranty work required within fourteen calendar days of notice.

Vendors must submit quotations electronically through the Idaho Purchasing and Receiving Online (IPRO) system or via email to the Solicitation Contact, Doug Buswell, and must include a price sheet, signature page, proof of insurance, and documentation demonstrating compliance with specifications. The lift gates must feature a 1,300-pound capacity, fifty-five by thirty-eight inch aluminum or steel tread plate platform, dual hydraulic cylinders, LED lighting, and marine-grade electrical components with stainless steel fasteners and weather-sealed connections. All transportation costs to and from the contractor's facility, including risk in transit, must be included in the fully burdened price. Contractors located within twenty-five miles of ITD Headquarters in Boise may drive vehicles to their facility, while those located between twenty-five and one hundred sixty-five miles must transport vehicles. Contractors must maintain Garage Keepers Liability Insurance with minimum coverage of $100,000 per vehicle per occurrence. Acceptance occurs thirty calendar days after vehicle delivery unless ITD notifies the contractor of specification deficiencies, requiring corrective action within fourteen calendar days at no additional cost.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDED RFQ1289

PICKUP TRUCK MOUNTED POWER LIFT GATES

ATTACHMENT 1 - GENERAL INFORMATION

Purpose The Idaho transportation department (ITD) is requesting quotes from vendors for the purchase and installation of twelve (12) aluminum power lift gates (Gates) in this solicitation.

Solicitation Contact Doug Buswell Contracting and Grants Officer Phone: 208-772-8077 Email: Doug.Buswell@itd.idaho.gov (Preferred Method of Contact)

RESTRICTIONS ON COMMUNICTIONS

From the issue date of this RFQ, until a contract/purchase order is awarded or the RFQ is cancelled, vendors and their representatives are prohibited from communications (written or verbal) regarding this RFQ with the ITD staff, other than the ITD RFQ Lead. Any communications (written or verbal) with ITD staff other than the RFQ Lead may result in the submitting vendor being found Non-Responsible and Non-Responsive.

Requirements and Specifications See Attachment 2 – Requirements & Specifications – Power Lift Gates See Attachment 3 – Price Sheet See Attachment 4 – Signature Page

Quote Your Quote may be submitted electronically via IPRO or email (see below for additional details). ITD will not be accepting manual submissions for this solicitation. Your Quote must include the Required Submittals listed below and be received prior to the deadline established in IPRO.

Electronic Submission:

IPRO – Enter your pricing in IPRO (https://purchasing.idaho.gov/information-for-vendors/) and upload all Required Submittals.

Email:

5.1. Send an email to the Solicitation Contact (see Section 2) and attach all Required Submittals.

Required Submittals:

Attachment 2 – Price Sheet Attachment 3 – Signature Page Attachment 4 – Proof of Insurance

Documentation that demonstrates, to ITD’s satisfaction, that the offered item meets the requirements of the solicitation. Failure to provide satisfactory documentation may eliminate the Vendor from further consideration.

(See Attachment 2 – Requirements and Specifications – Lift Gates - Section 2 Specifications)

List of Attachments
Required Submittal Items

Attachment 1 – General Information Attachment 2 – Requirements and Specifications Attachment 3 – Price Sheet Attachment 4 – Signature Page Attachment 5 – State of Idaho Insurance Exhibit 1 - Deliverable Acceptance Form Exhibit 2 - Contract Discrepancy Form State of Idaho Standard Terms and Conditions

Attachment 3 – Price Sheet Attachment 4 – Signature Page Equal Compliance Documentation

Award Award will be made, all or none, to the responsive responsible vendor with the lowest Total Cost.

Though it is not mandatory to submit your Quotation electronically via IPRO, all vendors participating in a solicitation issued through IPRO must establish an account in the IPRO system (even if submitting a quote via email, courier, fax, or other method outside of IPRO). It is free to establish an account and only takes a few minutes of your time.

ATTACHMENT 2 – REQUIREMENTS & SPECIFICATIONS

SECTION 1 – REQUIREMENTS

1. Brand Name

1.1. Any Manufacturer Brand Components referenced in this solicitation are intended to be descriptive—not restrictive—and serve only to illustrate the quality and characteristics required. Bidders proposing an equivalent Manufacturer Brand Component must provide documentation demonstrating, to the State’s satisfaction, that the offered item(s) meet all minimum requirements outlined in the solicitation. This documentation must be submitted prior to the closing of the question period as noted in LUMA and;

1.2. If your product offered does not meet any of the specifications, Bidder must provide an explanation of how the product offered is functionally equivalent to the stated specification, as well as descriptive literature that supports the product offered.

1. Specifications

2.1. The Gates must meet the minimum specifications provided in Attachment 1, Section 2 – Specifications and be the latest model of the manufacturer's current standard production, as offered to commercial trade. Though they are not specifically covered herein, all parts necessary to provide a complete and functional product must be included. All parts must conform in design, strength, quality of materials, and workmanship to current engineering practices and accepted standards of the industry. All parts must be the manufacture’s standard unless otherwise specified in this RFQ and;

2.2. Gates must be completed when delivered to ITD with all accessories and equipment in place or furnished. All equipment and accessories must be installed as per the manufacture’s specifications and must be ready for continuous operation at the time of delivery.

1. Warranty Warranty for Gates must be for a minimum period of two (2) years after Acceptance as outlined in Section 1, (Line 4). Warranty must include all parts, labor, travel expenses and freight to replace a defective warranted item. All warranty work must be completed within fourteen (14) calendar days after receipt of notice from ITD.

