AMEND 0004 P964 Specifications 22 Feb 21.pdf
PDF 8 MB Posted
- Solicitation number
- W31R
About this file
This is a solicitation amendment for the construction of P-964 Shore to Ship Utilities in Bahrain. The amendment provides additional specifications and drawings for the project, which will construct shore-to-ship utility systems at NSA II to support littoral combat ships and other visiting vessels. Specifically, the amendment details the construction of hotel service stations, an electrical distribution system with switchgear and frequency converters, a single-story addition to the Consolidated Utility Building for additional water treatment equipment and storage, and a high-bay storage facility. It also specifies site civil work including underground utilities and paving. The total project cost is to be determined. The response due date has been extended to an unspecified future date. The U.S. Army Corps of Engineers Engineering District Middle East is the contracting agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P-964 Shore to Ship Utilities, NSA2, Bahrain 474976
SECTION 01 11 00
SUMMARY OF WORK
Revised by Amendment 0003
08/15
PART 1 GENERAL
The P964 Shore to Ship Utilities project will construct adequately sized and efficiently configured shore-to-ship based utility systems on NSA II.
These dedicated shore-to-ship based utility systems will support forward deployed littoral combat ship (LCS) surface combatants, and be able to service compatible homeported, forward deployed, rotationally deployed, and visiting U.S. ships on extended leave at NSA Bahrain.
This project constructs hotel service stations along the waterfront for shore-to-ship utility connections.
Constructs an electrical distribution system, pad mounted switchgear and frequency converters along the waterfront to provide shore-to-ship electrical utility services for ship connections.
Constructs a single story addition to the existing Consolidated Utility Building. The addition will provide space for the addition of a third reverse osmosis plant and chemical storage.
Constructs a single story high-bay storage facility for the utility system. The building consists of open storage with racks for the efficient storage of power cable spools, piping, hoses, tools and equipment.
Facility-related control systems include cybersecurity features in accordance with current Department of Defense (DoD) criteria.
This project will provide Anti-Terrorism/Force Protection (AT/FP) features and comply with AT/FP regulations, and physical security mitigation in accordance with DoD Minimum Anti- Terrorism Standards for Buildings.
Alarm, ESS, and CCTV installation and maintenance shall be accomplished by U.S. citizen(s) who have been subjected to a trustworthiness determination per SECNAVINST 5510.30B. A basic background investigation will be facilitated by the US Government through USACE Transatlantic Middle East District Security Office.
Architectural systems include concrete masonry unit (CMU) walls, standing seam metal roof, insulated metal panel siding, overhead doors, translucent panels for daylighting.
Paving and site improvements include bases and sub-bases, pavement, roadways, equipment pads for frequency converters and generator, screen walls around the backup generator, equipment sunshades over the frequency converters and an above ground fuel tank.
Electrical utilities include automatic transfer switch with weather enclosure, transformers, diesel backup generator with fuel storage, telecommunications and advance metering.
Mechanical utilities will include potable water distribution system, SECTION 01 11 00 Page 1 W912ER21R0001 Amendment 0003
P- 964 Shor e t o Shi p Ut i l i t i es, NSA2, Bahr ai n 474976 r ever se osmosi s package wat er t r eat ment ski d, sani t ar y sewer di st r i but i on syst ems wi t h pump st at i ons, i ndust r i al wast e shi p hot el connect i ons and advanced met er i ng.
Thi s pr oj ect al so i ncl udes sel ect i ve demol i t i on wi t hi n t he exi st i ng consol i dat ed ut i l i t y bui l di ng.
Thi s wor k i ncl udes t he suppl y and i nst al l at i on of Naval Suppor t Act i v i t y I I ( NSA) Rever se Osmosi s ( RO) pot abl e wat er t r eat ment syst em, i n accor dance wi t h Sect i on 01 80 10 SUMMARY OF WORK FOR P964 WATER TREATMENT
EQUI PMENT EXPANSI ON.
The Cont r act or shal l pr epar e a const r uct i on phasi ng pl an i n accor dance wi t h Sect i on 01 15 00. 12 10 SUPPLEMENTARY REQUI REMENTS, 1. 5 CONSTRUCTI ON
PHASI NG PLAN.
The Cont r act or shal l pr ovi de pr i c i ng as an execut abl e bi d opt i on t o i nst al l t he r equi r ed har dwar e and make t he Base el ect r i cal i nt er connect i on bet ween NSA I and NSA I I , i n accor dance wi t h cont r act document s.
Ref er t o at t ached Exhi bi t s f or addi t i onal i nf or mat i on. Exhi bi t A pr ovi des phot os of t he pr oj ect s i t e as a s i t e v i s i t was not f easi bl e due t o cur r ent t r avel and base access r est r i ct i ons. Exhi bi t B pr ovi des as- bui l t i nf or mat i on f or t he exi st i ng el ect r i cal and communi cat i ons syst ems.
1. 1 Exhibits
Exhi bi t A - Phot os of Exi st i ng Condi t i ons Exhi bi t B - As- Bui l t Dr awi ngs
- - End of Sect i on - -
SECTI ON 01 11 00 Page 2
P
E x
Ex
Ex
Ex
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
Ex
Ex
E
E
E
E
X X X X
XXXXXX
X
X X
X
E
F
G
E
N
2.0M CHAIN-LINK FENCEWITH BARBED WIRE ON TOP
2.M CHAIN-LINK FENCE WITH BARBED WIRE AND CONCERTINA ON TOP
2.0M CHAIN-LINK FENCEWITH BARBED WIRE ON TOP
SEMI-PERMANENT
STRUCTURE
SEMI-PERMANENT
STRUCTURE
LOD
LOD
S F
S F
SF
N 2898483.716
E 461872.732
N 2898501.115
E 461855.437
N 2898544.014
E 461898.592
N 2898548.329
E 461894.304
N 2898541.92
E 461923.887
N 2898481.221
E 461870.217
N 2898477.851
E 461873.581
N 2898513.68
E 461912.026
N 2898535.047
E 461924.602
N 2898531.907
E 461927.742
N 2898526.583
E 461916.102
N 2898528.3
E 461882.232
W x
W x
W x
W x
W x
Ex
Ex
Ex
E x
E x
E x
E x
Ex
Ex
E x
E x
E x
Ex
Ex
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
Ex Ex Ex Ex Ex Ex Ex Ex
Ex
E x
E x
E x
E x
E x
E x
Ex Ex
E x
E x
E x
E x
Ex
Ex
Ex
Ex
Ex
Ex
Ex Ex Ex
E x
E
E
E
E
E
E
E
E
E
C x
C x
Cx
C x
C x
C x
C x
C x
C x
C x
C x
Cx Cx Cx
Cx Cx Cx
C
C
C
C
S S x
S S x
SSx SSx SSx SSx SSx
S
S x
SSx SSx SSx
SSx
L
S
L
S
L
S
W x
W x
W x
W x
W x
WxWx
Wx
W x
Wx
W
M
W
M
W
M
W
M
C H
W C
H W
CHW
C H
W C
H W
CHW
C H
W
C H
W
CHW
C H
W C
H W
CHW
E
F
F
FH
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
E
F
X X X X
X
X
X X
X X
X X
X
XXXXXX
X
X
X
X
X X
X
X X
X X
X X
X
E
W
M
T
R
A
S
H
B
O
X
T
R
A
X
W x
W x
W x
W x
CHW
CHW
CHW
CHW
CHW
CHW
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
Cx
Cx
Cx
CxCx
Cx
Cx
Cx
C xC xCx
Cx
Cx
Cx
Cx
Cx
Cx
Cx
Cx
Cx
Cx
Cx
Cx
CxCx
Cx
Cx
Cx
C xC xCx
Cx
Cx
Cx
Cx
Cx
Cx
Cx
Cx
Cx
Cx
E
C
E
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
C x
W
M
SSx
SSx
SSx
C x
C x
C x
C x
C x
C x
C x
C x
C x
C
GATE
GATE
P
E
E x
LOD
LOD
LOD LOD
LOD
L O
D
L O
D
LOD
L O
D L O
D
LOD
LOD LOD
L O
D
S F
S F
S F
SF
S F
S F
S F
SF
L
O
D
L
O
D
L
O
D
LOD
L O
D
L O
D
L O
D
L
O
D
L
O
D
L O
D
LOD LOD
LOD
L
O
D
LOD
L O
D
L O
D
N 2898761.296
E 461627.618
N 2898755.416
E 461584.215
N 2898753.824
E 461582.614
N 2898751.426
E 461584.997
N 2898752.956
E 461586.536
N 2898755.185
E 461593.675
N 2898755.427
E 461601.252
N 2898753.488
E 461603.18
N 2898755.512
E 461603.917
N 2898755.65
E 461608.234
N 2898755.915
E 461613.329
N 2898758.981
E 461623.946
N 2898759.948
E 461626.263
N 2898763.334
E 461625.592
N 2898773.516
E 461635.834
N 2898757.838
E 461631.055
N 2898762.447
E 461635.692
N 2898770.055
E 461639.267
N 2898777.451
E 461632.071
N 2898778.608
E 461633.038
N 2898790.639
E 461646.372
N 2898788.196
E 461656.657
N 2898795.524
E 461611.046
N 2898811.643
E 461627.602
N 2898804.742
E 461634.353
N 2898794.028
E 461617.894
N 2898793.368
E 461624.82
N 2898797.15
E 461621.055
N 2898779.401
E 461647.786
N 2898757.186
E 461652.06
N 2898751.049
E 461658.165
N 2898750.883
E 461663.307
N 2898754.711
E 461659.497
N 2898753.328
E 461669.552
N 2898749.908
E 461672.948
N 2898788.027
E 461704.302
N 2898790.599
E 461706.903
N 2898816.564
E 461702.169
N 2898815.654
E 461703.067
N 2898812.811
E 461715.818
N 2898817.244
E 461720.569
N 2898808.591
E 461709.003
N 2898807.689
E 461709.848
N 2898753.414
E 461648.224
N 2898747.125
E 461654.488
N 2898764.289
E 461687.607
N 2898765.7
E 461689.024
N 2898791.574
E 461715.039
N 2898793.958
E 461717.118
N 2898745.241
E 461668.96
N 2898761.481
E 461684.784
N 2898772.52
E 461695.882
N 2898833.641
E 461663.329
N 2898842.624
E 461672.439
N 2898833.808
E 461664.189
N 2898841.796
E 461672.104
%PRODUCTION DATA 1%
%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C T
N
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
J U
L
P L
D
A T
E
F I L
E N
A M
E
A N
S I
D
R M
Y
C
O R
F
E
N G
I N
E E
R S
N S
A
I I
P
O
S
H I
I L
I T
I E
S
US Army Corps of Engineers ®
B A
H R
A I N
W
E R
F
UNLESS OTHERWISE NOTED, LINEAR
DIMENSIONS SHOWN ARE IN METERS.
