Amend 001WithAttach.pdf
PDF 393 KB Posted
- Solicitation number
- 1240LN21Q0028
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30 (11_2016).pdf | ||
| Plans.pdf | ||
| ExperienceQuestionnaire.pdf | ||
| WDeterm.pdf | ||
| FSSS.pdf | ||
| 1240LN21Q0028CastlesRoadReconditionContractOppsPost.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240LN21Q0028
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40LN
BOZEMAN MT 59718
3710 FALLON ST
ATTN CRISTI HEANEY
USDA-FS CSA INTERMOUNTAIN 3
57712506/04/20210001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/26/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment incorporates the following and is hereby included in this solicitation:
- Adds Set 1- Questions and Answers - See below
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
ALISHA KNAUB
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Castles Checkerboard Road Reconditioning Questions and Answers - Set 1
Date Submitted Question Response 1 6/3/2021
Will the Forest Service be staking all the M.P.s for the work?
Yes
2 6/3/2021 Is testing required? If so can you clarify which of the requirements on the Sampling, Testing and Acceptance Pay Item #s 30207 – Aggregate Surface Course, Compaction MTD 3 and 30315
– Roadway Reconditioning, Compaction MTD 4 fall under?
No testing required on compaction, all compaction will be evaluated onsite with the Purchaser and FS inspector. Material will need to be moist to gain optimal compaction, so most likely a water truck will need to be onsite.
3 6/3/2021
Please clarify what is required for Pay Item #20302B – Removal of Metal Waterbar, Disposal MTD such as backfilling and disposal requirements and so on.
The metal waterbars are small opentops.
Disposal method is removal from the site.
Drain dips will be put in place of the open tops (metal waterbars), so no backfill is necessary.
4 6/3/2021 Please clarify Pay Item #61903 – Cattle Guard, Repair:
Repair includes reattaching the wings to the existing posts. All repairs are minor in nature
5 6/3/2021
Pay Item #s 30207 – Aggregate Surface Course, Compaction MTD 3; 30315 – Roadway Reconditioning, Compaction MTD 4 and 60201 18” Pipe Culvert, Corrugated Stee, Gage 16, Compaction MTD 6. for the compaction methods I am only seeing Compaction Methods 1- 6 in section 209 – Structure Excavation and Backfill. Is MTD 3, 4 and 6 referring to Compaction Methods 3, 4 and 6?
Compaction methods for the culverts will be in 209, compaction methods for reconditioning will be the methods in 204.11.
6 6/3/2021
Please clarify Page 3 of the Plans, General Notes 2 and 3 have Items 204, 303 and 202. The only Item Numbers that sort of match are 20425 and 30315.
The first 3 numbers (i.e. 204) refer to the specification (204 = Excavation and Embankment) and the last 2 numbers are more specific to the actual pay item and how it is measured
7 6/3/2021
Page 5 of the Plans has the End M.P at
6.34 intersecting with Road 8898.
However, on page 2 where the red line, indicating the work area, end at J8896 and J8896A. Please clarify
The road numbering in our GIS database and the road signs out in the field sometimes do not match. The end of this road will be staked at
6.34 miles.
RFQ 1240LN21Q0028,
Amendment 001
8 6/3/2021
Page 6 of the Plans shows rip rap detail for the culvert, but I am not seeing which class of rip rap is required. Can the excavated material be used as backfill?
No riprap is required. The standard typical shows it with riprap but we do not have any pay items requiring riprap..
9 6/3/2021
Page 8 of the Plans has a graph with different Types providing different lengths. The Pay Item Description calls out Type 1, but not the Grade %. On Notes #1 says “cross slope of the low point drain line shall be 5%”. I am assuming that the Grad % on the graph we are supposed to use for lengths is the 0-5 based on this note.
Grade percent in the table refers to the grade of the road.
10 6/3/2021
Page 6 of the Plans has a skew diagram. Is this referring to the angle the culvert is supposed to be to the road? Correct
File details come from the government source that posted it. Updated .