1. Acceptance

4.1. Acceptance will occur thirty (30) calendar days after the ITD owned vehicles with the installed lift gates are delivered as outlined in Section 1, (Line 6) unless ITD notifies the Contractor in writing that said items are not within specification of this RFQ;

4.2. In the event the specifications are not met, the Contractor must pick up, correct any discrepancies, and re-deliver within fourteen (14) calendars days after notification from ITD, at no additional cost to ITD and;

4.3. If approved by ITD, the Contractor may correct discrepancies on-site at ITD’s location in lieu of pick-up and return shipping. The Contractor will be responsible for providing all labor; tools, parts, supplies, travel expenses and worksite clean up to make any necessary corrections. The timeframe for corrective action will still be as identified above.

1. Installation And Delivery

6.1. The Contractor must complete installation of the Gates for the entire order within thirty (30) calendar days of delivery of all ITD owned vehicles;

6.2. Note: Due to recent supply issues, the thirty (30) day period will begin when all vehicles and products have been delivered either to the Contractor;

6.3. Contractor located within twenty-five (25) miles of the location listed below, may choose to drive or transport vehicles to and from the Contractor’s installation facility. Once the installation has been completed, Contractor must deliver back to ITD;

6.4. Contractor located beyond twenty-five (25) miles, and no further than one hundred and sixty-five (165) miles from the location listed below, will transport (not drive) vehicles to and from Contractor’s installation facility. Once the installation has been completed, Contractor must deliver back to ITD;

6.5. All expenses related to transporting ITD vehicles to and from the Contractor’s installation facility, including risk in transit, are the responsibility of the Contractor and must be included in its fully burdened price;

6.6. Pickup and delivery must be made Monday through Thursday, 8:00 am to 4:00 pm local time excluding state of Idaho recognized holidays (https://www.idaho.gov/government/state-holidays/), unless otherwise approved by ITD;

6.7. Vehicles will be delivered clean and free of any trash or packing supplies and;

6.8. Delivery Location:

ITD Headquarters – 3311 W. State St., Boise, ID 83703

1. Insurance

7.1. See Attachment 5 – Insurance on the Attachments tab in LUMA and;

7.2. In addition to the standard insurance requirements, the Contractor must maintain Garage Keepers Liability Insurance with a limit of not less than $100,000 per vehicle, per occurrence.

1. Invoicing

8.1. The Contractor must submit its invoice within thirty (30) calendar days after Acceptance to the billing contact identified on each Order. Invoices submitted prior to acceptance, or without the required information listed below, will be returned to the Contractor for correction and resubmission. The following information must be included with each invoice:

8.1.1. Contract Name and Order Number;

8.1.2. Invoice Number and Date;

8.1.3. Contractor Contact Information;

8.1.4. Itemization of Property (description, quantity, unit of measure, unit price, and total price);

8.1.5. ITD Purchase Order (PO) number;

8.1.6. Vehicle Identification Number (VIN) and;

8.1.7. ITD unit number (License plate).

Email invoices to HQHWYAP@itd.idaho.gov

AMENDED - SECTION 2 – SPECIFICATIONS

RFQ1289

Tommy Gate model G2-60-1342-EA38 or equal installed and at a minimum must consist of the following:

1. Lift Gate One thousand three hundred (1300) - pound capacity;

Load area fifty-five (55) inches x thirty-eight (38) inches aluminum or steel tread plate; platform, with 6 inch taper;

Dual hydraulic cylinders;

Platform torsion assist spring;

Pump, cylinder and electrical enclosure;

Recessed control box;

Transfer and recalibrate (Original Equipment Manufacturer) OEM rear camera and backup sensors and;

Must include stop/tail/turning/reverse and license plate (Light Emitting Diode) LED light kit.

Electrical All necessary electrical wiring for a fully functional liftgate;

Electrical wiring must be securely fastened and located away from all pinch points;

Electrical wiring must be clamped and held in place using stainless steel rubber-insulated, bolt-on cushion clamps;

Electrical wiring must be pass through bulkheads must be protected with either rubber or neoprene bulkhead wire protectors and/or body grommet type insert and;

Electrical wiring and components (relays, fuses and/or breakers) must be heavy duty marine grade quality. Location of these items must be described in an electrical schematic provided with each vehicle;

Cabling Must be multi-conductor marine cable;

Must be adequate size to handle the anticipated loads of all electrical components. All cabling must be uninterrupted and complete with no splice;

All wires and/or cable terminal ends must be crimped, soldered, and sealed with polyolefin heat shrink tubing. Scotch-Loc fasteners, crimp butt connectors, and wire nuts are not acceptable for any connections;

Weather pack connections must be protected with dielectric grease and;

Wire to lamps must be stress relieved within 6 inches of the lamp.

Switches Must be sealed and weather tight.

exisitng tail gate Contractor must remove current tailgates and bumpers from ITD trucks and place them in the bed of the pickup truck to be returned to ITD. All hardware will be boxed and placed in truck bed. Items must be bubble wrapped to protect from damage during transport.

itd supplied vehicles identification 2026 FORD F350 Long-bed 4x4 Trucks.

T03812
T03846
T03819
T03847
T03829
T03849
T03831
T03850
T03833
T03856
T03845
T03587

2 | Page db

RFQ1289 PICKUP TRUCK MOUNTED POWER LIFT GATES 05/26

File details come from the government source that posted it. Updated .