P
L O
T D
A T
E
P
L O
T T
I M
E
B A
NOT FOR
CONSTRUCTION
M I D
D L
E
E
A S
T
D
I S
T R
I C
T
P O
B
X
W I N
C H
E S
T E
R
V
CORRECTED FINAL
SHEETNUMBER SHEETCOUNTCUSTOM1
S
H O
S
H
I L
I T
I E
S
S
I T
E
C I V
I L
D E
M O
L I T
I O
N
A
L A
N
C
U
S
A
R E
A
CD011
J
C
O R
U M
B
L U
M
K
K
E N
N E
D Y
S
W
I L H
O I T
E
B A
C
D X
D d w g
A
S
I G
N
S
U B
M I T
T A
L
B
S
I G
N
S
U B
M I T
T A
L
C
S
I G
N
S
U B
M I T
T A
L
D C
O R
R E
C T
N
A L
D
GENERAL SHEET NOTES
SHEET KEYNOTES (CON'T)
25. EXISTING OUTFLOW FROM RO TRAIN TO TREATED WATER STORAGE
TANK, NOT SURVEYED. FIELD VERIFY LOCATION AND DEPTH. REMOVE
PORTION TO ALLOW FOR CUB ADDITION
26. EXISTING INFLOW PIPE FROM RAW WATER TANK, NOT SURVEYED.
FIELD VERIFY LOCATION AND DEPTH.REMOVE PORTION TO ALLOW
FOR CUB ADDITION
27. DEMOLISH EXISTING ELECTRIC DUCT BANK AND MANHOLE NOT
SURVEYED. RETAIN PORTION FOR REUSE.
28. REMOVE CONCRETE BLOCK FENCE. COORDINATE REMOVAL WITH
SECURITY FORCE
GRAPHIC SCALE
DIM. NOTE & NORTH
KEYPLAN
CUB
A B
C
D
E
F
G
H
I
J
K L
M
SFUS
MATCHLINE
SEE CD017
MATCHLINE
SEE CD012
MATCHLINE
SEE CD020
M A
T C
H L
I N
E
S E
E
C
D
MATCHLINE
SEE CD021
A1
DEMOLITION AND EROSION CONTROL PLAN - SFUS BUILDING
SCALE: 1:250
D1
SCALE: 1:250
DEMOLITION AND EROSION
CONTROL PLAN - CUB BUILDING
SHEET KEYNOTES
1. PROJECT LIMITS
2. SAWCUT AND REMOVE CONCRETE CURB
3. SAWCUT AND REMOVE CONCRETE PAVEMENT, SEE
CU701-CU729 FOR PAVEMENT REPLACEMENT
4. SAWCUT AND REMOVE ASPHALT PAVEMENT, SEE CU701-CU729
FOR PAVEMENT REPLACEMENT
5. REMOVE SIDEWALK PAVERS
6. TEMPORARY SOIL STOCKPILE
7. SILT FENCE, SEE A7/CD501
8. INLET PROTECTION. A1/CD501
9. GRAVEL CONSTRUCTION ENTRANCE / EXIT
10. REMOVE EXISTING SANITARY SEWER LINE
11. REMOVE 20 L/S PUMP
12. REMOVE CONCRETE WHEEL STOPS (16)
13. REMOVE CONCRETE FOUNDATIONS
14. REMOVE LIGHT POLE AND FOUNDATION
15. GOVERNMENT TO REMOVE SEMI-PERMANENT STRUCTURE
PRIOR TO CONSTRUCTION
16. PROTECT RADAR TOWER AND ALL ASSOCIATED EQUIPMENT
17. RELOCATE REJECT WATER HANDHOLE. SEE CU401 FOR NEW
LOCATION
18. REMOVE UNKNOWN UTILITY MANHOLE, CONTRACTOR TO
VERIFY MANHOLE IS ABANDONED PRIOR TO REMOVAL
19. CAP AND REMOVE EXISTING WATER LINE
20. MILL AND REPAVE AC PAVEMENT, 50 mm
21. REMOVE PARKING SIGN
22. PROTECT EXISTING LIGHT POLE TO REMAIN
23. REMOVE FENCING
24. TEMPORARY CONSTRUCTION FENCE, SEE E1/CD501
PLAN NORTH
1:250
25m5m 20m15m10m0m
A. SEE C-001 FOR GENERAL NOTES AND LEGEND
B. SEE CS100-CS101 FOR LAYOUT INFORMATION.
C. SEE CU400-CU401 FOR UTILITY INFORMATION
D. INSTALL INITIAL PERIMETER EROSION AND SEDIMENTATION
CONTROLS PRIOR TO START OF MAIN DEMOLITION AND
GRADING ACTIVITIES. COORDINATE INSTALLATION OF NEW
CONTROLS AND SEQUENCING WITH INITIAL CONTROLS TO
ENSURE ADEQUATE TREATMENT.
