JOB ORDER CONTRACT SYNOPSIS 25 JULY 24.docx

DOCX document 22 KB Posted

Attached to
JOC Synopsis W9124P-24-R-0004
Solicitation number
Not on record
Issued by

About this file

This document is a Job Order Contract (JOC) Synopsis that supports a U.S. Army Garrison Redstone (USAG-R) requirement for a full range of new construction, alterations, maintenance, repair, sustainment, restoration, and modernization services at Redstone Arsenal (RSA). The JOC is a 100% 8(a) small business set-aside contract with a projected period of performance from June 2025 through June 2030, including a 6-month option to extend. The contract will be a Single Award Task Order Contract (SATOC) with a firm-fixed-price (FFP) pricing structure, with a maximum ceiling value of $600 million. The JOC will support USAG-R's mission to maintain oversight of construction activities at RSA, including projects such as administrative facilities, vehicle maintenance, utilities, and research/development facilities. The contract will utilize a unit price book (UPB) for pricing individual task orders. Funding will be provided at the task order level, and the minimum guaranteed amount is $2,000.

View the file

Other files

File Type Posted
(R)Government Response W9124P-24-R-0004 3 July 2024.xlsx XLSX spreadsheet
Government Response W9124P-24-R-0004 3 July 2024.xlsx XLSX spreadsheet
Government Response W9124P-24-R-0004 3 July 2024.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JOC ORDER CONTRACT SYNOPSIS

1. This synopsis supports the United States Army Garrison Redstone (USAG- R) requirement entitled, “Job Order Contract (JOC) to provide for a full range of new construction, alterations, maintenance, repair, sustainment, restoration, and modernization services for the USAG-R and the tenant organizations located at Redstone Arsenal (RSA).” The JOC is a 100% 8(a) small business set-aside (SBSA) acquisition that supports the USAG-R mission to maintain oversight of construction activities on RSA, providing unspecified minor military construction, lab revitalization, and other Sustainment, Restoration, and Modernization (SRM) projects for annual work plan execution projects as requested by the tenants and satellite activities of Redstone Arsenal (RSA). Potential projects include administrative facilities; base support and facility maintenance shops; child development centers; physical fitness centers; vehicle maintenance and engine repair shops; food service facilities; public safety facilities (police, fire, and crash rescue); airfield structures (including rigid and flexible paving); roads; ball fields; bridges; underground utilities; overhead utilities; gates; warehouses; auditoriums; and research, development, and testing facilities. The work may also include incidental design and testing, studies, and survey and abatement for lead based paint (LBP) and asbestos containing materials (ACM). Facility repairs, renovations and construction shall conform to the requirements of the technical criteria listed in the task order.

2. The North American Industry Classification System (NAICS) Code: 236210 (Industrial Building Construction; Business Size Standard: $36.5 Million.

3. Product Service Code: C1QA, Architect and Engineering – Construction: Restoration of Real Property (Public or Private).

4. Projected Period of Performance (PoP): 20 June 2025 through 19 June 2030 (one - year base ordering period with four one-year ordering periods). The PoP also includes a 6-month Option to Extend services in accordance with FAR 52.217-8.

5. Place of Performance: Redstone Arsenal (RSA)

A1 CONTRACT TYPE:

1. This is a Single Award Task Order Contract (SATOC) type contract being awarded to satisfy the requirements that fall within the scope of the Performance Work Statement (PWS).

2. The contemplated business arrangement for this requirement is a SATOC base contract with a TO arrangement consisting of a firm-fixed-price (FFP), Contract Line- Item Number (CLIN) structure.

3. The total of all TOs awarded, shall not exceed the maximum ceiling value of $600 million.

4. Each JOC task order is priced using a unit price book (UPB) comprised of several pre-described and pre-priced repair, maintenance, and minor construction tasks. JOC unit prices include direct material, labor, and equipment costs. Indirect costs, including general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, and profit, are addressed in a coefficient.

A2 ORDERING:

1. The ordering period arrangement for this SATOC will consist of a one-year base, with four one-year option periods and a 6-month extension in accordance with FAR 52.217-

8. TOs will typically be awarded for a 12-month PoP.

2. All services to be performed under this contract will be set forth in individual TOs issued on a DD Form 1155, Order for Supplies or Services.

3. The contract will include Federal Acquisition Regulation (FAR) 52.217-8, Option to Extend Services and FAR 52.217-9, Option to Extend the Term of the Contract. Exercise of the option ordering period will be at the discretion of the Government; however, the Government’s decision may take into consideration the results of the contractor performance assessment as described in PWS, or elsewhere in the resulting basic contract.

4. If FAR 52.217-8, Option to Extend Services, is exercised, any order awarded under this option will be within the contract ceiling identified in Section A1.

A3 MINIMUM OBLIGATION:

The minimum amount guaranteed under this contract, and any contract awarded under the JOC program, is $2,000 (the minimum guarantee TOs will be issued commensurate with the award of the basic contract).

A4 FUNDING:

All funds will be provided at the TO level. No funding will be applied to the basic contract.

A5 CONTRACT REQUIREMENTS:

The contractor shall act independently and not as an agent or employee of the Government. The contractor shall furnish to the Government all necessary labor, services, supplies, equipment, and materials, except as specified to be furnished by the Government, and shall accomplish the requirements as specifically set forth in each TO awarded. All TOs shall be within the scope of the PWS, which is incorporated in Section C, and provided as Section J, Attachment 01, entitled JOC Performance Work Statement (PWS), of this solicitation and resultant contract.

A6 GENERAL INFORMATION:

1. Potential offerors are cautioned to closely review each section and provision of this solicitation, with particular attention to the provisions set forth in Section(s) L and M.

2. Proposals shall be prepared IAW the proposal preparation instructions provided in Section L of this solicitation. Failure to submit a proposal that complies with Section L may result in the rejection of the proposal for Government evaluation. By providing a signed proposal, the offeror agrees that they can meet the solicitation requirements.

3. Any discrepancies found between this synopsis and the individual sections of the solicitation shall be ruled in favor of the solicitation’s individual sections.

Points of contacts for this synopsis are both Contracting Officer Crystal Blake at Crystal.

Blake3.civ@army.mil and Contract Specialist Cledis Henry at cledis.henry.civ@army.mil.

File details come from the government source that posted it. Updated .