EXHIBIT A - SECTION 01 11 00
n0tamgtw Text Box Outside RO Photo n0tamgtw Line n0tamgtw Line n0tamgtw Text Box Inside RO Photo n0tamgtw Text Box Manhole Photo n0tamgtw Line n0tamgtw Line n0tamgtw Text Box Foundation 7 typ Photo
Ex Ex Ex Ex Ex Ex Ex Ex Ex Ex Ex Ex
Ex Ex
Ex
Ex Ex Ex
E x
Ex Ex Ex Ex Ex
Ex Ex
E
E
E
E
E x
E x
E x
Cx Cx Cx Cx Cx Cx Cx Cx Cx Cx Cx Cx Cx Cx Cx Cx
C x
C x
C x
C x
C x
C
SSx SSx SSx SSx SSx SSx SSx SSx
S S x S
S x
L
S
Wx
W x
W x
W x
W x
W x
W x
Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx
W x
Wx Wx
W x
WxWx
Wx
Wx
W x
Wx
Wx
W x
W xW
M
W
M
W
M
W
M
W
M
W
M
W
M
C H
W C
H W
C H
W C
H W
C H
W C
H W
CHWCHWCHW
C H
W
CHWCHW
CHW
C H
W
CHW CHW
C H
W
CHW
CHW CHW
C H
W
CHW
C H
W
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW CHW
CHW
C
L
S
C
W
M
X
X
X
X
S
S
G
E
N
G
E
N
X
X
X
X X
X
X X
X X
L O
D
L O
D
LOD LOD
LOD LOD LOD LOD LOD
L
O
D
L O
D
L
O
D
LOD LOD LOD LOD LOD LOD LOD
N 2898813.894
E 461730.367
N 2898817.95
E 461741.557
N 2898811.628
E 461725.88
N 2898805.537
E 461719.564
N 2898801.409
E 461719.781
N 2898835.215
E 461749.664
N 2898836.339
E 461750.795
N 2898835.282
E 461751.845
N 2898834.156
E 461750.717
N 2898880.455
E 461797.274
N 2898871.427
E 461795.34
%PRODUCTION DATA 1%
%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
L
P L
T
E
F I L
E N
A M
E
A N
S I
D
M
Y
C
O R
E
N G
I N
E E
R S
N S
A
I I
P
O
S
H
I L
I T
I E
S
US Army Corps of Engineers ®
B A
H R
A I N
W
E R
F
UNLESS OTHERWISE NOTED, LINEAR
DIMENSIONS SHOWN ARE IN METERS.
P
L O
T D
A T
E
P
L O
T T
I M
E
B A
NOT FOR
CONSTRUCTION
M I D
D L
E
E
A S
T
D
I S
T R
I C
T
P O
B
W I N
C H
E S
T E
R
CORRECTED FINAL
SHEETNUMBER SHEETCOUNTCUSTOM1
S
H O
S
H
I L
I T
I E
S
S
I T
E
C I V
I L
D E
M O
L I T
I O
O
S I O
N
C
O N
T R
A
N
A
R E
A
A
CD012
J
C
O R
U M
B
L U
M
K
K
E N
N E
D Y
S
W
I L H
O I T
E
B A
C
D X
D d w g
A
S
I G
N
S
U B
M I T
T A
L
B
S
I G
N
S
U B
M I T
T A
L
C
S
I G
N
S
U B
M I T
T A
L
D C
O R
R E
C T
N
A L
D
GENERAL SHEET NOTES
SHEET KEYNOTES
1. PROJECT LIMITS
2. REMOVE SIDEWALK PAVERS
3. SAWCUT AND REMOVE ASPHALT PAVEMENT, SEE CU701-CU729
FOR PAVEMENT REPLACEMENT
4. REMOVE SANITARY SEWER LINE
5. CAP AND REMOVE WATERLINE
6. REMOVE 20 L/S PUMP
7. MILL AND REPAVE AC PAVEMENT, 50 mm
8. CUT AND CAP EXISTING SANITARY SEWER MAIN AT MANHOLE
9. PROTECT EXISTING RAW WATER TANK
10. PROTECT EXISTING LIGHT POLE TO REMAIN
11. RELOCATE REJECT WATER HANDHOLE. SEE CU401 FOR NEW
LOCATION
12. SAWCUT AND REMOVE CONCRETE CURB
13. COORDINATE WORK UNDER FENCE WITH SECURITY FORCES
14. TEMPORARILY REMOVE AND STORE LIGHT POLE TO FACILITATE
SANITARY SEWER INSTALLATION. REINSTALL AT SAME LOCATION
AT END OF PROJECT
D1
DEMOLITION AND EROSION CONTROL PLAN - AREA A
SCALE: 1:250
GRAPHIC SCALE
DIM. NOTE & NORTH
KEYPLAN
CUB
A B
C
D
E
F
G
H
I
J
K L
M
SFUS
MATCHLINE
SEE CD017
MATCHLINE
SEE CD011
M A
T C
H L
I N
E
S E
E
C
D
1:250
25m5m 20m15m10m0m
PLAN NORTH
A. SEE C-001 FOR GENERAL NOTES AND LEGEND
B. SEE CS100-CS101 FOR LAYOUT INFORMATION.
C. SEE CU400-CU401 FOR UTILITY INFORMATION
D. INSTALL INITIAL PERIMETER EROSION AND SEDIMENTATION
CONTROLS PRIOR TO START OF MAIN DEMOLITION AND
GRADING ACTIVITIES. COORDINATE INSTALLATION OF NEW
CONTROLS AND SEQUENCING WITH INITIAL CONTROLS TO
ENSURE ADEQUATE TREATMENT.
n0tamgtw Line n0tamgtw Text Box Typical Demolition Area Photo
ExEx ExExEx
ExEx
E x
E x
E
Ex Ex Ex Ex Ex Ex Ex Ex Ex Ex Ex
Ex Ex Ex Ex Ex
E
E
E
E x
E x
Ex
E x
E
E E
E
Cx CxCx
CxCx CxCx
CxCx
Cx
Cx Cx
Cx Cx
Cx Cx
C x
C
C x
C x
CC
S S x S
S x
SSx
SSx
SSx
SSxSSxSSxSSxSSx
S
S x
S S x
Wx
Wx
Wx Wx
Wx Wx
Wx Wx
Wx
Wx
Wx Wx
Wx Wx
Wx Wx
W x
W x
W x
W x
W
M
W
M
W
M
W
M
W
M
W
M
W
M
W
M
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW
CHW
W
M
E
F
F H
G
E
N
LOD LOD LOD LOD LOD LOD LOD
L
O
D
LOD
L O
D
L O
D
LOD LOD LOD LOD LOD LOD LOD
L
O
D
N 2898673.067
E 461831.959
N 2898695.45
E 461839.885
N 2898619.814
E 461901.424
N 2898621.904
E 461903.526
N 2898600.813
E 461924.601
%PRODUCTION DATA 1%
%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
L
P L
T
E
F I L
E N
A M
E
A N
S I
D
M
Y
C
O R
E
N G
I N
E E
R S
N S
A
I I
P
O
S
H
I L
I T
I E
S
US Army Corps of Engineers ®
B A
H R
A I N
W
E R
F
UNLESS OTHERWISE NOTED, LINEAR
DIMENSIONS SHOWN ARE IN METERS.
P
L O
T D
A T
E
P
L O
T T
I M
E
B A
NOT FOR
CONSTRUCTION
M I D
D L
E
E
A S
T
D
I S
T R
I C
T
P O
B
W I N
C H
E S
T E
R
CORRECTED FINAL
SHEETNUMBER SHEETCOUNTCUSTOM1
S
H O
S
H
I L
I T
I E
S
S
I T
E
C I V
I L
D E
M O
L I T
I O
O
S I O
N
C
O N
T R
A
N
A
R E
A
G
CD018
J
C
O R
U M
B
L U
M
K
K
E N
N E
D Y
S
W
I L H
O I T
E
B A
C
D X
D d w g
A
S
I G
N
S
U B
M I T
T A
L
B
S
I G
N
S
U B
M I T
T A
L
C
S
I G
N
S
U B
M I T
T A
L
D C
O R
R E
C T
N
A L
D
GENERAL SHEET NOTES
SHEET KEYNOTES
D1
DEMOLITION AND EROSION CONTROL PLAN - AREA G
SCALE: 1:250
GRAPHIC SCALE
DIM. NOTE & NORTH
KEYPLAN
CUB
A B
C
D
E
F
G
H
I
J
K L
M
SFUS
M A
T C
H L
I N
E
S E
E
C
D
M A
T C
H L
I N
E
S E
E
C
D
1. PROJECT LIMITS
2. SAWCUT AND REMOVE ASPHALT PAVEMENT, SEE
CU701-CU729 FOR PAVEMENT REPLACEMENT
3. REMOVE ROADWAY PAVERS
4. MILL AND REPAVE AC PAVEMENT, 50 mm
1:250
25m5m 20m15m10m0m
PLAN NORTH
A. SEE C-001 FOR GENERAL NOTES AND LEGEND
B. SEE CS100-CS101 FOR LAYOUT INFORMATION.
C. SEE CU400-CU401 FOR UTILITY INFORMATION
D. INSTALL INITIAL PERIMETER EROSION AND SEDIMENTATION
CONTROLS PRIOR TO START OF MAIN DEMOLITION AND
GRADING ACTIVITIES. COORDINATE INSTALLATION OF NEW
CONTROLS AND SEQUENCING WITH INITIAL CONTROLS TO
ENSURE ADEQUATE TREATMENT.
n0tamgtw Text Box Typical Demolition Area Photo n0tamgtw Line
Existing Photos of Site
Typical Vegetation
Typical Trench Typical Demolition Area
6” Diameter Pipe Inside Outside
Reverse Osmosis
Manhole is 1050 mm x 1050 mm inside dimensions with a 780mm diameter circular opening. It has 3 openings on the plan West and Plan south sides, but no conduits. It is clean and empty.
There are 7 foundations. Dimensions are roughly 450mm square with some variation.
Four are very short, two are taller, around 600mm and one is over 1m.
This manhole has been capped by concrete and abandoned.
EXHIBIT B - SECTION 01 11 00
SECTI ON 01 91 00. 15
TOTAL BUI LDI NG COMMI SSI ONI NG
REVI SED BY AMENDMENT NO. 0003
02/19
PART 1 GENERAL
1. 1 SUMMARY
Commi ssi on t he bui l di ng syst ems l i s t ed her ei n. Empl oy t he ser vi ces of an i ndependent Commi ssi oni ng Fi r m. The Commi ssi oni ng Fi r m must be a 1st t i er subcont r act or of t he Gener al or Pr i me Cont r act or and must be f i nanci al l y and cor por at el y i ndependent of al l ot her subcont r act or s. The Commi ssi oni ng Fi r m must empl oy a Lead Commi ssi oni ng Speci al i st t hat coor di nat es al l aspect s of t he commi ssi oni ng pr ocess. Conf or m t o t he commi ssi oni ng pr ocedur es out l i ned i n t hi s speci f i cat i on.
1. 2 SYSTEMS TO BE COMMI SSI ONED
Commi ssi on t he f ol l owi ng syst ems:
Heat i ng, Vent i l at i ng, Ai r Condi t i oni ng, and Ref r i ger at i on Syst ems
(HVAC)
Bui l di ng Aut omat i on Syst em
Fi r e Suppr essi on and Al ar m Syst ems
Power Di st r i but i on Syst ems
Fi r e Suppr essi on and Al ar m Syst ems - Ref er t o speci f i cat i ons Sect i on 21 13 13. 00 20 WET PI PE SPRI NKLER SYSTEM, FI RE PROTECTI ON and Sect i on
28 31 63. 00 20 ANALOG/ ADDRESSABLE I NTERI OR FI RE ALARM SYSTEM.
Pl umbi ng Syst ems
Ener gy and Wat er Ut i l i t y Met er i ng Syst ems and Sub- Met er s
Wat er Tr eat ment Syst em - Ref er t o Speci f i cat i on Sect i on 01 80 10
SUMMARY OF WORK FOR P964 WATER TREATMENT EQUI PMENT EXPANSI ON
1. 3 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AMERI CAN SOCI ETY OF HEATI NG, REFRI GERATI NG AND AI R- CONDI TI ONI NG
ENGI NEERS ( ASHRAE)
ASHRAE 202 ( 2013; Addenda B 2018) Commi ssi oni ng Pr ocess f or Bui l di ngs and Syst ems
ASSOCI ATED AI R BALANCE COUNCI L ( AABC)
ACG Commi ssi oni ng Gui del i ne ( 2005) Commi ssi oni ng Gui del i ne
SECTI ON 01 91 00. 15 Page 1
NATI ONAL ENVI RONMENTAL BALANCI NG BUREAU ( NEBB)
NEBB Commi ssi oni ng St andar d ( 2009) Pr ocedur al St andar ds f or Whol e Bui l di ng Syst ems Commi ssi oni ng of New Const r uct i on; 3r d Edi t i on
SHEET METAL AND AI R CONDI TI ONI NG CONTRACTORS' NATI ONAL ASSOCI ATI ON
(SMACNA)
SMACNA 1429 ( 1994) HVAC Syst ems Commi ssi oni ng Manual , 1st Edi t i on
1. 4 COMMUNI CATI ON WI TH THE GOVERNMENT
The Lead Commi ssi oni ng Speci al i st ( CxC) must submi t al l r equi r ed submi t t al s t o t he Gover nment v i a t he pr i me cont r act or . The Lead Commi ssi oni ng Speci al i st must have di r ect communi cat i on wi t h t he Cont r act i ng Of f i cer ' s Techni cal Repr esent at i ve r egar di ng al l el ement s of t he commi ssi oni ng pr ocess; however , t he Gover nment has no di r ect cont r act aut hor i t y wi t h t he Lead Commi ssi oni ng Speci al i st .
1. 5 SEQUENCI NG AND SCHEDULI NG
1. 5. 1 Sequencing
Compl et e t he f ol l owi ng pr i or t o st ar t i ng Funct i onal Per f or mance Test s of mechani cal and pl umbi ng syst ems:
a. Al l equi pment and syst ems have been compl et ed, c l eaned, f l ushed, di s i nf ect ed, cal i br at ed, t est ed, and oper at e i n accor dance wi t h cont r act document s and const r uct i on pl ans and speci f i cat i ons.
b. Per f or mance Ver i f i cat i on Test s of t he cont r ol s syst ems have been compl et ed and t he Per f or mance Ver i f i cat i on Test Repor t has been submi t t ed and appr oved i n accor dance wi t h Speci f i cat i on Sect i on
23 09 00 I NSTRUMENTATI ON AND CONTROL FOR HVAC.
c. Test i ng, Adj ust i ng, and Bal anci ng has been compl et ed and t he Test i ng, Adj ust i ng, and Bal anci ng Repor t , and al l TAB and DALT r el at ed submi t t al s pr er equi s i t e t o t he TAB Repor t , have been submi t t ed and appr oved i n accor dance wi t h Speci f i cat i on Sect i on 23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC.
d. The bui l di ng envel ope i s encl osed accor di ng t o cont r act document s wi t h f i nal const r uct i on compl et ed.
e. The Pr e- Funct i onal Checkl i st s have been submi t t ed and appr oved.
f . The Cer t i f i cat e of Readi ness f or mechani cal and pl umbi ng syst ems has been submi t t ed and appr oved.
Compl et e t he f ol l owi ng pr i or t o st ar t i ng Funct i onal Per f or mance Test s of t he el ect r i cal syst ems:
a. Al l el ect r i cal , power gener at i on, and l i ght i ng equi pment and syst ems have been compl et ed, cal i br at ed, t est ed, and oper at e i n accor dance wi t h cont r act document s and const r uct i on pl ans and speci f i cat i ons.
SECTI ON 01 91 00. 15 Page 2
b. The bui l di ng envel ope i s encl osed accor di ng t o cont r act document s wi t h f i nal const r uct i on compl et ed.
c. Cei l i ng t i l es, f l oor cover i ngs, and wi ndow cover i ngs ar e i n pl ace.
d. The Cer t i f i cat e of Readi ness f or el ect r i cal syst ems has been submi t t ed and appr oved.
1. 5. 2 Pr oj ect Schedul e
I ncl ude t he f ol l owi ng t asks i n t he pr oj ect schedul e r equi r ed by Sect i on 01 32 17. 12 10 COST- LOADED NETWORK ANALYSI S SCHEDULES ( NAS) . Ensur e suf f i c i ent t i me i s schedul ed t o accommodat e t he r equi r ement s of t hi s speci f i cat i on sect i on. The or der of i t ems l i s t ed bel ow i s not i nt ended t o i mpl y a speci f i ed sequence:
a. Submi ssi on and appr oval of t he Commi ssi oni ng Fi r m and Commi ssi oni ng Specialist
b. Submi ssi on and appr oval of t he Test i ng, Adj ust i ng, and Bal anci ng ( TAB) Fi r m and TAB Speci al i st speci f i ed i n Speci f i cat i on Sect i on 23 05 93
TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC
c. Submi ssi on of t he Desi gn Revi ew Repor t speci f i ed her ei n.
d. Submi ssi on of t he Desi gn Revi ew Repor t speci f i ed i n Specification Sect i on 23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC.
e. Submi ssi on and appr oval of t he Const r uct i on Phase Commi ssi oni ng Pl an f . I nst al l at i on of per manent ut i l i t i es ( gas, wat er , el ect r i c)
g. Ai r Bar r i er Pr essur e Test s speci f i ed i n Speci f i cat i on Sect i on
07 27 10. 00 10 BUI LDI NG AI R BARRI ER SYSTEM
hg. Dr ai nage and Vent , Bui l di ng Sewer s, Wat er Suppl y Syst ems and Backf l ow Pr event i on Assembl y Test s speci f i ed i n Speci f i cat i on Sect i on 22 00 00
PLUMBI NG, GENERAL PURPOSE
i h. Fact or y Accept ance Test i ng f or each of t he syst ems t o be commi ssi oned as r equi r ed by t echni cal speci f i cat i ons j i . Manuf act ur er ' s Equi pment St ar t - Up f or each of t he syst ems t o be commissioned.
kj . Pot abl e Wat er Syst em Fl ushi ng speci f i ed i n Speci f i cat i on Sect i on
22 00 00 PLUMBI NG, GENERAL PURPOSE
l k. Oper at i onal Test s of t he pl umbi ng syst em speci f i ed i n Specification Sect i on 22 00 00 PLUMBI NG, GENERAL PURPOSE.
ml . Pot abl e Wat er Syst em Di si nf ect i on speci f i ed i n Speci f i cat i on Sect i on
22 00 00 PLUMBI NG, GENERAL PURPOSE
nm. Submi ssi on and appr oval of t he TAB Schemat i c Dr awi ngs, Repor t For ms, and Pr ocedur es speci f i ed i n Speci f i cat i on Sect i on 23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC.
on. Test i ng, Adj ust i ng, and Bal anci ng ( TAB) Fi el d Wor k r equi r ed by
SECTI ON 01 91 00. 15 Page 3
Speci f i cat i on Sect i on 23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR
HVAC
po. Submi ssi on and appr oval of t he TAB Repor t speci f i ed i n Specification Sect i on 23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC
qp. TAB Fi el d Accept ance Test i ng r equi r ed by Speci f i cat i on Sect i on
23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC
r q. Submi ssi on and appr oval of t he St ar t - Up Test i ng Repor t speci f i ed i n Speci f i cat i on Sect i on 23 09 00 I NSTRUMENTATI ON AND CONTROL FOR HVAC.
sr . Submi ssi on and appr oval of t he Per f or mance Ver i f i cat i on Test Pr ocedur es speci f i ed i n Speci f i cat i on Sect i on 23 09 00 I NSTRUMENTATI ON
AND CONTROL FOR HVAC.
t s. Per f or mance Ver i f i cat i on Test s r equi r ed by Speci f i cat i on Sect i on
23 09 00 I NSTRUMENTATI ON AND CONTROL FOR HVAC
ut . Per f or mance Ver i f i cat i on Test Repor t speci f i ed i n Specification Sect i on 23 09 00 I NSTRUMENTATI ON AND CONTROL FOR HVAC
vu. Pr e- Funct i onal Checkl i st Submi t t al
wv. Funct i onal Per f or mance Test i ng f or each syst em t o be commi ssi oned
xw. Post - Test Def i c i ency Cor r ect i on f or each syst em t o be commi ssi oned
yx. Re- Test i ng
zy. Tr ai ni ng f or each of t he syst ems t o be commi ssi oned aaz. Syst ems Manual bbaa. Submi ssi on and appr oval of t he Commi ssi oni ng Repor t cc bb. Seasonal Test i ng ddcc . Post - Const r uct i on Si t e Vi s i t
1. 6 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Commi ssi oni ng Fi r m; G M/ R
Lead Commi ssi oni ng Speci al i st ; G M/ R
Techni cal Commi ssi oni ng Speci al i st s; G M/ R
Commi ssi oni ng Fi r m' s Cont r act ; G M/ R
SD- 06 Test Repor t s
SECTI ON 01 91 00. 15 Page 4
Desi gn Revi ew Repor t ; G M
I nt er i m Const r uct i on Phase Commi ssi oni ng Pl an; G M
Fi nal Const r uct i on Phase Commi ssi oni ng Pl an; G M
Pr e- Funct i onal Checkl i st s; G M
I ssues Log; G M
Commi ssi oni ng Repor t ; G M
SD- 07 Cer t i f i cat es
Cer t i f i cat e of Readi ness
SD- 10 Oper at i on and Mai nt enance Dat a
Tr ai ni ng Pl an; G R
Tr ai ni ng At t endance Rost er s; G R
Syst ems Manual ; G R
SD- 11 Cl oseout Submi t t al s
Fi nal Commi ssi oni ng Repor t ; G M/ R
1. 7 COMMI SSI ONI NG FI RM
Pr ovi de a Commi ssi oni ng Fi r m t hat i s cer t i f i ed i n commi ssi oni ng by one of t he f ol l owi ng: t he AABC Commi ssi oni ng Gr oup ( ACG) ; t he Nat i onal Envi r onment al Bal anci ng Bur eau ( NEBB) ; t he I nt er nat i onal Cer t i f i cat i on Boar d/ Test i ng, Adj ust i ng, and Bal anci ng Bur eau ( I CB/ TABB) , t he Bui l di ng Commi ssi oni ng Associ at i on ( BCA) ; t he Associ at i on of Ener gy Engi neer s ( AEE) . The Commi ssi oni ng Fi r m must be cer t i f i ed i n al l syst ems t o be commi ssi oned t o t he ext ent such cer t i f i cat i ons ar e avai l abl e f r om t he cer t i f y i ng body. Descr i be any l apses i n cer t i f i cat i on or di sci pl i nar y act i on t aken by t he cer t i f y i ng body agai nst t he pr oposed Commi ssi oni ng Fi r m or Lead Commi ssi oni ng Speci al i st i n det ai l . Any f i r m or commi ssi oni ng pr of essi onal t hat has been t he subj ect of di sci pl i nar y act i on by t he cer t i f y i ng body wi t hi n t he f i ve year s pr ecedi ng cont r act awar d i s not el i gi bl e t o per f or m any dut i es r el at ed t o commi ssi oni ng.
a. Submi t t he Commi ssi oni ng Fi r m' s cer t i f i cat i on of qual i f i cat i ons i ncl udi ng t he name of t he f i r m and cer t i f i cat i ons no l at er t han 60 cal endar days af t er Not i ce t o Pr oceed. Submi t one har d copy and an el ect r oni c copy.
b. The Commi ssi oni ng Fi r m' s and Commi ssi oni ng Speci al i st s ' cer t i f i cat i ons must be mai nt ai ned f or t he ent i r e dur at i on of t he dut i es speci f i ed her ei n. I f , f or any r eason, t he f i r m or a speci al i st l oses a cer t i f i cat i on dur i ng t hi s per i od, i mmedi at el y not i f y t he Contracting Of f i cer ' s Techni cal Repr esent at i ve and submi t anot her Commi ssi oni ng Fi r m or Commi ssi oni ng Speci al i st f or appr oval . Al l wor k speci f i ed i n t hi s speci f i cat i on sect i on per f or med by t he Commi ssi oni ng Fi r m or associ at ed Commi ssi oni ng Speci al i st s i s i nval i d i f t he Commi ssi oni ng Fi r m or Commi ssi oni ng Speci al i st l oses i t s cer t i f i cat i on pr i or t o
SECTI ON 01 91 00. 15 Page 5 cont r act compl et i on and must be per f or med by an appr oved successor .
c. The Commi ssi oni ng Fi r m must over see and assi st t he Gener al or Pr i me Cont r act or wi t h t he wor k speci f i ed her ei n. Submi t t he Commi ssi oni ng Fi r m' s Cont r act i ncl udi ng t he Scope of Wor k associ at ed wi t h t he par agr aph POST- CONSTRUCTI ON SUPPORT no l at er t han 30 cal endar days af t er appr oval of t he Commi ssi oni ng Fi r m. Submi t one har d copy and an el ect r oni c copy.
1. 7. 1 Lead Commi ssi oni ng Speci al i st
The Commi ssi oni ng Fi r m must pr ovi de a Lead Commi ssi oni ng Speci al i st ( CxC) t hat has a mi ni mum of f i ve year s of commi ssi oni ng exper i ence, i ncl udi ng t wo pr oj ect s of s i mi l ar s i ze and compl exi t y, and t hat i s one of t he f ol l owi ng: a NEBB qual i f i ed Syst ems Commi ssi oni ng Admi ni st r at or ( SCA) ;
ACG Cer t i f i ed Commi ssi oni ng Aut hor i t y ( CxA) ; I CB/ TABB Cer t i f i ed Commi ssi oni ng Super vi sor ; BCA Cer t i f i ed Commi ssi oni ng Pr of essi onal ( CCP) ;
AEE Cer t i f i ed Bui l di ng Commi ssi oni ng Pr of essi onal ( CBCP) ; Uni ver si t y of Wi sconsi n- Madi son Qual i f i ed Commi ssi oni ng Pr ocess Pr ovi der ( QCxP) ; ASHRAE Commi ssi oni ng Pr ocess Management Pr of essi onal ( CPMP) .
a. Submi t t he Lead Commi ssi oni ng Speci al i st ' s cer t i f i cat i on of qual i f i cat i ons i ncl udi ng t he name of t he speci al i st and f i r m;
cer t i f i cat i ons; year s of exper i ence; and a l i s t i ng of r epr esent at i ve pr oj ect s of s i mi l ar s i ze and compl exi t y no l at er t han 30 cal endar days af t er Not i ce t o Pr oceed. Submi t one har d copy and an el ect r oni c copy.
b. The Lead Commi ssi oni ng Speci al i st s cer t i f i cat i ons must be mai nt ai ned f or t he ent i r e dur at i on of t he dut i es speci f i ed her ei n. I f , f or any r eason, t he speci al i st l oses a cer t i f i cat i on dur i ng t hi s per i od, i mmedi at el y not i f y t he Cont r act i ng Of f i cer ' s Techni cal Repr esent at i ve and submi t anot her Lead Commi ssi oni ng Speci al i st f or appr oval . Al l wor k speci f i ed i n t hi s speci f i cat i on sect i on t o be per f or med by t he Lead Commi ssi oni ng Speci al i st i s i nval i d i f t he Lead Commi ssi oni ng Speci al i st l oses i t s cer t i f i cat i on pr i or t o cont r act compl et i on and must be per f or med by an appr oved successor .
c. The Lead Commi ssi oni ng Speci al i st must l ead and over see t he commi ssi oni ng wor k speci f i ed her ei n and be t he pr i mar y poi nt of cont act f or t he Gover nment r egar di ng t he commi ssi oni ng wor k. One of t he Techni cal Commi ssi oni ng Speci al i st s may be t he Lead Commi ssi oni ng Speci al i st pr ovi ded t hat al l of t he qual i f i cat i on r equi r ement s ar e met .
1. 7. 2 Techni cal Commi ssi oni ng Speci al i st s
Techni cal Commi ssi oni ng Speci al i st s, empl oyed by t he Commi ssi oni ng Fi r m and t hat have t he f ol l owi ng qual i f i cat i ons, must per f or m t he t echni cal wor k speci f i ed her ei n associ at ed wi t h each syst em t o be commi ssi oned:
a. Mechani cal Techni cal Commi ssi oni ng Speci al i st : The t echni cal wor k associ at ed wi t h mechani cal syst ems i ncl udi ng Heat i ng, Vent i l at i ng, Ai r Condi t i oni ng, and Ref r i ger at i on Syst ems; Bui l di ng Aut omat i on Syst em;
Pl umbi ng Syst ems; Wat er Pumpi ng and Mi xi ng Syst ems; Ener gy and Wat er Ut i l i t y Met er i ng Syst ems; El ect r i cal Di st r i but i on Syst ems must be per f or med by a Commi ssi oni ng Speci al i st cer t i f i ed by NEBB, ACG, ICB/TABB, AEE, Uni ver si t y of Wi sconsi n- Madi son, ASHRAE, or BCA i n t he commi ssi oni ng of HVAC syst ems wi t h f i ve year s of exper i ence i n t he commi ssi oni ng of HVAC syst ems.
SECTI ON 01 91 00. 15 Page 6
b. Submi t t he Techni cal Commi ssi oni ng Speci al i st ' s cer t i f i cat i on of qual i f i cat i ons i ncl udi ng t he name of t he speci al i st and f i r m;
cer t i f i cat i ons; year s of exper i ence; and a l i s t i ng of r epr esent at i ve pr oj ect s of s i mi l ar s i ze and compl exi t y no l at er t han 30 cal endar days af t er Not i ce t o Pr oceed. Submi t one har d copy and an el ect r oni c copy.
1. 7. 3 Commi ssi oni ng St andar d
Compl y wi t h t he r equi r ement s of t he commi ssi oni ng st andar d under whi ch t he Commi ssi oni ng Fi r m and Speci al i st s qual i f i cat i ons ar e appr oved. When t he f i r m and speci al i st s ar e cer t i f i ed by BCA, AEE, ASHRAE, or t he Uni ver si t y of Wi sconsi n- Madi son, compl y wi t h t he r equi r ement s of one of t he accept abl e st andar ds unl ess ot her wi se st at ed her ei n. The accept abl e st andar ds ar e ACG Commi ssi oni ng Gui del i ne, NEBB Commi ssi oni ng St andar d, SMACNA 1429, or ASHRAE 202. Compl y wi t h appl i cabl e NETA t est i ng st andar ds f or el ect r i cal syst ems.
a. I mpl ement al l r ecommendat i ons and suggest ed pr act i ces cont ai ned i n t he Commi ssi oni ng St andar d and el ect r i cal t est st andar ds.
b. Use t he Commi ssi oni ng St andar d f or al l aspect s of Commi ssi oni ng, i ncl udi ng cal i br at i on of i nst r ument s.
c. Wher e t he i nst r ument manuf act ur er cal i br at i on r ecommendat i ons ar e mor e st r i ngent t han t hose l i s t ed i n t he Commi ssi oni ng St andar d, adher e t o t he manuf act ur er cal i br at i on r ecommendat i ons.
d. Al l qual i t y assur ance pr ovi s i ons of t he Commi ssi oni ng St andar d such as per f or mance guar ant ees ar e par t of t hi s cont r act .
e. The Commi ssi oni ng Speci al i st s must devel op commi ssi oni ng pr ocedur es f or any syst ems or syst em component s not cover ed i n t he Commi ssi oni ng Standard.
f . Use any new r equi r ement s, r ecommendat i ons, and pr ocedur es publ i shed or adopt ed pr i or t o cont r act sol i c i t at i on by t he body r esponsi bl e f or t he Commi ssi oni ng St andar d.
1. 8 I SSUES LOG
The Lead Commi ssi oni ng Speci al i st must devel op and mai nt ai n an I ssues Log f or t r acki ng and r esol ut i on of al l def i c i enci es di scover ed t hr ough submi t t al r evi ews, i nspect i on, and t est i ng. I ncl ude t he dat e of f i nal r esol ut i on of i ssues as conf i r med by t he Commi ssi oni ng Speci al i st . Submi t t he I ssues Log t o t he Cont r act i ng Of f i cer ' s Techni cal Repr esent at i ve on a mont hl y basi s at a mi ni mum. At any poi nt dur i ng const r uct i on, any commi ssi oni ng t eam member f i ndi ng def i c i enci es may communi cat e t hose def i c i enci es i n wr i t i ng t o t he Commi ssi oni ng Speci al i st f or i ncl usi on i nt o t he I ssues Log.
Tr ack const r uct i on def i c i enci es i dent i f i ed i n t he I ssues Log i n accor dance wi t h t he Qual i t y Cont r ol Pl an r equi r ed by Speci f i cat i on Sect i on
01 45 00. 00 20 QUALI TY CONTROL.
1. 9 CERTI FI CATE OF READI NESS
Pr i or t o schedul i ng Funct i onal Per f or mance Test s f or each syst em, i ssue a Cer t i f i cat e of Readi ness f or t he syst em cer t i f y i ng t hat t he syst em i s r eady f or Funct i onal Per f or mance Test i ng. The Cer t i f i cat e of Readi ness
SECTI ON 01 91 00. 15 Page 7 must i ncl ude, f or each syst em t o be commi ssi oned, al l equi pment and syst em st ar t - up r epor t s; Per f or mance Ver i f i cat i on Test Repor t s; completed Pr e- Funct i onal Checkl i st s; Test i ng, Adj ust i ng, and Bal anci ng ( TAB) Repor t ;
HVAC Cont r ol s St ar t - Up Repor t s; and t he Ai r Leakage Test Repor t s and Di agnost i c Test Repor t s t o t he ext ent appl i cabl e t o t he syst em. The Cont r act or ; t he Lead Commi ssi oni ng Speci al i st ; t he Cont r act or ' s Qual i t y Cont r ol Repr esent at i ve; t he Mechani cal , Electrical, Cont r ol s, and TAB subcont r act or r epr esent at i ves must s i gn and dat e t he Cer t i f i cat e of Readi ness. Submi t t he Cer t i f i cat e of Readi ness f or each syst em no l at er t han 14 cal endar days pr i or t o Funct i onal Per f or mance Test s of t hat syst em. Submi t one har d copy and an el ect r oni c copy. Do not schedul e Funct i onal Per f or mance Test s f or a syst em unt i l t he Cer t i f i cat e of Readi ness f or t hat syst em r ecei ves appr oval by t he Gover nment .
PART 2 PRODUCTS
Not used
PART 3 EXECUTI ON
3. 1 CONSTRUCTI ON PHASE
3. 1. 1 Const r uct i on Commi ssi oni ng Coor di nat i on Meet i ng
The Lead Commi ssi oni ng Speci al i st must l ead a Const r uct i on Commi ssi oni ng Coor di nat i on Meet i ng no l at er t han 14 days af t er appr oval of t he Commi ssi oni ng Fi r m and Commi ssi oni ng Speci al i st s t o di scuss t he commi ssi oni ng pr ocess i ncl udi ng cont r act r equi r ement s, l i nes of communi cat i on, r ol es and r esponsi bi l i t i es, schedul es, document at i on r equi r ement s, i nspect i on and t est pr ocedur es, and l ogi st i cs as speci f i ed i n t hi s speci f i cat i on sect i on. The Cont r act or ' s Super i nt endent or Pr oj ect Manager , t he Cont r act or ' s Qual i t y Cont r ol Repr esent at i ve, and t he Gover nment must at t end t hi s meet i ng. I nvi t e t he User and a Publ i c Wor ks Di v i s i on Repr esent at i ve t o at t end t hi s meet i ng.
3. 1. 2 Const r uct i on Phase Commi ssi oni ng Pl an
3. 1. 2. 1 I nt er i m Const r uct i on Phase Commi ssi oni ng Pl an
The Lead Commi ssi oni ng Speci al i st ( CxC) must pr epar e t he I nt er i m Const r uct i on Phase Commi ssi oni ng Pl an. Submi t t he I nt er i m Const r uct i on Phase Commi ssi oni ng Pl an no l at er t han 30 cal endar days af t er t he Const r uct i on Commi ssi oni ng Coor di nat i on Meet i ng and no l at er t han 14 days pr i or t o t he st ar t of const r uct i on of t he bui l di ng envel ope. Submi t one har d copy and an el ect r oni c copy.
I dent i f y t he commi ssi oni ng and t est i ng st andar ds and out l i ne t he over al l commi ssi oni ng pr ocess, t he commi ssi oni ng schedul e, t he commi ssi oni ng t eam member s and r esponsi bi l i t i es, l i nes of communi cat i on, document at i on r equi r ement s f or t he const r uct i on phase of t he pr oj ect i n t he I nt er i m Const r uct i on Phase Commi ssi oni ng Pl an.
3. 1. 2. 1. 1 Checklists
Downl oad exampl e Pr e- Funct i onal Checkl i st s and Funct i onal Per f or mance Test Checkl i st s f or speci f i cat i on sect i on 01 91 00. 15 TOTAL BUI LDI NG COMMI SSI ONI NG at t he f ol l owi ng l ocat i on:
http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/forms-graphics-tables The checkl i st s submi t t ed i n t he I nt er i m and Fi nal Const r uct i on Phase
SECTI ON 01 91 00. 15 Page 8
Commi ssi oni ng Pl ans must cont ai n t he same l evel of det ai l shown i n t he exampl es. The submi t t ed checkl i st s ar e not r equi r ed t o mat ch t he f or mat of t he exampl es.
3. 1. 2. 1. 2 Contents
I n addi t i on, i ncl ude t he f ol l owi ng i n t he I nt er i m Const r uct i on Phase Commi ssi oni ng Pl an:
a. Pl an pur pose
b. Commi ssi oni ng scope
c. Syst ems t o be commi ssi oned
d. Exampl es and descr i pt i on of devel opment of pr e- f unct i onal and f unct i onal per f or mance t est checkl i st s
e. Bui l di ng i nf or mat i on f . Cont act i nf or mat i on f or t he Commi ssi oni ng Speci al i st s, t he Cont r act i ng Of f i cer ' s Techni cal Repr esent at i ve, and t he Commi ssi oni ng Team l i st ed i n par agr aph Commi ssi oni ng Team
g. Rol es and r esponsi bi l i t i es
h. Management pl an i . Owner ' s Pr oj ect Requi r ement s Document j . Basi s of Desi gn
k. Descr i pt i on of desi gn r evi ews by t he Commi ssi oni ng Speci al i st s l . Descr i pt i on and t empl at es f or s i t e obser vat i on r epor t s and t he i ssues log
m. Li st i ng and descr i pt i on of r equi r ed meet i ngs
n. I dent i f i cat i on and sequence of commi ssi oni ng and accept ance t asks f or i ncor por at i on i nt o t he Pr oj ect Schedul e
o. Li st i ng of r equi r ed submi t t al s t o Gover nment and Commi ssi oni ng Specialists
p. Descr i pt i on of execut i on of pr e- f unct i onal checks and f unct i onal per f or mance t est s
q. Oper at i on and mai nt enance manual r equi r ement s r . Descr i pt i on of t r ai ni ng r equi r ement s
s. Descr i pt i on of r equi r ed Syst ems Manual t . Descr i pt i on of t he Commi ssi oni ng Repor t
3. 1. 2. 2 Fi nal Const r uct i on Phase Commi ssi oni ng Pl an
The Lead Commi ssi oni ng Speci al i st ( CxC) must pr epar e t he Fi nal
SECTI ON 01 91 00. 15 Page 9
Const r uct i on Phase Commi ssi oni ng Pl an. Submi t t he Fi nal Const r uct i on Phase Commi ssi oni ng Pl an no l at er t han 30 cal endar days pr i or t o t he st ar t of Pr e- Funct i onal Checks. Submi t one har d copy and an el ect r oni c copy.
I ncl ude t he i nf or mat i on pr ovi ded i n t he I nt er i m Const r uct i on Phase Commi ssi oni ng Pl an. I n addi t i on, t he Techni cal Commi ssi oni ng Speci al i st must devel op t he Pr e- Funct i onal Checkl i st s and Funct i onal Per f or mance Test Checkl i st s f or each bui l di ng, f or each syst em r equi r ed t o be commi ssi oned, and f or each component f or i ncl usi on i n t he Fi nal Const r uct i on Phase Commi ssi oni ng Pl an.
3. 1. 2. 2. 1 Pr e- Funct i onal Checkl i st s
The Pr e- Funct i onal Checkl i st s must i ncl ude i t ems f or physi cal i nspect i on or t est i ng t hat demonst r at e t hat i nst al l at i on and st ar t - up of equi pment and syst ems i s compl et e. Ref er t o par agr aph Pr e- Funct i onal Checks f or mor e i nf or mat i on.
3. 1. 2. 2. 2 Funct i onal Per f or mance Test Checkl i st s
Funct i onal Per f or mance Test Checkl i st s must i ncl ude pr ocedur es t hat expl ai n, st ep- by- st ep, t he act i ons and expect ed r esul t s t hat wi l l demonst r at e t hat t he syst em per f or ms i n accor dance wi t h t he cont r act .
Ref er t o par agr aph Funct i onal Per f or mance Test s f or mor e i nf or mat i on.
I ncl ude t he f ol l owi ng sect i ons and det ai l s appr opr i at e t o t he syst ems bei ng t est ed i n t he Funct i onal Per f or mance Test Checkl i st s:
a. Not abl e syst em f eat ur es i ncl udi ng i nf or mat i on about such at t r i but es as syst em si z i ng and cont r ol s t o f aci l i t at e under st andi ng of syst em operation
b. Concl usi ons and r ecommendat i ons based on cont r ol syst em f eat ur e, poi nt - t o- poi nt , act uat or , and syst em oper at i on obser vat i ons.
Concl usi ons must c l ear l y i ndi cat e i f syst em does or does not per f or m i n accor dance wi t h cont r act r equi r ement s. Recommendat i on must c l ear l y i ndi cat e t hat t he syst em shoul d or shoul d not be accept ed by t he Government.
c. Test condi t i ons i ncl udi ng dat e, begi nni ng and endi ng t i me, and begi nni ng and endi ng out door ai r condi t i ons
d. At t endees pr esent t hr oughout t he ent i r e syst em t est
e. I dent i f i cat i on of t he equi pment i nvol ved i n t he t est f . Cont r ol syst em f eat ur e i dent i f i cat i on i ncl udi ng cont r ol poi nt descr i pt i on, embedded/ vi s i bl e t ype, adj ust abl e/ moni t or i ng t ype, act ual val ue, and set poi nt val ue/ al ar m r ange
g. Poi nt - t o- poi nt obser vat i ons i ncl udi ng demonst r at i ng syst em f l ow met er s and sensor s have been cal i br at ed and ar e cor r ect l y di spl ayed on t he Oper at or wor k st at i on
h. Act uat or oper at i on obser vat i ons demonst r at i ng act uat or r esponses t o commands f r om t he cont r ol syst em i . Syst em oper at i on obser vat i ons f or syst em- based t est s demonst r at i ng each cont r ol al gor i t hm, oper at i on mode, and al ar m condi t i on r esul t i ng f r om cont r ol poi nt ( s) mani pul at i on. Syst em oper at i on obser vat i ons
SECTI ON 01 91 00. 15 Page 10 must cont ai n t he f ol l owi ng:
( 1) i nt r oduct i on i dent i f y i ng t est i ng met hodol ogy
( 2) as- f ound condi t i ons pr i or t o cont r ol poi nt ( s) mani pul at i on
( 3) c l ear l i s t of t est i t ems ( st ep number s)
( 4) cont r ol al gor i t hm ( desi gn cont r ol sequence) segment ed by uni que functions
( 5) i nt ended t est pr ocedur es f ol l owi ng each segment ed cont r ol al gor i t hm i dent i f y i ng cont r ol poi nt ( s) r equi r ed t o be mani pul at ed t o i ni t i at e syst em r esponse
( 6) expect ed syst em r esponse
( 7) space f or comment s f or each t est i t em compl et e i ncl udi ng r esul t i ng cont r ol s i gnal such as 0- vol t s, 10- vol t s, act i ve, or i nact i ve
( 8) pass or f ai l i ndi cat i on f or each t est i t em
3. 1. 3 Desi gn Revi ew
The Lead Commi ssi oni ng Speci al i st and Techni cal Commi ssi oni ng Speci al i st s must r evi ew t he const r uct i on cont r act pl ans and speci f i cat i ons, t he Owner ' s Pr oj ect Requi r ement s Document , and t he Basi s of Desi gn. The Owner ' s Pr oj ect Requi r ement s Document i s at t ached as Appendi x A. The Basi s of Desi gn i s at t ached as Appendi x B. The Owner ' s Pr oj ect Requi r ement s Document and Basi s of Desi gn document s ar e not cont r act document s and ar e pr ovi ded f or commi ssi oni ng r evi ew pur poses onl y.
a. Advi se t he Cont r act i ng Of f i cer ' s Techni cal Repr esent at i ve of any di scr epanci es bet ween t he Basi s of Desi gn and Owner ' s Pr oj ect Requi r ement s, def i c i enci es of t he desi gn t o compl y wi t h t he Owner ' s Pr oj ect Requi r ement s or Basi s of Desi gn, and def i c i enci es t hat woul d pr event t he bui l di ng syst ems and f eat ur es f r om oper at i ng or per f or mi ng ef f ect i vel y and f r om bei ng adequat el y mai nt ai nabl e.
b. The Commi ssi oni ng Speci al i st s must pr ovi de a Desi gn Revi ew Repor t i ndi v i dual l y l i s t i ng each def i c i ency and t he cor r espondi ng pr oposed cor r ect i ve act i on necessar y f or pr oper syst em oper at i on or per f or mance. Submi t one har d copy and an el ect r oni c copy of t he r epor t t o t he Cont r act i ng Of f i cer ' s Techni cal Repr esent at i ve no l at er t han 14 days af t er appr oval of t he Commi ssi oni ng Speci al i st s.
c. The Lead Commi ssi oni ng Speci al i st must par t i c i pat e i n a meet i ng t o di scuss any i t ems cont ai ned i n t he r epor t no l at er t han 14 cal endar days af t er submi ssi on of t he r epor t .
3. 1. 4 Const r uct i on Submi t t al s
Pr ovi de al l submi t t al s associ at ed wi t h t he syst ems t o be commi ssi oned, i ncl udi ng shop dr awi ngs; equi pment submi t t al s; t est pl ans, pr ocedur es, and r epor t s; and r esubmi t t al ' s t o t he Commi ssi oni ng Speci al i st s. The Techni cal Commi ssi oni ng Speci al i st must r evi ew t he submi t t al s t o t he ext ent necessar y t o ver i f y t hat t he equi pment and syst em i nst al l at i on wi l l compl y wi t h t he cont r act r equi r ement s and t he r equi r ement s of t he Basi s of Desi gn and t he Owner ' s Pr oj ect Requi r ement s Document .
SECTI ON 01 91 00. 15 Page 11
3. 1. 5 I nspect i on and Test i ng
Demonst r at e t hat al l syst em component s have been i nst al l ed, t hat each cont r ol devi ce and i t em of equi pment oper at es, and t hat t he syst ems oper at e and per f or m, i ncl udi ng i nt er act i ve oper at i on bet ween syst ems, i n accor dance wi t h cont r act document s and t he Owner ' s Pr oj ect Requi r ement s.
Requi r ement s i n r el at ed speci f i cat i on sect i ons ar e i ndependent f r om t he r equi r ement s of t hi s sect i on and do not sat i sf y any of t he r equi r ement s speci f i ed i n t hi s speci f i cat i on sect i on. Pr ovi de al l mat er i al s, ser vi ces, and l abor r equi r ed t o per f or m t he Pr e- Funct i onal Checks and Funct i onal Per f or mance Test s.
3. 1. 5. 1 Commi ssi oni ng Team
Pr ovi de a commi ssi oni ng r epr esent at i ve f or each sub- cont r act or associ at ed wi t h t he syst ems t o be commi ssi oned. Each commi ssi oni ng r epr esent at i ve i s r esponsi bl e f or coor di nat i on of t hei r r espect i ve sub- cont r act or ' s execut i on of t he commi ssi oni ng act i v i t i es and par t i c i pat i on i n t he i nspect i on and t est i ng r equi r ed by t hi s speci f i cat i on sect i on. The desi gner s l i s t ed bel ow ar e t he desi gner s of r ecor d f or t hei r r espect i ve syst ems. Subst i t ut es must be appr oved by t he Cont r act i ng Of f i cer ' s Techni cal Repr esent at i ve.
3. 1. 5. 1. 1 Mechani cal and Pl umbi ng Syst ems Pr e- Funct i onal Checks Team
The f ol l owi ng t eam member s must par t i c i pat e i n Pr e- Funct i onal checks of mechani cal syst ems:
Designation Function
CxM Mechani cal Syst em Techni cal Commi ssi oni ng Speci al i st
QAR Cont r act i ng Of f i cer ' s Qual i t y Assur ance Repr esent at i ve
CQC Cont r act or ' s Qual i t y Cont r ol Per sonnel
MC Cont r act or ' s Mechani cal Commi ssi oni ng Repr esent at i ve
FC Cont r act or ' s Fi r e Suppr essi on and Al ar m Commi ssi oni ng Representative
CC Cont r act or ' s Cont r ol s Commi ssi oni ng Repr esent at i ve
TABC Cont r act or ' s TAB Commi ssi oni ng Repr esent at i ve
PC Cont r act or ' s Pl umbi ng Commi ssi oni ng Repr esent at i ve
3. 1. 5. 1. 2 El ect r i cal Syst em Pr e- Funct i onal Checks Team
The f ol l owi ng t eam member s must par t i c i pat e i n Pr e- Funct i onal checks of el ect r i cal syst ems:
SECTI ON 01 91 00. 15 Page 12
Designation Function
CxM El ect r i cal Syst em Techni cal Commi ssi oni ng Speci al i st
QAR Cont r act i ng Of f i cer ' s Qual i t y Assur ance Repr esent at i ve
CQC Cont r act or ' s Qual i t y Cont r ol Per sonnel
EC Cont r act or ' s El ect r i cal Commi ssi oni ng Repr esent at i ve
3. 1. 5. 1. 2 Mechani cal and Pl umbi ng Syst ems Test Team
The f ol l owi ng t eam member s must par t i c i pat e i n Funct i onal Per f or mance of mechani cal syst ems:
Designation Function
CxM Mechani cal Syst em Techni cal Commi ssi oni ng Speci al i st
QAR Cont r act i ng Of f i cer ' s Qual i t y Assur ance Repr esent at i ve
CQC Cont r act or ' s Qual i t y Cont r ol Per sonnel
MC Cont r act or ' s Mechani cal Commi ssi oni ng Repr esent at i ve
EC Cont r act or ' s El ect r i cal Commi ssi oni ng Repr…